Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #65515 next resume »»
CONTACT INFORMATION:
View contact information...

Position: MECHANICAL/PIPING ENGINEER
PIPING DESIGN ENGINEER
SENIOR PIPELINE / PIPING ENGINEER (ONSHORE)
INSTALLATION ENGINEER ( TOP-SIDE,MECHANICAL,EQUIPMENT & HOOK-UP)

Total Years Experience: 20

Nationality: FILIPINO Born: April 17,1961

Status: MARRIED

Qualifications:
MEMBER – PHILIPPINE SOCIETY OF MECHANICAL ENGINEERS (PSME)
BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING, 1992
BACHELOR OF SCIENCE IN CIVIL ENGINEERING, 1984
TRUMAN COLLEGE. WILSON ST., CHICAGO, ILLINOI, U.S.A
FEATI UNIVERSITY, STA CRUZ, MANIAL, PILIPPINES

Languages: English (Fluent)
Tagalog (Fluent)

Objectives: To obtain a position with the possibilities of advancement opportunities with a progressive organization, where I can make a significant contribution.

Motivation: Established a good relationship to all aspect to attain a target schedule on time.

SUMMARY OF EXPERIENCE: Able to generate P&ID, Process Plant Layout and piping design, piping drawings and isometrics for construction, fabrication drawings, pipe spooling & detailing, As-built drawings with special focus on construction design engineering, evaluate & review and finalization of project procedures in consultation with key project personnel each pipeline contractor per Shell DEP's. ANSI, ASME, API. And B31.1, B31.3, B31.4, B31.8 Authorized to review all work packages for the modification & tie-in points @ the existing live plant and all types of piping for refinery, petrochemical and oil & gas plant Testing commissioning, planning, scheduling, expediting, issuing and control materials to the ongoing projects related to refinery, shutdown works in different system pertaining to oil & gas refinery plant. Supports and follows all Safety & Environmental guidelines and Process Safety Management processes.

EXPERIENCE:
Oct. 26, 06 TO DATE: BHP AFRICA ENGINEERING & CONSTRUCTION LTD.
MECHANICAL/PIPING SUPT.

Projects:
* ETIM ASASA DEVELOPMENT PROJECT, ( ExxonMobil
Offshore project )
* Ovade-Ogharefe flowstaton upgrading.
* Oyot-Satellite field, Offshore Project ( ExxonMobil )

Job Description:
* As a Mechanical/Piping Supt. responsible for project execution planning, including engineering, construction regulatory activities, Interface with all required groups to ensure successful execution.
* Directly reporting to the Principal Lead & Project Manager for the project progress and achievements.
* Assist the Principal engineer & Project Manager in reviewing project communications and identifying and following up key issues requiring action /response.
* Monitor progress against base plan and recommend corrective action to the main contractor when required.
* Manage the activities of the Project Team and the Contractors, so as to complete the design, construction and commissioning of the project facilities, in accordance with the specified standards and specifications, on time and within budget.
* Executing the tendering and evaluation of design, construction, installation and procurement contracts.
* Supervising the materials procurement process from requisition to delivery
* Responsible for collating and updating deliverables progress, liaising with the Cost Controller and Scheduler to provide a weekly analysis of project status, ensuring change orders are raised correctly in Incontrol, agreed and documented in accordance with project requirements.
* Reviewing & assessing variations requests from contractor & evaluation & recommending eligibility of claims.
* Review & approve design drawing & other technical documents to ensure compliance with applicable shell group projects standard (DEP's) & contract requirements & especially operational demands.
* Prepare timely response to technical queries from the contractor.
* Provide project management advice and support to the project engineering team.
* Ensuring, that construction uses the current revision of design documents and uses all applicable quality control criteria. Monitor quality control results and initiates corrective actions where required.
* Monitors the site field engineers. Insures that field engineering accurately interprets the design and that they promptly resolve any design, constructability, or quality issues.
* Responsible for working within provision and guidelines of the Quality Assurance system, Overseeing the development of the Project Quality plan, and coordinating project audits and close-out of audit reports.
* Prepare project progress reports as required, and close out reports for each of the contract phases, reporting on follow-up issues, lessons learnt and making recommendations for future projects.
* Participate in meetings and assist the project team, concerning technical matters main contractors/vendors.
* Ensure that ExxonMobil SHE and sustainable development policies and standards are addressed in the facilities detailed design and the execution of work on- and off site.

MAY 03 – TO SEPT-06 NIGERIAN LIQUEFIED NATURAL GAS, (NLNG) NIGERIA
PROJECT INTERFACE ENGINEER (GAS SUPPLY PROJECTS)

Projects:
* Gas Transmission Pipeline (GTS-2)
Consist of 40" 90 KM Upstream Eastern Gas Gathering System
Contractor – Shell (SPDC)
* Slugcatcher area / Receiver Downstream
Contractor – Aker Kvaerner (AKZ- Nigeria Ltd.)
* Gas Transmission Pipeline (GTS-5)
Consist of 24" 59 KM Amenam / Kpono Gas Line Bonny
Export Receiver
Contractor – Total / Elf Petroleum Nigeria Ltd.
Job Description:
* Assigned as 3rd Party Project Interface Engineer for all GTS Pipeline.
* Coordinates with the gas supplier construction manager in all technical matters during construction, commissioning and RFSU & shut down activities.
* Develop an overview of long-term project activities and identify potential synergies and conflicts for consideration in execution plans.
* Provide technical support for review of contractor design, proposals and method statements from third party gas supplier on behalf of the project engineering group, ensuring that work on the facilities complies with the shell Design Engineering Practice (DEP's) and NLNG project procedures at all times.
* Promote the effective application of internal and third party HSE by contribution to optimising methods and minimising "unknowns".
* Identify Risks (threats and opportunities) through workshops, Management sessions, information gathering or any other effective means.
* Responsible for establishing and maintaining working relationship with the project managers of the third party gas suppliers to train 4&5. (SPDC,NAOC,TOTAL)
* Ensure effective stakeholder involvement in all relevant aspects of project design and development in order to ensure cooperation and successful start-up of the facilities.
* Organize (and chair if required ) the NLNG-PTG group weekly interface meeting with all parties work involvement in the plant area and with in NLNG property areas – TSKJ,SPDC,TOTAL,NAOC,MOBIL.
* Direct field engineering supervision to all GTS activity.
* Provide detailed engineering input during all design phases, including interpretation and challenge of standards.
* Ensure the technical and interface issues are identified early and pro-actively addressed by the project execution groups and external parties involved.
* Involved FEED designed study for the TOTAL O.U.R Project.
* Performed site survey, and attend projects interface meetings.
* With basic knowledge of codes & standards (ASME,ANSI,ASTM,API's etc)
* Ensuring, in liaise with the Piping Department head, the integration of "feed back" and "lessons learned" on the Project (including site "feed back") in the department knowledge management base.
* Able to work with people at all levels within the organization a multi- disciplined environment/cultural environment.
NOV 02 – MAY 03 NIGERIAN LIQUEFIED NATURAL GAS, (NLNG) NIGERIA
PIPING / PIPELINE ENGINEER (CONSTRUCTION)

Projects:
* Gas Transmission Pipeline (GTS-3)
Consist of 32" X 258 KM & Crossover / Slugcatcher
Onshore /Offshore Gas Gathering System (OGGS) to RPA
Contractor – Shell (SPDC)
* Gas Transmission Pipeline (GTS-4)
Consist of 24"Loop line 50 Km Upstream and Pig Launcher Receiver.
* Feed to 36" 81 Km NODE to Bonny River Receiving Facilities
Contractor – Nigerian Agip Oil Company (NAOC- ENI)
* NLNG EXPANSION PROJECT – TRAIN 3
Water Cooled type
EPC - TSKJ
Contractor–TSKJ–JV(Technip/Snamprogetti/KBR/Japan gas corp.)
Job Description:
* Responsible for ensuring all mechanical & piping installation are in compliance with specifications & all documentation is completed. Inspecting shop fabricated & field erected piping and ensuring that main contractor has effective quality control systems.
* Familiar with the design and specification of scrapper trap launcher/receivers, intelligent /pigs, scrapper passage indicators and mainline valves.
* Participate in pipeline projects audits / reviews, Hazops, Hazard and QRAs during concept development, conceptual and detailed design basis. Implement recommendations of the Environmental Impact Assessments studies in the pipeline designs and specifications.
* Implement recommendations of the Environmental Impact Assessments studies, in the pipeline designs and specifications.
* Conduct field verification to determine the preliminary routing of the pipeline and be able to recommend the most economical route.
* Maintaining business and technical controls, and cost challenges to ensure that the project objectives are met.
* Ensuring that NLNG management and JV partners are kept appraised and have a clear picture of the business performance in this area by issuing timely, accurate and concise project progress reports.
* Supervising the execution of the EPC contracts from detail design through to commissioning, drawing on the appropriate technical & commercial expertise and other specialist support as and when required, from within and outside NLNG. This to ensure that the pipeline systems are designed and installed to meet statutory and Company requirements.
* Identifying areas of concern or threats to the project schedules/delivery and recommend appropriate pro-active remedial actions to minimise the impacts.
* Planning, co-ordinating and participating in safety, quality and technical reviews to assure overall pipeline integrity and safe operations, in line with the project quality plan.
* Co-ordinating and ensuring that the appropriate resources are available for the commissioning, start-up and seamless hand over of the pipeline systems to the Asset Team.
* Producing the close-out reports immediately upon completion of the projects, highlighting areas for lateral learning and suggested areas of interest for the post implementation reviews.
* Monitor equipment foundations & verify survey results/equipment installation, setting, cold & hot alignment, clearances, correct support configuration, internal installation, packing, trays, final closure, trim out & insulation to ensure installation is in compliance with the project specs.
* Verify contractor is following method of statement / ensure piping connections to equipment nozzles are stress free.
* Witness flange bolt – ups, including verification of flange face condition & gaskets
* Inspect equipment after completion to ensure all components are per the drawing & report deficiencies on the pre-hydro punch list.
* Witness pressure test including verification of temperature, pressure & calibration of test instrumentation, safety devices & verify leaks tightness.

AUG 98 - NOV 02 TECHNIP/SNAMPROGETTI/KBR/JGC- TSKJ (JV) NIGERIA
PIPING ENGINEER / TESTING ENGINEER

Projects:
* LNG EXPANSION PROJECT – TRAIN 1 & 2, 3 – BONNY ISLAND
Water Cooled type
* 12" & 18" 8KM GRP WATER FEED LINES SUPPLY TO TRAIN 1-2-3 & RESIDENTIAL AREA.
* 40"- 3 KM GRVE CWS-CWR AND 4 KM AOC/COCLINES.
EPC - TSKJ
* Contractor – TSKJ – JV (Technip / Snamprogetti / KBR / Japan gas corp.)
Job Description:
* In –charge for utility and installation of underground piping, such as GRP-GRVE CWS/CWR, AOC, COC, Demin Water, FW, HTF Lines.
* Conduct equipment installation inspection per the ITP's.
* Issued field decision to rectify design error: punching, monitoring testing and documentation based on existing International Piping International Codes and Standards (ASME/ANSI B31.1, 31.3, 31.4, 31.8, 16.5 & 16.34).
* With knowledge of material selection, corrosion control, GRE, non-metallic piping specification, full appreciation of international codes / piping classes for piping, valves.
* Coordination with the Client/Vendor for the smooth execution of construction activities and conducts safety, operability and maintain ability audits.
* Ensure any area – controlled inspection & test equipment is calibrated before the execution of testing.
* Preparation development of hydro test procedures: assist personnel in the preparation of hydro test diagrams / test packages during execution of test.
* Inspect equipment after completion to ensure all components are per the drawing & report deficiencies on the Pre-hydro Punchlist.
* Monitor heat tracing installation in coordination with the E&I inspector.
* Monitor insulation installation including correct type & application.
* Supervise walk down and punch of all systems.
* Witness pressure test including verification of temperature, pressure & calibration of test instrumentation, safety devices & verify leaks and tightness.
* Ensure all welds are reported, NDE is cleared in news before authorizing pressure test packages for test.
* Clear Hydro test packages for test including pre-hydro walk down.
* Conduct reinstatement walk down & log outstanding items on the punch list.
* In-charge all system turnover to commissioning group.
* Attend daily construction meeting direct to Construction Manager Office.

APRIL 97-NOV 97 MITSUBISHI KAKOKI KAISHA LTD. (MKK) INDONESIA
PIPING ENGINEER

Projects:
* NOF MAS CHEMICAL INDUSTRIES, DI PEROXIDE – INDUSTRIAL CITY, JAKARTA
EPC – MITSUBISHI (MKK) LTD.
Contractor – MKK

Job Description:
* Provide detailed engineering input during all design phases, including interpretation and challenge of standards.
* Actively communicate with other disciplines to optimise areas of interface, during the design development, review and check processes.
* Ensure design packages meet the relevant safety, environmental and ergonomic standards.
* Responsible for Piping Project schedule and planning relating to fabrication and erection, preparation of Inspection Test Plan (ITP's) and Test packages & documentation's.
* To develop a system for an effective implementation of Piping Quality Construction Installation all piping works project material specifications and standards,
* Modification of Piping Drawings, issued field decision to rectify design error of material modification during Final Punch Out of the Piping System prior to testing and commissioning.
* Provide engineering support to the construction / commissioning phases as necessary.

APRIL96-APRIL97 MITSUBISHI KAKOKI KAISHA LTD. (MKK) INDONESIA
PIPING ENGINEER

Projects:
* CARBON BLACK EXPANSION PROJECT – CELIGON / MERAK
EPC - MITSUBISHI (MKK) LTD.
Contractor – MKK
Job Description:
* Execution Engineer In-Charge for Refinery Shutdown works of piping fabrication, erection, modification, tie-in works, hot tapping, punching, testing, and commissioning.
* Developed quantity estimates and material take-off (MTO).
* Field jobs inspection.Clients/Vendors/Subcontractors coordination, preparation planning and scheduling and manpower reports.
* Attend daily construction meeting direct to the Head of the project.

FEB 94 - FEB 96 BECTHEL/TECPNIP/CCIC/PRITCHARD – (JV) ABU DHABI,UAE
PIPING ENGINEER

Project:
* ONSHORE GAS DEVELOPMENT PROJECT (OGD-545) - HABSHAN
(Sulfur Recovery Plants = 3 Trains)
EPC – BECTHEL / TECHNIP
Contractor – CCIC
Job Description:
* New Plant Piping Erection In-Charge for Utility and Installation of all piping work raging ½" to Large bore.
* Issue field decisions to rectify constructions conflict field suiting design error or material modification, and responsible for the final punch-out of the piping system prior to testing and pre-commissioning.

MAY 93 - FEB 94 CCIC/ CHIYODA/MITSUBISHI – (JV) ABU DHABI,UAE
PIPING ENGINEER

Project:
* DAS ISLAND 3RD LNG PROJECT – ADGAS - UAE
EPC – CHIYODA / MITSUBISHI
Contractor – CCIC
Job Description:
* Coordinates with client Senior Piping Engineer during construction activities.
* Cross check isometrics and PEFS:
* Responsible for the fabrication and installation of plant refinery piping..
* Coordinate with project consultants for final inspection.
* Inspect equipment after completion to ensure all components are per the drawing & report deficiencies on the Pre-hydro Punch list.

SEPT 92 - MAY 93 CONSOLIDATED CONTRACTOR CO. SAUDI ARABIA,KSA
PIPING ENGINEER

Project: 1
* PETROKEMYA OLEFINS – JUBAIL, SAUDI ARABIA
EPC – MESAR / MITSUI - JAPAN
Contractor – CCIC

Project: 2
* IBN ZAHR MTBE II – JUBAIL, SAUDI ARABIA
EPC – SNAMPROGETTI / ITALY
Contractor – CCIC
Job Description:
* Responsible for fabrication and installation/erection of all piping work ranging from ½" – 100" Dia inch, on a reactor lines.
* In–charge for utility and installation of underground piping, such as COC, AOC, HTF, FW lines.
* Supervise flange bolt – ups, including verification of flange face axial alignment & type of gaskets.
* Conduct reinstatement walk down & log outstanding items on the punch list.

APR 91 - AUG 92 MANNESMANN ARABIA LTD. SAUDI ARABIA,KSA
MECHANICAL ENGINEER

Project:
ARAMCO PUMP STATION EAST – WEST PIPELINE STATION 1~4.
EPC – MANNESMANN / GERMANY
Contractor – MABSA

Job Description:
* Involved in design engineering services works preparation of piping lay-out / drawing for all piping system, Pipe support for pump station # 1 ~ 4 and design modification.
* Execution In-Charge for Refinery Shutdown works of piping fabrication, erection, modification, tie-in works, punching, testing, and commissioning.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 301 to 350 of 2819)Go to Search Parameters...
Brief Description
Seeking to apply my skills as a Planning & Scheduling Manager; QA/QC manager; Document Control Manager; Assistant Project Manager; Superintendent; Consultant. Great organizational and computer skills. MS Office, Excel, Word, MS Project, P3, Project Manager, and more.
I would like to apply for a permanent job position in Construction Engineering and Project Management to solidify and enhance my qualifications. Roles could include Project Planning, Scheduling and Controls, Quality and Safety Controls.
Job Title : Software Enginer Education : Ordinary Degree in Bachelor of Science Previous Employer: Motorola Australia Software Centre
Successful profit-driven management professional qualified by 12 years of visible achievements in business management and sales development. Visionary leader and team player with stellar track record of superior performance communicator with excellent qualifications in :
Quantity Surveyor having more than 15 years experience
I am a Filipino Citizen currently working in an Airport Project in Doha, Qatar. My contract ends in May 2008 and I am looking for a job in the US.
Construction Management of Roadways, Bridges and Buildings. Roadway Design.
Expert Layout Designer of PCB, HMC and 3D Packages using VISULA Layout Edit, CADStar, OrCAD and AutoCAD. Experience in Production of PCB, HMC and 3D Packages.
I am working since 22 Years - 9 Years in Karachi - Pakistan and since last 12 Years I am working in Saudi Arabia as a Quanity Surveyor.
I am a Canadian citizen having 17 years solid building construction, Civil and structural design, quality Management, project management, construction Management. a dedicated team player/leader exhibiting a high level of energy and initiative under pressure.
with 8 years extensive experience in mechanical drafting using Solid Edge, Autodesk Inventor, Mechanical Desktop software.
Mx Raod/Highway Designer , AutoCAD profficiency, Topograhical Survey data processing using MX, AutoCAD, Survey Control Centre(Atlas Computers), Familarity with GIS & Remote Sensing, Enviornmental Impact Assesment
Control and Instrumentation Engineer
NDE Project Manager, III Ultrasonics ASNT/ACCP/EN473, Phased Array, TOFD, API 510 (lapsed), CWI (lapsed)
I am an architect and urban designer practicing in the Middle East for over thirteen years. I have held design and project management responsibilities at senior positions with international British consultants and Government organizations wherein I handled wide range of building types such as commer
Masters degree in Highway/Structural engineering, 14 years of professional experience - working in the department of roads, good skills in CAD application (eg. SAP2000) and other computer applications (eg. spreadsheets)
Electrical Design Engineer for 10 years experience in detailed knowledge of control system engineering in conceptual, FEED, detailed design, calculation, testing, installation commissioning and operating phases of project
Mechanical Stress Engineer
Complete knowledge of Mike 21
*Qualification : 1) Bachelor of science in civil Engineering ) Job responsibility :
Presently I am working in Saudi Arabia. I have nearly 17 years experience. From 1996 November I am using Microstation. I can work in Microstation & AutoCAD. I have experience in AutoCAD 2006 from my personal PC. Mainly I am working in architectural discipline. I can do structural & civil work also.
Mechanical Engineer having 14 years of experience in the field of construction in Refinery, Petrochemicals & Power plant mainly focussing on Piping, Reformers & Heaters. Has been worked with major international companies like TEchnip, Technip KTI etc.
Dear Hiring Manager
Over Seven years of experience in the construction industry serving in the areas of Highways Construction, Project Management, Telecommunications, and Field Engineering.
detailed deisgn of building services,project management and execution
Extensive experience in managing complex construction and service projects with the knowledge to balance the requirements for functionality, quality, timeliness, and safety.
Over 14 years working experience 3 years experience in design office and 11 years experience in the construction and supervision of major prestigious international projects .
An engineering position in the emphasis of tool design, opto-mechanics, manufacturing, liaison, stress analysis, aircraft interiors or structures.
13+ years geological/geotechnical/GIS international hands-on experience in the construction & energy industries. MSc/BSc/PgD in the geosciences. Excellent software skills. Contractual or permanent post sought. Available now.
17 years in the field of construction, Experience Architectural Works and Interior works in the construction of the following building such as: Five Star Hotel, Convention Center<Condominuim, High rise Offices, Commercial and residential ,Civil Defense Mass Rapid Transit and chemical Plant.
•Strong knowledge of engineering design principals and methods necessary to adequately dimension and detail complete design concepts. •A thorough knowledge of mechanical, pneumatic, hydraulic components and electrical systems. •Experience with Classification Society Rules and Regulations.
ENGINEERING MANAGER / CIVIL ENGINEER Specialized in Tunneling utilizing EPBMs and SEM / NATM. Holding a Masters Degree in Civil Engineering with 8 years experience in working overseas for leading Construction Contractors, 6 years in tunnelling.
Project Engineer To be a member of a company that designs and builds large offshore and multi-purpose projects. Interests: Hydraulic Structures and Pipelines – Project Execution and Construction Management.
Condition Monitoring Technician
Civil Engineer/Construction Project and Site Engineer/Construction Project Manager/Property Manager
Educational Qualification : Degree in Civil Engineering.
CIVIL/STRUCTURAL ENGINEER W/ 10 YRS EXP
Responsible of all surveying works such as layout, setting out of points, vertical and horizontal grade lines measurement, establishment of vertical and horizontal survey control points, computation of coordinates and elevations, preparations of as- built drawings and any other scope related to surv
Experience in multistoreyed buildings
Job potation in Kazakhstan or Russia
A certified Engineer-in-Training. Possess a Master of Engineering Degree in Civil Engineering from the University of British Columbia, Canada. Worked as an Assistant Project Manager with the California Department of Transportation.
Product Support for Hydraulic Drilling Rigs and Screw Compressors
Bachelor of Architectural Engineering 2001 - Ain Shams University, Cairo, Egypt•Internal auditor course on quality systems according to ISO 9001-2000-•Internal auditor course on Occupational Health & Safety Assessment Seriesaccording to ISO 18001-1999 from QUENSH systems co.•Autocad 2007
Mechanical/Piping Engr., Design of Process Plant Layout and Piping, Installation Engr. (Offshore), Pipeline Engr. ( Onshore ), Sofwareused: Autocad, PDMS, PDS, Autoplant, Caesar II for stress analysis.
„X Diversified and proven experience in program management & development of infrastructure projects, including highways, rural roads, jeepable tracks, water supply, sanitation and irrigation schemes with regards to social mobilization, planning, implementation, contract administration
NUCLEAR SAFETY ENGINEER / NEBOSH INTERNATIONAL
12 years work experianc in plumbing supervisor/engineer
Water Resources Hydrologist and Civil Construction speacialist
I am a 41 year old Civil Engineer with over 20 years of "hands on" construction experience. However, I have only had a Civil Engineering degree for 2 years.
MECHANICAL ENGINEER WITH A VAST EXPERIENCES IN REPAIR AND MAINTENENCES OF ALL CONSTRUCTION MACHINES AND PLANTS FOR ROAD MAKING INDUSTRIES.
First   1   2   3   4   5   6   [ 7 ]   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com