Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #48161
next resume »»
CONTACT INFORMATION:
View contact information...
EDUCATION:
July 1987 Graduated as a Chemical Engineer, Gas option in 1987 from the
Algerian Petroleum Institute (IAP), Algeria.
Education program prepared and held for the IAP institute from:
Institute of Gas Technology, Chicago, Illinois USA.
ADDITIONAL TRAININGS & EDUCATION:
1986 - 1987 06 Months training in Module 1 Gas treatment plant, Hassi R'Mel. ALGERIA
Project for my last year study titled: Improving the condensate recovery of the plant.
By this project, I got the first grade.
Dec 1993 FOXBORO TRAINING INSTITUTE. Boston, Massachussets USA.
Certificate in I/A Series Distributed Control System. Integrated configuration.
1995 - 1996 PULLMAN KELLOG PLANT SERVICES.
Certificate in Engineering Improvement. Attended different modules on turbines, pumps, compressors, gas processing, LNG, LPG, piping sizing and process control.
Mars 2004 ALGERIAN PETROLEUM INSTITUTE, Boumerdes. Algeria
Certificate in Process Simulation HYSYS (Version 3.2).
Feb. 2005 QUALITY CONTROL MANAGEMENT QCM, Algiers, Algeria.
Certificate as Internal Auditor for the Quality and Environment Systems.
LANGUAGES SPOKEN & WRITTEN:
Arabic, English and French.
PAPERS ISSUED:
Sept. 2001 "Technology of Liquefied Natural Gas".
Document prepared for the Algerian Petroleum Institute (IAP) and used actually in the education program for the new engineers.
Oct. 2002 "LNG Tanks Repair Project".
Paper prepared and presented at the International Gas Conference GASTECH 2002
held in Doha, Qatar.
June 2004 "New Control Strategy of the LNG tanks Boil-off header and fuel gas systems".
Paper prepared and presented at the International Scientific Meeting of Sonatrach,
Hilton Hotel, Algiers ALGERIA.
June 2006 " Existing LNG Plant Upgrade ".
As a Co-author, paper prepared and will be presented in Session 4 at GASTECH 2006
conference which will be held in Abu Dhabi, UAE from 4 to 7 December 2006.
PROFESSIONAL EXPERIENCE:
Jan. 2006 to date SONATRACH, Down Stream Research & Development Division ARD.
From January 2006, I was assigned to the Down Stream Research and Development
Division as a Lead Process Engineer for the Gas Processing and liquefaction.
My tasks involve the main following activities:
* Prospecting in the LNG and LPG operation units and conducting an international benchmarking in order to define the main research topics related to the development of the gas processing and liquefaction.
* Studying different approaches to implement for de-bottlenecking and life extension of the existing LNG and LPG plants.
My actual activity is focused essentially on plants optimisation in order to maximize the production while increasing reliability and availability.
2002 - 2005 SONTRACH, LNG 1 Plant. BP 96 Bethioua, Oran - Algeria.
Technical Department, Studies & Development Service. Senior Process Engineer
* Trouble-shooting and following the operating of the LNG production units and the storage and expedition facilities.
* Providing technical supports to the production units and initiating different modifications and improvements.
* Using HYSYS simulation to monitor the performance of the production units.
* In charge of the quality control improvements of the plant by following the different concerns related to the HSE systems.
* Participating in many compatibility studies of the LNG1 terminal loading facilities with new LNG tankers either after construction or when loading for the first time in the plant.
* Preparation of different tender documents and participation in the evaluation committees of different tenders after call for bids.
2000 - 2002 Technical Department, DCS Service. Senior Process Engineer
Improving different control loops presenting various problems, especially the pressure control of the gasoline sphere and the control of the LNG tanks boil-off header pressure
Involved with process and control engineers in the implementation of the advanced control for the following systems in the LNG1 Plant:
* Fuel gas control system.
* LNG tank boil-off header control system.
1998 - 2000 Project Manager for the LNG Tanks Renovation Project.
This project was the last subcontract during the LNG 1 plant renovation project which was administrated by Bechtel International.
The repairs of the three (03) LNG tanks (100 000 M3 each) in service were conducted by a temporary association of two companies: MCL from United
Kingdom and Basse Sambre from Belgium.
The whole operations were supervised by Sonatrach and Bechtel.
1997 - 1998 Technical Department. Process Engineer.
* Follow up and check the operating of six LNG production units.
* Study the technical concerns from the operations department and implement different modifications.
* Involved in the ethane extraction project which consisted of defining the different options to extract Ethane product (C2) from LNG1 plant.
1993 -1997 Operation Department. Head of Planning & Programs Service.
* Prepare production plans and schedule loading of the LNG tankers.
* Plan and schedule start-up and shut-down of the production units in accordance with the maintenance department.
* Monitor the quality of the finished products and follow the consumption of the chemical products in the plant.
* Calculate the down-time production and the auto-consumption of the plant.
* Establish statistical reports with the performance of the production units in order to improve the production rate of the plant.
* Evaluate in accordance with the financial department the plant processing cost and establish the production department budget.
Operation Department. Project Engineer
During that period, the LNG1 plant was undergoing a major renovation project while maintaining the plant in operation. (Revamping on each 02 trains).
I participated as a project engineer for Sonatrach to follow the contractor (Bechtel)
progress involving progress tracking, turn-over packages, inspection and equipment acceptances.
1987 - 1993 Operation Department. LNG Process Shift Supervisor.
After a period of six month training to be familiar with different sections of the plant,
I was in charge of supervising the operating of the LNG1 production units with their utilities and managing the shift personnel.
The LNG1 plant using the APCI C3-MCR is processing LNG and gasoline as commercial products and producing different products such as methane, ethane, propane and butane used as make up for the MCR ( multi component refrigerant ) as well as propane with purity more than 99 % C3 used as a make up for the propane loop.
The plant consists of: sea water pumps station, power generation, desalination units, air compressors, vapor system and boilers, six LNG production units, storage and loading facilities.
REFERENCES:
Available upon request
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 2101 to 2150 of 3118)
Go to Search Parameters...
Brief Description
PE in Mining, Environmental & Civil Engineering with 26+ years experience in surface coal mining management, engineering & environmental. I've held positions up to and including Vice-President of Operations. Well experienced in open pit dragline & truck/shovel operations. Well organized.
API 510 / CSA Level 1 Welding Inspector. Construction Coordinator
Project Management, Oil & Gas Industry, Civil Costing, Planing and Estimation
Piping/Mechanical Draughtsman (sewerage plant/Oil & gas)
Radiography Interpreter, QC, Lead QC, Welding Inspector, Client Inspector and 3rd Party
Thorough knowledge in Primavera, MS Project and MS Office
Quailty Coordinator, Welding Specialist, Safety Training Coordinator, Operations Coordinator Prefer Former CIS Russia, Kazakhstan
Professional Qualifications: BE Sales & Marketing Open, City & Guilds Mechanical Technician,ONC Pipe Maintenance & Instillation,NVQ Level I, II, III Quality Auditing,Diploma supervisory management Team Leadership I & II,
Surgical Emergencies :- Road Traffic accident, crush injuries, blunt trauma abdomen,Head injury, liver tear, gunshot, spleen rupture, face injuries, stab injuries, spinal cord compression, assult injuries, burn injuries etc.n Medical Emergencies :Myocardial Infraction, COPD, sun stroke, snake etc.
Corporate Executive in Information Technology with extensive international experience in Systems/Product Architecture (Analysis & Design), Program/Project Management, Business Continuity Disaster/Recovery Planning, Technical Service Delivery & Support, Technical/Operations Management
As you will see from the enclosed details I am a qualified and highly experienced hands-on Corrosion, Coating and Insulation Professional with + 20 years extensive onshore and offshore experience within the construction, oil & gas and petrochemical industries in both the Netherlands and abroad.
Designer or draftman
Mechanical Technician for oil and gas rotating equipment Electro Mechanic Technician for Domestic and Industrial HVAC Equipment.,NDT UTI and MTI LEVEL – II (Welding non destructive testing),
Apprenticed rigger with vast skills gained over 28 years,qualifications = resin socketing,crane/winch operator deck foreman,lifting gear coding,inspection ,certification.rig mechanic,rigging instructor
Civil Engineer with wide and solid experience in planning and execution of remodeling projects and construction of gas station in multinational company dedicated to the commercialization of fuel and lubricant. Skilled making decisions lowers pressure. With easiness to manage teams of high acting and
To apply a position as an Electrical Engineer
Experienced offshore Client Representative and qualified Hydrographic surveyor; with Master's ticket, NEBOSH, MCSE .
Project Management / Inspection / Procurement / Quality Assurance
Power Plants Commissioning , Operation, HRSG Commissioning
I am a Diploma in Electrical and Eletronics Engineer with 3years experience in the field of Electrical Cad Designing and Electrical Control Panel Wiring, i do have knowledge in system administration and Primavera Project Planner.
Have a working knowlege of setting up total stations, performing traverses, level loops, topos, and drafting with Land Development Desktop
Piping Supervisor : Large bore & Instrument pipework/ Oil&Gas/ Nuclear/ Refinery/Offshore and Abroad
Cost Estimating, Project and Contract Management, Planning/Scheduling, Project Controls and Finance
Surveyor with diploma and 3 years of wide range of professional experience
Workshop / Fleet manager over 20 years experience
Free!
Over 10 years Project Management, Engineering and Construction experience, Confident using Autocad, sketch-up, Microsoft office and Coreldraw to complete projects successfully , Skilled in drafting and preparation of shop drawings , A hardworking individual that enjoys new challenges , Can offer sal
I am a Red Seal certified Heavy Duty Mechanic. For the past ten years I have been employed with Douglas Lake Equipment first as Field Service Technician then moving up to Parts and Service manager.
Chemical engineer with 17 years petrochemical work experience with experienece in Oracle VB6 , AutoLISP
Nanagement engineer power utilities oil gas construction
Regional Manager for GSM site construction, Registered Civil Engineer, AutoCADD detail supervisor
Mapping Draftsman, Cartographer, CAD Operator, Survey Draftperson, Mapping, Draftsman, GIS Technician, GIS Operator
Knowledgeable in all aspects of capital projects including but not limited to the planning phase, progress and cost tracking, material requisitioning, project reporting, project documentation, and scheduling. Proficient in analyzing cost trends and variances for clarification or correction.
Provide technical expertise, guidance and leadership for a variety of designated engineering projects at site.
SENIOR PLANNING ENGINEER (OIL & GAS)
Results-Driven Leader/Senior Executive, BS/MS/PhD work ChE, MBA, PE, 25+ years experience
I have a good experience in Plant Modelling using PDMS and knowledge about Pressure Parts & piping Stress Analysis.By majoring in PDMS, I have been exposed to ADMIN, DESIGN, PARAGON, SPECON, DRAFT AND ISODRAFT Modules. And, Iam also involved in creating 4D simulation and presenting of pro
Maintenance, water purification, reverse osmosis, materials, logistics, management
Worked experience of 4 yrs. in the field of EIA and EMP for various infrastructure and construction projects including world bank funded projects.
CAD/CAM engineering
I have Excellent technical, communication and interpersonal skills with very good troubleshooting and problem solving skills and ability to work on multiple tasks in a fast paced environment independently and in a team. I can strive to make things work more efficiently and effectively .
12 years of experience on Intergraph EDMS/CAD System, specially PDS & Smart Plant products administration; at present working as EDMS Engineer in Sabic, Saudi Arabia since April-2001. I am going to be released by end of 2007; please find my CV attached herewith.
Instrument Engineer (Construction) , Site Engineer (Instrumentation), Field Construction Engineer (Instrumentation), 05+ Years Exp., Engineerind Degree in Electronics & Instrumentation
80 Hour Certification, 10+Years experience Construction, Light Mechanical Experience, 8+ Years Heavy Equipment Experience
Entry level electrical engineer resume
In response to this, please consider my PROJECT BASED resume for Instrumentation positions pertaining to your need.
I am a Senior Process Engineer in oil & gas systems. Along my 18 years experience in the field, I have held a number of positions going form operation to project execution and management and process engineering activities. I am fluent in English, French and Arabic.
I am Electronics and Communication graduate and presently working in Saudi Arabia
Of late brilliantly completed the scheduled Training in Calibration, Testing and Conformity Assessment from RTC(ER), Govt. of India
I am a young ,dynamic, smart having a good percentage degree of production engineer.
I am Civil Engineering graduate and having three years experience in the construction field.
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
[ 43 ]
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com