CONTACT INFORMATION:
View contact information...
Nationality: Indian
Professional Membership
American Society of Non Destructive Testing (ASNT)
Indian Society of Non Destructive Testing (ISNT)
The Indian Institute of Welding (IIW)
Association of Quality Systems Auditors (AQSA)
Professional Qualification
Bachelor Degree in Engineer (Metallurgy) – Pune, India.
Piping Engineer Certificate Course, IIT Bombay
Lead Assessor ISO 9000 series, Lloyds.
API 580 Risk Base Inspection
API 510 - Pressure Vessel Inspector.
API 570 - Authorized Piping Inspector.
API 653 - Above Ground Storage Tank Inspector.
CSWIP 3.2, Senior Welding Inspector
British Gas Painting Inspector Gr. III.
ASNT-TC-1A ASNT Level II: UT/MT/RT /PT/ AUT Interpreter.
NACE, Pipeline Corrosion Engineer India
Belzona coating application for Industrial Protective coatings & to Repair Composites, Harrogate, England
Projects: Fabrication, Construction, Installation, Hook-Up, Pre-commissioning, commissioning works of offshore Process platform, jackets ( 4, 6 & 8 Leg), decks ( Access decks), bridges, modules, laying of sub-sea pipeline, construction of dam ( hydroelectric project), Rehabilitation works for offshore complexes, reconditioning and replacement of process piping, laying of cross country pipeline, fabrication of pressure vessels, tanks, piping works and heat exchangers.
Work Summary
For the past Fifteen years working for onshore/offshore Plant Maintenance, fabrication, installation, hook-up and commissioning works for jackets, top side process platform, bridges, access deck's, pipeline laying.
Implementing quality assurance plans to provide assurance that the activities are performed according to approved procedure.
Maintain the EP quality plan ensuring that it is implemented and kept updated throughout the development of the project.
Provide assistance to arrangement and implementation of quality improvement workshop and techniques for use by the EP project.
Involved in design review and fabrication of pressure vessels, piping and valves.
Review WPS / PQR/NDT to international codes, standards requirement and clients engineering standards. Establish, monitor, handle and control quality assurance and quality control requirements for the project.
Perform both internal and external audit.
Safety Courses: - STOP, client and site safety systems, HSE, H2S, first aid, permit to work, gas testing, and fire fighting, offshore survival.
Work Locations:-Singapore, Malaysia, Thailand, Hong-Kong, China, Turkey, Brunei, Vietnam, Indonesia, Qatar, Iran, and UAE.
Client's:- Shell( Iran ), BP( Vietnam), BSP ( Brunei),Maersk Oil Qatar, PTT( Thailand), Town Gas( Hong Kong), BTC( Turkey ), CAIRN Energy( India), TOTAL( Thailand), ONGC( India).
Professional Experience
October 2006 to date
Client: Maersk Oil Qatar, Abu Dhabi
Position: QA/QC Material & Welding Engineer (Offshore/Onshore)
Phase 2 Fabrication and installation of 3 jackets ( 2000 MT ), 3 Process Top Side ( 8000 to 10,000 MT ), 4 bridges ( 500 MT ), associated piping with 43 vessels and sub sea pipeline laying for green and brown field.
Phase 1 Fabrication and installation of 5 offshore wellhead jackets, 5 wellhead decks, 2 bridges, associated piping and sub sea pipeline laying for Green and Brown field.
Key Roles & Responsibilities
Involved in Writing WPS, preparing PQR, welders and welding operators qualifications, Co-ordinates onshore and offshore, including NDT Technicians, Supervisors roles, information, etc. Audits of the Contractor's Quality Control System as required. Interface with Project QA Engineer regarding Project Quality System. Supports Project Execution Plan. Develops QC team member's continuous improvement skills and ability. Liaise with Contractor regarding documentation, QC issues, etc. Counsels other disciplines regarding verification of specification requirements, in-house procedures, Quality Control needs etc. Interpret Project Specifications. Identify areas where "change" can improve quality. Review workscope via Contractor generated Jobcards and detail Project QC requirements. Assist in any quality related queries. Review incoming NDT Reports and interpret Radiographs. Co-ordinate close-out activities. Review workpacks and confirm Project QC requirements. Review drawings and assist with interpretation where required. Verify material usage. Conduct inspections of fit ups completed welds etc. Maintain compliance with specifications. Inspect Contractor's work. Ensure products meet the required standards. Issue non-conformances.
April 2006 to September 2006
Employer: Germanischer Lloyd Offshore and Industrial Services, Egypt
Position: Plant Inspection Engineer
Project: Rehabilitation project of BP offshore complexes (GUPCO).
Work Involved: - Inspection of Piping (gas, crude oil, fire water, utility, valves, fittings, flare lines, drain), vessels, tanks, risers, offshore / onshore facilities. Identify the lines, equipment, update the drawing, carry out close visual and base line inspection and where required assisted by rope access, measure thickness, view radiographs, view support conditions and settlement, witness UT and eddy current test, report writing, identification the thickness reduction areas and suggest for rectification works and re- Inspection.
December 2005 to March 2006
Employer: SMEC, Australia
Position: Technical Advisor ( Welding & NDT )
Project: Construction of Dam (Hydroelectric Project in Bakun - Malaysia)
Provide technical support to the main and sub contractor for the Tunnel Lining, draft tube, and water drafts in the area of welding, NDT, coating and painting, Conduct Internal audits, approve the billings of the sub contractors.
November 2004 TO November 2005
Employer: ABS Consulting, Singapore
Position: Technical Representative ( Welding & NDT) (Offshore / Onshore)
Project: Installation of Jacket & Top Side for PETRONAS
Site 1 PTT Exploration & Production Installation of offshore Wellhead Platform (Jacket / Deck) at Arthit Asset,
Project: Laying of Sub-Sea Pipeline for Town Gas (Hong Kong)
Site 2 Town Gas Shenzhen to Tai Po Twin Sub Sea Gas pipe Line Project, Hong Kong as a
Review and approve offshore WPQT, WPS, monitor QA activities. Certification and inspection work as lifting, floatation, upending, bottom stability, Installation of jacket and Leveling, installation of deck structure.
August 2003 to November 2004
Employer: TUV Anlagentechnik, Germany
Position: NDT & Welding Expert
Project: Laying of Cross Country Pipeline for BP, Turkey
Baku Tbilisi ceyhan crude oil cross country pipeline laying project, Turkey
Monitor the QA activities, Prepare ITP and monitor its implementation, Review auto UT graphs. Involved in river, road, rail crossing, Familiar with Horizontal Boring works.
November 2001 to July 2003
Client: Hyundai Heavy Ind. Brunei / Vietnam
Position: QA/QC Coordinator
Construction & Installation of 11 Jackets, Top side and related facilities. Client, Maersk Oil Qatar.
East Hp Gas Expansion Pipeline project. Client, Brunei Shell Petroleum
BP Nam Con Son Gas project. Client, British Petroleum, Vietnam.
MUT Sub Sea Pipeline Project. Client, ONGC
Bombay High Offshore for HV Well and Lakshmi ONGC Project.
Sub Sea Pipeline laying of 75Km using automatic welding and inspection with Auto UT, which include shore pulling, 3 riser and dog leg installation. Jacket and top side installation for British Petroleum Project.
Monitoring all the QA/QC activities (Review of ECA calculation, MIG process).
Coordinate with the inspection team for the day to day work, Responsible for project quality and implementation QC procedures, conduct audits. Monitor the fabrication activity, Responsible for inspection of welding, reviewing radiographs, scrutinized ultrasonic testing report and painting /coating in aspect of quality assurance, quality control, inspection, testing and conduct audits.
August 2001 to October 2001
Employer: Offshore Testing & Inspection Services, India
Position: Inspection Engineer
Project: Reconditioning and replacement of Process Piping, ONGC ( Offshore)
Managing construction activities carried out by contractors, ensuring the scope of work is achieved in accordance with contract requirements and timeframe, and in compliance with specifications and standards established.
Promptly advising the construction area manager of any areas of concern. Review and comment on documentation produced by contractors (technical reports, specifications, procedures, drawings, etc) ensuring implementation of established procedures and good engineering practice.
February 2001 to July 2001
Employer: Hyundai Heavy Ind. Iran
Position: Senior NDT/ Welding Inspector
Project: Soroosh and Nowrooz Integrate Field Development Project for Shell (Iran)
Project PTTEP Bongkot Field Development Project Phase 3 B (Gulf of Thailand) installations of two wellhead platforms / jacket / risers and sub sea pipeline laying Project.
Monitor QA activities, supervision of discipline inspectors for welding, painting and dimensional control. Review NDE, grouting, painting.
March 1998 to January 2001
Employer: ACE Pipeline Contracts Pvt. Ltd. India
Position: Welding Engineer
Project: Laying of cross country pipeline for HPCL, BPCL, ILF
Monitor QA activities related to welding, NDT, painting, coating, and hydro test. Maintaining daily progress reports. Final documentation. Involved in river crossing, road crossing, rain crossing. Familiar with Horizontal Boring works.
January 1994 to December 1997
Employer: Chaitaniya Const & Engg Pvt Ltd. India
Position: Pressure vessel supervisor
Fabrication of pressure vessels, tanks, piping works and heat Exchangers for various clients like L & T, Godrej, Vijay Tanks
Reference
Will be provided
View contact information... |