I would like to introduce myself as Mr. Appu Chandran, presently working in FAFCO as Electrical Superintendent in various ARAMCO projects. I would like to pursue my further career in your organization, as an Electrical Superintendent or in an equivalent job description.
Speaking of my job exposure, I have served FAFCO for more than 33 years as an electrical superintendent with experience in the field of engineering, inspection, construction, design, project estimating and so on. The application areas include construction of overhead power lines, Substation, Control Room, installation of cable trays, transformer, Motor Control Center (MCC), individual feeders, switch rack, motor control stations, platform task lighting, security lighting system, area lighting system and other instrumentation works particularly in Saudi Arabian Oil Company (ARAMCO) projects in the Middle East.
------------
OBJECTIVE:
------------
To work in a Position where extensive experience will add value to operations and help in developing the company further.
------------
WORK EXPERIENCE:
------------
Having 33 years in electrical Construction and sound knowledge for doing construction works as per Saudi Aramco Standards.
ELECTRICAL CO ORDINATOR: FAFCO LTD, KSA(SEP 2007 – DEC 2007)
SITE: Petro Rabigh Under Sumitomo Chemical Engineering Company, Rabigh, KSA.
Installation of Polymer plant. Co ordinating Electrical job with the site electrical superintends and with Sumitomo Chemical Engineering Company.
Incharge of carrying out the work of site instructions and handling / preparing site queries. Giving technical advices to the site electrical superintends.
ELECTRICAL / INSTRUMENTATION ENGINEER: FAFCO LTD, KSA (Sep 2005-Oct 2006)
- Oct 2006 – Aug 2007, KJO, Al-Khafji, ksa
Installation of electrical equipments, Instrumentation, PABX System, Fire Alarm System and CCTV Systems with Related wiring for loading facilities of Diesel and Utilities.
- Sep 2005 – Sep 2006, ABQAIQ GAS PLANT, KSA
Demolition of existing Power plant. Installation of shipper pumps and booster pumps. Installation of 13.8 KV Substation and powering. Laying of 69 KV cables to the transformer yard and powering.
ELECTRICAL ENGINEER: FAFCO LTD, KSA, (June 2005 – Sep 2005)
SITE: ISO Pentane Recovery, Project BI – 3186(Under AL-SHUWAYER Company), Yanbu, KSA
Organizing Electrical and Instrumentation work and clearing of punch list items and reporting the progress of work periodically.
ELECTRICAL SUPERVISOR: FAFCO LTD, KSA, (May1997 – May2005)
- Nov 2004 – May 2005, SAUDI ARAMCO Cont # 6600007844 SGP & UGP Sulphur Plants Upgrade, UTHMANIYAH, KSA
Installation of Electrical devices and equipment, conduit work and wiring of electrical equipment.
- Sep 2004 – Oct 2004, Qatif Facilities at BERRI GAS PLANT, Jubail ( Under the Sub – Contract of TECHNIP, Italy), KSA.
Cabling for the electrical equipments and instruments. Termination of JBS instrument and electrical equipments. Clearing of punch list items.
- July 2003 – July 2004, SAUDI ARAMCO Cont# 6600006663, RASTANURA REFINERY Waste Water Treatment Plant Expansion, KSA
Marking and excavation of cable and conduit trenches. Installation of area lighting & task lighting. Installation of conduits and wiring of new equipments. Cathodic protection work of fire water system.
- May 2002- May 2003, SAUDI ARAMCO Cont#6400074052/00, Safety System replacement at RABIGH REFINERY, Rabigh, KSA.
Installation of DCS & ESD cabinets in control room. Installation of cable trays and conduits and supports. Cabling and wiring for the new equipment inside control room and wiring.
- July 2001- April 2002, SAUDI ARAMCO Cont#44591/00,Install DCS and Turbine control system, UTHMANIYAH AND SHEDGUM
Demolition of existing conduit and wiring. Installation of new DCS and turbine control system and wiring. Support and conduit works.
- April 2000-May 2001, BI – 3764/J. O – 3764385 Fire & Gas Detection and alarm system and boiler management and fire heaters ESD system projects at RABIGH REFINERY, KSA.
Installation of PLC & ESD cabinets and wiring. Install conduits, cable trays, panels, equipments and instruments. Wiring of field and control room devices. Fire alarm system and gas detection system work.
- Nov 1998-April 1999, JEDDAH REFINERY, Tanking and monitoring system
Installation of UPS equipments and wiring. Installation of instruments and equipments for tankaging and monitoring system and wiring.
- Aug 1998 – Oct 1998, Jubail, Installation of Sub station(Under ABB), KSA
Marking and installation of cable tracks under the sub station.
- Mar 1998 – July 1998, Dhahran to Riyadh pipeline for petroleum products(under SAIPEM), KSA
Installation of Solar stations. Installation of Cathodic protection panels, workstations and wiring.
- May1997-Feb1998, ABQAIQ GAS PLANT, Natural Gas liquids facilities Glycol dehydration for Abqaiq Plant Project, KSA.
Installation of supports for conduits and airlines. Installation of conduits for instruments and electrical equipments. Cabling for electrical instruments and wiring work.
SITE SUPERINTENDENT: FAFCO LTD, KSA, (Feb 1996 – March 1997)
SITE: ABQAIQ GAS PLANT, BI- 3120-JO-31200, Khuff Condensate Abqaiq Plant, KSA
Installation of Electrical Equipments and wiring. Installation of conduits and cabling. Installation of instruments and wiring.
ELECTRICAL SUPERVISOR: FAFCO LTD, KSA, (June 1995 – Jan 1996)
- June 1995 – Jan 1996, UTHMANIYAH GAS PLANT, S. A. Control System Replacement project, KSA
Replacement of existing pneumatic / electronic process control system by a " state of the art" DCS/PLC(TMR) system for 4 each sulphur recovery unit. Installation of ESD/TMR and DCS cabinets and wiring. Installation of UPS units. Cable tray and conduit work. Electrical and instrument cabling.
- Nov 1994- May 1995, SHEDGUM GAS PLANT, S. A. Control System Replacement project, KSA
Replacement of existing pneumatic / electronic process control system by a " state of the art" DCS/PLC(TMR) system for 4 each sulphur recovery unit. Installation of ESD/TMR and DCS cabinets and wiring. Installation of UPS units. Cable tray and conduit work. Electrical and instrument cabling.
- 1993 – 1994, Safaniya GOSP – 4 Offshore Project under BELLELI HEAVY INDUSTRIES LTD.(ARAMCO PROJECT).
Installation of conduits, electrical equipments, instruments, cabling, termination & control wiring.
- 1992 – 1993, JUAYMAH GAS PLANT, Juaymah, KSA
Installation of conduits, electrical equipments, instruments, cabling, termination & control wiring.
- 1984 – 1992, VIKING ELECTRICALS, CHENNAI, INDIA.
Erection and repair of Electrical Motors & Generators. Industrial Wiring etc.
ELECTICAL FORMAN: PETCON Italian Co, KSA, (1983 – 1980)
- 1983-1984, RATANURA REFINERY, KSA
Installation of Control & Marshaling Panels. Laying and Termination of Control cables.
- 1982-1983, SAFANIYA GAS PLANT, Safaniya, KSA
Installation of instruments and lighting. Cable & Termination.
- 1981-1982, SAUDI PETROCHEMICALS, Jubail, KSA
Installation and assembly of Substation Panels. Cabling of power and control cables & Termination.
- 1980-1981, SALINE WATER CONVERSION COMPANY(S.W.C.C), Aziziya, KSA
Installation of Electrical equipments. Cabling of power, lighting and instruments & termination.
ELECTRICAL FORMAN: PIICO, KSA(1978-1980)
SITE: University of Riyadh & Utility Complex, Riyadh, KSA.
Installation of 15KV Switchgear Panels and laying of 15 KVA Cables. Cabling through conduits for long distance and termination. Installation of panels for Utility Compressors and Boilers & Termination. Operation of Control Panels.
ELECTRICAL FOREMAN: Modern Indl. Fabricators, INDIA(1974-1978)
SITE: Mettur Dam, Salem, India.
Maintenance of Generators, Welding Transformers and Industrial equipments.
FOREMAN: STAR ELECTRICALS, INDIA(1972-1974)
SITE: Coimbatore, India.
Installation of Industrial Transformer and generators. Industrial wiring etc.
------------
EDUCATION & CERTIFICATION:
------------
NCTVT course Electrical Engineering (1969-1972) 3 years - Mettur Dam, Tamilnadu,India.