Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #64421 next resume »»
CONTACT INFORMATION:
View contact information...

EDUCATION
Tertiary: University College, Cardiff
B.Sc. (hons.) Civil & Structural Engineering
: Postgraduate Diploma in Environmental Decision Making (O.U.)
Computer literacy: M.S. Project, Word, Excel, M.S. Office applications
Courses attended: CITB 5 day Safety for Site Managers
: Environmental Issues in Construction
: Leadership and Motivation
: Network Planning
: FIDIC 4 Conditions of Contract
: NEC Conditions of Contract
: ICE 5 Conditions of Contract
Languages (10 = Fluent in speech & writing, 1 = Basic.)
: English 10; French 6; Swahili 2.

SUMMARY EXPERIENCE
Broad experience of oilfield infrastructure, water and sewage treatment plants, gas turbine stations, oil pipelines, rig sites, commercial and industrial building, housing, earthworks, rail and general civil, mechanical and electrical works in UK, Africa and Asia. Project and Site Management in a variety of challenging locations.

KEY ATTRIBUTES
* Self reliant with the ability to manage projects in remote areas involving forward and contingency planning.
* Commercially aware.
* Ability to motivate local staff and labour to achieve results.
* Ability to interface diverse cultures.
* A flexible approach to problem solving.

EXPERIENCE DETAILS
February 2003 - Present
Christian International Ltd. –
Currently Seconded to Verenex Energy, Tripoli, Libya
* Tripoli based Construction Superintendent responsible for enabling works (Roads, Water Wells and Rig Sites) for exploration drilling campaign in Libya. Management of civil Contractors and Company personnel, planning, Contract preparation, cost monitoring and control. Preparation and scouting work for future production infrastructure development.
August 2006 – January 2008: Seconded to Woodside Energy, Tripoli, Libya
* Tripoli based Civil Superintendent responsible for enabling works (Roads, Water Wells and Rig Sites) for exploration drilling campaign in remote desert locations in Libya. Management of civil Contractors and Company personnel, planning, Contract preparation, cost monitoring and control.
February 2003 – August 2006: Seconded to Veba Oil Operations, Tripoli, Libya.
* Lead Construction Engineer responsible for management and coordination of all construction operations, manpower requirements and NDT services.
* Acting Project Execution Superintendent from September 2005 to August 2006.
* Project Engineer responsible for the survey and repair / replacement of 630km of 30"/36" oil pipeline and for all ongoing pipeline survey and repair projects.
o Preparation of Project Scope of Work and Budget.
o Preparation of Bid Documents for material supply and construction packages.
o Evaluation of Bids received and preparation of Contract Documents.
o Monitor physical and financial Project performance and deal with all Contractual issues and claims.
o Deal with all QHSE issues.

January 2002 – January 2003
Rockson Engineering Ltd, Rivers State, Nigeria; Construction Manager.
Management and supervision of civil works for a turnkey project to construct a 6 x 25MW gas turbine power station. Co-ordination with Design department. Establishment of Site Management control systems, QA/QC and Safety Procedures. Liaison with Mechanical and Electrical installation staff. Liaison with overhead line contractor. Responsibility for co-ordination of the overall Project programme.

August 2000 – January 2002
David McLean Contractors; Contracts Manager.
Installation of LPG facilities at Shell filling stations throughout Britain. Management of operations and specialist subcontractors in the field, implementation and monitoring of QA/QC and Safety Procedures while operating in Hazard zones. Preparation of risk assessments, method statements, liaison with planning and fire Authorities and conducting start-up safety inductions. Carrying out regular safety, environmental and quality audits on sites under my control.

January 2000 – June 2000
Relocation from Zimbabwe to Britain.

October 1997 – December 1999
Skanska Africa, Tanzania
1. 1. Project Manager responsible for civil and building works for the expansion of Mwanza Brewery, value £5m. Full operational, financial and contractual control of the project, direct liaison with the Client and with Mechanical and Electrical specialist installers and vendor representatives. Responsibility for motivation and welfare of expatriate and local staff.

2. Responsibility for operation and reorganization of Central Services division comprising clearing and forwarding, transport logistics throughout the East African region, overseas and local procurement, stores, fabrication shop and pre-casting operations.
Oct. 1994 – Oct. 1997
Self employed being the Proprietor and Manager of a civil & building contractor based in Nyanga, Zimbabwe. Work undertaken comprised smaller works of construction, engineering consultancy and included a three month management service for Chimoio e Beira Construtores Lda. for supervision of civil works for a 400kv substation in Songo, Mozambique, liaison and co-ordination with M & E contractor and transformer installation contractor.
June 1992 – Sept. 1994
ICIL, Tanzania; Contracts Manager
Responsibility for the day to day operations of an M&E contractor comprising management, motivation and welfare of expatriate and local staff; liaison with current and prospective Clients; preparation of valuations and invoices; follow up of debtors and collection of payment; preparation of financial reports for all projects; ordering and follow up of all imported material inputs. 50% of my time was spent visiting sites spread throughout Tanzania to monitor operations, safety, programme and progress, anticipate problems and deal with any concerns of main contractors and clients.
M&E Subcontract, Pangani Falls rehabilitation project, value £2m. Electrical and water supply installation, supply erect and commission modular water treatment plant.
M&E Subcontract, Dar es Salaam port rehabilitation, value £3m. LV and HV installations; replacement of fire water ring mains and installation of new domestic services to port buildings.
Erection (structural steel supplied by main contractor) of heavy locomotive repair shop for TAZARA in Mbeya, value £0.5m.
Construction of 160km of 33kv overhead power line in the Southern highlands, value £5m.

Jan. 1991 – May 1992
Wade Adams Construction; Contracts Manager
1. Zambia Expedite progress on concrete shaft lining, Mufulira mine, value $0.5m. Expedite progress on refurbishment of Mosi-o-Tunya hotel and Rainbow Lodge in Livingstone, total value $5m.

2. Uganda Expedite progress on Port Bell ferry terminal involving marine piling and offshore concrete structures in Lake Victoria and earthworks / trackworks for Port Bell to Kampala Railway, value $8m (excluding free issue piling and trackwork materials). Management of quarry operation for production of rail ballast and concrete aggregates.

3. Zaire Mobilization for $7m Tailings Leach Plant at Likasi.
Feb. 1990 – Jan. 1991

Biwater Projects Ltd., Malaysia
Malaysia rural water supplies scheme. Sub Area Manager with responsibility for all work on water treatment and supply schemes in Perak State, reporting to Area Manager (Peninsular Malaysia – West).

Feb. 1982 – Feb. 1990

Wade Adams Construction

Malawi 1987 – 90
Project Manager, Second Lilongwe water supply project
Scope: Water treatment works (Upward flow clarifiers, filters, on site reservoirs, river intake and forebay, 4 remote reservoirs (2 elevated "mushroom" type, 2 on ground)
Value (Civil works): £7m.

Project Manager. Full responsibility for construction of the VIPLY project comprising bulk earthworks, sawmill, plywood factory and complete infrastructure: power transmission and distribution, water supply and treatment, roads. 17000 sq. m of industrial building, houses and all external works, value $12m. Close liaison with mechanical installation contractor to ensure optimum efficiency and completion of the project.

Management of quarry producing aggregates for all company projects in Northern Malawi.

ADMARC grain storage facility, Mzuzu, value $1m.

Tanzania 1986 – 87 Project manager. Full responsibility for building and mechanical works Contract in Dar es Salaam Harbour, value $7m. Additional responsibility for coordination of all works in the coastal region.

Zambia 1985 – 86 Project Manager. Full responsibility for construction of Northern, Luapula and Eastern Provinces microwave link, value $6m (excluding free issue tower materials) comprising roadworks, bulk earthworks, foundations and tower erection.

Construction of Katanshya bridge, value $1.5m.

Zimbabwe 1982 – 85 Site Agent. Full responsibility for the construction of various sewage works and slipform silo projects valued up to $3m

March 1981 - Feb. 82
Delkins Ltd., Zambia Site Agent responsible for the construction of 42 high/ medium cost houses in Chambeshi.

1973 – 1981 Site Agent / Site Engineer on various LNG projects and sewage works in Britain.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1851 to 1900 of 3123)Go to Search Parameters...
Brief Description
Process / Production / Project Engineer (Aluminium Smelter)
Quality Assurance Manager - Civil and Rail Engineering - Contruction site practice N1,N2&N3, Certified lead auditor ISO9001
Technical Author, Trainer, Project Manager
I am an engineering specialist having more than 19 years of experience, graduated from M.I.T, the most reputed Institute in India for Instrumentation. At present I am working as the Associate General Manager (Projects) for one of the leading Zinc producer in the world.
Quarry, Blasting, Explosives, Tunneling, Mining, Open pit, Crusher, Earth Moving
supervision and inspection of piping jobs,review and acceptance of test packages, punch listing and other construction activities
Broad experience of oilfield infrastructure, water,sewage treatment , gas turbine stations, oil pipelines, rig sites, industrial building, housing, earthworks, rail & general civil, mechanical & electrical works in UK, Africa & Asia. Project and Site Management in a variety of challenging locations
Highly experienced manager in the mining, aggregates, construction, and marine industries.
Engineering/Project Manager skilled in organizational/project management/business development. Highly skilled in client relations/development. Diverse experience in environmental consulting/nuclear power/regulatory compliance/facilities/systems engineering/infrastructure projects.
Bachelor of Engineering(first grade with distinction) in instrumentation.
Retired from PAF as “Chief Technician”
Telecom Field Engineer :- Having experience in telecom planning, field survey, telecom construction, testing, and maintenance of Telecom field & quality assurance. Installtion & testing of telecom equipment & networks.
Experience of more than 11 years in the sector of Oil and Gas , Petrochemical , Ship Building, High Rise buildings and expertise on planning and scheduling with prima vera soft ware , keeping track of records with prima vera expedition , involved in tender level programming as well as master level
AutoCAD MEP 2009; Revit MEP 2008, Civil Survey CAD programs
Planning, project engineering/management of Petrochemical/Oil and Gas plants with around 28 years experience with design and engineering consultants, EPC contracting companies and oil producing companies. Associated with planning and control of projects with international companies like Shell etc.
Years Experience Including 14 Years Projects Management Experience With Saudi Aramco
I graduated from Texas A & M University with a Master of Science degree in in Civil Engineering with a specialization in Construction Engineering and Management in December 2008 and I have 2 years of work experience in the construction field.
Thirty Eight years in Material Handling, Purchasing, Logistics, Expediting and Management with a record of Reliability and Progressive Advancement. I have handled the entire Purchasing Process for as many as twenty projects at any given time involving m
Energetic and versatile Quantity Surveyor (QS) with proven expertise, working with an International Airport Construction Company.
Site investigation, Design of Foundation, Design of Embankment and Retaining Structures, Slopes Stability, Numerical Analysis, Constitutive Modelling, Contaminated Land Remediation, Ground Work Supervision, Mining Engineering, Total Station and Precise Level Surveying.
Power electrical engineer from Aleppo university
17 year experience in environmental management as Head - EHS and GM (Env. Tech) in large environment consulting and waste management co
Welding inspector with 4 years experience in welding QA/QC
Piping engineer currently working with Bechtel India Pvt Ltd. I am having a 2.6 year experience as piping engineer/ PDS administrator.
Over five years of experience in Environmental Engineering including environmental evaluations, water quality impact analysis, environmental permits and environmental management.
More than 10 years of Information Technology and Customer Services experience, Technical support across multiple industries, including Sales, Transportation, Oil Technologies and Services and Outsourcing Services. An intermediate level in English, effective in formulating and deploying alternative
Work experience in design and Manufacturing industries for 5 Years with Auto CAD 2004, CATIA V5 R10, Matlab, Ansys, Solid works
Diversified: Nuclear Power Clearance /Mechanical/Electrical/Civil/Architectural/GIS Map/Water Design
31 yrs im field. I have ben an Electrical Field Engineer For a long time
I am a GRADUATE MECHANICAL & CERTIFIED COST ENGINEER possessing 20 years of diversified experience in Petrochemicals, Refining, Chemical, Fertilizer, Oil & Gas with various multinational companies in Pakistan, Bahrain & Saudi Arabia in the fields of Project control, Cost & Contract Management, Plant
Construction manager/Chief field engineer with HND Mechancial engineering and Member Institute of Mechanical Engineers. 18 years of construction management experience at all levels.
My key strength includes communication, interpersonal, analytical, creativity, troubleshooting skills and quick problem solving ability. CAD skills include AutoCad, SolidWorks, Catia V5
Production, planning & maintenance (reactive & proactive) of crushing & screeing plant as well as projects execution (have 3 yrs. full time Dip in Mechanical Engg)
I had completed my B.E. & DIPLOMA in mechanical engineering. I followed through 2 major projects, seminar, industrial training, national level paper presentation & visited number of power plants, companies which are specially related with mechanical field.
I am certified by MACS in air conditioning. I have worked on heavy equiptment for three years at Patten Industries. I worked a couple of months at the Mossville Caterpillar plant as a experimental technician. I completed a two year caterpillar base technical program at Illinois Central College.
17+ years contruction electrician foreman, electrical engineering and PLC experience. The majority of which was obtained on high profile DOE contracts; DOE Q cleared; BSEE
Construction/Maintenance Superintndent, Mechanical/Civil fields
Entry Level
1.B.E(Electrical Engineering)from College of EME,(National University Of Sciences and Technology,NUST) 2.CGPA=3.31/4.00(in percentage equivalent to 80.24%) 3.final year project nominated among the best three projects of the electrical engineering department.
Respected Sir, I am a holder of B.S. in Civil Engineering. I seek to have a job as an AUTOCAD specialist/OFFICE Assistant in your reputed firm. I am hence attaching my CV along with this mail.
Project Managements and project designing; Study, dimensioning and amelioration of thermique, hydraulic and frigorific installations; Study and conception of mechanical structures with the help of CAO (Solid works, AutoCAD, Catia...); Maintenance management and stock exchange of tools
Highly motivated, results and detail – oriented professional with 11 years of experience specializing in the Oil and Gas, Industrial, Construction and Residential Industries.
My background encompasses over 10 years working experience in different industries.
Well-rounded professional with 15+ years experience in areas of: Project Management, Operations, Product Development and Engineering
4 Years BE graduate, with 1 Year Diploma Fire safety Engineering, OSHA & Basic Life support train certificates.
Experience in instrumentation and control, P&ID, Wiring Schematic Diagrams, Process Flow Chart, Specifiying instruments, Strong Electrical Engineering Skills, PLC, DCS, MCC, strong analytical skills, stong knowldge in vaious engineering desciplines, microsoft office,
Piping engineer with 10 years experience in oil field. Experienced in designing, supervising and construction of pipelines and piping for oil industry.
I`m willing to relocate and work as QC inspector, Site Engineer in sewer and water treatment field
Experience in using AC Drives, DC Drives, Servos and Stepper Motors Proficient in PLC programming using Allen Bradley, Siemens and Omron PLC Proficient in HMI interfaces including Panelview, Maple, Omron systems Proficient in using RS Logix , Simatic Step-7, Omron CX-Programmer
University graduate with over 6 years of expirience in surveying and geomatics, both in the field and in the office.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   [ 38 ]   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com