CONTACT INFORMATION:
View contact information...

DETAILS OF QUALIFICATION

Exam Passed Year of passing Name of University / Board Remarks

Diploma in Mechanical Engg. 1970 Board of Technical Education Tamilnadu, India
Diploma in Tool Design 1975 Board of Technical Education Tamilnadu, India
CSWIP 3.2 - Sr. Welding Inspector May 2000 TWI London Valid up to April 2010
Level III in PT, MT, RT and VT Nov 1999 ASNT Valid up to NOV 2009
ISO9000:2000 Series Auditor/Lead Auditor 2008 LRQA

8. COMPUTER LITERACY Microsoft word, Excel, FoxPro, Access & WinPCS

9. BRIEF SUMMARY OF EXPERIENCE:
QA/QC/ CERTIFICATION / DOCUMENTATION /COMPLETION / TURNOVER

a. Preparation of Quality Plan, Inspection and Test Plan.

b. QA/QC on Equipment/Structural/Piping erection, Welding and Documentation.

c. Preparation of WPS and conducting PQR/WQT as per ASME Sec IX, API 1104 & IBR

d. Auditing and Surveillance as per Procedures.

e. Welding visual Inspection.

f. MT, PT, UT and Radiographic film Interpretation.

g. Preparation of test packs, Arrangements for Piping/Valves testing, Co-ordination and Inspection.

h. Stores incoming Material Inspection-Equipments, Valves, Pipe, Fittings, Insulation, etc.

i. Certification/Turnover - Organising and Managing Certification/Turnover Department activities
Verification of MRB, Inspection reports for Mechanical, Piping, Civil and E&I as per QCP, Documentation of Inspection reports, Preparation & Submission of Mechanical completion dossiers to cover Construction, ProComm and Commissioning Completion. Preparation of required Programmes, Reports and Status In FoxPro Database. Activities to satisfy ISO 9000 series requirement.

j. Co-ordination with Construction, QA/QC, Planning and Engineering departments.

k. Scanning and Final Handover of Original documents to the client.

l. Organising and Managing the Punch List Activities, Database files and Reports.

m. Equipment, Structural, Piping and Pipeline fabrication and erection.

n. Site co-ordination, progress monitoring & preparation of progress reports and Billing.

o. Computerisation involving data entry, preparation of database and reports.

- 2 –

10. DETAILS OF EXPERIENCE:

COMPANY / PROJECT / CLIENT / PERIOD / POSITION / EXPERIENCE

A. Teknica (U.K.) Ltd.
Mellitah Oil and Gas BV, Gas Division
HSEQ Corporate office, Tripoli, Libya - Sr. Certification Engineer

Nov 2008 – As of Date

Preparation of Procedures as per the requirement of Projects.
Review and Approval of Contractor and Sub-Contractor Procedures, Work Instructions and
Inspection & Test Plan.
Review and Revision of various Department Procedures.
Internal and External Auditing.
Ensure the required QA/QC requirements are fulfilled by the Projects and indicating the exact requirements
To satisfy Corporate/Project Procedures, ISO 9000 and International Standards.

QA/QC Co-ordination to Projects for Contractors and Sub-contractors activities

Review of Mechanical Completion Packages, MRB and Final Turnover Documents during the phase of Construction, Pre-commissioning and commissioning to ensure all these packages are arranged as per Project Procedures and as per the required Standards.

B. Consolidated Contractors Int'l Co., Abu Dhabi, UAE,
Habshan Gas Complex Expansion Project, GASCO
Sr. Certification / Turnover Engineer

April 2008 – Sept 2008

Organising Databases and Reports, Receiving Data from Client, Checking for the Correctness and Preparing Databases, Informing Missing Data to Client. Checking of Tags requirement and assigning tags as per Drawing for which tags not issued by Client. Assigning System No. for Tags as per System limit Drawings. Forecasting ITP requirements, Receiving ITPs, System Limit Drawings, As built Drawings, Punch Lists and Verification of completed inspection reports for All (Mechanical, Piping, Pipeline, Civil & E&I) Disciplines to check the completion as per specification and procedures.
Execution of All disciplines Inspection Reports Filing and arranges to locate for easy traceability.

Co-ordination with Construction, QA/QC, Pre-com and Commissioning Departments for the requirements to achieve Mechanical Completion and Commissioning as per Project Schedules.
Compiling of Specific and Generic inspection reports as per System to handover to client. Tracking of Progress, informing Status to Discipline Managers and Follow-up to achieve Mechanical Completion as per Schedules to Achieve Commissioning.

Preparation of interim mechanical completion packs and final mechanical completion packs ensuring Construction and ProComm/Commissioning Completion.
Computerisation of data including preparation of Software/Programs in FoxPro for entry in Database, preparation of status / report as required. Punch list Tracking, Status and Preparation of required Reports.
Scanning and Turnover of Documents as per Project Procedures.

Cont…3

- 3 -

C. Chiyoda Corporation, Chiyoda Technip Joint Venture, - QGX II LNG Project, State of Qatar
Sr. Certification Engineer
Feb 2007 – Dec 2007

Turnover / Mechanical Completion Department
Execution of Activities:

Ensure the proper setup of Sub-Contractors certification Department with required resources.
Ensure Sub-Contractor's database for documentation is developed to meet the project Procedures requirements to track the progress and producing Reports for the required Details.
To check transfer of the required tags from Contractor's WinPCS system to Sub-contractors database and to ensure the forecast of the required Inspection and test reports, Data entry into Database for the required details and filing of the documents as per Project Procedure requirements.
Co-ordination between Sub-Contractors, CTJV Turnover Group and Client for all Certification issues in resolving day to day problems,

Organising Databases and Reports as required for assessing the Progress and Status of Systems for CTJV personals.

Arrange required reports to ensure components required for Systems are completed with the appropriate Inspection Reports to submit with Mechanical Completion Package.
Co-ordination with Sub-Contractors, CTJV Construction/QC/Commissioning & Turnover Departments to keep the target date of the Mechanical Completion.
Arrange to Issue the progress /outstanding Reports to ensure the System completion as required.
To ensure Sub-Contractors maintain outstanding items in Punch List Database incorporating required details and closing of the activities after completion. To produce required reports to track the punch list outstanding and completed.

To ensure Sub-Contractors maintain Specific and Generic inspections reports for easy traceability and as per project procedures.
Indicate the requirements for arranging and Turn over of Original Documents as per Project requirements with appropriate files & indexes and to ensure all the required Specific and Generic documents are included.
Assisting Turn Over Group for the Preparation of Mechanical Completion and Commissioning Dossiers, Scanning of the Documents and
Turn over of System Original Documents to Client as per schedules.

D. Global Petroprojects Services, Saipem, Sakhalin, Russia - Phase 2 Oil & Gas Pipeline Project

Sept 2005 – Jan 2007 Certification Engineer
QA/QC - Certification Dept.
Execution of activities:
Preparation of Main System / Sub-System Limit Drawings and components as per Project requirements.

Organising Databases and Reports, Receiving Data from Client, Checking for the Correctness and Preparing Databases, Informing Missing Data to Client. Forecast of required tags for Pipeline & AGI Activities. Assigning System No. For Identified Tags forecasting ITP requirements, Receiving Inspection and Test Reports, System Limit Drawings, As built Drawings, Punch Lists and Verification of completed inspection reports for all Disciplines and to check the completion as per specification and procedures.
Checking of sub-contractor's Pre-test, C&G and Final Test packs as per Project and Procedure requirements and to issue clearance for the activity.

Compiling of Western and Russian Documents as per System to handover to Client. Tracking of Progress, Preparation of CRR, informing Status to Spread/Discipline Managers and Follow-up to achieve Mechanical Completion as per Schedules to Achieve ProComm / Commissioning. Ensure outstanding activities are carried over to Punch, tracking of Punch List Status and Preparation of required Reports.
Preparation of interim mechanical completion packs and final mechanical completion packs ensuring Construction and ProComm/Commissioning Completion.
Coordinating the activities with All Pipeline Spreads and organising Main Database, to achieve final completion of the Project.
Scanning and Handing over the Documents as per Project Procedures.

Cont…4

- 4 -

E. Consolidated Contractors Int'l Co., Sultanate of Oman - Oman – Sohar Refinery Project

June 2005 – July 2005 Certification Engineer
Certification Department Activities (As indicated in Sl. No.K )

F. Consolidated Contractors Int'l Co., Sultanate of Oman - Oman – India Fertilizer Project

Oct 2004 – April 2005 Certification Engineer
Certification Department Activities (As indicated in Sl. No.K )

G. Consolidated Contractors Int'l Co., Aksai, Republic of Kazakhstan - Karachaganak Project

July 2001 - Sept 2004 Certification Supervisor

Certification Department Activities (As indicated in Sl. No.K and also executed the works as per the requirements of ROK Standards and Procedures. )

H. Consolidated Contractors Int'l Co., Abu Dhabi, UAE - Onshore Gas Development Project, Phase 2
Abu Dhabi National Oil Company

May 1999 - April 2001 Certification Supervisor
Certification Department Activities (As indicated in Sl. No. K )

I. Dodsal Private Ltd., Muscat - Gas Pipeline Project, Petroleum Development of Oman

FEB 1999 - APR 1999 Sr. QA/QC Inspector
Duplex Stainless Steel Piping/Pipeline Fabrication,Erection,Welding Inspection,PT,UT and QA/QC activities

J. Consolidated Contractors Int'l Co., Doha, Qatar - Khatiyah Degassing Plant and pipeline.
Pressure Water Injection project
Ras Laffan LNG Project,
Qatar General Petroleum Corp.
Ras Laffan LNG Company

Jan 1997 - Oct 1998 Sr. QA/QC Inspector

QC Dept. - Welding Procedure preparation, Conducting PQR, Qualification of Welders, welding visual Inspection, Piping spool dimensional checking, MT, PT, Radiographic film interpretation and co-ordination, PWHT / Pressure test co- ordination and inspection, preparation of Pressure Test Packs, Material Inspection, QA/QC on equipment, structural/ piping fabrication & erection and preparation of Project
Dossiers.

K. Consolidated Contractors Int'l Co., Abu Dhabi, UAE - Onshore Gas Development Project, Phase 1
Abu Dhabi National Oil Company
Nov. 1993 -July 1996 Certification Supervisor
Certification Dept. Activities: Organising Databases and Reports, Receiving Data from Client, Checking for the Correctness and Preparing Databases, Informing Missing Data to Client-Assigning System No. for Tags as per System limit Drawings. Forecasting ITP requirements, Receiving ITPs, System Limit Drawings, As built Drawings, Punch Lists and Verification of completed inspection reports for All (Mechanical, Piping, Pipeline, Civil & E&I) Disciplines to check the completion as per specification and procedures. Compiling of inspection reports as per System to handover to client. Tracking of Progress, informing Status to Discipline Managers and Follow-up to achieve Mechanical Completion as per Schedules to Achieve Commissioning.
Preparation of interim mechanical completion packs and final mechanical completion packs ensuring Construction and ProComm/Commissioning Completion.
Computerisation of data including preparation of Software/Programs in FoxPro for entry in Database, preparation of status / report as required. Punch list Tracking, Status and Preparation of required Reports.
Scanning and Handing over the Documents as per Project Procedures.

L. Consolidated Contractors Co, Dhahran, K.S.A - Gas & Oil Separation Plant, Saudi Aramco Project
Jan 1992 - Sept 1993 QA/QC Inspector
QA/QC inspection on structural fabrication / erection, equipment erection & CS/SS/RTR piping fabrication and erection. Inspection of internal and external coating/painting for vessels and piping. Preparation of Procedures, progress, planning schedules and Turnover of Original documentation to Client.

Cont…5

- 5 -

M. AICAM Engg. Pvt. Ltd., Madras, India. Nuclear Power Project, Oil Natural Gas Project, Offshore Project
Aug 1990 - Dec 1991 Deputy QA/QC Manager
Fabrication, Welding, NDT and QA/QC of Nuclear components, Pressure vessels and tanks. Planning, estimation, fabrication, welding, erection and QA/QC for Jacket.
N. Foster Wheeler - SNC, Canada, Zia Fertiliser Co. Ltd. Bangladesh (129 TPH Process Boiler)
Nov 1989 - July 1990 Mechanical site Engineer
Planning, erection of structurals and stack. Fabrication & erection of LP & HP piping, welding, NDT, Insulation & painting. Preparations of field run piping drawings/As-built drawings and QA/QC.
O. GEC Power Engg. Services, New Delhi, India - GEC TGIL, UK, Balco Captive Power Plant (68MWx 4)
Ennore Thermal Power Plant (110MW)
Malaysia National Elect. Board(210MW)
July 1986 - Nov 1989 Deputy Manager
Erection of equipments and piping. QA/QC on erection, testing, welding, NDT, store and documentation. MT, PT, UT and Radiographic film interpretation. Computerisation to maintain drawing, welding/NDE status and other documentation. Maintenance of pumps, boiler and other piping systems, Insulation and painting.
P. Vijay Engg. & Trading Co., Bangalore, India - Tamilnadu Newsprint Plant,
Tamilnadu Ind'l Explosives Plant
Mettur Thermal Power Plant-210MW
Sept 1983 - June 1986 Resident Engineer
Erection of recovery boiler, erection of all types of equipment and piping. Welding/NDT, QA/QC, Planning, Estimation, Procurement, store, accounts etc. associated with site.
Q. Mukund Iron & Steel Works, Bombay, India - Reactor Research Centre, Kalpakkam, India
June 1982 - Sept 1983 Piping Engineer
Fabrication & erection of Nuclear piping and testing. Welding/NDT, Quality Control and inspection.
R. Madras Atomic Power Project, Dept. of Atomic Energy, India - Madras Atomic Power Station-235MW
May 1974 - Apr 1982 Senior Supervisor
Erection of all types of equipments, HP & LP piping, Planning, Estimation, Inspection, Procurement, Control of sub-contractor, Billing, Preparation of as-built sketches and commissioning of the systems.
S. Tamilnadu Transport Dept. Madras, India - Workshop
Nov 1972 - Apr 1974 Chargeman
Vehicle maintenance, planning, estimation, procurement, Inspection & workshop activities
T. Pallavan Transport Corporation, Madras, India - Workshop
Jan 1972 - Nov 1972 Engg. Apprentice
Vehicle maintenance, planning, estimation, procurement & inspection
U. Vel Engineering Works, Madas, India - Workshop
June 1970 - Jan 1972 Engineer
Procurement and inspection of automobile parts

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1351 to 1400 of 3118)Go to Search Parameters...
Brief Description
Emad Toubar is currently employed by Saudi Consolidated Engineering, SA as a senior mechanical piping engineer, where he provides engineering design services for Saudi ARAMCO and other major petroleum companies in Saudi Arabia including design of piping systems and petroleum pipelines for new wells.
Highly motivated individual with strong FEA experience. As a stress analyst, I enjoy analysing the products that designers design, highlight potential problem areas and ultimately help product development by saving cost. My aim is to make product more durable and cost effetive.
Electrical & Instrument Designer
Structural Engineer +3 Years EXP.
HSE officer with 6yrs of exp. having Nebosh, Iosh, Osha etc.
Working as Senior Project Engineer in Ontario, Canada with a firm, which specializes in the design of municipal infrastructure, roads and water resource management.
Ability: proficient in window application
Senior Electrical Engineer
I have over 5years and 8 months of combined experience in computer programming and design of electronic appliance controls mainly for HVAC products. Presently I am working as an Electronics Engineer (HVAC Electronic Controls Design, Testing & Approval) in the R & D dept. of Awal Gulf Mft. Co.
This is a resume which will illustrate briefly what I have achieved both with educational and industrial environments.
Sr Structural Designer / PDS FrameWorks Coordinator and project set up.
Estimator, Project Manager, Project Engineer, Construction Administrator, Architectural Designer, CAD
instrument engineer with 6 yrs of experiencer in construction management,projects and commisioning in instrumentation field.
Primavera Scheduler
Facilities supervisor for utilities, electrical disturbution, ammonia refrigeration, power boilers and heat exchangers,production equipment, infrastructure, mechanical contractor for twenty years,
Radiation Safety Officer, Certified Health Physicist, Environmental Manager
Mechanical Engineer, 2 yrs of experience in design and development, cad packages- CATIA V5, solidworks 2006
For the post of Design and draughting
Six years of experience in Project Management, Contract Management, Quality Control and site supervision of high-rise residential and commercial project. About four year of experience in Project Management of an industrial projects.
Objective: To contribute my technical skills and to be part of professionally managed Organization that provides excellent opportunities for learning and scope for Individual development.
Architect and Environmental Planner Total Job Experience-2.5 yrs as an Architect 2 Months as a Planner
Bilingual engineer with experience in engineering and teaching. Experience in administration, group management. Dynamic and outgoing by nature.
MSc in Environmental Engineering from University of Nottingham, UK
I am piping engineer with diploma in mechanical engineering to Poli- Technic institute "GH.Asachi" Iasi, Romania
Piping Designer with Over 20 years experience within the Oil and Gas, Petro Chemical, Refinery, Textile, Pharmaceutical and Nuclear Waste Industries
Young academically accomplished geotechnical engineer, practical experience in the mining industry both domestic and overseas.
Application for the post of Safety officer
EXPERIENCED PIPING ENGINEER WITH PDS ADVANCED EXPERTISE / TECHNICAL DATA SPECIALIST
Make, Review and implement Engineering design, construction work,inter-diciplinary interfaces, Construction Specifications, Progress reports, Quality Plans and all the commssioning and Maintenance Procedures.
Knowledge of Hydrotreating & Hydrocracking, Catalytic Cracking, Distillation and Amine plants. Knowledge of Process simulation (HYSYS, ASPEN Plus, PRO II and HTRI), PFD, P&ID, Flare and Relief systems, LDT, Hydraulic calculation, HAZOP review, Equipment sizing, TBE, DPDT and process data sheet
QA/QC, CERTIFICATION, TURNOVER
Interior fitouts Project Manager - expertise in Site execution, Management, Planning , Procurement, Coordination between Services. A Go-Getter and Self-Motivated Engineering Professional.
I have a master degree from the American University in Cairo, excellent computer skills, English & French languages, Excellent communication skills, and presentable. I prefer workin in construction management field
I am a master electrician with 35 plus years in the management of large construction projects. I have over three years experience working in Iraq, working with many different cultures and in adverse conditions.
Develop & implement Contractor’s Quality Control Plan in accordance with contract & technical specifications including writing the Inspection & Test Plan, Quality Audits, Record Keeping, Prepatory Phase Meetings, Resolve NCR's, Process Control, Sub-Contractor Control, every aspect of Quality Control
Im certified coating inspector B-GAS grade2&SSPC-PCI
Senior Electrical, Energy Model, LEED, sustainable, Head, Manager, renewable, coordinator, building commercial, residential, healthcare, Education, industrial, parks, Hotels
Career Objective
Twenty five years experience in ten manufacturing sites with four integrated major and three independent oil companies. Responsibilities include Unit Operator through Refinery Manager, and span operations, maintenance and technical departments. Steady promotion and career growth.
Experienced Autocad drafter with 5 yrs. structural steel detailing experience seeking employment.
6+ years of software design and development experience with specialization in Client/Server programming, Object Oriented Analysis and Design. Proficient in, C/C++, MFC, Visual C++, Win32 API, COM/DCOM, multithreading.
Curtain Wall Civil Structural Engineer Manager
A structural engineer with experience in design, construction and inspection of buildings and bridges.
11 years of experience in Erection & Installation, Engineering, Design, Commissioning, Inspection and other Management activities in the field of Terminal Automation, Gas Metering, Refinery, Gathering Centers and others.
Engineer with practical business, design and management experience in the areas of Civil and Geotechnical Engineering. Educated professional, committed to continuous improvement, ethics, teamwork and quality service. Detail oriented, excellent communicator, and capable of managing multiple projects
16 years in Engineering, Procurement and Construction projects associated with cost control, planning and scheduling fields. Project categories includes petrochemical, gas and oil refining, power, and industrial, buildings, roads and a sports complex. Conversant with project cost control s
Willing to accept challenging career in telecom Development Equipment Environment with management and seeking for a position where I can utilize my technical skills and professional experience, to provide the best of mine for the success and growth of the organization and gain satisfaction thereof.
To obtain Position in Project Management or Project Engineering in an International Environment
SAP knowledge,Material engineer,controller.Thorough knowlege of Isometric drawing,fabrication,material manual,and inventory.oil and gas field,gulf and offshore experience.
Senior Project Coordination/Management Engineer-Oil Gas Petrochemical Energy & Infrastructure
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   [ 28 ]   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com