CONTACT INFORMATION:
View contact information...
Working Experience:
Procurement Manager in CONSOLIDATED CONTRACTORS INTERNATIONAL COMPANY S.A.L. (C.C.I.C.) from November 2006 till now.
Supervising all Procurement, Purchasing, Stores, Material Control and Subcontractors Activities.
MAIN CONTRACTOR for NEW DOHA INTERNATIONAL AIRPOT PROJECT (7 Billion USD) AIR TRAFFIC CONTROL AND SUPPORT FACILITIES (DOHA, QATAR) (50 Million USD) Managed By OVERSEAS BECHTEL Inc., Owned by NDIA STEERING COMMITTEE Comprises:
The Air Traffic Control and Navigation Aids Facilities Includes all Services and Work Necessary for Design, Procurement and Construction of the Control Tower Building 90 m High Plus Technical Building, the Meteorological Facilities, the Radio Receiver Building and the Radio Transmitter Building.
Senior Procurement Engineer in SIX CONSTRUCT LTD (Member of BESIX GROUP) from June 2005 till October 2006.
* Studying the Price Quotations Received from Suppliers and Subcontractors.
* Preparing Material Submittal and Getting Approval from Client / Engineer.
* Following Up Site Activities with Subcontractors.
* Reviewing the Invoices with Subcontractors and Suppliers.
* Material Control.
MAIN CONTRACTOR for SPORTS CITY TOWER PROJECT (DOHA, QATAR) (200 Million USD) Independent Checker is BURO HAPPOLD, Managed By PROJACS INTERNATIONAL, and Owned by KHALIFA SPORT CITY DEVELOPMENT COMMITTEE Comprises:
The Tower (300 m High) Houses Hotel Facilities (160 Room Hotel & 3 Floors Hotel Offices), Health Club, Juice Bar, Presidential Apartments, Museum, Revolving Restaurant, Viewing Platform and Olympic Torch Asian Olympic Games Flame Doha 2006
Site Engineer (Earthworks, Roads& Surveying work) in PARSONS INTERNATIONAL from September 2004 to June 2005.
CONSULTANT for SOHAR PORT& INDUSTRIAL AREA INFRASTRUCTURE (SOHAR, OMAN) Owned By MINISTRY OF TRANSPORTATION AND COMMUNICATIONS (150 Million USD) Comprises:
Site Clearance, Bulk Earthmoving, Disposal of Lagooned Material, Roads, Roundabouts, Culverts, Ducts, Bridges, Pipe Crossings, Miscellaneous Signs, Water Services, Fire Mains, Fire Fighting, Pump House, Sewage Services, Irrigation Lines, Potable Water Supply, Storm Water Drainage System, Flood Protection, Seawater Return Canal, Fencing, Landscaping, Small Boats Yard, High Mast Yard Lighting, Miscellaneous Services, Port Entrance, Gate House, Customs Buildings, Custom Shed, Car Parking, Chiller Compound, Amenity Blocks, Administration Building, Administrative Area Roads, Electrical Works, Substations, 33KV Transformer, Switching, Supply Cable & Dual Carriage Extensions.
Technical Office Engineer in ARCHIRODON CONSTRUCTION (OVERSEAS) CO. S.A. (Member of ARCHIRODON GROUP N.V.) from April 2003 to August 2004.
* Preparing and Reviewing the Monthly Payment To/With the Subcontractors & Suppliers.
* Preparing Variation Orders.
* Preparing Detailed Cost Control Reports.
* Presenting Periodic Progress Reports.
* Studying the Price Quotations Received from Suppliers.
* Quantity Surveying (Earthworks, Concrete, Steel Reinforcement & Metallic Construction).
* Checking and Analyzing Company's Assets (Manpower, Equipments, Stored, Etc…).
* Coordinating the Different Departments of the Company (Purchasing, Warehouse, Personnel, Etc…).
* Material Control.
* Preparing Workshop Drawings (Concrete, Steel Reinforcement & Metallic Construction).
MARINE CIVIL CONTRACTOR for OMAN INDIA FERTILIZER PROJECT (SUR, OMAN) Managed By J.V. TECHNIP-SNAMPROGETTI and Owned By OMAN INDIA FERTILIZER COMPANY (40 Million USD) Comprises:
* Engineering, Procurement, Construction and Commissioning of a 1,070 m Long Jetty with Substructure of Socketed Tubular Steel Piles and Superstructure of Composite Steel-Concrete Deck for Approach Trestle and Pre-cast / In-Situ Concrete Deck for a Loading Platform.
* Installation of 2 No 2,9 m Dia. 1,000m Long GRP Intake Pipelines and Corresponding Intake Head.
* Installation of 1 No 2,9 m Dia. 700m Long GRP Outfall Pipeline and Corresponding Diffuser.
Assistant Technical Office Manager in JV BESIX-ORASCOM (Member of BESIX GROUP) from August 1999 to April 2003.
Preparing Detailed Construction, Shop drawings, Material Submittals and Procurement Time Schedules.
* Preparing and Reviewing the Monthly Payment To/With the Client and the Subcontractors.
* Preparing the Cash Flow of the Project.
* Presenting Periodic Progress Reports (weekly and monthly) to Compare Executed Works with Targets Focusing on the Handicaps Confronted and Purposing Remedial Actions.
* Preparing Variation Orders (Cost & Schedule Impact).
* Assisting in Claims Preparation.
* Preparing Detailed Cost Control Reports.
* Quantity Surveying (Concrete, Steel &Finishing Work).
* Material Control.
* Quality Assurance.
* Reviewing Façade Work (G.R.C. &Curtain Wall) with Subcontractors.
General Steel Coordinator.
* Preparing Method Drawings (Scaffoldings & Shuttering).
* Preparing Workshop Drawings & As Built Drawings (Concrete, Steel Reinforcement & Metallic Construction).
MAIN CONTRACTOR for NILE CITY PROJECT (CAIRO, EGYPT) consultant is HAMZA ASSOCIATION and Owned By NILE CITY INVESTMENT COMPANY (250 Million USD) Comprises:
* A Five Stars Hotel of 25 Floors (700 Room Hotel) Operated By Fairmont.
* 2 Administrative Towers of 34 Floors.
* A Podium (Shopping Mall & Cinemas) of 4 Floors & a Basement of 4 Floors Underground Connecting the 3 Towers.
With a Total Built up Area of 16,200 m2
Part-Time Technical Office Engineer in CONTRACK INTERNATIONAL Inc. from December 2001 to November 2002.
Preparing Workshop Drawings (Concrete, Steel Reinforcement).
MAIN CONTRACTOR for UPGRADE OF FAYED AIRBASE PEACE VECTOR VI (FAYED, EGYPT) Managed By US ARMY CORPS OF ENGINEERS (130 Million USD)
Ass. Site Engineer in BESIX from 11/7/98 to 11/8/98.
MAIN CONTRACTOR for GRAND HAYATT HOTEL (CAIRO, EGYPT) 870 Room Hotel (115 Million USD), Managed By BECHTEL.
Ass. Site Engineer in ORASCOM HOTELS & DEVELOPMENT (O.H.D.) from 9/6/98 to 9/7/98.
Main Contractor for Construction of a Tourist Village (EL GUNA - HURGHADA, EGYPT)
Ass. Site Engineer in CONSTRUCTION & RECONSTRUCTION COMPANY (C.R.C.) from 15/6/97 to 15/9/97.
Main Contractor for Construction of a Tourist Village of 1,000,000 m2 (SHARM EL-SHIEKH, EGYPT)
Ass. Site Engineer in EGYPTIAN ARAB CONTRACTOR (E.A.C.) from 15/6/96 to 15/9/96.
Sub Contractor for a Tunnel of 75 m Long Using Pipe Jacking Method under Salah Salem Street (CAIRO, EGYPT).
Computer Skills:
* WINDOWS 9X, 2K, NT, ME&XP
* OFFICE 2003
* PRIMAVERA PROJECT PLANNER VER. 3.1
* AUTOCAD 2006
* SAP 90
* ORACLE SQL, PL/SQL, FORMS & REPORTS
Education: B.SC. Civil Engineering (May 1999), Grade (Good), Cairo University.
Graduating Project: Project Management Grade (Distinction).
Language Skills:
* Arabic (Mother Tongue)
* English (Fluent Written & Spoken)
* German (Fair Knowledge)
References: All References & Documents are Available upon Request.
View contact information... |