Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #80743 next resume »»
CONTACT INFORMATION:
View contact information...

OBJECTIVE:
------------
Obtain a position ultilizing strong analytical, communication, leadership, and time management skills that contribute to a higher level of a efficiency of conducing bussiness.

WORK EXPERIENCE:
------------
2007 to Now
Employed with: BBBH Consortium.
Bilfinger Berger & Baulderstone Hornibrook.
Position: Scheduler / Planner
Project: Phu My Bridge
PMC (Phu My Bridge Cooperation)
Project description: description of the scope of work, project size
When completed, The Phu My Bridge will span the Saigon River between Districts 7 and 2 in Ho Chi Minh City. The Phu My Bridge contract includes the design and construction of a 705m long cable stayed main bridge with a clear span of 380m, as well as the approach structures on either side being approximately 758m on District 7 and 638m on District 2.
In charge of
Responsible for Preparing the Baseline programme, Maintaining the works programme up to date, update the construction work progress incorporate any extensions of time, critical path and What-if analysis, Prepare and update Time chainage diagram, program status, Three/four weeks look ahead schedule through weekly construction meeting.
Preparation of monthly report (update schedule, comparison actual and planned, progress S curves, histogram, action plans) and preparation of documentation required from Management to tight timelines and changing requirements to reflect the requirements of the programme, Construction photographs and report to management accordingly.
Using Primavera for Bar chart and Tilos for Time/Location Diagram.
2005 - 2007
Employed with: VINCI Construction
Position: Schedule and Cost Control
Project: Camau 1 & 2 Combined Cycle Power Plant (750x2 MW)
Address: Camau Province, Viet Nam
Client
Petrovietnam
Project description: description of the scope of work, project size
The Construction of 2 phase natural gas fired Combined cycle power stations, the scope of these phase cover the installation of the generating unit(s) with a capacity of 1500 MW, which includes also the supply to the Fertilizer plant along with switch yard system, site infrastructure and auxiliary system.
In charge of
Responsible for Develop the overall program of the project, including interfaces between Contractors, planning and scheduling of all construction works, Critical Path and What - if analysis, Developing detailed project schedule for Construction team weekly activities, Cost control, Construction photographs, Monthly report and report to management accordingly.

Using Primavera for control Overall programme.
2004-2005 Employer and function (title, project name, place, country)
Employed with: Apave Viet Nam & South East Asia
Position: Senior Engineer
Project: Hoang Thap Plaza
Client Hoang Thap Ltd
Project description: description of the scope of work, project size
The building is located at Saigon south, with 15 storeys complex of office and apartment buildings.
In charge of
Responsible for planning, scheduling and supervising the construction of piling works, deep foundation, and building structures.
2003-2004 Employed with: Petro Vietnam
Position: Site Manager
Project: Low pressure Phu My – Go Dau Gas Pipeline
Address: Vung Tau City, Viet Nam
Project description: description of the scope of work, project size
The Construction of 14" Pipeline via 28 km, supplies Gas to five Industrial zones with the capacity about 1 BCMY from Phu My station.
In charge of
Responsible for managing the planning, construction and cost control for the civil works section.
2002-2003 Employed with: Petro Vietnam
Position: Site Engineer
Project: PTSC Oil & Gas storage
Address: Da Nang city, Viet Nam
Project description: description of the scope of work, project size
The Construction of Oil and Gas products storage tanks in Lien Chieu – Da Nang (capacity: 7,000m3)
In charge of
Responsible for planning and supervising the construction of the office building (04 storeys), pumping stations, piling works, tank foundations, internal road and landscaping.
Responsible for all the paper works.

2001-2002 Employed with: Petro Vietnam
Position: Part-time position in tendering for major and target contracts

EDUCATION & CERTIFICATION:
------------
Education: Profession: Civil engineer
1997-2002: BA Civil engineering, two years general basic, two years general engineering, and one and haft years civil engineering at Ho Chi Minh city University of Technology
Grades: Good (First class honour)
Languages: English: Good
Vietnamese: Mother tongue

TECHNICAL SKILL:
---------
Significant planning experience on EPC Construction Project
Proficient with Primavera all version (SureTrak, P3, P3e, P5, P6)
Proficient with Time Location Software (Tilos)
Asta PowerProject: Intermediate
Proficient with Microsoft Project
Proficient with Microsoft office
Proficient with Microsoft Powerpoint
Proficient with Auto Cad, Visio

View contact information...
«« previous resume next resume »»
Search Results (Resumes 351 to 400 of 3118)Go to Search Parameters...
Brief Description
Experienced in surveying, pipeline works and under ground tunnels. Have total 19 years experience.
HSE Manager, specializing in Oil and Gas Plant Construction, adaptable person with extensive travel and international experience. I am ambitious, aggressive, multilingual and entrepreneurial.
P3, MS Project, MS office Applications, High Rise buildings. 9.8 yrs Exp
Instrument & Control Supervisor / Engineer
Teaching assistant at faculty of engineering and senior welding engineer at DSD company
Structural Engineer with 8 years experience
Electrical system design, engineering and execution for MV/LV/ELV services. Adequate knowledge to review HVAC and other mechanical services. Coordination works for MEP Engineering.
Experienced in Pressure vessels, Piping, Pipelines (onshore & offshore), Offshore structures such as jackets & deck, buoys, turrets, PLEMS etc., Storage tanks, etc. for major oil/gas, petrochemical, fertilizer and power sector companies involving materials.
Safety looking for construction employment ready to travel
Gas turbine repair coating blade vane nozzle hot gas path corrosion oxidation
Senior controls and Scada Systems Analyst
BSc in Civil Engineering & 8 years experience in Oil &Gas feild & Dam Construction
HSE Manager
Computer Aided Design and Drafting
Project Planner, Project Scheduler, Project Control, over 9 years experience working As planning/scheduling with Primavera/Tilos and MS project
Acting as QA/QC Manager/Cordinator (Welding, Inspection & NDT), with more 15 years of experience in the Middle East and European Union in the field of Oil & Gas and power piping projects. Experienced in work with multinational engineering companies (ALSTOM. TOTAL, KAVAERNOR¡K)
A proven track record of success in international construction projects spanning 14 year. Highly capable in any role from hands on tradesperson to Project Managements. Certification in a trade (Plumbing) and a Civil engineering diploma.
Having 15 years of experience in Geology Industry
project manager,bridge engineer,cost/quantity engineer,resident engineer
7 years of experience in sales and marketing of acoustics products like sound attenuators & acoustics louvers
A QA/QC Manager in an organization where extensive knowledge of Quality Management Systems, Welding, Inspection, Fabrication and Installation of Heavy steel structures and Pressure Vessels in Industrial Construction with excellent managing and organizing skills is required to drive the organization
Bachelor of Engineering Batch 1978 From Punjab Engineering College – Chandigarh – India.
Naval architectural & marine structural engineering design with cad skill and experences
Installation, & Maintenance Engineer
Civil engineering design consultant and project management professional
I am gratueted civil constructions engineer later specialized and certified in planning and cost control using Primavera Softwerw, all versions. I have large experience in planning and cost control; experience working abroad, in Europe, Asia and Middle East;
Pre and post project contract control and responsibility To ensure service delivery to clients. General knowledge of current legal developments in respect of construction and associated law. Preparation of tenders documents, cost estimates, preliminary costing, bill checking, preparation of project
Knowledgeable in ship planning. Knowledge in welding, cutting/fitting, machining. Knows how to drive. Computer knowledgeable in Autocad, MS word, MS excel and internet manipulation. Service-oriented person and communicates effectively. Ability to deal different kind of personalities. Can easily adap
18 years experience on Land and underground surveying works
11 years experience in Oil & Gas, Refineries, Power Plant and computer literate
Cad Draftsman, I have 15 years of experience as draftsman, most especially in structural work, I am fully dynamic worker and workaholic. Once I employed I will gave all the best, to the company I work and most of all the Sincerity to the company.
Skill: ArcView GIS +AutoCAD-2002, M.A.in Geography and Post Graduate Diploma in Remote Sensing and GIS
Excellent in using computer, Microsoft Office , Auto CAD, Synchro and Sim Traffic, and LDD
Experience of over 18 years in Civil Engineering - Road, Building & Railway works i.e., Topographical Survey, Estimation (Quantity Survey), Planning, Preparation of Drawings/ Reports
License Civil Engineer with 4 yrs experience in contracting company
Specialized in freehand sketches, sketch up, auto cad, photoshop, architectural model making , planning
B.ENG(CIVIL) AND AUTOCAD 2D-3D
Over 17 years of experience as an Electrician
Project \Contracts Engineering professional with 17 years of multi faceted experience in Projects\ Planning\Budgeting\Costing\Execution\Construction\Production\Logistics\Global Procurement with commercial knowledge.
Electrical engineer with more than 14 years experience in electrical construction, supervision of contractors, project management, with vast knowledge also about mechanical systems (pumps, tanks, cooling equipments etc.)
A dedicated highways engineer with 18 years of professional experience in the Asia and Middle East;
Working 18 years with multinational companies of Power Sector (includes related Water & Waste Water treatment and Oil & Gas systems). Now working as Site Representative (Manager)and reporting directly to Project Director. See the CV
DESIGN ENGINEERING IN FIRE PROTECTION SYSTEM, FIRE ALARM SYSTEM, BMS, SECURITY SYSTEM, PHE.
Masters Degree in Seismology, Three years experience in a Consulting Organization, ability to present concise reports, Diplomacy, tact and administrative skills in order to work with people at managerial levels. Well developed interpersonal and team skills and proven ability to be flexible in demand
Land Surveyor/Layouts,setting of elevation/Road Constructions/Drainage system and alikes
More than 5 years experience in surveying cum supervision works which includes cadastral, horizontal and vertical constructions – experienced in construction layout, boundary, topographic surveys; computer literate (Microsoft word, Microsoft Excel, Microsoft Outlook, AUTOCADD and TGO
Fervent and dedicated Engineer with seven year's field and design experience, seeking a position in well established company which offers vast technical and analytical skills, team work and environment conducive for professional enhancement and career development.
10 years field, 5 years structural design experience
I have over 8 years working experienced in different industries. 1 year in United Arab Emirates as Electrical Drafter, 4 years in a Japanese firm as Graphics Operator, 3 years in Government sector in the Philippines as Document Controller. I need sponsorship for my visa
Safety Engineer with Mechanical Engineering Background having total 8 years of eeperience out of which 5 years in UAE. I possess an OSHA certificate and First Aid Certificate from American Safety & Health Institute.
First   1   2   3   4   5   6   7   [ 8 ]   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com