Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #62584 next resume »»
CONTACT INFORMATION:
View contact information...

B-GAS /CSWIP LEVEL II PAINTING INSPECTOR RESUME

COATING/PAINTING/ INSULATION-INSPECTOR CARRIER SUMMARY:
About 15 years experience in the fields of inspection,Quality control,Engineering study and review, working to Power,Major oil and Gas industries.Out of which 8 years exclusive experience at Habsan-Abudhabi,Karazakanak-Kazakizthan,Sur-Muscat,Doha-Qatar,
Dammam-KSA.

B-GaS/CSWIP Certified Painting Inspector level-II
Certificate #19325
Expiry date:12 march 2010

Software used:MS office,MS Project
Codes&Standards used:SSPC,SIS 05 5900,ASTM,AWWA,ISO 9001:2000 and other international codes

Since June 2007 to Till Date working as EPC coating/painting/insulation Qc
Supervisor in Snamprogetti-Saipem- Mesaieed-Doha-Qatar.

Since Oct 2006 to April 2007 worked as EPC coating/painting Inspector in
Saudi Techint Int co., K.S.A / Saudi Aram co Approved SAP #70006901
SAUDI-ARAMCO APPROVED COATING INSPECTOR [NORTHEN AREA]

Since Feb 2006 to July 2006 Worked as painting/coating inspector in Peninsular Petro tec Engg.,Teyseer Group of companies(Qatar)
Client: Qatar Steel Company /Qatar Petroleum

Since July 2005 toDec 2005 Worked as painting/insulation Inspector in Consolidated Contracting company(Doha-Qatar)

Since July 2004 to April 2005 Worked as painting/insulation inspector in Consolidated Contractor Company Muscat
Client: Oman-India fertilizer (Omifco).,

Since Jan 2001 to April 2004 Worked as JV painting/insulation inspector in CCC/Saipem(Jv) kazakizthan
Client:KPO Bv.,

Since Oct 1999 to Oct 2000Worked as painting/insulation inspector in
Consolidated Contractor Company Abu-Dhabi
Client: Abu-Dhabi National oil co(ADNOC).,

Since Jun 1992 to July 1999 Worked as Inspector/Supervisor in
Sujay Engineering Co(Bangalore-India)

Project Handled:
Qatofin low line density polyethylene production unit,4,50,000 mt per yr
Consist of civil/mechanical/electrical-instrument activities.
Khursananiyah Up stream&Down stream 425 km pipe line project which covers
40„c,36„c,24„c,14„c cross country Pipe line
Water injection pipe line with internal/external fusion bond epoxy coating.
Contract No:TDR-013/02/2003-(46)Supply,fabrication,painting&installationo of
Reformed cooler by Pass line in DR Plant(Qatar steel company)
ContractNo:WO-TDR-013/02/2003-(44) Design,supply,Fabrication,painting,erection&commissioning Of new compressor house pipe lines for EF(Qatar steel company)
ContractNo:WO-TDR-013/02/2003-(57)Fabrication,Painting&Supplyof ladder stand(Q.S.C)
Fabrication,Painting&erection of structural steel members
(M/S Al-Balagh Trading contracting CO)
Fabrication,Painting&erection of Fire water pump house structural steel members
(M/S Simplex Concrete piles(India)ltd
Ethylene expansion project which covers structural steel, pipe, spool painting, under ground pipe Cold applied wrapping

Urea/Ammonia production plant which covers structural steel (zinc epoxy primer,micasiose iron Oxide intermitted, polyurethane finish)three coats painting, high temperature boiler external Zinc Aluminum painting, tank external/internal painting,
28,000 tons storage capacity go down concrete beams, wall epoxy painting, Ammonia export pumps, piping cold insulation
Crude condensate Export project which covers structural steel, piping/spools painting with
-18*C Surface tolerant epoxy paint,48 diameter Floating roof storage tank external painting/insulation, High solid glass flake paint tank internal lining, Below the frozen level Fire water GRP pipe line Insulation,24¡¨ coated export pipe line inspection.
On-shore Gas Development phase II project which includes structural steel painting, vessel internal Lining,sulphur unit pipe internal calumniation

CORE RESPONSIBILITIES:

Project Management

- Title, function, responsibilities and authorities
- Key contacts for co-ordination
- Scope of work, project contractual requirements such as milestones and completion schedule
- Design engineering, fabrication and construction sequence
- Review specification (including all amendments and pertinent appendices), applicable codes
And standards
- Conflicting requirements, project field change requests, technical deviations and engineering change notices
- Pre-job conference records or minutes of meetings
- Attend ad-hoc clarification meetings with client
- Review tender documents for paint supply subcontract
- Attend tender clarification meetings with paint vendors
- Review paint vendor priced & un-priced (technical) documents
- Perform audit at paint vendor facility to assess capabilities
- Submit assessment report & recommendations on potential paint vendors
Attend technical & commercial negotiation meetings with paint vendors
- Attend paint vendor finalization meeting
- Review paint vendor documents
- Project history or track record
- Project specific site technical representatives resume
- Key personnel - title, function, responsibilities and authorities
- Daily report or log
- Specific field tests & reports
- Laboratory test reports
- Review tender documents for blasting & painting subcontract
- Attend tender clarification meetings with subcontractors
- Review subcontractor priced & un-priced (technical) documents
- Perform audit at subcontractor facility to assess execution capabilities
- Submit assessment report & recommendations on potential subcontractor
- Attend technical & commercial negotiation meetings with subcontractor
- Attend subcontractor finalization meeting
- Review subcontractor documents
- Project history or track record
- Project organization chart
- Resume of key personnel
- Key personnel - title, function, responsibilities and authorities
- Manpower histogram
- List of plant, machinery, equipment, tools, inspection instruments & site office facility
- Procedures
- Inspection test plan
- Daily progress report
- Daily inspection report
- Review company procedures and inspection test plan
- Ensure effective utilization of subcontractor resources
- Monitor subcontractor performance
- Monitor project schedule planned VS actual
- Identify areas in critical path, cause and effect
- Establish, implement & monitor recovery plan
- Attend quality surveillance with client
- Conduct co-ordination meeting
- Conduct weekly meeting with subcontractor
- Review & verify subcontractor monthly valuation
- Advise contracts department on variation orders & claim
- Constant co-ordination with project management team

GENERAL OVERVIEW:

- Cause and effect of corrosion
- Protection, maintenance and prevention of corrosion
- Design and material selection
- Anti-corrosion protective coatings
- Surface preparation methods
- Mechanical surface preparation during pre-fabrication and onsite portable centrifugal blasting
- Open air blast cleaning
- Vacuum blast cleaning
- Hydro blast cleaning
- Wet blast cleaning
- Hand and power tool cleaning
- General uses of coatings / linings / wrappings
- Painting
- Galvanizing
- Thermal Sprayed Aluminum
- Passive Fire Protection
- High performance internal linings
- Tape wrapping
- Cement linings
- Self leveling compounds
- Anti-skid deck coatings
- Type of coatings commonly used and the major components of coatings
- General physical and chemical properties of the generic types of coatings and application process of coatings / linings
- Calibration of inspection and test instruments
- Using coatings inspection and test instruments
- Defects affecting performance of the applied coatings
- Causes for most common coating defects
- Inspection of defects on coated surface
- Acceptable and unacceptable defects
- Identification of defects and implementation of repair procedure
- Premature failure analysis of coatings
- Protective coating inspection standards for field and shop applications
- Internal spin blasting and spray painting methods
- Plural spray method
- Hot spray method
- Documentation

Enforcement and verification of work performed in accordance with specification, manufacturer recommendations and applicator coating procedure.

- Witness applicator qualification or trade test and paint system qualification
- Measure ambient conditions, surface temperature and air quality requirements
- Inspect location and suitability of access for areas of work
- Inspect type of blasting equipment and tools to be used
- Inspect type and size of blasting media
- Inspect metal surface imperfections / defects
- Test indication of oil or water in compressed air
- Test conduct metric analysis of water-soluble ionic contamination of blasting media
- Inspect pre-cleaning or solvent cleaning of surface
- Measure compressed air pressure
- Inspect degree of cleanliness required
- Measure surface profile of blast cleaned surface
- Assess surface cleanliness of blast cleaned surface
- Assess surface cleanliness soluble salt contamination on blast cleaned surface
- Inspect coating material storage conditions
- Inspect type of coating material to be used
- Monitor thinning, mixing, induction time and pot life
- Inspect type of coating application equipment and tools
- Monitor application method, type and pattern
- Measure wet film thickness by notch gages
- Non-destructive measurement of dry film thickness of non-magnetic coatings applied to ferrous surface
- Non-destructive measurement of dry film thickness of non-conductive coatings applied to non-ferrous surface
- Destructive measurement of dry film thickness of coatings
- Monitor re-coating and final curing schedules
- Test MEK resistance of Inorganic Zinc Rich Primers by solvent rub
- Test film hardness
- Measure the adhesion of coatings applied
- Test pull-off strength of coatings applied
- Test discontinuity (holidays or pinholes) of nonconductive coatings and linings

Health, Safety & Environment:

- Understand local and international legal and HSE regulations
- Project specific HSE requirements
- Witness tool box briefing, safety surveillance & safety audit
- Attend monthly management safety committee meeting
- Conduct project safety co-ordination committee meeting (Permit to work system)

Administration:
- Delegation and distribution of responsibilities
- Employee recruitment
- Employee training needs & wellness programs
- Employee appraisal
- Constant interaction, counseling & team building session
OBJECTIVE:
Obtain a position that will allow the utilization of my skills tempered by over fifteen years of professional experience in Coatings and, ultimately, to become a long term, highly valued employee of a successful organization.

Nationality: Indian

Date Of Birth: 14.07.1964

Education Qualification:
Bachelor in Science (Chemistry)

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1151 to 1200 of 2813)Go to Search Parameters...
Brief Description
Afifi A/C Establishment Al-Khobar, Saudi Arabia as a Project Engineer.
I am graduated civil Engineer, has worked in two countries (Nigeria and Pakistan) before. cv can be sent as attachment.
5 years of experience in the field of civil construction and Designing , Estimation of Under Ground Drainage system , Water supply distribution , feed mains, Storm water drain , Road and Drains. Presently working for M/s NCPE as project Engineer
14 MONTHS EXPERIENCE IN BELLELI SAUDI HEAVY INDUSTRIES, SAUDI ARABIA AS PRIMAVERA PLANNER. 5 YEARS EXPERIENCE IN RIYADH CABLES GROUP AS PLANNING ENGINEER
Breakdown Quantity for Project Construction, Mining and Project Control specialist.
X-STEEL OPERATOR, DETAILING, CIVIL DRAFTSMAN
As an experienced civil/Building engineering (more than twenty years) I am willing to participate in your construction projects.
Electrical Engineer
7 yrs experience Generator Maintenance
I Have 4 years of exp in design of diesel engine power train components in reputed R&D AVL Technical center,Having good knowledge in PRo-e,got 1 year special training in Graz Austria on engine design
Discovered 2 World Class & 2 Medium Size ore deposits - base and precious metals, gold, platinum, iron, open pit, under developed contries, Spanish, Portuguese, English, reg mining engineer & geologist USA & Brazil, Central & South America, Africa, Amazon, excellent Vice President, General Manager
B.E. in Civil Engineering under Bangalore University from Ramaiah Institute Of Technology scoring a percentage of 71.85.(1995-1999)
Preparation of tender document, issuing tender, evaluation of tenders, submitting recommendation to tender committee for award of contract, preparation of contract document, administration of contract, corresponding with contractors on contractual matters, finalyzing variation PRPSL. from employer
An Civil Engineer with 9 years of experience in the oil & gas, infra structure, marine structure, pipeline and construction industry. Able to work on own initiative and part of a team, to provide full support to the project with regard to all civil construction aspects, in addition to the engineerin
I started my career as a structural engineer for more than 10 years. After some years on the field of Information Technology I want to go back to Civil Engineering. I prefer a position in Northern NJ or New York City, but I will consider relocation. I don’t mind some travel.
ZTE Pakistan (Pvt.) Limited: - Currently I am working as MSS Engineer in the O&M Team in the Telecard CDMA WLL Project .Installed & Commissioned ZTE ZXC-10 MSC, HLR..Operation & Maintenance of ZTE CDMA Network Elements like ZTE MSC, HLR and VLR.
B.Sc. in Civil Engineering (CE), Bangladesh University of Engineering & Technology (BUET), Merit scholarship recipient in every under graduate level (Second grade)
I have over thirty years experience working in the oil, gas & petrochemical industries on the maintenance, construction & commissioning of various rotating & mechanical equipment. The positions I have held have been hands on and supervisory, in both the UK and overseas, working onshore and offshore.
I have wide experience (more than 22 Years) in Maintenance & Project field in Ammonia Refrigeration Plant, ice-cream, Dairy & Pharmaceutical Industries.
I am a QA/QC Civil Eng. with experience in the Kuwaiti Oil Sector.
Application Manager - Control Valves and Engineered Products
Near 13 years of professional work experience in the oil and gas industry, working experience on the on/off shore in Iran and extensive experience in oil and gas unit processing, reservoir engineering and well completion engineering.
Electrical Installations and Commissioning Engineer in Low/High Power Distributions
Experienced in Construction of Offshore/Onshore Oil &Gas plants in the field of Fabrication, Installation, Hydrotesting & Pre-commissioning of In-plant/Well Head Piping and cross Country Pipe Line. Qualification: Bachelor of Engineering (Mechanical)
10+ yrs experience in construction field with specialized in RCC structure & refractory material installation.
Completed Amusement and water Parks project in India and Bangladesh. I am Civil Engg. Diploma Holder. It is 3 year course.
Just I have graduated from Sheffield Hallam University in UK on October 2002 and looking for work opportunities throughout USA
I am a recent college graduate who majored in Civil Engineering Technology and is seeking the opportunity to gain experience, as an Entry Level Civil Engineer.
Engineer looking for job in construction industry in Los Angeles area.
The purpose of this resume is to define and highlights the skills and ability to work as a Planning Engineer. I secures 5 year of working exp. as Maint. Planning Engineer and Proj. Plan Engr. in Petroleum Refinery and for the const. of Pet.chem. & Steel Plant respectively.
Site Safety
I have been doing civil drafting for an enigneering firm that does contracts for Texas Department of Highways and National Texas Toll Authority for a year now. I also work for the land development department and the surveyors. I have one year microstation experience in a job setting.
Configuration of Routing Protocols like RIP, IGRP, EIGRP, OSPF, BGP in Cisco routers.
As a Manager/Project Manager, I have over 12 years of experience managing various design build projects and services business in OEM, Pipeline and Water treatment industry
Moniitoring and implementation of all related painting/coating/lining works involved in the construction packages managed under co project department.this also includes the major painting works associated with the major overhauling of crude oil storage tanks in oil and gas co under control environm
The past 16 years has been in the Oil & Gas and Mine Industry, with the reminder being associated with the Onshore – Offshore Oil & Gas Plant industry. Experience has been gained in all aspects of Engineering Piping Design & drafting activities with the emphasize on piping plan, isometric, pipe spoo
Electrical Technician/Cell Phone Technician
Project Management
Mining engineer and experienced manager with over 20 years of successful executive management, project development, engineering, construction and operations experience in the mining, tunneling, fossil power, rail and heavy construction sectors.
Inspection of Oil & Gas, Refinery, Petrochemical plant and offshore field Static equipments, Welding, piping, pipelines, painting& coating and NDT.
Eight - year experience in Civil Engineering Projects.
10 years of professional experience in commissioning trouble shooting and servicing heavy-duty diesel engines. Presently working as Senior Service Engineer, responsible for field service of Cummins Diesel Engines. I possess strong academic credentials and good communication skills.
An Entry level position within a growing industry that takes advantage of my electrical engineering education and skills.
A highly motivated, ambitious and systematic individual with exceptional interpersonal skills •Presently doing Masters in Mechanical Engineering with one year of full time experience as Design Engineer working on PRO-E.Proficient in Pro/Engineer 2000, Wildfire, Pro/Mechanica.
Strong structural engineering knowledge, Energitic, Good analitycal thinking, Self motivated, Hardworking, Dedicated person, Able to work under pressure.
B-GAS LEVEL II PAINTING INSPECTOR.MORE THEN 15 YEAR EXPERIENCE IN INSPECTION FIELD.
Accomplished professional leveraging strengths in hydrogeology, geology, geomatics and geotechnical engineering to earn a position on a team committed to making genuine social contributions within challenging, multifaceted environments. Possess an MS in Geology and an MS in Hydrology / Hydrogeology;
Safety Engineer, (NEBOSH) Lifting & Rigging Supervisor, (NVQ 3.)
Have working experience in 6 countries; around 15 years of experience in Project Management, Project Engineering, Engineering Design, R&D, Construction, Technology Management and Business Development. Have extensive experience in subsea/offshore pipeline, cross-
Estimating Engineering for Oil & Gas Projects from FEED to EPC stage.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   [ 24 ]   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com