P1979 – B.S. Electrical Engineering, University of Houston, Houston, Texas, USA
October 2006 – March 2007 Bechtel Corporation, Houston, Texas, USA
Motiva Crude Expansion Project
Unit engineer with Control Systems group responsible for P&ID development and updating. Also input to the index database using Intool program.
August 1999 – October 2004 Texas Shooters Range, Houston, Texas, USA
Owner / Operator of a retail business.
May 1990 – June 1999 Bechtel Corporation, Houston, Texas, USA
Senior control systems engineer assigned to various projects for such companies as Union Carbide, Monsanto, Georgia Gulf, Shell, Chevron, Occidental, Ethyl and Star. The type of plants have included refinery, VCM, Round UP, Aromax, lube oil additives, chemical and LNG.
Responsible for developing and issuing specifications, data sheets and requisitions for all types of field instrumentation including flow elements and valves.
Performed flow elements and control valves sizing calculations. Generated alarm summaries.
Reviewed quotations and prepared bid summaries for gas metering skids, valves, etc.
Developed P&IDs, symbology and logic narratives. Performed revamp work and field surveys. Reviewed and checked packaged equipment drawings and other design documentation. Witnessed and followed through vendors panels' checkout.
Developed data base for instrumentation bid book package for batch controls automation.
Responsible for an electrical and instrumentation construction contract package.
Quality checker of data sheets, material requisitions, loop drawings, location drawings, installation details, instruments detail connections and wiring drawings.
As lead engineer supervised and checked the work of assisting engineers and designers.
Prepared man-hour estimates, and schedules. Coordinated and interfaced with other disciplines, project, and client.
June 1988 – April 1990 M.W. Kellogg, Houston, Texas, USA
Instrument engineer assigned to several ethylene/propylene projects. Responsible for P&IDs development, control valves and flow elements sizing. Specified instruments and issued requisitions, process control description, and technical specifications. Packaged equipment vendor's coordination and quotation review. Also, assigned to Pequiven Olefins Plant Expansion Phase II in El Tablazo, Venezuela. Responsible for the design and technical specifications as well as leading the instruments data sheets development effort. Other work included process gas compressor, gas expander, heat pump compressor and refrigeration units' instrumentation.
Finaneste No. 3 Project a 400,000 MTPY grassroots plant in Belgium
Instrument engineer responsible for the total fractionation, cold ends section, instrumentation design requirements. Produced all the instrument connections sketches necessary for the project.
January 1985 – April 1988, Hema Energy Services
Self-employed. Air conditioning and heating contractor involved in the design and installation of air conditioning and heating for businesses and homes.
January 1984 – November 1984, Fluor B.V. Harleem, Holland
Instrument engineer assigned to the Exxon Flexicoker Project in Rotterdam. Responsible for coordination and checking of all field instrument specifications and requisitions. Also responsible for three offsite units: Mea, gas treating and flare gas. Work included P&IDs and system diagram development.
July 1983 – December 1983, Westinghouse B.V. Zaandam, Holland
Instrument field engineer participated in the installation and loop checking of instrumentation at the Mobil terminal in Amsterdam. Responsible for the design and detailed drawings for analyzers concrete houses utilities, and power hookups.
February 1983 – June 1983, Verhaar Uniad B.V. Den Helder, Holland
Instrument engineer, implemented client initiated systems changes for offshore gas platforms. Duties included instrument and material specifications, as well as modification and updating of all relative documents from P&IDs to detailed pneumatic and electrical drawings.
January 1980 – July 1982, M.W.Kellogg, Houston, Texas, USA
Instrument engineer involved with Shell LNG project in Bintulu, Malaysia. Prepared instrument data sheets, instrument indexes, alarm summaries and vessel sketches. Specified and requisitioned field instruments. Reviewed vendor quotations. Responsible for answering and solving field trouble reports. Duties included a four month assignment to the Amsterdam office to assist in completion of instruments bid package for Shell LNG project in Australia.
PERSONAL
Speak English, Italian, Greek, Arabic and some French and Dutch.
COVER LETTER
Dear Sir,
I am writing to introduce myself to you. I am a senior control systems/instruments engineer.
I have 25 years working experience in which 15 years were spent in the design and engineering of instrumentation for petrochemical plants.
I was employed by major engineering and construction companies: Bechtel Co and MWKellogg in the USA, Fluor BV and others in Holland. I have had some offshore modifications experience when I worked for Verhaar Uniad BV in Holland.
I was involved in developing P&IDs, specifications, data sheets, instruments indexes, logic narratives, systems diagrams and alarm summaries. Issued material requisitions and reviewed vendors' quotations. Selected instrumentation, issued bid summaries and reviewed vendor drawings.
Performed control valves and flow elements calculations.
Performed field surveys and revamp work.
Performed checking of data sheets, loop drawings, wiring diagrams, location plans, installation details and all other instruments design deliverables.
The types of plants include ethylene, propylene, LNG and petrochemical.
The types of equipment include rotating machinery, boilers, furnace, analyzers' shelters, gas metering and other packaged skids.
I have performed supervisory role, planning, estimating, scheduling as well as coaching.
I have a thorough knowledge of inter-discipline: electrical, mechanical, piping and project interaction. Client and vendors coordination.
I am a team player and my permanent desire is to have a positive impact with my contributions to the project.
I am a Greek citizen. I speak several languages.
I will consider relocating and moderate travel. Presently I am in Houston, Texas, USA.