Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #53217
next resume »»
CONTACT INFORMATION:
View contact information...
Nationality: American
Preferred Status: Single status
Qualifications: HND, High Voltage: Power / Electronics
Work Experience: Refineries, Oil field work & Gas Plants. NGL/LNG/LPG. Cryogenic tank works.
Offshore/Onshore module & Jacket work. FPSO and Hook-up work. Oil &Gas Terminals Power Stations. Combined Cycle Power Plant, Nuclear, Gas, Oil and Coal fired..
Water Treatment & Desalination Plants. Polythene, Ethylene plants.
Aluminium Smelters & Bauxite refining plants for the aluminium industry.
Personal Profile: An experienced commissioning and construction engineer with over 30 years experience in the Oil, Gas and Power industries which has included Project Management and Client representation associated with multi-dollar EPC and EPIC projects world-wide.
A skilled communicator, in both written and oral forms, able to develop and lead multi-national work teams. Able to work in difficult locations and maintain work schedules with minimum support from head office. Dedicated to safe and environmentally compliant HSE work practices and procedures. Covering multi-disciplined work fronts associated with major building works, Oil & Gas facilities / terminals and high voltage work on all types of power stations and power transmission systems. QA/QC Certification records work also covered.
2005 Dec – Sept 2006 Chevron/Texico Bonzala Project _Angola/Louisiana USA
Senior commissioning engineer overseeing the EPIC contractor Dynamic Ind during the fitting out and commissioning period.
2004 Oct - Nov 2005 Exxon / Mobil"YOHO" Project Malaysia
Senior commissioning engineer overseeing the EPIC contractor SIME. SEMBCORP Engineering during the fitting out and commissioning period of the generation / process and associated accommodation platforms for the Nigerian YOHO project at the Johor Bahru shipyard Malaysia. Additional work on FPSO offshore vessels in Nigeria also.
2002 September – Dec 2003 Shell CCAGG Project Nigeria / Louisiana USA.
Returned to Shell Nigeria to initially co-ordinate the compilation of O&M manuals and contract documentation for the above project before transferring to Louisiana USA. Evaluation and review of the Korean EPC contractor's general services plus claims associated with this project. Co-ordination of commissioning, QA/QC certification records on the Power & Process Barges for the (CCGG) Cawthorne Channel Associated Gas Gathering Project. Additional work covered sub-contract support, witnessing factory acceptance tests, training nationals etc. Witnessing HV & LV energising of E&I switch-gear, Pressure testing of vessels, rotating equipment etc. On completion of the initial contract commissioning, QA/QC work in Louisiana, returned to Nigeria to assist with the contracts offshore hook-up work of the barges and incoming pipelines from the associated LNG Bonny Island offshore facility. Projects value $US 400 + million.
2002 April- Aug 2002 Enelpower for Dubai Electricity & Water Authority.
Seconded to Enelpower as senior electrical co-ordination / contracts engineer to oversee and assist major work on a new 1000M/watt CCPP Power Station / Desalination plant for Dubai Electricity and Water Authority, Dubai, UAE. Support of the sub-contractors during the initial contract, pre-com and commissioning activity period. Initial review of contract schedule and monitoring of contract performance against the planned man-hour estimate. Recording of restraints plus certification of completed services also undertaken. Management meetings covered the activities of the main sub-contractors and essential safety requirements associated with this project on a daily basis. The main 400,000 / 132,000 volt Gas insulated switch-gear systems and Gas turbines were supplied by Siemens Power Div Germany & Hyundai. Main transformers by Fuji Japan. Initial contract value $8 billion.
Jan 2001 – Feb 2002 Shell AGG Project Port Harcourt Nigeria.
Seconded to Shell. Overseeing the initial contract documentation associated with the construction / commissioning work/start-up and operation of live plant in line with the Shell DEP requirements on associated gas gathering and non-associated gas gathering plants. Review of contract documentation and contract schedule covered at regular management meetings between Shell and the EPC contractor. Overseeing certification and Pre com / commissioning procedures prior to plant start-up. Monitoring and recording contract delays and possible contentious claims by the EPC contractor relating to design changes etc during the contract period.
July 1997 – June 2000 Tengiz, Kazakhstan. C.I.S. Asia.
Responsible for the co-ordination of major project sub-contract work on de-bottlenecking four trains of crude oil stabilization plant from 6 million to 8.5 million tones per year.
Direction of EPC contractor, Bechtel-Enka Joint venture overseeing planning, cost control, training national work teams and construction activities to ensure that all aspects of the project was completed on time and within the contract budget. Weekly management meetings to review of expended man/hours against the contract schedule plus recording of restraints also covered on a daily basis. Contract assistance to encourage the EPC contractor to avoid obvious delays and the proposal of alternative work fronts achieving earlier completion dates, also part of management team overview.
Major alterations to the existing high voltage power generation network, included the integration of a new 35/10kv sub station and control room. The installation and commissioning of new transformers / reactors, new HV and LV switch-gear plus a new 35,000 volt underground transmission cable service between the main Gas Turbine Station and Central Power Station transformers. Complete rebuild of the existing 12 No Russian built gas turbine control systems to support the new power management system from central control. All conversion work was achieved without loss of power to the main gas and oil processing facility. A further two additional 35 Mw frame 6 machines were also installed to give additional power for future refinery developments.
On completion I transferred to the oilfield development facility to assist Operations with QA/QC certification and to co-ordinate the installation of new well sites, cathodic protection installations, metering stations and central plant manifolds controlled via a new SCADA transmission system. The debottlenecking project was a fast track $290,000,000 project with many commercial / contract interface problems, which required day by day monitoring of the workforce culture and was successfully completed on time.
March 1996- June 1997 K. Home Eng. Consultants. Dubai UAE.
Worked on a consultancy basis overseeing the contract management of high voltage / control work associated with a new smelter extension for DUBAL at their existing Dubai Aluminium plant UAE. Attendance of management meetings to overview cost control and planning, also review of possible contract restraints and deliverables, support and advice to sub-contractors relevant to work fronts, delays etc, essential safety requirements and interface requirements with other sub-contractors and vendor services.
The installation of new plant covered: two new frame 9 120Mw capacity GEC Alsthom Atlantique Gas Turbines. A 132,000 volt rectification system for the 200,000 Amp Bus-Bar Anode installations to feed the Potroom smelter section. Overhead conveyor system. PLC control systems, a new carbon anode manufacturing system including two new anode kiln batteries and casting plant. HV and LV switch-gear installation including commissioning. A new air handling system by ABB Ltd to control gas emissions from the new anode kilns. Security camera and fire alarm installations. Water treatment & desalination plant work also covered. Permit to work responsibilities covered the authorization and acceptance of permits associated with the HV& LV power distribution, rotating equipment and confined space entry in liaison with the live plant permit control dept. Inspection / testing and witnessing of vendor equipment and materials prior to site acceptance. Planning & safety involvement plus the compilation of all QA/QC certification also part of job scope.
Nov 1994 – Feb 1996 M.W.Kelloggs Major Projects. Abu Dhabi UAE.
Contracts engineer responsible for the E & I installation works and integration of new pneumatic / electronic instrumentation with the existing Foxboro control systems on the Ruwais refractionation LNG gas storage facility. Implementation of contract procedures and certification for the sub contractor plus permit control and method statements / work packs and planning control for the shut-down tie-in to the LNG requirement was a major part of management responsibility on this project. (Specification as per Shell D.E.P). On completion of construction works and integration of new systems with the existing gas trains, assistance with commissioning and plant start-up team plus training / maintenance duties then followed.
July 1994 – Sept 1994 Mott Ewbank Preece Consultants. Abu Dhabi UAE.
Returned to the power station integration project on Das Island for ADGAS & ADMA-OPCO to complete the remaining instrument / electrical / turbine commissioning work prior to final close out of contract documentation, claims and certification for client acceptance. Training of overseas national's also undertaken through-out contract period. Honeywell 3000 DCS Control system used for the integration of both power stations. Existing Frame 5 Asthom Atlantique 18Mw gas turbines by John Browns supplied the main power.
Sept 1993 – June 1994 Awazi Gargash / Aughton. Dubai UAE.
Worked on a consultancy basis overseeing new contract work and promoting sales associated with the Petro-chem, Gas, Oil, Water Treatment and Electricity companies and major building works such as hotels, accommodation blocks and plaza complexes throughout the Emirates. Major companies associated with being: DUGAS, Emirates Oil, ADMA-OPCO, ADGAS, GASCO, Baker Oil, Brown & Root, Chiyoda, Al Khaleej Sugar, John Brown Turbines, Rolls Wood Turbines, Wimpey UAE, Deutsche Babcock, Foster Wheelers, Six Construct, Abu Dhabi Water and Electricity, Bechtel, Kelloggs.
Nov 1992 – Sept 1993 Mott Ewbank Preece Consultants. Abu Dhabi UAE.
Assigned to the power station integration project on Das Island to initially develop and oversee the initial cost and planning logic between the ADGAS & ADMA-OPCO power stations during the construction phase of this live plant project. Later into the project duties covered overseeing cost control and the monitoring of the sub-contractor, Cegelec during the installation and commissioning phase of the power / protection systems associated with the Honeywell DCS work. This system ultimately monitored the control of 4 No Frame 5 Althom Atlantique 18 Mw turbines. PTW activities also covered the weekly look-a-head and submission of written permit requirements for excavation works; all associated live plant activities, entry into live sub-stations and de-energization of switch-gear to carry out modification works etc.
Nov 1991 – Oct 1992 Consolidated Contractors Co. Greece/USA/Far East.
Originally assigned to oversee the High voltage / Gas turbine project work associated with new (CPU) Central Process Units, Gas powered power stations and marine terminal facilities. Duties at home office Athens covered the evaluation of base bid tenders, planning & cost control plus the recommendation of contractors for future project work associated with: Airport security systems, new townships, gas plants, CCPP and coal powered power stations, waste water & water treatment plants, pipe lines, steel plants and the rebuild of Oil facilities for KNPC Kuwait.
May 1990 – Oct 1991 Egyptian National Petroleum Industries. Egypt.
This work entailed representing the owners, BP, AGIP/ Snamprogetti and Marathon oil to monitor the planning/liaison phase, QC/QS certification and commissioning phase of the Abu Madi LNG gas Project. Other E&I / Piping work associated with pumping stations, waste water & water treatment plants, wellheads, pipe lines and irrigation systems in the lower Nile and Sinai locations also covered.
Nov 1988 – April 1990 Lummus International. Nigeria.
This work involved the development of proposals / contracts /cost / planning and QA/QC work associated with various forthcoming gas projects in West Africa and the Middle East locations. Supervision of the E & I contract works on the Wari project Nigeria also covered.
Aug 1986 – Oct 1988 Imperial Chemicals Engineering Group (ICI). UK.
This position involved overseeing a number of projects associated with ICI plastics/ power group initially covering the contract management and cost control of various sub contract disciplines for fast track development work at their ICI Darwen, Huddersfield and Fleetwood facilities. Multi disciplined supervisory work covered HV and LV E&I installations, Civils, Piping, Steel structures, Vessel installations, Coal fired power station / boiler work at Fleetwood, Water treatment, Dis-investment of redundant process plant, Site clearance, Piling and Drilling etc. QA-QC Inspection and certification work to BS 5750 & ISO9000 plus safety meetings on a daily basis also part of overall job involvement with all contractors. PTW activities required all contractors to report direct to me to obtain permits for activities in all the above live plant areas. Issuing of permits was in accordance with ICI regulations and dependant on live plant conditions 24 hours a day.
Nov 1985 – July 1986 Matthew Hall Engineering.
Responsible for electrical / instrument construction work associated with the control, high and medium voltage systems at the Heysham 2 nuclear power station. This work also covered the seismic qualified cable rack and steelwork installation through-out the reactor and turbine areas. Planning and design work covered the make up of packages, drawings and schedules for the various sub contract material and take off requirements. Liaison with the Central Electricity Generating Board (CEGB) regarding design changes, back drafting and computer updates covered on a weekly basis. Later, transferred to the Trident project at Barrow shipyard to assist with the design, planning and supervision of security control systems, high and medium voltage construction work, installation of Power Systems and fitting out of the submarine construction halls. All design work was to British and American standards.
April 1983 – Oct 1985 Lummus Inc,
Process electrical / instrument superintendent overseeing construction / planning, QA/QC/Certification plus vendor inspection work for the new plant area of this ethylene process plant. Selection and recruitment of supervisory personnel. Monitoring progress and advising all personnel on safety measures to be adhered to. Overseeing control and final commissioning work associated with the Honeywell 2000 DCS control system. Major sections of vendor packages such as gas turbine compressors and cryogenic tanks monitored and supervised with select construction teams.
June 1980 – March 1983 Alumina Contractors
Sub contracts engineer involved with the management / co-ordination of the EPC E&I contractor during the design, inspection, construction, commissioning and handover phase of this major project. Associated works covered the main 22.000 volt and 380 volt power systems, all jetty installation work including ship loaders and unloader construction, cathodic protection on the jetties, DCS systems, Bauxite storage facilities with all overhead conveyor systems, laboratories, workshops and main offices. Vendor packages such as Foster Wheeler boilers, Water treatment plant, Interrogation / camera security and Fire Alarm systems monitored as separate contracts. Planning and cost control monitored with the aid of Artemis computer software. PTW activities covered the issuing and control of permits for all contractors during the construction and commissioning phase of this project. The main activities covered excavation works for high voltage cabling, associated terminal and jetty works covering piling, underwater Cathodic Protection installations, and erection of ship loaders and loading arms etc.
Nov 1978 – March 1980 British Steel Chemicals Ltd
Initially in charge of contracts up-rating and re-organizing the main power distribution system at the BS Port Clarence works Teesside. This work then developed into a general multi disciplined sub-contracts position overseeing all construction activities for British Steel on coal fired power stations and various steel producing and chemical projects through-out the UK. Supervision of various contracts including cost control covered: management of E&I work, Piping, Tank work, Insulation of tanks, steam boilers, Rod and Rail making mills, various types of Furnaces and Water treatment plants.
Sept 1975 – Nov 1978 Brown & Root INT
This position covered the supervision and inspection of all E&I work associated with offshore generation and accommodation modules for the Forties Field project. Equipment installed covered Ruston Gas Turbines, (now European Gas turbines) 11,000 volt GEC switch-gear, 11,000 /415 volt transformers, motor control panels plus all power and control cabling.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 651 to 700 of 3092)
Go to Search Parameters...
Brief Description
20+ years in EPC heavy/industrial. Sharpest skills in resource & time control. Expert Planner/Scheduler w/Primavera P3, P3e Teamplay etc. software, 14 years experience (superuser & administrator). Capable Cost Engineer & Good communicator.
I am very experienced and have worked at all levels worldwide and also worked with many nationalities. I work very hard and get on well with everybody.
Mechanical & Electrical Engineer Location East London, Essex, Kent, Greater London Salary To £30,000 plus package
Civil Engineer with solid background in structural design, experience working with oil companies. Project supervision experience, costing and evaluation. Vast field experience leading working crews and supervising jobs. Good communications skills. Multilingual, speaking Spanish, French and Italian.
Mining Engineer and Geologist with twenty-seven years’ in precious and base metals, coal and industrial minerals. P. E. licenses in three states, with unique construction achievements. Advanced technical and strong supervisory skills in underground and surface settings.
Work Experiences : Mechanical equipment and piping installation in the following industrial plants: 1) Natural gas plant 2)Power plant 3)Polypropylene plant 4) Oil Refinery 5)Desalination plant 6)Steel mill 7)Foundry plant(maintenance of mechanical equipment)
NACE Certified Coating Inspector #7278, with +20 years of experience, available as (3rd party) Q.A./Q.C. coating inspector, coating surveyor, coating supervisor, vendor surveillance, etc.
Looking for a new challenge at the end of 2003 my present contract end then
C/C++/ VB / SCADA / Electronic / Embedded / Automation / Systems Engineering
I completed my degree in Electrical Engineering and had taken and passed the highest National Examination in The Philippines, Professional Electrical Engineers Examinations in 1986. I have a good experience in Oil and Gas, Controls, Fire and Gas Systems, Design, Detailed Autocad Drafting(Isometric),
Erection, Commissioning field instruments & Systems
AutoCAD, PDS (3-D modeling). Lead engineer of erection department
Instrument engineer with around 15 yrs of versatile experience in the field of installation,commissioning , operation amd maintenance.
Riview contract, Claim of insurance, Invoicing , Claim od additional and variation works, Count the Quantity progress.
Electrical engineering on EPC projects, analyses of power distribution grid, FEED design of power distribution and power generation systems, detail design of power distribution in hazardous and non hazardous areas, technical coordination of subcontractors and procurement on projects, site supervisi
I am a Graduate Mechanical Engineer and have good proficiency in Computers. I have put in 13 years of hard work in Construction of Oil & Gas Pipelines, which has given me exposure in all fields like Project Management, Planning, Tendering, Cost Estimation and Control, Execution.
A competent Chartered Mechanical Engineer with over 14 years experience, gained in Aluminium, Iron & Steel, Nuclear & Petrochemical Industries. Worked in areas of Design, Construction, Installation, Projects, Commissioning, Overhead Cranes and SAP.
30 years experience in all types of heavy industry, the equipment used, predominately in coatings and linings. Experienced in all phases of construction projects. Supervised numerous larger projects, overseen and implemented safety, inspection.
Extensive experience in the construction of industrial buildings, Multi-story buildings, Steel Structures, Water Structures, Infrastructures Writing Progress Reports, Maintaining and Coordinating Construction work schedules Computer skills: Office 2000, Primavera 5.1, Auto CAD
ELECT. ENGGR WITH 21YRS+ CONSTRUCTION SUPERVISION EXP.PG DIP IN CONST MANGMT AND MSPROJECT PI PPM. INVOLVED IN PROJ MANAGMT CONSULTACY FOR ELECTRICL/PLNNG COORD/QUALITY ASSURANCE COORD AND HSE MANAGEMENT.
Mature Canadian seeking work on major civil projects. Available Immediately.
Piping Design using CadWorx, Smart plant Review. Construction General Foreman
3 years Diploma (mechanical engineer) &12 years work exp- oil & gas area for mechanical supervisor.
Seasonal Professional with nearly 9.3 years of experience in Construction, Erection & Project Management and Team Management with well known organizations. Demonstrative abilities in identifying potential, deconstructing complex situations and further conceiving and implementing streamlined solutio
Multi-disciple project engineer covering, electrical, instrument, mechanical, piping work etc. Gas Turbine & High Voltage Power installation work. DCS work. Contract Management / Planning / Cost/ Commissioning, Training, Maintenance,. Vendor Inspection. Contract estimation work, QA/QC/QS.
Results oriented electronics technician. Background includes twelve years of experience in troubleshooting, assembling, installation, testing, upgrading, configuration, support, and maintenance of Audio, Video, Communication devices, Cellular phones, computer hardware and software.
A capable, enthusiastic civil engineer with 12 years experience on site construction specialize in horizontal and vertical construction, tunneling, viaduct, high speed railways, High rise buildings
Diploma of Associate Engineer in Civil Technology
I have BSC in electrical engineering and now I am working in ethiopian electric power corporetion since june 16 - 2005 under protection and communication enginering
I finished in diploma in Architecture, master diploma in architecture cadd
I have 4 years experience exclusively as a safety and Security professional. Presently working with Technical & Trading Establishment (Technical Division of Easa Saleh Al Gurg Group) as a Health & Safety Officer. As far as my Education is concerned, I Have Completed my Diploma in Mechanical Engineer
I have more than 14 years expertness in construction and 6 years in LNG and oil and last project for me was in Sakhalin I work there more than 2 years
Proficient in Microsoft Office suite (Word, Excel, PowerPoint) and AutoCAD
I have worked as an Associate RF Engineer where my responsibilities were . Post & Pre Drives, Single site verification, hand off, call dropping, blocked calls, signal level, and frequency scanning . Used Delorme Streets & Atlas for route determination & navigation.
I am intrested to work as senior planning engineer with a consultant, project management group or with a developer in Abu Dhabi, UAE
Solutions-oriented Field Service/Application Engineer with a proven track record of delivering effective product engineering, maintenance and customization across a diversity of industries.
I am an Instrumentation Supervisor with a large experience in oil and gas projects, I have worked many years for importants companies in Brasil, Saudi Arabia, UAE, Mexico and USA.
Seeking a position with an organization that allows me the opportunity to utilize my education, experience, skills, and talent to achieve and promote a common goal in a teamwork environment.
Construction Engineer in Oil and Gas Facilities
Resume 2003: Joseph W. Bisselle Location: AZ, USA. Objective: Engineering, Supervision, Maintenance or Managerial Position. Relocation and overseas positions are considered.
11 years of rich and diverse experience in Engineering and Construction industry covering wide spectrum of activities including Project controls, Construction Supervision, Quality control etc.,
electrical design/project engineer with 14 years of work
with a master degree in engineering and more than ten years experience at level of project manager, looking for an engineering job in the field of construction or offshore engineering.
I have 30 years total conceptual design experience. I take project from conceptual phase through vendor quotes to final manufacturing layout details.
Career Summary Wide ranging experience in Oil/Gas Industry of participating and co-ordinating multi disciplined workforce engaged in all aspects of Oil/Gas construction management activities. Career progression from project engineer to project co-ordinater and commercial co-ordinator.
I am a fully qualified and experienced Project Mechanical / Piping Designer capable of handling a project from initial concept to final handover utilizing current software, design codes and procedures being used in the Pharmaceutical / Chemical Industry.
Summary of qualifications * Over thirty years of experience in design, engineering, and manufacturing of aerospace, military, marine, and commercial equipment with emphases on robotics and automation.
36 plus years as pipeline construction inspection/consultant.
Geotechnical or Port and Coastal engineering
Certified Project Management Professional (PMP), and very organized, articulate and detailed-oriented professional architect, with a strong educational background and more than twenty years of professional experience, a superior work ethic, developed skills and commitment to excellence.
First
1
2
3
4
5
6
7
8
9
10
11
12
13
[ 14 ]
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com