* B.Sc: Bachelor's degree in CIVIL Engineering
* Ain Shames University, Cairo, Egypt
* Date of graduation: 1995
* Degree of graduation: good
* Degree of project: Excellent

Special Courses/Seminars/Training/Workshops Etc.:
*
* Microsoft Office Programs: - Good command of using Excel, Win-word and power-point programs
* Drawing Programs: - Autocad 2000 up to 2007 with high skill ability
*
* Water & Sewer network - KY pipe-2 Version 6 -2000
* Programs - Water cad Version 6.5 -2004
- Surge water hummer analysis
- Storm water cad Version 5 -1999
- Sewer cad Version 5 -1999

WORK HISTORY
December 2002 - present
SAUDCONSULT EL-KHOBAR – SC SAUDI ARABIA
SENIOR DESIGN ENGINEER

The work in this period included the design and technical support of several strategic projects like:

* Water, Sewer, Irrigation and Fire network of the KING ABDULLAH University Science and technology in UANBUA.

* Prepare the tender documents of the water, sewer, irrigation and fire water network system of KING ABDULLAH university of science and technology.

* Water, Sewer, Irrigation and Fire network of the kHAFJI project located in East region of Saudi Arabia (600,000,000 SR).

* Pump station mechanical work for sweet, raw, irrigation and fire water system for the Khafji project.

* Mechanical work for the elevated water tank capacity 1000 M3 for the Khafji project.

* Prepare the tender documents of the water, sewer, irrigation and fire water network system of the Khafji project.

* Water, Sewer, Storm water and Fire network of the KING FAISAL university site development infrastructure – Dammam (second phase).

* Pump station mechanical work for sweet, raw, and fire water system for the KING FAISAL university site development infrastructure – Dammam (second phase).

* Grading work for the KING FAISAL university site development infrastructure – Dammam (second phase).

* Design of the sanitary sewer pump station and storm pump station of the KING FAISAL university site development infrastructure – Dammam (second phase).

* Prepare the tender documents for the water, sewage, storm water and fire water network system of the KING FAISAL university site development infrastructure – Dammam (second phase).

* Design of the storm water and lowering ground water for some areas in (Dammam, Khobar, Qatif and Syhat) first stage area about 40 KM2 including network, catch basin, pump station,……Ect.

* Design of the storm water and lowering ground water for some areas in (Dammam, Khobar, Qatif and Syhat) second stage area about 60 KM2 including network, catch basin, pump station,…..Ect.

* Design of storm water and lowering ground water for Ras Tanoura including network, catch basin, pump station,……Ect.

* Design the plumbing work for some buildings including (water, sewer& fire fighting) in the KING FAISAL university site development infrastructure – Dammam (first and second phase).

* Design the plumbing work for the compound villages Adel El-Duble including (water, sewer and fire fighting).

* Design the plumbing work for the compound villages Adel El-Duble including (wter, sewer and fire fighting)

* Design the plumbing work for the new location of the El-mowasa hospital the work was including the (water and sewer network).

3 February 2001- December 2002
SAUDCONSULT MISR –SCM EGYPT:
SENIOR DESIGN ENGINEER

The work in this period included the design and technical support of several strategic projects like:

* Water Sewage network of the new Campus of the American university in new Cairo city (1,700,000,000 L.E).

* Water and Sewage network of the IBB University in YEMEN.

* Mechanical works of gold factory in Saudi Arabia which contain the following system: potable water, distilled water, treated water, gypsum water, nitrogen and compressed air systems (1,200,000,000 SR)

* Mechanical and site work of the Ministry of interior regional headquarters, Jeddah- special security forces (17 buildings – 25,000 sq.m., site 130,000 sq.m.).

* Schematic design for waste water treatment plant (compact unit) for new site of American University in New Cairo 1500M3/ day.

* Mechanical and site work of the Ministry of interior Rymaya sites (Highways-Facilities-Emergency-Jails-Drugs) security forces (5buildings 3,500 sq.m. site 16,400 sq.m.).

October 1999- January 2001
ENGINEERING CONSULTANTS GROUP (ECG):
SENIOR DESIGN ENGINEER

The work in this period included the design and technical support of several strategic projects like:

* Water Sewage network of the Dreamland project of a total area 2000 fed. 6 of October city (2,500,000,000 L.E.).

* Design of the plumbing work for villas including (water, sewer& fire fighting).

* Water and Sewage network of the Holiday med. Project of total area 1800 fed. Sidi Abdel Rahman Southern coast (1,300,000,000 L.E.).

November 1995- September 1999
CIVIL ENGINEERING CONSULTING CENTER (CIVEC):
DESIGN ENGINEER

During this period was responsible for the following:

Design of water pipe networks for the following projects:

* Pipe network for the new Cairo city at the east of the circular road – area of 66,000 fed.

* Pipe network of El Abour city – area of 16,000 fed.

* Pipe network of El Shrouk city – area of 8,300 fed.

* Design and replacement of pipe network of the eastern Shoubra El Khima – area of 4,200 fed.

* Design and replacement of pipe network of El Haram zone – area of 3,400 fed.

* Design pipe network of Nasser Center – Bani Sweife City area of 480 fed.

* Design pipe network of golf Course of El-Obour City – area of 500 fed.

* Review and redesign for pipe network of El-Rehab City – area of 1,400 fed.

* Design pipe network of Samma El-Areesh villages.

* Design pipe network of Style village at Hurgadah.

* Design pipe network of Tibba village – located in new Cairo City

* Design the main pipeline of El-Shourk El-Ahsher of Ramadan cities from the water plant of El-Asher of Ramadan untilled El-Shourk city total length 24 KM and studing of the water hammer case as well as its protection system.

* Study of main pipeline of El-Zafrana- El ain El-Sokhna total length 67 KM and diameter 900mm, also study the temporary feeding to west south area of Sueze Bay.

* Design pipe network of Lotus village- 6 October city.

* Design the pump station of El-Obour waste water treatment plant (666,000M3/day) from El-Obour to New Cairo.

Design of Sewage pipe networks for the following projects:

* Design and planning the main sewage pipe network and its pump stations for the first, second and fifth zones – east of circular road.

* Design and planning the sewage pipe network og fifth collector Urban.

* Design and planning the sewage pipe network of El-Yassmin zone – New Cairo City

* Design and planning the sewage pipe network of El-Banafseg zone -New Cairo City

* Design and planning the sewage pipe network of El-Narges zone – New Cairo City

* Design and planning the sewage pipe network of El-Investors zone– New Cairo City

* Design and planning the sewage pipe network of the industrial area– El-Obour City

* Design and planning the sewage pipe network of El-Shrouk City

* Design and planning the sewage pipe network of El-Sama El-Areech village.

* Design and planning the sewage pipe network of Style village – Hurgadah City

* Design and planning the sewage pipe network of El-Tibba village – New Cairo City.

* Design and planning the sewage pipe network of Lotus village – 6 October City.

* Design and planning the sewage pipe network of Lotus village – 6 October City.

Plumbing work design

* Design the plumbing work for the Tibba village the work was including (water, sewer and fire fighting).

* Design the plumbing work for the Lotus vilaage the work was including (water, sewer and fire fighting).

* Design the plumbing work for the Samma El Areesh village the work was including (water, sewer and fire fighting).

Supervision of execution for the following projects:

* Main pipeline of El- asher – El-Shrouk diameter 1200mm.

* Water pipe network of the first and second zones of the fifth Collection Urban – New Cairo City.

* Main pipeline from the pump station (1) to pump station (5) diameter 1200mm – New Cairo City.

* Replacement and renew the water pipe network of the eastern zone of Shoubra El-Khima.

* Sewage pipe network of the first, second and fifth zones – New Cairo city.

* Sewage pipe network of the industrial area of El-Obour City.

Surveying works of the following projects:

* Ras Kareb City area 10,000 fed.

* Industrial area of El-Obour City area 450 fed.

* East zone of Shobra El-Khima area 3,400 fed.

* Nasser Ceter Bani Sweif area 460 fed.

* El Kossir City area 3,000 fed.

* Main pipeline of El-Asher – El-Skrouk length 24 KM.

* Main pipeline of the middle of Sina length 360 KM.

* Main pipeline of Zafrana El-Ain El-Sokhna length 67KM.

July 1994 – October 1995
CIVIL ENGINEERING CONSULTING CENTER (CIVEC):
ASSITANT ENGINEER

During this period I have participated in the following:

* Pipe network of El-Obour City area 8,000 fed.
* Pipe network of El-Shrouk City area 3,600 fed.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 101 to 150 of 2813)Go to Search Parameters...
Brief Description
Mechanical building services design engineer. Experience in design HVAC, Plumbing & Fire Fighting along with site supervision and project management activities.
Project managemet, construction management
Professionally qualified and highly experienced Electromechanical Design/Senior Project Engineer offering over 26 years experience in the design, project management, installation, commissioning and maintenance of HVAC systems and associated electrical and control equipments.
Broadcast Engineer
Electrical Engineering. Hardware Design. Hardware/Software Testing. Hardware/Software Troubleshooting.
Skills: Computer Literate ( Microsoft Windows: Words, Excel, Project ), Primavera- Working Knowledge
Thermal Power Plant Operation & Maintenance. 17 years experience in Project Management & Execution which involves Engineering, Procurement, Construction, Commissioning, Operation & Maintenance of Thermal Power Plants up to 100 MW capacities.Project Engineering, Project Management & Execution of Coge
I have experience in procurement of contractors and consultants, contract administration using FIDIC conditions of contracts and highway designs. I have more than 15 years total experience in above fields.I can therefore engage as a project manager of a road and bridge project.
Detailed Structural designs of Civil Structures(RCC structure i,e, Buildings(Multi-storied office and residential), Roads, Bridges, Culverts, earth retaining structures(Retaining wall), Dams, rig & machinery foundations for Gas exploration
Civil Engineer, Site/Construction Manager
Presently working as Site Supt. Civil here in the construction of Khursaniyah Gas Plant (KGP) at NGL Trains 1 & 2, Saudi Arabia with Saudi ARAMCO. Representing the client in all civil works aspect of the work, I supervise two (2) major contractors-Bechtel/Technip Joint Venture.
Iam an Indian working in Malaysia for the past twelve years,I have a vast experience of 19 years in civil construction field.Idon't hold arelavant visa to enter Australia.Is it possible for an employer to sponsor me a visa?.
Thermal generating plant facility engineering experience
MEP Professional Engineer with advanced Management Knowledge For High Rise Building
I have 20 years of experienced in the field of Quality Control, Material Engineering and Construction Supervision in Heavy Construction such as: PetroChemical industries, Pipelines, Infrastructure, Highrise Building, Commercial Mall, Sewage Treatment Plant, Pumping Station, Milk Processing Plant etc
Extensive experience in project mgmt, tool,fixture, & machine design
I am having vast experience (22 Years) in Maintenance & Projects and in diverse fields. I am suitably qualified (BE, ME, PGDM, PGDIT) to take up any challenging assignments across the globe.
Civil Engineer. Management in RCM Reliability centred Maintenance.
Electrical engineer - building electrical design and rapid transit systems; proposals and specifications; CAD.
Engineering Geologist having 12yrs of exp. in Planning & Execution for Geotech Investigations for Hydropower Projects, Collection of Geotechnical field data & their analysis for Civil Design, Slope Stabilization, Tunneling & blasting, Rock & Soil Stabilization & Support Analysis, Foundation studies
Electrical Engineer ,exp 16 years in Maintenance & MEP Project Building Services /Hospital Facilities
I have intensive experience in project estimate, project supervision and management.
To secure a position in a company where career advancement is achieve thru efficient performance and hard work. I am working in Luanda, Angola as a Maintenance Engineer in a prestigious Hospital in this country. Under Sigma Group Co., we involves in a Consultancy, Designing and Management.
7 Years of exposure to ABB/Honeywell DCS systems erection, testing and commissioning of Boilers, Turbines and Desalination Plant. 18 Years of Power and Desalination Plants Instrumentation experiencets.
A result oriented and self-motivated M.Tech Civil Engineering Professional with over 18 years of rich & qualitative experience in Project Management, Civil Engineering and Construction Management of infrastructure projects including Airport Terminals, Buildings Roads and Flyovers.
APPLIACATION FOR THE POST OF JUNIOR CIVIL ENGINEER.
I am a creative civil engineer and construction inspector, with diverse multi disciplinary experience in reinforced concrete, pre-stressed concrete, precast concrete, structural steel and timber construction. I am well versed with all aspects of project management from inception to completion.
Welding(certificates). Electrical, mechanical, hydraulic and pneumatic equipment, installation, (30MPa certificate). Workplace Safety & Health field (Certificates). Staff training and retraining. Drawing and reading blueprints and schematics. Robotics. Repair. Maintenance. Management. Sales.
A specialist in rock mechanics and engineering geology. 26 years tunnelling and mining experience. Expertise in stability analysis, support design and monitoring; blast design and optimisation; TBM and road header performance; risk analysis.
i have worked for construction of oil and gas ,refinery,petrochemical,fertilizer and powerplant construcion work i have responsible for fabrication,erection and mechanical completion work
To take up challenging responsibilities in relation to actual management and supervision in all various discipline related to my expertise as Site Superintendent .
Looking for a long term contract or permanent challenging position worldwide, utilizing broad - based experience in projects maintenance– Maintenance manager, Supervisor, Team leader – Air Traffic Control, Industrial projects, Telecommunications.
Senior Hydrogeologist
Senior Mechanical Engineer (M.Sc.) having experience as plant manager and project manager, specialist in mining, safety glass, manufacturing plant and brewery investments.
Mechanical engineer with design and project engineering experience. Proficient Designer with over 10,000 hours total CAD experience including Autocad 2002, and some Microstation. Extensive experience in mechanical systems design, product design, as-builts, and fieldwork.
CSI / Construction Document Technology
Looking for the opportuniy in switchgear industry
Throughout my Professional Career and experiences being a GC, one of my duties was Estimating, which I did learned and had to do from ground Up, on most of the Projects I did Participated in, from simple Electrical Ductworks up to Special Warehouses at Industrial Division.
I am an expert Civil Engineer with over 18 years of experience to offer. My most recent experience was Consultant Engineer in Kuwait. Furthermore, I work well with others, and I am experienced in project management. I've got the Master Degree in Construction Management.
I have been employed in the field of Power Engineering, Industrial Installations, Cement Industry and Sewage Treatment Plants at all stages, covering turnkey projects: erection, starting - up, commissioning, running and all kinds of maintenance.
Instrument supervisor
I am a 1995 Graduate I have been working in the field of utilities &civil engineering for almost 12 years.
Diploma in Mechanical Engg. Having 19/20 years of experience in FABRICATION AND PLANNING of structural steel, Pressure vessels, Boiler, as per ASME code and storage tanks etc. Last 15 years Iam working in Dubai in various organisation in verious responsible positions.
I have a diploma in Industrial Instrumentation and have recently completed a year in Process Operations with BCIT to gain certification as 4th Class Power Engineer and am looking forword to obtaining my 3rd Class.
I am seeking a position which Railway Signalling experience on design, systems interface, installation, test and commissioning and maintenance skills can be fully facilitated. Techniques on project and resources management can be utilized.
PCS Manager - Cost and Planner Engineer
Demonstrated ability and skills in the Project construction contract management
Project Management Lead Zinc Copper Nickel Gold Silver Base Metals
Project Manager, Automation & Controls, Instrumentation, IT Systems, PLC, SCADA,
Looking for an engineering position with the responsibility of structure research and analysis.
First   1   2   [ 3 ]   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com