Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #70663
next resume »»
CONTACT INFORMATION:
View contact information...
Construction Project Manager
Date of Birth: 30th September 1980
Driving Licence: Full, Clean, Valid Driving Licence
Qualifications:
2004 – 2006 Chartered Management Institute (CMI)
CMI Chartered Manager (A.C.M.I)
2004 – 2006 Management Standards Centre
Advanced Apprenticeship in Management
2004 – 2006 National Vocational Qualification (NVQ) Level 3
Management and Supervision
2003 – 2005 National Vocational Qualification (NVQ) Level 2
NVQ Level 2 in Business and Administration
Personal Statement:
Having over 7 Years experience in the Water Industry with the UK's Largest Water Company, 5 of which in Project Management, 4 in Engineering, Construction, M&E and Installation, with project costs varying between £500k to £12Million. I feel I am a well-rounded and knowledgeable individual in my field.
My enthusiasm for work, finding solutions to field problems and to be able to complete multi million pound projects is something that I am immensely proud of and passionate about.
I like working in a team and believe that I have a good rapport with those I work alongside and take pride in leading the team to achieve goals and objectives whilst ensuring good practise and a high standard.
I have been involved with various jobs from different backgrounds, which I believe have given me a multitude of skills that I can draw upon both in everyday life and the working environment to suit.
Water Industry Formal Training:
* City & Guilds Principles of Health and Safety Management in Construction
* Confined Space Management, Managers and Supervisors
* City & Guilds in Operation and Maintenance of Pressure Reducing and Sustaining Control Valves (PRVS and PSVS)
* NRSWA Chapter 8 Signing, Lighting and Guarding Certified
* Confined Spaces Management & Basic Entry and Escape (CP1)
* National Water Hygiene UK
Employment Details
Location: Thames Water Offices, Kidlington Airport, Oxford, (2007- Present)
Role: Construction Project Manager, Engineering, Thames Water
Location: Thames Water Offices, Atlas Road, Park Royal, London (2006- 2007)
Role: Construction Project Manager, Construction, Engineering, Thames Water
Location: Thames Water Offices Maple Lodge STW, Rickmansworth, London (2005-2006)
Role: Project Construction Engineer, Construction, Engineering, Thames Water
Location: Thames Water Offices Mill End Road, High Wycombe (2004-2005)
Role: Provinces Pressure Management Manager P.N.Daly Ltd. Seconded to Thames Water
Location: Thames Water Offices Rose Kiln Court, Reading (2003)
Role: Provinces Pressure Management Supervisor P.N.Daly Consultancy Ltd
Location: Thames Water Offices Spires Business Park, Kidlington (2001)
Role: Provinces Pressure Management Supervisor P.N.Daly Consultancy Ltd
Projects:
2001 – 2002 P.N.Daly Consultancy,
Thames Water Provinces Pressure Management Upgrade and Verification.
Value of Contract £645,000
This was one of the first projects of its kind for Thames Water. The task was over 6 counties around Oxfordshire, Buckinghamshire, Berkshire, Wiltshire, Gloucestershire and Northamptonshire.
The team created a separate division internally in P.N.Daly to effectively deal with the focus of the task, of which I was chosen to come inside and run.
The project was 42GD Upgrade and Verification of the pressure management systems for P.N.Daly Consultancy Group for client Thames Water.
I was a Supervisor for P.N.Daly managing a team of 6 two man gangs which were identifying the number of assets that Thames had in the Provinces region and understanding if they were still in use, if the DMA's were valid and if the pressures were acceptable to the DWI guidelines.
The work carried out by the team identified 800 assets that were in the ground, 250 of which Thames Water were unaware of and 500 of which were either out of commission or redundant.
The assets that were found to be unusable yet still in commission and causing customer issues were then replaced by our teams for newer versions of PRV to enable a smoother running of the networks.
Tasks performed by myself included work coordination, liaising with the client and the issue of permits to work on Thames assets, running and scheduling training for the teams, regular updates to the Directors of the company and to the performance Directors of Thames Water.
It was from this position I was then asked to run my own division of men to contract alongside RPS Water.
2002 – 2004 P.N.Daly Consultancy,
Thames Water Provinces Pressure Management New Schemes.
Initial Value of Contract £1,250,000
This was under the project code 32GD New Schemes. Thames Water had tasked the company to run alongside RPS Water Services. The goal was to achieve a water saving, in the drought of this year, of 16Meg to secure the supply of one of the areas largest open reservoirs, Farmoor.
With an increased team of myself the Senior Supervisor, another Supervisor and 10 two man gangs we set about the task and at the end of the project managed to identify, design and install 36 new PRV schemes which in total saved 10Meg of water.
This was a great achievement for Thames and was recognised accordingly however, with the drought hitting the UK hard the team also identified the benefit for the optimisation of existing assets.
Alongside the main project we created a splinter group of Optimisation to manage the existing asset pressure down to enable a greater saving overall.
This meant working alongside the emergency services, liaising with the local area managers and the external affairs team in Thames Water.
It was during this time that I proudly became the overall Project Manager for P.N.Daly Ltd. Reporting the progress, cost analysis, design solutions, day to day running of the team.
I was also carrying out the CMI Associates Certification and the Advanced Apprenticeship in Management during this time.
2004 – Ongoing Thames Water UK
Thames Water Engineering, Construction.
The following listed projects are some of those that I have been involved with from the Client side through Thames Water. Being the client I manage and oversee as many as 15 projects per year ranging from £15k to £15m to detail all of these would mean a very extensive CV. Detailed later in the resume are the professional experiences drawn form the work alongside these projects and the roles/duties I was tasked to.
Those detailed are a varied selection of projects, which have been completed or are in completion at the time of writing this resume. As part of the Capital Delivery Team in Thames Water Engineering it has been a very successful few years and Thames are still achieving the capital investment budget of £1bn per year.
North London Network Improvements (Thames Water & Laing O'Rourke Partnership)
Construction Project Manager
I provisionally joined Thames Water Engineering after being approached by them to oversee the design, construction and installation of the London Pressure Management Schemes, which then developed into all engineering capital projects that are to be issued to the construction phase.
Working for Thames I have been the Construction Project Manager for the Client undertaking tasks to ensure that the projects are delivered on time, on or under budget and to be able to troubleshoot any issues.
As the CPM I am the only point of contact for the Design, ICA and the Contractors for the Client. In my team are a Lead Design Engineer, QS, A Principle Project Manager and a Commissioning Engineer. Many of the tasks I have under this role are stated under 'Professional Experience' above on my CV.
3 of the largest projects were the Pressure Management Schemes for Thames Water briefly described below:
* Crouch Hill Reconfiguration – 6RVD. Total Project Value – £7million (Total Water saving 5meg)
* Highbury Pressure Management – 424F. Total Project Value – £700k (Total Water saving 3meg)
* Maiden Lane Network Improvements – 29WD. Total Project Value - £12million (Total Water saving 5meg)
My role was to control the design department including Carl Bro (Now Grontmij), Mouchell Parkman and Fabur Maunsell. I was also the main point of contact for Laing O'Rourke who were constructing the three schemes.
The projects were pressure managing Islington and some of the surrounding area, Crouch Hill and Maiden Lane which are all on the north side of the river Thames in London.
All three projects were based around 3 Main PRV's, ICA and cross connections for the network and were run concurrently. All three schemes are now up and running and are feeding a large population of north London including feeding the Great Portland Street Hospital, Leicester Square, The Royal Courts of Justice, Highbury Stadium, The Strand and Covent Garden.
On the back of this project a Tall building study is now being carried out to see if there is potential to reduce the pressure further (Optimise the PRV) to get an increased water saving overall.
North London Zonal Metering (Thames Water & Barhale/Z-Tech Partnership)
Construction Project Manager
This project was already running when I joined the team. The scope of the project was to install 7 meters on the distribution mains from the local reservoirs in north London. Thames had decided that to calculate the leakage and usage effectively the metering at the reservoirs would need upgrading.
The ITC was agreed at £1.4m and it was decided by the design/construction team that Barhales would be the principle contractor for the works. The reservoirs were ranging from 50 to 100 years old and some of the distribution mains were laid up to 8m deep involving temporary works, line stops and the sinking of caissons. The mains sizes varied from 12" to 36" imperial.
On the back of this project Z-Tech, a specialised metering and ICA company were called in to replace the 4 main meters from the ring main shafts. 2 were at the Hammersmith Pumping Station (2x 900mm) and the other 2 were at Regents Park Ring Main Site, which involved close coordination between London Water Control Centre and the Engineering team to ensure that 15% of London's water stayed on whilst the work was carried out.
Once again I was involved with design coordination, Operations coordination, highways and external affairs as well as customer communication in the sensitive areas within London.
The project succeeded in its goals when it was handed over to Operations (The client) and was under budget by £87k with the final account totalling £2.3m.
Brasenose Pumping Station Upgrade Thames Water & Dean and Dyball
Construction Project Manager
One of the OFWAT deliverable projects handed to myself was to increase the pumping capacity of the Brasenose Pumps from 19mld to 29mld. To enable the team to increase the pump size and not to interrupt the water distribution to a large part of the network a temporary supply needed to be sought whilst the refurbishing of the main Pumping Station was underway.
The project was submitted as a design and build contract between Dean & Dyball and Pell Frischmans. The target date was for the 31st March 2008 and the goal was to have the temporary pumps in place to enable the refit to take place.
The project is still underway with the temporary solution now in place and the refurbishment underway. The project is currently forecast to be overspent which will eat away at some of the risk monies put aside. The current target cost is £3.8m, however due to procurement and internal management issues within D&D the project is over running by 3 months.
There is also a pipeline required to duplicate the mains from the pumping station to the next reservoir in the system. The size designed and programmed for is 450mm DI pipe.
Witney Pipeline (Thames Water and Laing O'Rourke Partnership)
Construction Project Manager
Another of the OFWAT beneficial deadlines for this years 31st target. A pipeline over 4km at 500mm OD in PE. The project was awarded to Laing O'Rourke working with most of the team from the pressure management projects from earlier in my career.
The project was a pipeline from one storage reservoir to another ensuring supply for the future development of RAF Brize Norton airfield and the surrounding housing developments in the next 15 years. Over 10 months the pipeline was installed, with close coordination between us and the Operations team we cross connected 6 times. This was expecially critical due t the main being such an important feed for the local area.
Overseeing the running of the project and tenders to the subcontractors M.A.Roarty we laid pipe in open cut through farmland and through the A40 east west bypass from Witney to Cheltenham. Main liaison was with the farmers and the local community and also the local government officials which happened to be David Cameron leader of the Conservative party, so close communication was needed.
The final forecast for spend is £25k under the agreed ITC of £2.8m.
Tring Pipeline and Pumping Station (Thames Water & Dean and Dyball Partnership).
Construction Project Manager
Another of the pipelines reaching over 4km through the Beacon Hills in High Wycombe for the Thames Valley region of Thames. This project was in two phases, the first was the pipeline from one storage res to a pumping station and reservoir site and a pumping station to increase the throughput of water from one site to another. Due to increased demand on the area overall there was the need to install this under the Capital Delivery programme.
The pipeline was once again open cut, with 3 auger bore sites under historical monuments to ensure that the local area and integrity of the history of the sites were not disturbed. Close correspondence with the local community and with the land agents and farmers was required to enable smooth operation through the works.
The pipeline was in push fit DI 450mm with anchor gaskets to reduce the requirement for thrust blocks. The project was once again delivered on budget and 4 days earlier than programme even though time was lost due to the inclement weather of last year. The final account was £2.4m.
Bailey Hill Reservoir (Thames Water & Murphy Partnership)
Construction Project Manager
A new storage reservoir in Lambourn in Swindon, the local race horse breading grounds/studs, once again to ensure that storage demands are capable of handling the high usage due to new housing and climate change increasing temperatures throughout the south of England.
Murphy were awarded the project after a good Pre ITC cost of £2.2m. The project was to duplicate the cells of the existing reservoir into one main 3rd cell which would hold in total 4meg of water. The construction was in pure chalk due to the geology of the ground which made for good digging once the excavations were underway.
The commissioning is still underway and is due to be completed at the end of May, 5 weeks later than originally programmed due to issues with the Electricity board not being able to move the overhead pylons due to the storms earlier in 2008.
hobbies and Interests:
I enjoy the challenge of learning something new thoroughly and try to get involved in or with as much training and self-learning as possible to keep developing for different situations. I like to socialise with friends and enjoy travelling the world when I get the opportunity and my ambition is to work abroad.
I now have a family and enjoy spending time with them and developing my children's futures with the knowledge I have gained enabling them to get the most from life.
Professional Experience to Date
Project Management
Operational: Contractual / Commercial:
* Responsible for overall management of projects from conception to completion.
* Ensure all operations are undertaken in a safe manner in accordance with UK law and project /company H&S policy.
* Liaison with and supervision of Q.A. staff to ensure project quality objectives are attained.
* Management of project team functions.
* Supervision and co-ordination of multiple contractors.
* Effect close liaisons with client reps.
* Control and direction of a multi-disciplinary workforce.
* Procedure review and revision if required, in conjunction with Project Designers and Contractors.
* Review project programme and update on a regular basis.
* Co-ordination, liaison and support for customers and land agents.
Project Engineering
Systems / Communications and Reporting:
* Establishment and responsibility for project communications with client, sub-contractors.
* Development and review project planning and programming.
* Preparation of weekly and monthly reports to project team and management.
* Co-ordination and preparation of project close out reports.
Quality
* Development and review of project quality plans.
* Compliance with corporate Quality Management.
Systems.
* Ensure compliance with client quality objectives.
* Co-ordination and undertaking of project audits and initiate post audit actions.
* Compliance with corporate, Health and Safety management systems.
* Compliant with CDM and the New 07 Regulations
Health and Safety and CDM
In accordance with UK and European HSE Law:
* Development, review and approval of project
Health and Safety plans.
* Development, review and approval of risk assessments.
* Ensure project team have a clear understanding of contract and applicable obligations.
* Risk analysis-development review and management of procedure / schedule.
* Undertaking Health & Safety, Environmental and Management audits.
Financial
* Review and agree project measurement, cost assessments and monthly valuations.
* Co-ordinate and assist Q.S. in producing claims and initiate negotiations with client.
* Close liaison with Q.S. / Commercial Management.
* Review variation schedules and assess entitlement and income.
* Assist Q.S. in 'end' forecast as required.
* Preparation and development of subcontract, tender packages, incl. specifications, scope of work, and schedules.
* Review and assessment and reporting on subcontract tenders / bids.
* Review of material / subcontract procurement and delivery schedules and updates.
Construction Management
Pipeline:
* Design and problem solving.
* Clean Water pipelines.
* Pipeline Butt Fusion and Fusion Welding operations.
* Pipeline materials – Steel, Ductile, Cast Iron, PE, HDPE, GRP, Asbestos and Plastic up to 42".
* Pipe mediums - Water.
* Installation using trenching, excavation, and trenchless techniques.
* Pressure testing, Chlorination and commissioning of pipelines.
* Horizontal directional drilling.
* Construction operations within SSSI environments.
Civil Engineering:
* Reinforced concrete bases, walls and floors for thrust restraint and reservoir walls.
* Structural steelwork.
* Sheet Piling, Cofferdam installation, Highway construction and repair.
* Under pressure line stops and tees.
Design Engineering:
* Investigating installation / construction methods.
* Preparation and development of method statements and procedures.
* Design and development of both temporary and permanent works items.
* Technical reviews and development of reports.
* Co-ordination and preparation and approval of as-built documentation.
* Network solutions, checking and evaluating.
* Tall building selection and investigation of pumped supplies.
* Secondary Validation on the network.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1601 to 1650 of 2819)
Go to Search Parameters...
Brief Description
I am a certified electrical engineer with 15 years experience
I've been working as HSES Advisor more than 5 years in different oil& gas projects such as Offshore and Onshore Pipe laying operations,platform constructions, Flotel, diving operations etc.
Aconex system user for Management on Line in Dubai Metro Project, 2. Health & Safety Environment (HSE Management), 3. Construction Management, 4. Computer software (Microsoft office& AutoCAD).
Electrical Engineer/Manager in Petrochemical Industries and Electrical Power Companies in Testing, Commissioning, Design, Projects, Plant Engineering, Maintenance, Operation, Technical Services, Training. Developement, System Improvements, Problem Solving, Analysis, System Study, etc
CSWIP 3.1 Welding Inspector, ASNT NDT Level 3, QC Engineer
To get a challenging position in the field of Electrical Engineering in a growth oriented company, where I can apply the knowledge, skill and experience I have acquired for growth of my prospective employer and for my personal development.
A proactive, adaptable and conscientious scientist with five years international experience in Science, Education and Administration. Solid experience acquired in management of research grants, conference organization, scientific consulting, presentations and biological sciences.
AT PRESENT I AM ON THE VACATION FROM PETROKEMYA (SABIC)KSA AND WORKING FOR ARCHIRODON CONSTRUCTION OVERSEAS CO.S.A IN DOHA -QATAR ON THE VISITING BASIS AND ASSIGNED AS PROJECT INCHARGE FOR THEIR ON GOING QATOFIN MARINE PROJECT DOHA-STATE OF QATAR.
Preventive and corrective maintenance for engines amd pumps at Rigs
Industry experience in Designing of Electrical System for Offshore / Onshore oil & Gas projects using Auto CAD, ETAP, MATLAB, CGLUX.
Good manager- exact-lovely-like travel-profetional in supporting in surface and tunnel excavation-english and arabic and farsi -hard worker
QA/QC Inspector having 6 years experience in Refineries, Offshore, Gas Plants, LNG
Safety officer - 3 years
College education and master's degree in civil and environmental engineering within the research area of construction engineering and management
want to work hard ,best up to my level, in a progressive environment with a feeling of team work.
14 years of experience in steel structures detailing and checking. I know the tools Auto CAD, X-Steel and Micro station for detailing the jobs. Now, working in Aumund Engineering Pvt. Ltd. as a Sr. engineer. my responsiblitie is to lead team for detailing.
Technical manager of Construction & Services Companies - Manages all the company activities, adiministratives excluded.
DCS, ESD, SCADA design and commissioning, expertise in field instruments design and commissioning
1
Sr. PDS Piping Designer, Chemical, Petrochemical, Slurry esperience. Very strong in ALL elements of PDS including administration and support.
Engineer have Bsc. in civil eng. & higher diploma in water polllution control eng. with experience of more than 5 years in Building & environemtal works
Realiable and Multi Skills worker for engineering , construction, and mining related jobs
Graduate Civil Engineer with 13 years of experience in construction and Readymix concrete
I am a safety practitioner with wide experience in construction, mining, dredging and marine, onshore drilling, etc. I have a good knowledge in MS Word, MS Excel and MS Powerpoint.
Professional 15 years experience in geotech and geology with engineering consultancy and construction company with various responsible position.
I have vast experience in pipeline inspection involving smart pig, pipeline cleaning, coating. Also, i have experiences in commisioning/decommisioning of pipelines and other engineering maintenance activities relating to static equipment. I am very conversant with Microsoft office and HSE standards.
Piping designer
industrial instrument mechanic/building automation
Chartered Project Manager in the UK with the CMI Body
19 years in Oil and Petrochemical with Project Management, Commissioning and Maintenance/Reliability background as well as all associated mechanical equipment and safety system. BS in ME and MS in Engineering Science. in English and Mandarin.
Project Interface Manager, Stategy Planning, Engineering/Projects Development/Management/Controls
I hold a B.ENG (Bachelor of Engineering) Certificate in Civil Engineering with proven track record in providing design and construction oversight of civil engineering tasks; Planning, organizing, management skills and ability to work independently.
Nine years (09) experience as Quality Control Engineer/Third party Inspector (TPI)/ Inspector/ Supervisor in Welding, Piping, Painting, Structural and Insulating jobs at various sites in petrochemicals, Fertilizers, Refineries, Water treatment plant and steel plants.
Preparing Topographic survey.
An Electrical Engineer with over 17 years of versatile experience in the field of Proposals, Contract Management/ Co-ordination, Marketing with sufficient exposure to ISO 9001 quality standards and Total Quality Management. Have undergone skill enhancement courses at IIT & IIM.
Electrical field
„« More than 11 years of professional working experience in an Oil/Gas, Petrochemical, & Electro-Mechanical Construction Industry; experienced in development implementation, quality, supervisions and inspections.
B.S. in Mechanical Engineering, 14 years of experience from inception to completion of HVAC design and construction in commercial building (high-rise, shopping mall), pharmaceutical, laboratories, clean room, and hospitals.
Installation, maintenance and repair of medical equipments
NACE-USA Certified Senior Corrosion Technologist & MICorr grading from Institute of Corrosion-UK, having 19years work experience in Cathodic Protection Technology Services & Corrosion Control Services is available for employment.
A proactive and experienced individual with excellent Turnover and Acceptance Coordinator, Senior Document Control, HSE coordinator and Basic Life Support coordinator skills in various sectors like Oil & Gas sector, Petrochemical, Desalination Water & Power Plant Sector.
Bridge, Highways/Roads engineer: A devoted qualified Civil Engineer seeking a challenging career opportunity in Bridges/Roads construction management projects in the Middle East/Africa regions
Construction Manager for large scale projects
MSc Engineering / Business Development / Project Management /Energy fielsd
Control Systems Engineer (Programmer & Designer)
Instrument Quality Engineer/Inspector & Instrument Engineer and Commissioning Coordinator
graduated in mechanical engineering, Proficient in Autocad, Trained on HVAC systems of Indian Institute of management, Worked as maintanence engineer in The Western India Plywoods, India, Worked as a software engineeer in Cognizant technology solutions,
Project Manager / Finance Management
Instrumentation Technician/Trainer/QA/QC
Masters in Mechanical Engineering , with CAD/CAM and FEA courseowrk , Done Maintenance Engineer job in Textie indutsry , Undergarduate Internship in Desiging and Graduate Internship in Desiging and Analysis , Handled 3D softwares like CATIA , Pro-E and 2D software like Autocad
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
[ 33 ]
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com