. More than 25 years experience in electrical field combined with DCS-PLC programme.
21 years work experience in Oil,Gas and Petrochemicals Industry.
10 years experience as a crew trainer in power unit transformers 6Kv/0.4Kv and electricalfield.
6 years experience in construction site field.
Experience of high /medium/ low voltage systems, design of power generation system and earthing systems.
Very good knowledge of electrical installation techniques.
Familiar with the determination of fault levels, specification of secure supplies, motors and other electrical equipment.
Practiced in the use of computer based design packages.
Familiar with HVAC systems and PC programme(word,excel,autocad)
Bio Data

Countries Worked In: Turkmenistan,Gabon,Libya,Angola.
Countries Lived In: Austria, Germany,France,Turkish,Turkmenisten,Gabon,Italy,
Norwey, Tunisia,Libya,Angola
Foreign Languages: Russian-very good level of both, English-very good level of both,
French-pretty good level of both, Italian-pretty good level of both

Work Experience
Period:Present
Position:Electrical Supervisor
Company&Location:Amec Spie Capag France-Soyo town, Angola
. Responsible for all site erection electrical works to a new life camp situated in Soyo town(onshore)on border with Congo and at over 500 Km from central office Amec
Spie Luanda.
Coordinating and supervising of Earthing System, Cable Grooves,Lightning System
Internal-External Lighting, using power supply from set generators Eneria
440KvA(three pic.)by TGBT 0,4Kv,bus-bare 1600A,Schneider Switch Gear 800 A, mounting of electrical panels(250A),conections and electrical equipment 380v-220v ensure that the subcontractor's works complies with the contract, drawings and specifications.
Commissioning and start-up of set generators,TGBT,electrical panels to every area calculated(three accommodation area,kitchen area,office area, clinic area mec&electrical workshops,utilities area(pomp station,water trat.plant,water tanks fire pomps...)
Daily Subcontractors Time Sheet and daily report to Construction Manager regarding electrical works progress.etaps of installations and eficientsy solutions for electrical works.
Responsible for electrical work permits ensuring that the works comply with all
Health,Safety,and Environment (HSE) issues.

Period: Oct. 2006 – April 2007
Position: Site Electrical Supervisor (contractor)
Company & Location: Takenaka Europe GmBh-Ploiesti town Romania
Providing of engineering design guidance, supervision and design checking of all electrical design work per project requirements including: Single Line
Diagrams,Transformer Station Drawing20Kv/0,4Kv, Power and Control Layout
Drawings, Cable Trays & Conduit Layout Drawings, Lighting & Grounding
Layout Drawings,Cable & Conduit Schedules, Control Schematics & Wiring
Diagrams and Electrical Specifications.
Monitoring,supervising all electrical subcontractors works,erection,precomm.
commissioning and start-up for a new factory Calsonic Kansei ensure that the electrical works comply with the contract requirements and the project execution is in accordance with policies, procedures, systems, and requirements.
Responsible to review and approve electrical designs, supervise the erection, testing and commissioning of power station, to ensure that the subcontractor's works complies with the contract, drawings and specifications.
Carry out work in accordance with project and client engineering Health,Safety,
Environmental,QA-QS and report progress and problem areas related to the execution of the work.
Reasposible for all the electrical works including Transformer station
20Kv/0,4Kv,Medium voltage-Low voltage Distribution,Lightning and
Grounding,Lighting-Sockets,Weak Currents Installation(Tel.&Lan conduit,
Automatic fire alarm system,Public Address system,Security System,
CCTv system,MATv system)

Period: Nov.2005 – Oct.2006
Position: HVAC-Electrical Spc.Tehnician
Company & Location:ENI-GAS Sabratha Platform Libya
Responsible for all HVAC department in production activities in the oil and gas treatment plant(proces and utilities units).
Training course for the HVAC Libyan technicians team regarding operation
Parameters and procedure during start-up, normal operation,shut-down,
Alarm,Fire&Gas and Emergency Shut-Down System pipelines,P&ID with help of DCS
program and field instrumentation for the HVAC system.
Responsible for a good function to MCC panels,PLC panels useing all test equipment required for a loop testing.
Responsible for loop troubleshootings (electrical,instr.,mech.)and for daily report,daily work permits depending on necessity and preventive maintenance-daily reports with regard to the system problems and solutions to maintenance superintendent.
Operates HVAC system through PLC and control system and immediate checks of equipments in case of alarms or false alarms and takes neccesary actions.
Checks for all HVAC rotating machinery,HVAC system,Clima system,cooling water pumps and the temperatures through display system and PLC and immediate visual equipment control on Living Quarter and Top Side for preventive maintenance reports.

Period: Mai 2005-Oct.2005
Position: Site Electrical Supervisor Coordinator (subcontractor)
Company & Location: SOGEC Gabon-West Africa
For six months I had contract with SOGEC-Gabon for Gabon President
Palace site in Oiem town at over 600 Km from central officeSOGEC- Libreville.
Responsible to finish of project work,in accordance with the Discipline Design
Instructions,including the company and Project Procedures on Safety and Quality
Control within the man hour and cost budgets and the project schedule targets to the air condition system,TVsystem,telephone system,external-internallighting system to power station.
Responsible for the control of electrical construction quality assurance,look after the plans concerning the inspection and testing of electrical materials and control as-
built documentation preparation.
Verification and approval acts of hidden work and completion, assess the electrical work site progress and supervising electrical construction work to ensure a minimal environmental.ensuring that the electrical work comply with all Health,Safety,and
Environment (HSE) issues.
Review the project execution schedule by the cost and Planing Department.
In addition providing contracts and salary week for the daily workers,materials,tools accomodation,meals,transportation in-out to site for Gabonien technicians arrived from central office SOGEC-Libreville.
I was connected for this program full time to take care of whole project.

Period: Oct.2003-April 2005
Position: HVAC-Electrical Engineer
Company & Location: Bouygues France ;Asghabat-Archabil(Firuza)Turkmenistan
Preventive and corrective maintenance full-time work for Turkmenistan
President Palace Archabil (Firuza).
Monitoring of power station6Kv/0,4Kv(Schneider Electric Transf.)1600KVA
Diesel generator sets(Cummins) UPS(Liebert),HVAC systems controlled by
Honeywwell Data acoquisition,processing and command equipment(Excel
500/600-software Excel100-PLCS,ABB-ACS400 frequency and power converters, fema pressure transmitters,Honeywell temperatire transducers)units for cool and heat water production (Carrier Coolers and Lacaze heaters,hydromodules
Salmson)water and air traitment units(Aqua des UV 30)
Responsible for monitoring plants parameters(electrical,utilities,HVAC,mechanical, instrumental) through display system and PLC and takes the best decisions for corrective actioons.
Operates HVAC system through PLC and control system and immediate checks of equipments in case of alarms or false alarms and takes neccesary actions.
Checks all rotating machinery,HVAC Units,all standby emergency equipments(Diesel generators,fire water pumps)every two hours day or night and anallyses data collected for preventive maintenance.
Supervising and checking electrical power supply( 6Kv/0,4Kv,UPS room,6Kv room,transformers,0,4Kv room, MCC panels) 15HVAC Units and plant utilities for a good function useing all test equipment required.
Responsible for preventive maintenance,solutions of all troubleshootings electrical-
instr.,mech,HVAC various power utilities equipment and water tratment
Responsible for daily work permits,daily report, cause and effects of the field reading loop diagrams and sheets-reports to maintenance supervisor.
Identyfing any risks which may effect the work schedule or budget.
Responsible for all field operations in power station(high,medium,low voltage)
UPS,water production and treatment by offering supervision and quality control.
Training course for Turkmenian team programme regarding operation parameters and procedures during start-up,normal operation,shut-down to power station,plant utilities, diesel generator sets,HVAC system,HSE, useing DCS
and field instrumentation.
The last three months I have worked in site for precommissioning HVAC system at Comercial Bank, Expositional Palace Asghabat Turkmenistan,buildings with over ten floors.

Period: 2000-2003
Position: Electrical Supervisor Coordinator
Company & Location: Oztasar U K-Baicoi Romania
Responsible for all site erection electrical works to the new ready-made clothes manufacturer ( 4phases)offices and utilites in accordance with the Design
Instructions and Procedures on Safety and Quality Control.
Responsible for daily work permits ensuring that the works comply with all
Health,Safety,and Environment (HSE) issues.
Coordinating and supervising of Earthing System, Lightning System, mounting of electrical panels and electrical equipment 380v-220v ensure that the subcontractor's works complies with the contract, drawings and specifications.
Erection,pre-commissiong,commissioning and start-up internal and external lighting System,generators set,air conditioning system,security system and utilities.
Erection of metalic network pipe for the air pressure to in-out compressors room and in all the production halls by weldings useing different sizes of metalic pipe.
Supervising and coordinating works for fire alarm system, metalic pipes installation for utilities (water networks,boilers, toilets,showers,washing machines,etc...)
Supervising works to cutting tables(wood and metalic profiles, size14m/1,80m for cutting area,metalic doors by welding useing different metalic profiles.
Weekly reports with regard to work sheet,materials,controls as-built
Documentation preparation, works site progress to Project Manager.

Period: 1999 – 2000
Position: Chief Electrical Team
Company & Location:DIS-INTERPLAST Italy-Filipestide Targ,Prahova County-Romania
Erection, pre-commissioning, commissioning and start-up electrical installation works together with an Italian team from Sinergia Italiana for the new socks factory,offices and utilities.
Supervising and coordonating electrical works for Grounding and Lighning installation,Cable Tray installation,Low Voltage Panels installation and equipments, External and Internal Lighting, Air Conditioning System,Security
System,Tv System.
Supervising and coordinating works for metallic pipe installation for the air pressure from the compressors room to all the factory area.

Period:1978-1999
Position:Lead Electrical Shift –Power Plant
Company&Location:Petrotel-Lukoil Refinery Ploiesti Romania
Supervising and coordinating activity of the four electricians in power units transf.6Kv/0,4Kv and responsible for all the monuvers 6Kv/0,4Kv.
Monitoring preventive maintenance and planned maintenance tasks in line with the installation maintenance schedule on electrical installation, including protection relays,LV, MV, HV, switchgears and drives.
Responsible for the safe and efficient maintenance of power systems so as to efficiently meet business requirements within the framework of Permit to
Work and Health & Safety at Work guidelines and requirement.
Reparing engines and electric equipment in the principal workshop for the electrical installation of a high and low tension to power unit transformers
Servicing, repairing, intervention and monuvering 6kv/0.4kv it practically ment constant with providing with electricity for production plants.
I changed the work place into principal power unit transformers 400kv/110kv.
More than 10 years I've worked in Gas Plant and in over 20 worked years I've changed the majority power production plants of Petrotel-Lukoil Refinery.

Period: 1977-1978
Position:Electrical Technician
Company&Location:T.I.A.B Bucharest -5Ploiesti Site Romania
Everything that made me become a skilled electrician, started training and working for this company.The main duties required to be performed by an electrician in construction
I've learnt and practiced while working for this company.
The operations include everything needed on a construction site in the electrical field like erection of power plant,power stations,power substation, mounting of high- medium voltage transformers(630KVA,1000KVA,1600KVA,
, 2000KVA) cable trays,digging trenches,grounding and lightning system, laying conduits underground,calculate the proper lenghts and sizes off setting saddling,connecting electrical wires to control panels,protection system
(fuses,breackers,relays)fixtures,outlets,machinery equipment.

Education Nov. 2005 Training Center course(Pavia-Italy)for basic off shore Safety
Induction&Emegency (included Huet and EBS) Expiry Nov.2009
1982-1987 Polytechnical Institute Bucharest(section-Electrotechnical)
1974-1978-High School Diploma Energetics Ploiesti(electro-mechanics section)
1977-1978-T.I.A.B-awarded diploma of moumting electrician for automatic
Electrical installation.
1967-1974 Elementary School Ploiesti

Practical Skills
Good practical backgrounding electrical-mechanical fields.
Familiar with GE Power Generation Equipment
Experience with hook up,commissioning,and start up of high,medium and low voltage electrical system.
Good knowledge of electrical power and control hardware and systems up to and including the medium voltage level
Good knowledge and practical backgrounding regardingwelding,pipes and metalic profiles.
Ability to adjust quickly to new technologies and different cultural and working envirorment.
Experience in working in bad wather condition and on the constructions site conditions.
Abilty to handle tight deadlines.
Good experience in leading my subordinates.
Great ability to work in any kind type of construction.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 451 to 500 of 2856)Go to Search Parameters...
Brief Description
Qualification Bachelor Degree in Civil Engineering Total Professional Experience 14 Years and 2 Months –Include 4 years and 9 months in Singapore & 2 yrs. in Malaysia.
Electrical Engnineer with experience in system design and maintenance planning of electrical facilities including motors, motor starters, switchgears, power distribution, and cabling.
Proactive and versatile drafting professional with a solid reputation for generating long-term results in a short-term world. Effective problem-solver who interfaces well with management, co-workers and clients. Able to meet aggressive deadlines, juggle multiple priorities independently or in a team
Execute all structural works, finishing works. Aware of survey works. Using computer software proffessionally
Experienced Cad Manager/Project Coordinator. Multi Discipline Design. Proficient with 3d modelling using Autocad, ADT33, Autoplant, CadDuct and MultiSteel. Also experienced in using Microstation, PDMS, Prime Medusa and ProCadam. Engineering background - Structural/Civil.
a. 10 years in Qty. Survey and Cost Estimates for multi-million dollar Int'l Projects. b.10 years in Electrical Power Projects for Power Plants, HV OHL Transmission Lines and Substations. c. 2 years in multi-million dollar Military a
1) GULF EXPERIENCE (21 YEARS). 5 YEARS EMPLOYED AS PROJECT ENGR IN ALMORAM CO SULTANATE OF OMAN. 2)Past 9 years from 1989 to 1998 worked as E& M Engineer at UNITED CONTRACTING Company. 3)3) 7 Years ( 1977 – 1984) worked as maintenance supervisor in ARAMCO at SAUDI ARABIA.
Full Project Life-Cycle Control and Maintenance Implementation.
Bachelor Of Civil Engineering, IELTS score of Avg6.5, Experienced in building industry for 19 years and trained in OHS
BS Electronics and Communications Engineering, Proficient in Microsoft Office XP (Word, Excel, and PowerPoint), Taken up CCNA Sem 1-4 of CISCO Networking Academy, Knowledgeable in Autocad,
More than 25 years experience in electrical field.
Civil & Structural & QAQC Construction Superintendent
Hands on experience in planning, erection, commissioning and trouble shooting of Cement Plant Machinery. Additional experience in Refractories for kiln and Steel Casting parts for Cement Plants. Diploma In Mechanical Engineering (4 years - Industry Integerated from Larsen & Toubro Institute)
To build a strong career in the industry, take up more challenging assignment, responsibilities and rewarding career in the excellent working environment and move up the ladder by working towards achieving organizational goals and objectives.
Ability to perform under pressure,Ability to work in a team or independently,Energetic, enthusiastic with a flair for customer service
Experience in all theoretical and practical aspects of construction surveying, exposed to international safety standards experience in segment lining tunnel (TBM and EPBMs) and NATM Tunneling, Topographical Survey, wriggle survey, Siffa Gantry and Slip Form Gantry, Laser Fixing in tunnels,Rockboltin
Structural Engineer
Welding Superintendent: SSCL. DME (3years welding), WI (QA/QC) 1992, Safety Training qualified and 21 Years Experience (QA/QC Welding Engineer-01 Year; Welding Supervisor--12 Years; Welding Educator-04 Years; Welding Instructor-02 Years) in working with ASME, AWS, API standard in EPC Industries
Civil engineer
A Senior Project Engineer with a wide range of experience in Construction and Maintenance. Able to work on own initiative and as a part of a team. Proven leadership skills involving managing, developing and motivating teams to achieve the planned objectives.
Phisicyst with Power Electronics specialization
Diploma civil engineer from Mumbai(1st class with distinction)have 23 years of actual field experience of executing various types of civil works in & around Mumbai & pune.I hereby attach my C.V.along with this letter for your consideration & evalution.
30 years experience soils concrete and asphalt testing, radiation safety officer, Laboratory technician/supervisor/manager. Full responsibility of laboratory procedures, reporting, calibrations,training of technicians and administration of office.
* Construction Project Manager * Engineering Design Manager * Civil/Structural Engineer
Network Planning including load flow, short circuit and transient stability studies using PSS/E and various other planning softwares
Electrical engineer looks for a junior position in Dubai
• Solid logic with critical thinking, and problem solving abilities. Self-motivated and willing to take initiative.
Experience, skills, and abilities that I can offer to your company include: FIve years of experience in the operation and maintenance of substation equipments and devices. Ability to work effectively in a dynamic, multi-tasking environment. Extensive team management and team building experience.
Civil engineer with 17 years experience
Objective: Joining Challenge job in a progressive organization in which I can be best utilized and developed according to my abilities and performance efficiency.
Over 40 Years Quantity Surveying/Cost Estimating experience on projects in Ireland, England, Australia, Greece, Middle East and the USA. Largest project: Headed the US office working on King Khalid Military City , North Eastern Saudi Arabia ($6 Billion for the US Army Corps of Engineers)
I am currently looking for a construction assignement overseas, in the fields of instrumentation or building management systems.
Certification as a machinist, supervisor, Engineer, & licensed teacher + 25 years in 16 countries machine service centers (GE, Sulzer), supervise overseas workshops (Badak LNG), start-up & commissioning, chemical plants field supervisor (Dow, Mobay) trouble shooter (Brown & Root, GE),
I am a multi field Estimator, Designer and Project manager, Electrical and mechanical is my best fields, working knowledge of structural steel, concrete, IT and plumbing. I have designed and installed Power Distribution and generator systems. Safety and code compliance is a must.
A DIPLOMA IN MECHANICAL ENGINEER HAVING 20 YEARS EXPERIENCE IN CONSTRUCTION FOR VARIOUS INDUSTRIES LIKE CROSS COUNTRY PIPELINE, CEMENT, CHEMICAL, FERTILISER, POWER, ETC., PRESENTLY FOR THE PAST 7 YEARS WORKING AS A DY. MANAGER (CONSTRUCTION) WITH SIMON INDIA LIMITED, INDIA.
Truck driver
A professionally qualified Engineering Project Manager, with a total commitment to excellent performance, combining experience that encompasses a broad range of technical and management skills well as practical, ‘hands-on’ involvement.
20+ years in EPC heavy/industrial. Sharpest skills in resource & time control. Expert Planner/Scheduler w/Primavera P3, P3e Teamplay etc. software, 14 years experience (superuser & administrator). Capable Cost Engineer & Good communicator.
I am very experienced and have worked at all levels worldwide and also worked with many nationalities. I work very hard and get on well with everybody.
Mechanical & Electrical Engineer Location East London, Essex, Kent, Greater London Salary To £30,000 plus package
Civil Engineer with solid background in structural design, experience working with oil companies. Project supervision experience, costing and evaluation. Vast field experience leading working crews and supervising jobs. Good communications skills. Multilingual, speaking Spanish, French and Italian.
Mining Engineer and Geologist with twenty-seven years’ in precious and base metals, coal and industrial minerals. P. E. licenses in three states, with unique construction achievements. Advanced technical and strong supervisory skills in underground and surface settings.
Work Experiences : Mechanical equipment and piping installation in the following industrial plants: 1) Natural gas plant 2)Power plant 3)Polypropylene plant 4) Oil Refinery 5)Desalination plant 6)Steel mill 7)Foundry plant(maintenance of mechanical equipment)
NACE Certified Coating Inspector #7278, with +20 years of experience, available as (3rd party) Q.A./Q.C. coating inspector, coating surveyor, coating supervisor, vendor surveillance, etc.
Looking for a new challenge at the end of 2003 my present contract end then
Good written and oral skills, a pleasing personality, a flair for dealing with people and ability to work in a multi-cultural group
Document controlling.
Occupational health and safety trainer. More than 20 years experience with hazardous materials. Twenty one years military experience.
Has more than Seventeen (17) Years of continuous experience in Cost Engineering and Quantity Surveying works which involved the following:
Instrument engineer with around 15 yrs of versatile experience in the field of installation,commissioning , operation amd maintenance.
First   1   2   3   4   5   6   7   8   9   [ 10 ]   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com