Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #66585
next resume »»
CONTACT INFORMATION:
View contact information...
3.0 Date of Birth: 8th August 1959
4.0 Specialisation: Design and project engineering in the areas of Fuel oil handling, material handling, utilities systems and Balance of Plant., Project Development.
5.0 Academic Qualification
NAME OF EXAMINATION YEAR OF PASSING NAME OF INSTITUTION BOARD/
UNIVERSITY DIVISION, %
MARKS, RANK
Higher secondary 1975 Scottish Church Collegiate School West Bengal Board of Secondary Education First Div,71.7%
(secured National Scholarship)
Bachelor of Mechanical Engineering 1980 Jadavpur University, Calcutta Jadavpur University, Calcutta First Class with Honors,83% Rank-Fifth
ME in Project Engineering 1984 BITS in collaboration with DCPL, Calcutta Birla Institute of Technology and Science, Pilani,
India
Master of Business Administration (Marketing Management) 1998 Institute of Business Management Calcutta Jadavpur University, Calcutta 58%
6.0 Professional Experience: : Twenty seven(27) years. +
6.1 Joined DODSAL Engineering & Construction Pte Ltd. Dubai on July 2007 and continuing till date
6.2 Joined Development Consultant Pvt. Ltd. on December 2003 and left end June 2007.
6.3 Since October,1999 appointed by Schemex Corporation Calcutta, design and project engineering / management consultant to Mahindra AshTech Ltd for ash handling project design execution. continued till November 2003
6.4 Joined Birla Technical Services, 11,Dr U N Brahmachari Street, Calcutta 700 017 on 21st July, 1989 and left on 30th September,1999
6.5 Joined Development Consultant Limited, 24B Park Street, Calcutta 700016 on 17 Th July,1980 after graduation and worked there till 19 Th July, 1989
7.0 Nature of work a) Basic and Detail engineering (systems).
b) Preparation of equipment specification, equipment design.
c) Preparation of equipment and piping layout.
d) Securing approval on drawing etc from client/consultant.
e) Tender evaluation, negotiation, and recommendation for order placement.
f) Follow up and expediting supply in schedule time.
g) General inspection.
h) Constant coordination with site for erection of equipment and providing solution as applicable from design point of view.
i) Attending trouble sooting in system operation during commissioning and afterwards at site.
j) Preparation of quotation, prebid engineering, cost estimate against tender inquiry.
k) Preparation of Project Feasibility Report.
l) Project Development.
8.0 Detail of assignments undertaken
Present Assignments at DODSAL Engineering & Construction Pte Ltd. Dubai. (Engineering Manager )(since July, 2007)
a) Overview and management of engineering for material handling packages consisting Ship loader, Stacker Reclaimer, Belt conveyor systems along with other auxiliaries e.g. dust suppression, dust extraction for phase three expansion project of Sulphur handling plant at Takreer Ruwais sulphur terminal.
Assignments at Development Consultants Pvt.Ltd. (Engineering Manager )(since DEC 2003)
a) Project Management of Integrated steel plant at SOHAR Oman in DRI-Melt shop route for Advance Project Development, AlGhaith group, Abu Dhabi as Lead Mechanical engineer ( Since October 2004) ( Deputed to Abu Dhabi from end January 2005 to end April 2005)
b) Execution of WBPDCL Kolaghat Effluent Treatment Plant as Project Manager for contractor Andrew Yule( since December 2004)
c) Execution of total ash handling project and mill reject handling package for WBPDCL 1X 250 MW Sandaldih unit 5 ( since February 2004)
d) Execution of total ash handling project and Mill reject packages for WBPDCL 2X 300 MW Sagardighi Stage I ( since February 2004)
e) Execution of total ash handling project an Mill rejet Hndling package for DPL 1X 300 MW unit 7 ( since February 2004)
f) Execution of total ash handling project and Mill reject hansling package for Jindal 4X 250 MW Raigarh plant ( since July 2004)
g) Execution of Dry ash handling project for WBPDCL 1X 210 MW Bandelunit 5 ( complete Dec 2004)
h) Detail Project Report for DVC Bokaro 3X210MW TPS Dry Ash Handling.(completed Aug 2004)
i) Execution of total ash handling project for Jindal Steel & Power at Angul 4X 250 MW Captive Power Plant. ( since January 2006)
j) Execution of total ash handling project and Mill Reject Handling packages for HPGCL Yamunanagar 2X 300 MW on behalf of Reliance ( since February 2005)
k) Execution of total ash handling project and Mill Reject Handling packages for HPGCL Hisar 2X 600 MW on behalf of Reliance ( since February 2007)
l) Execution of combined slurry system DVC Bokaro 'A' & 'B' TPS ( since January 2007)
m) Execution of total ash handling project and Mill Reject Handling packages for Rosa 4X 300 MW on behalf of Reliance ( since Dec 2006)
Assignments at Schemex Corporation( Manager Engineering)
a) Complete project engineering for hydropnumatic ash handling system for NTPC Shimadri Thermal Power plant(2X500 MW)(since October 1999)
b) Design engineering of handling and bagging plant for Hindustan Lever Ltd,Haldia SSP Plant.
c) Development of Air Drier-proto type for rail locomotive.
d) Preparation of project reports, detail engineering of miscellaneous industrial systems.
Assignments in BTS ( designated as Asst. General Manager)
a) Development of Gouripore Power Project ( 1X 150 MW) WB (Since 1995)
Preparation of project feasibility report alongwith all front-end engineering for balance of plants, estimation, coordinating with Government bodies / Authorities for various clearances etc. Cash flow analysis, power tariff calculation.
b) Preparation of quotation against tender inquiry for a number of EPC jobs for IPPs (Since 1994), As Proposal Manager- prebid engineering, vendor development and selection, estimation, proposal engineering, coordination with client and joint venture partners.
1) Bakreswar Thermal Power Station ( 2 X 210 MW ),alongwith TPE, Russia
2) Indeck Bomlai ( 2 X 250 MW ) Thermal Power Station, alongwith PARSONS, USA
3) Usha Martin Industries Captive Thermal Power Plant ( 1 X 25 MW )
4) ISRO Second Rocket Launching Facility. Storage and distribution facility of liquid Fuels.
5) Other miscellaneous projects.
c) Modernisation of Durgapur Steel Plant, Sinter plant package, (1989-1993) as Project Manager
Complete Mechanical systems e.g. Fire Fighting, Belt Conveyor, Compressed Air, Water, Fuel Gas. Sampling Systems, Fire Alarm System Basic and detail Engineering, Preparation of specification, layout, Bid evaluation, Vendor Drawing review, general inspection, field engineering, commissioning, coordination with TPE, Russia.
d) Development of Sinter Plant for Iron and Steel Complex, Durgapur alongwith DPL. (1993-1994) and Davy Macky, As project engineer--Basic engineering, conceptual layout, estimation of project cost for material handling, utilities and offsite units for the sinter plant.
e) Synthetic aggregate preparation plant at Philippines ( Preparation of synthetic aggregate from garbage and clay by burning the mix in special kiln. (Since 1998). As project Manager preparation of project report including basic engineering, layout, plant specification, estimation.
Foreign assignment:
Having posted at Dubai, UAE presently I am deputed at project home office at Tampa, Florida USA since July 2007 to supervise and coordinate detail engineering along with engineering subcontractor Pegasus USA (formerly Mustang), Takreer (client) and Tebodin ( PMC).
I was deputed by Birla Technical Services to Sherwin Green, UK for absorbing technology in connection with preparation of basic engineering for a Synthetic Aggregate Project..
I was deputed by Development Consultant Pvt Ltd to UAE Abu Dhabi for four months ending April 2005.
Assignment at DCPL ( Designated as Project Engineer )
a) CESC Titagarh (4 X 60 MW) Thermal Power Station: (Part) hydropnumatic ash handling systems.(1980-81). Design engineering of LP Piping, valves and fittings, fly ash and bottom ash piping, equipment specification, bid evaluation, vendor drawing review.
b) RCF Thal 3 X 275 T/Hr Steam Generating Units: hydropnumatic ash handling systems, (1981-1983). Ash handling system design, Design engineering of LP Piping, compressed air system engineering, fly ash and bottom ash piping, equipment layout and specification preparation, bid evaluation, vendor drawing review, preparation of instruction manual.
c) HSEB Panipat Stage I ( 2 X 110 MW ):Thermal Power Plant: -hydropnumatic ash handling systems(1984-1986). As project engineer, Ash handling system design, Design engineering of LP Piping, compressed air system engineering, fly ash and bottom ash piping, equipment layout and specification preparation, bid evaluation, vendor drawing review, preparation of instruction manual.
d) MSEB Bhuswal Extension Thermal Power Station ( 1 X 110 MW ): Analysis of surge in ash disposal piping.(1985).
e) NTPC Farakka Super Thermal Power Station: (Part) hydrosluicing ash handling systems.(1985-86). Design engineering of LP Piping valves and fittings, fly ash and bottom ash piping, equipment specification, bid evaluation, vendor drawing review.
f) Hindustan Lever Limited Haldia DAP Offsite Project: product handling system involving belt conveyor, Hydrant type fire fighting system, Stress analysis of steam piping.(1985-87), Design engineering, equipment specification, bid evaluation, vendor drawing review.
g) TNEB Tuticorin Thermal Power Station: Attending trouble sooting of ash handling system operation at site and assessing remedies.(1987)
h) IOC Haldia water distribution system for refinery and township.: (1988) As project engineer responsible for mechanical facilities, selection of pump parameters, designing pump house arrangement, piping layout Design engineering of LP Piping valves and fittings, equipment specification, bid evaluation, vendor drawing review. Coordination with civil and electrical.
i) ACC Chaibasa Captive power plant: ash handling system(1988) As project engineer, Ash handling system design, equipment layout and specification preparation, j) As proposal engineer preparation of Tender and estimates for a no of Ash Handling Projects.
k) Modernisation of Rajabagan Dockyard: Installation of various offsite facilities e.g. Water, Air, Oxygen, Acetylene, distribution and cranes etc.(1989) As project engineer responsible for mechanical facilities, selection of pump parameters, piping layout Design engineering of LP Piping valves and fittings, equipment specification, Coordination with civil and electrical.
l) Away from Reactor Spent Fuel Storage Facility, Narora Atomic Power Plant: Analysis of liner plate for storage pool.(1987)
m) DMDE Equipment Testing Facility, Vizag: LP Piping,valves,Fire Fighting system (1988)
n) Renovation of Coal Handling System for CPP # 1 of Rourkella Steel Plant: (1989) Design engineering, equipment specification, bid evaluation, vendor drawing review.
o) Taloja Copper Project: Installation of Offsite facilities e.g. water, air, fuel gas, oxyacetylene distribution, material handling crane, weigh platform etc and installation of imported Continuous Casting cum Wire Drawing ( Southwire USA ) plant.(1988-1989) As project engineer responsible for mechanical facilities, Coordination with civil and electrical. Design engineering, equipment specification, bid evaluation, vendor drawing review
9.0 Professional Course: Attended Two days training program on Pneumatic conveying of Bulk solids organized by IIT Delhi by eminent persons like professor David Mill
10.0 Seminar, Presentation of paper: Presented paper and delivered lecture on one day workshop on Present day power plant practice ( with prime concentration on Ash Handling) organized by Kalyani Govt. Engineering College.WB.
11.0 Computer orientation: Fully Conversant with working In PC environment in DOS, Windows, MS-Office, AutoCAD, MS Projects etc.
12.0 Present annual emoluments: AED 3. 3 Lac annually plus one month paid leave, free transportation return fare for self and family to home town etc.
13.0 Salary expected: Negotiable
12.0 Passport No: F2424602 valid upto 31/05/2015
13,0 Referee
Will be provided
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 201 to 250 of 2856)
Go to Search Parameters...
Brief Description
I have more than 15 years experience in safety and environmental policy implementation for construction sites , drilling , workovers and explorations, refineries, pipelines, shipyard and offshore/onshore oilfields installations.I worked with clients Bechtel, Technip, Chiyoda, Brown and Root, Flour D
I'm a civil engineer andhad worked in different countries. I've been in this field for about 20 years.
Thorough knowledge of all aspects involving residential,commercial and Industrial HVAC and Electrical systems. Extensive sxperience working and leading project teams worldwide in challenging technical environments and different cultures. Understanding and ability to work with other disciplines.
13 years of Land Surveying with 9 years in a Party Chief Position and 8 years experience with GPS
heighted , office oriented, global person
I am a bachelor of engineering degree holder, with vast experience in oil and gas construction projects, i have experience in crane and equipment inspection, plant maintenance and supervision, quality control welding and fabrication and piping process. I am fluent in english .
10 years of total experience in engineering geology & rock engineering in site investigations, slope stability, foundations and risk assessment of structures of Civil Infrastructure projects like Tunnels, power station, underground Chambers, Dams, bridges, road cuttings.
Party chief, heavy construction
14 years experinced senior electrical estimator
NOC/ Installation/ O & M/ Technician/ Engineer
Senior mechanical engineer with experience in engineering for material handling, industrial installations and conveying machines in steel industry, mining, cement & chemicals. Start-up assistance for steel industry.
chartered civil engineer with 20+ years experience in project management and execution including oil/gas plants
Construction/Commissioning Instrumentation & Control Superintendent, or Project Management (PMC-role), or I & C Field Engineer/Supervisor, or I & C Maintenance Engineer
22+ years of professional knowledge and experience in QA/QC Engineering and Field Civil Construction on EDPC onshore oil/gas/petrochemical plants, defense, infrastructure projects in the Middle East, UAE, Iran and North Africa.
Engineering/Management professional offering expertise in domestic and international construction management and engineering support. Demonstrated proficiency in managing schedules, budgets and personnel for multiple projects with an emphasis on profitability in a variety of environments.
Licensed Civil Engineer with BS degree in Civil Engineering; over 20 years experience in Land Surveying and Civil Engineering in government projects (irrigation, dam, reservoir, roads), construction and surveying firms in the Philippines and abroad.
HNC Qualified Engineer with an extensive experience in a broad cross-section of engineering, predominantly structural/mechanical civil/building services, familiar with all aspects of project management. I.e. planning, cost control, tender evaluations, contract law, health and safety.
I have over 35 year's experience in the Cement Industry, Machinery Manufacture, Refractory Technology, Large Projects Execution and Commissioning,
Over 25 years of experience of which have more than 15 years of experience in Developed Countries.
ELECTRICAL-MECHANICAL TECHNICIAN CONSTRUCTION – INDUSTRIAL & MANUFACTURING OPERATION & MAINTENANCE – COMMISSIONING – CONTROLS – LO-MED-HI VOLTAGE ELECTRICAL INSTALLATION & MAINTENANCE – HVACR – WATER AND WASTEWATER TREATMENT PLANT.
12 years in wireless industry with experience in various fields of telecommunication such as transmission network planning and engineering, installation, commissioning, integration and optimization
Seeking a challenging position as a mechanical engineer in a well established company that provides an opportunity for career advancement
Survey and layout subdivision lots for rural and urban development and established and marked legal boundaries of properties using different kinds of surveying instruments.
All the related activities of construction power supply transformer erection, laying of 11kv and 0.4kv cables, providing street lighting etc were carried out. Earthing pits for construction power supply transformer, LT distribution boards were laid under my supervision.
Making of drawings in autocad in various capacities related to plant. qualifications : I. Sc. from Ranchi university & N.C.T.V.T in Electrician trade from M/S. TELCO Ltd.
Fire Protection design with construction experience in installation of fixed fire protection systems. Possess in-depth expertise in the bid criteria, layout, hydraulic design, estimating, sales, contracting, installation, repair, inspection and testing.
Sub : Application for the post of Project Manager
My experiences in the field of mechanical mostly covered construction/maintenance of power plants and oil/gas/petrochemical plants. Pls. see attachments.
I have done bsc in civil engineering and have an experience of 20 years in it.
Extensive experience in the civil engineering construction industry ,Feasibility and Pre construction Survey , Construction of buildings ,Dikes, roads, railways, Power Plants, Oil and Gas processing Plants on local and Overseas projects with renown multinational companies in the industry as Engineer
I am a Civil Engineer with more than twelve years experience. I can perform structural analysis and design by manual and computer methods.
Contract Management / Quantity Surveying
My most importance skills are: Trusting in God, Loyal, Self-confident, Adaptive, Honest, Conscientious, Persevering, Dependable, and Efficient.
An Electrical Engineer with 13 years of Progressive Experience in Maintenance and Plant Operations
I have 15 years of Planning experiences within oil and gas, petrochemical, mining, power plant and industrial plant construction. I am also an advance user of P3/P5.
Work as Senior Civil engineer in all aspect but mostly in Quality control and Materials control
I am a self employed, highly motivated and innovative Engineer. I have much experience in the management of projects for the construction of Rail Equipment plants, Aircraft Facilities, Paper and Steel Mills.
*Twenty-seven (27) years of experience, have been working in MIDDLE EAST, EUROPE and in Far East Asia. Highly professional with strong communication and leadership skills. Well organized with flexibility and common sense. Computer literate in WIN 95/98,Office 2000,MS XP and Internet task.
Structural Design Engineer
Quality control or administration on about steel structure and pressure vessels.
Senior Cost and Planner Engineer
Experinced quality control in shipbuilding,
MTech structures having 9 yrs of exp in structural designs. knowledge in staad ,etabs,cad
15 years experience in Mechanical Construction, Commissioning and Maintenance work with Multi National Companies, in Country and Abroad.
Computer programming knowledge in BASIC, COBOL, C+, DBASE, LOTUS.
Master of Business Administration(Marketing),Master of engineering (Project engineering),Bachelor of Mechanical Engineering. Experienced in project design and engineering (engineering manager for EPC execution) for Balance of plants,material handling,offsites in power plant,steel plant,oil & petro
Expecting a challenging and dynamic career in Civil/Quality Control and Quality Assurance where I can apply my knowledge and development skills.
Experienced Certified Engineering Geologist. Perceptive, creative problem solver. Computer literate. Effective communicator. Undaunted by remote operations. US and Australia resident.
A licensed Civil Engineer, organized individual, goal oriented, committed to responsibilities, affable person, self motivated, determined and a God fearing person.
Bitumen Technology (Hot Mix and Cold Mix), Analysis and Design
First
1
2
3
4
[ 5 ]
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com