The last years I have been in the forefront of electrical construction project, which included the boilers, digesters and paper machine. For this I did the planning and managed till completion. I also did planning for our piping division to get them back on track. Working with, and for, a word-class companies like Murray & Roberts MEI gave me a lot of experience in management. Earlier Projects included Automation design of mine shafts and also programming of this, SCADA and the Commissioning of all panels and instruments. During my studies I have been part of all aspects of electrical, electronic and computer engineering. As I have this experience it would be a wonderful opportunity to be an asset to you and gain some more at this prime and professional company.
I would appreciate your kind consideration and look forward to hearing from you in the near future.
PERSONAL INFORMATION
Status Married
Nationality South African
Computer skills Microsoft Projects, Prima Vera
MS Word, PowerPoint, Excel, All Standard office software
PLC Programming, Allen Bradley, Siemens, SCADA
Programming Languages include: Visual Basic, Delphi, C (All forms), VHDL, Matlab, Altera, Webpage Design DreamWeaver, Oberon, Pascal, and MPLAb
Ingeneering Programs include: Matlab, Pspice, Hspice, Altera, PowerWorld, CAD (All forms) and Matlab (Simulink).
Simulations
Languages English & Afrikaans
ACADEMIC INFORMATION ___
University of Stellenbosch - South Africa (All reports added)
2005: B. Eng. Electric and Electronic
Thesis: Hybrid Energy Management System
2001: B. Eng. Electric and Electronic with Computer Science
Rand Afrikaans University - South Africa (RAU)
2000: B. Eng Electric and Electronic with endorsement B. Sc IT
(Report of first year studies added)
Nylstroom High School - South Africa
1999: Matriculated: B Aggregate, Distinction in Maths
(Matric Certificate, with School Reference added)
WORK, PROJECT AND SUBJECT HISTORY
Current- August 2007
At: Murray & Roberts MEI (PTY) Ltd
Position: Electrical Engineer/ Planner
Experience gained:
* As Murray & Roberts MEI is a construction company I was in the extreme good situation to learn from one of the leading construction companies in South Africa.
* Acted as the Company representative with the Client and Contractors during the project construction. Negotiates changes to the scope of work with the Client and key subcontractors. Responsible for following up on instructions & commitments associated with the project.
* Established Project Execution Plan, Health & Safety Plan, Quality Control Plan and other documents.
* Established the program requirements for all areas of the project and monitors site staff performance.
* Used Primavera project management and Microsoft projects software for all processes
* Plans, directs, supervises and controls the execution of all technical, fiscal and administrative functions of the project and the site team.
* Assigned responsibility to key subordinates in their respective fields of expertise.
* Provided input to performance reviews and develop plans for subordinates.
* Worked with other managers, project engineers and discipline Heads to develop budgets, schedules and plans for the various elements of the project.
* Monitor and reported to management on the progress of all project activities within the program, including significant milestones and any conditions, which would affect project cost, schedule, performance or Client relation.
* Established internal weekly meetings to review project status and formulate action items.
* Performed other responsibilities associated with this position as it was required.
* Represent the company in all Client meetings.
* Ensured accuracy and completeness of the As-Built / Record drawings.
* Maintain financial records and forecasts for budgeting purposes.
* Coordinated an accurate assessment of work completed in conjunction with the Quantity Surveyor.
* Ensured Quality of the Works and advice corrective action as required.
* Engender and maintained claims avoidance procedures including prompt responses and timely resolution of conflict.
* Acted as a Senior Representative on site and monitored the work of the members of the Construction Management team to ensure conformance with project procedures.
Skills developed:
* Thorough knowledge of current technology; able to select and apply appropriate engineering software for use on project.
* High level of critical thinking skills.
* High level of numerical skills.
* High level of literacy skills in English.
* Clear Verbal communication skills.
* High level of computer literacy.
* High level of Client liaison and service skills.
* Thorough knowledge, experience and skills in electrical construction methods, sequence and related contractual matters.
* Leadership abilities.
* Attention to detail.
* Committed to quality standards.
* Sound interpersonal & relationship building skills.
* Team oriented.
July 2007- June 2006
At: Jolly Jumbo (PTY) Ltd
Position: Managing/Production/Factory Engineer
Experience gained:
* Jolly Jumbo is a manufacturing company and the experience was immense in the fine details of production and solving problems quick.
* All the cabling and standards that a factory of these sorts had to adhere to was done by me.
* Had to learn fast as my mechanical knowledge wasn¡¦t up to scratch, being an electrical engineer.
* The production must go on, and that was something I learned with managing the factory, working with 150 workers included operators and ground staff. Managing this with maintaining all the machines is not an easy job, and I had to adapt to do and think several things at a time.
Project Experience:
* Being the engineer in charge I had to streamline the factory, design and build better machines, new one's for new lines which we ventured into.
* The main project for me was to get everything in order, to get some sort of structure going in the company. The company is managed by the idea that everybody is equal, and only the director can make all the decisions. With knowing that it was difficult to incorporate a hierarchy of people that should be managed by the top management.
* I had to think quickly on my feet, because there was no structure to follow, to decide which technician should do what and when. If he didn¡¦t succeed, I had to show him how it is done. Especially this gave me lots of experience of a field I didn¡¦t know much of, I had to go back and learn the machines, so that I could give the advice.
* I designed and build three Rusk ovens for the new line RUSKIES, which two of them was for Gauteng branch and the other for Natal branch. The project included designing of the machine which mould and cut the rusks.
June 2006- Jan 2006
At: Hiprom (PTY) Ltd
Position: Jnr. Engineer
Experience gained:
* The skills which I learned at Hiprom exceed the normal education which I got out of it, but more the people skills and how to work together as a team.
Project Experience:
* From day one I have been in charge of my own projects and had to learn quickly how to manage a project.
* I started managing a project which was already designed by somebody else and it was clear from the beginning that every engineer's design thinking is not the same and had to fall in with the programming style and project planning that was already laid out. Projects like these take at least 6 to 7 months to finish, and this particular project was also almost 3 months behind schedule. We finished the project in 3 months, in which I already started a new project from scratch.
* My Second project included the whole automation design with the company Impala Platinum Mines. Doing al the PLC programming and doing the SCADA for this particular shaft. The automation design included the design of the shaft, direction of the ore, weight, and opening and closing of doors, belt speed, and block detection, drives start etc.
* As part of my internship at Hiprom I had to do the basic ground work as well. That meant going down in the mine pulling cables, installing instruments, installing panels and doing commissioning. These were basics I had to learn, and did well, so that I could climb the ranks as fast as I did.
* A major experience was the fact that with no experience whatsoever to start with I have gained a lot in a short space of time and was thrilled being offered a managing post at the end of the first 5 months, but had to relocate from Rustenburg to Pretoria, so couldn¡¦t take the opportunity.
Des 2005- July 2005
At: University of Stellenbosch
Position: Final Year Student
Experience gained:
Project Experience:
(Thesis: Hybrid Energy Management System)
* This project concentrates on the suffecient use of electricity when available so that some can be stored for the times when eskom power fail.
* A lot of programming is involved to design a proper and powerful controller which desides what power is to be used and when is to be stored.
* A solar panel bus charges a battery pack through the controller, which will check, all the time if the grid power has failed or not. If it has failed the controller will automatically switch to the battery power, which is converted through a 5kW inverter for a 220V AC signal. UPS. If on a bright sunny day the battery pack is fully charged the the controller will trickle charge the pack and the rst will go through the inverter to the house and will minimize the use of the power consumed from the eskom grid.
Project Management Experience:
* Time scheduling, planning and enough research.
* Working alone on a big project, with not much extra influence
* Challenge and improve operating practise of current communications between the storerooms, students and ordering of components.
Des 2004-Jan 2003
At: University of Stellenbosch - South Africa
Position: Non-Final Year Student
Experience gained:
Project Experience:
(Computer controlled door access system for a Guest House)
* Team leader for this project, which was done in groups of four.
* Deligating different task to everyone and integrating different programming styles and ideas in the end.
* Writing a fully described manual and report for the project.
* Programming a Pic was an experience, because it was not teached to us. Part of my job to sort things out, which we encountered.
Project Experience:
(Analog weapon that shoots infrared)
* Writing a website to promote this playing device.
* Project was to design an analog gun that shoots an infrared on a selected signal frequency. With the capability to to check if it has been hit by another frequency, which is not the same as it's own. Then the gun will disarm him for a few seconds.
* The project include the following:
- Designing cascade filters, which can choose between 10Ghz and 1 Ghz
- Designing a powerfull amplifier and sending structure to send an infrared signal more than 100 metres in daylight.
- The improvement of battery life, so that the playing time can last up to 12 hours before charging.
Des 2000-Jan 2000
At: Rand Afrikaans University - South Africa
Position: First Year Student
* Top in my class in all IT subjects
* Above 70% average. Report attached.
* For personal reasons I left RAU and further my studies at the University of Stellenbosch.
Des 1999-Jan 1995
At: Nylstroom High School - South Africa
Position: Student Body President (1998 -1999)
Head Boy (1999)
Experience gained:
* Being at the head of a school a lot of leadership skills are developed. The communication between higher order and lower order.
* Being able to create things in that previously was only a dream.
* The balance between academics sport and management.
Des 1999-Jan 1995
At: Waterberg Toyota - South Africa
Position: Holiday Work - Auto Electrician and Mechanic
Experience gained:
* Learning all different skills of being an auto electrician.
* Functioning and implementation of a car air-condition.
* The complete package of the works of a car engine, which includes diesel and petrol of all shapes and sizes.
PROFESSIONAL OBJECTIVE______________ ___
A full-time operational or technical management position in the electric, electronic or construction industry, utilizing my technical abilities and leadership skills working as a team leader or team member to contribute to which ever process I have been assigned to, focused on making a positive change to the company bottom line.
SKILLS ACQUIRED AND DEVELOPED ___
DESIGN AND ANALYTICAL SKILLS:
* Usage of all simulation software, programming software and standard office software mentioned above.
* System simulation, design and costing analysis.
* Circuit simulation, design and costing of all components and feasibility studies.
* Modelling of PLD¡¦s, High Frequency Systems and Antenna¡¦s.
PROJECT MANAGEMENT SKILLS:
* Is a Project Planner and Management, Electrical Engineer at Murray & Roberts MEI
* Were the managing-production Engineer at Jolly Jumbo
* Managed my own projects with several other Engineers at Hiprom
* Successfully managed projects as Project Leader
* Worked as part of team on multi-discipline CPU project.
* Effectively managed to develop better communication paths for students and lecturers with each other and the ordering system.
* Compilation of specifications, tender evaluation, contract and quality management.
MANAGERIAL AND GENERAL SKILLS:
* I have developed sound leadership skills.
* I am an extremely flexible and adaptable individual.
* One can say that I am an allrounder, whether it is life, sport or academics (business).
REFERENCES AND TESTIMONIALS:
Will be provided
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1501 to 1550 of 2814)
Go to Search Parameters...
Brief Description
EXPERIENCED HEALTH/MEDICAL PHYSICIST-ENGINEER-SCIENTIST
Well experienced in Project Control functions and proficient in Primavera, MS office, SAP MM with programming skills.
Professional career spans 16 years in field of contracts and procurement management, strategy formulation (for high spend areas), strategic sourcing and supply chain process reengineering.
Safety Director
Planning, project engineering/management of Petrochemical/Oil and Gas plants with around 28 years experience with design and engineering consultants, EPC contracting companies and oil producing companies. Associated with planning and control of projects with international companies like Shell etc.
Years Experience Including 14 Years Projects Management Experience With Saudi Aramco
E&I, Material, Project coordination
Energetic and versatile Quantity Surveyor (QS) with proven expertise, working with an International Airport Construction Company.
NACE Certified Cathodic Protection Technchnician (Level-2) # 8789
Free!
„X Continually ascertain and adjust operating parameters regarding more than 375 on-base diesel generators.
17 year experience in environmental management as Head - EHS and GM (Env. Tech) in large environment consulting and waste management co
Electrical Installation and Management
Work experience in design and Manufacturing industries for 5 Years with Auto CAD 2004, CATIA V5 R10, Matlab, Ansys, Solid works
I am a GRADUATE MECHANICAL & CERTIFIED COST ENGINEER possessing 20 years of diversified experience in Petrochemicals, Refining, Chemical, Fertilizer, Oil & Gas with various multinational companies in Pakistan, Bahrain & Saudi Arabia in the fields of Project control, Cost & Contract Management, Plant
Construction manager/Chief field engineer with HND Mechancial engineering and Member Institute of Mechanical Engineers. 18 years of construction management experience at all levels.
Production, planning & maintenance (reactive & proactive) of crushing & screeing plant as well as projects execution (have 3 yrs. full time Dip in Mechanical Engg)
Senior Project Manager, Quality Manager, International experience
O & M Supervisor, Licensed, Unlimited Stationary Engineer, USN experience
Construction/Maintenance Superintndent, Mechanical/Civil fields
Entry Level
1.B.E(Electrical Engineering)from College of EME,(National University Of Sciences and Technology,NUST) 2.CGPA=3.31/4.00(in percentage equivalent to 80.24%) 3.final year project nominated among the best three projects of the electrical engineering department.
Respected Sir, I am a holder of B.S. in Civil Engineering. I seek to have a job as an AUTOCAD specialist/OFFICE Assistant in your reputed firm. I am hence attaching my CV along with this mail.
Experienced Construction Project Management Electrical Engineer/Staff
Experienced Manufacturing Engineer with applied knowledge of processing equipment, metal forming machinery and structural components, manufacturing processes, and MRP progams.
An E&I Construction Supervisor with over 16 years extensive experience in the construction of commercial, heavy plant and petrochemical indusrty. Sound working knowledge of Power/Distribution and Control Systems including Drives, P.L.C’s, DCS and Instrumentation. Knowledgeable in Mechanical, Civil,
Project Manager with international industrial and commercial experience. Managed and designed Piping, API and ASME tanks and vessels. Have working in Beijing, China and San Juan, Puerto Rico. Able and willing to work internationally. Please see my resume for additional details.
I&C ENGINEER - 9 years experience. Control Valves, flowmeters, shutdown systems, proximity sensors, and PLC programming. Oil Production, Refineries, Power Plants.
My background encompasses over 10 years working experience in different industries.
Piping engineer with 10 years experience in oil field. Experienced in designing, supervising and construction of pipelines and piping for oil industry.
I`m willing to relocate and work as QC inspector, Site Engineer in sewer and water treatment field
An EXPERIENCED ELECTRICAL ENGINEER with 16+ years experience in Oil & Gas, Power and Desalination plant & Engineering Industries in the areas of Manufacturing, QA/QC, Inspection, Erection, Testing and Commissioning of Electrical Equipments.
I am an Instrumentation & Control Engineer by Profession. Review of my credentials will confirm that I have 15 years of experience in instrumentation, operations, maintenance & design.
Desalination Plant Maintenance/Inspection, Materials Testing, Technical Evaluation,Troubleshooting, Supervisory/Managerial Skills
Electrical Engineer, Planner, Electrician, Multi Skilled, Hands-on, Leader,
Mechanical engr 3 + years exp in Sugar Industry/process industry
CSWIP Senior Welding Inspector
Coordinator Project, Site/Project/COnstruction Engineer, Cost Engineer and Project Management
Skilled Technician, Electrician. Instrumentation and Electrical cable Termination and Lube checking
Self reliable individual that is looking to improve in career and goals within self and a company, expericenced in design, 3D design and custom made projects
IT Network/Systems Manager
I am sridhar.K working as a safety engineer in IBN ZAHR PP III,jubail,KSA.I have nearly four years experience in safety field only
B.tech mechanical, cswip3.1, level2, iso9000 lead auditor
I&C Technician with broad experience
B.E. in Electrical, having basic knowledge in Embedded Systems, Robotics, Matlab, Simulink, Autocad, C++
EDUCATION: „h Govt. Polytechnic, Rajkot D.E. (Civil) WORK EXPERIENCE: „h 6 Year experience as a Site In charge (Construction Project) at Backbone Enterprises Limited, Ahmedabad
Civil Construction & Contracts Manager
Experitse in geophysical surveys, geotechnical, hydrogeological investigations, environmental and engineering applications as well as software development using VB.
Seeking a responsible and challenging growth oriented position in the field of electrical engineering with emphasis on high voltage out-door substations including its preliminary design, selection of transformers, switchgears and other materials
Civil / Structural Engineer with various international exposure on Power Generating structures, knowledgable with design and detailing software such as StaadPro. and Tekla Structures.
Instrument Engineer / Supt
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
[ 31 ]
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com