Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #80833
next resume »»
CONTACT INFORMATION:
View contact information...
Objective
To obtain a professional technical position where utilization of my skills can benefit an employer and provide new challenges in area of expertise.
Qualifications
Complete knowledge of managing and scheduling multiple EPC projects utilizing Primavera and MS Project software's. Employed at senior levels in Project Controls departments and have a full understanding of the procedures necessary to develop and maintain project schedules. Have an extensive background in Project Controls with the capability to generate costs and resource usage reports & graphs
Experience
2008-2009 CB&I /Bergaila & Associates, Beaumont TX.
Lead Project Planner/Project Controls
Responsible for the development of Multi-Discipline resource loaded E&P project schedules for a multi-million dollar Hydo-Cracker Unit Project utilizing Primavera Project Planner 3.1 for Hunt Refinery in Tuscaloosa AL.
Tracked and updated E&P schedule with information provided from Engineers & Designers, as well as visually verified the reported progress.
Generated Month ending Reports and schedules required by client, Informed Management of potential schedule conflicts and recommended corrective action.
Tracked progress utilizing Earned Value methodologies as well as job cost.
Generated Job Cost reports as well Project Progress reports for weekly project team meetings to insure allocated project budget was not exceeding man-hour budget plan and project cost plan.
2008-2008 Innovative Management Solutions, Plano TX.
Project Controls Specialist
Responsible for the development of Multi-Discipline resource loaded construction project schedules for a multi-million dollar Hydo-Cracker Unit Project utilizing Primavera Sure Trak for Navajo Refinery in Artesia NM.
Tracked and updated master schedule with information provided from contractors, as well as visually verified the reported progress from the contractor.Acted as mentor to the development of the contractor construction schedules and assisted with the refinement as necessary.
Tracked progress utilizing Earned Value methodologies as well as job cost.
Generated Job Cost reports as well Project Progress reports for weekly project team meetings to insure allocated project budget was not exceeding man-hour budget plan and project cost plan.
2007-2007 CDI Engineering/Exxon Mobil/Contract Houston TX.
Project Controls Manager
Responsible for the Pre-Feed development of Multi-Discipline resource loaded project schedules for a multi-billion dollar (GTL) Gas to Liquid Refinement project located in the Middle East Country of Qatar.
Continued implementation of Primavera P3ec software for utilization during the development of multi-discipline resource loaded project schedules during the Pre-Feed exercise for Exxon Mobil. Responsible for the schedule refinement during the entire Pre-Feed exercise, working with all discipline managers to obtain passage through gate 2 of the GTL project in order to obtain continuous funding of the project.
Tracked progress utilizing Earned Value methodologies as well as job cost.
Generated Job Cost reports as well Project Progress reports for weekly project team meetings to insure allocated project budget was not exceeding man-hour budget plan and project cost plan.
2006-2007 Veco Engineering / Bergaila and Associates /Anchorage Alaska.
Project Control Specialist
Developed Multi-discipline resource loaded EPC schedules for Trans-Alaskan pipeline upgrade projects for utilizing Primavera P3ec.
Ensured that project progress was tracked and updated for all involved engineering and production disciplines.
Worked directly with Engineering Leads & Lead field personnel to ensure that Engineering and Production updates were accurately reported.
Generated weekly updated project schedules and resource usage reports for review during weekly team meetings.
2006-2006 BE&K Engineering Houston Tx.
Engineering Scheduler/ Project Cost
Responsible for developing the Detailed Engineering and Procurement side of the project schedule utilizing P3 EC.
Ensured that all logic associated with scheduled deliverables would not conflict with the production side of the schedule.
Insured that project progress was tracked and updated for engineering side of project schedule.
Tracked Job cost and reported project labor expenses to insure project budget was not exceeding costing plan.
2005-2006 Dow Engineering Solutions, Houston Tx.
Engineering Project Planner/ Project Controls Lead Contract
Responsible for developing the Detailed Engineering and Procurement side of the project schedule utilizing P3 EC.
Ensured that all logic associated with scheduled deliverables would not conflict with the production side of the schedule.
Insured that project progress was tracked and updated for engineering side of project schedule. Tracked Job cost and reported project labor expenses to insure project budget was not exceeding costing plan.
Generated the project status report on a monthly basis for the project team.
2004-2004 LK Jordan / Albert-Garaudy and Associates, Inc.Houston Tx.
Engineering Project Planner/ Project Controls Contract
Responsible for developing the Detailed Engineering and Procurement side of the project schedule. Ensured that all logic associated with scheduled deliverables would not conflict with the production side of the schedule.
Insured that project progress was tracked and updated for engineering side of project schedule.
Tracked Job cost and reported project labor expenses to insure project budget was not exceeding costing plan
2004-2004 J Ray McDermott / G.A.S Unlimited. Houston Tx.
Engineering Project Planner/ Contract
Responsible for developing the Engineering side of the project schedule.
Ensured that all logic associated with scheduled deliverables would not conflict with the production side of the schedule. Insured that project progress was tracked and updated for engineering side of project schedule.
2003-2003 Universal Compression Houston TX.
Master Planner/Contract
Developed and Implemented master plan for industrial compression unit manufacturer utilizing Primavera P3, including all schedule coding and resource loading.
Created data gathering processes for client for schedule updating and progressing.
Created proposal schedules for future work.
2001-2002 General Electric AEP/ Granite Houston TX.
Project Coordinator/Contract
Developed installation and commissioning schedules for GE LM 2500 marine package power units. Insured schedules were updated weekly with information provided from onsite managers.
Insured the update of project action item lists on a weekly basis.
Presented updated project information in weekly staff meetings.
Scheduled resources available for installation, commissioning and testing for projects abroad. Coordinated the shipment of the power units and sub-systems to construction facilities abroad.
2000-2001 Halter Marine Gulfport, MS.
Master Planner/ Scheduler
Developed multi-yard master schedule and insured yards construction plan was followed according to schedule. Incorporated any change to plan into master schedule.
Developed integrated construction schedules to be incorporated into the master schedule for multi-million dollar vessel contracts utilizing Primavera P3 and MS Project software's
Generated weekly job cost reports in MS Access for weekly review by corporate executives.
Created and published building strategies for vessel contracts to be utilized by primary construction facilities.
1998-2000 Bollinger Shipyards Lockport, LA.
Planner/ Scheduler
Developed integrated project schedules for multi-million dollar government contracts utilizing Primavera P3.
Insured MRP process was run to insure that productions needs were met material needs according to scheduled activities.
Generated weekly job cost reports for weekly review by corporate executives.
Insured that schedules were updated from information provided by yard personnel and physically verified this information on a weekly basis.
1994-1998 Service Marine Ind. Morgan City, LA.
Lead Planner/ Planning Manager
Managed staff of four Planner/Schedulers and Project Controls.
Assigned projects to individual planners and supervised the development of vessel construction schedules in Primavera P3.
Insured that construction schedules were updated on a weekly basis with information provided from individual yard disciplines.
Responsible for reporting production progress and efficiencies to Vice President of Engineering and Production.
Created proposal schedules for future work.
Education
2008-Present Currently Working on Project Management Professional Certification (PMP)
2008 - Primavera Contracts Manager Training Plano, TX.
2000-2000 ORACLE, MRP & BOM Lockport, LA.
1997-1997 Primavera Courses 601,602, and 603, Morgan City LA.
1987-1988 San Antonio College San Antonio, TX.
1984-1985 USCG Marine Engineering, Yorktown, VA.
A.A.S. Marine Engineering Technology
Graduated with distinction
Honorably Discharged from the United States Coast Guard
Other Skills Proficient with Microsoft Excel, Access, Word, Power Point and others.
References
Bryan Ready
CB&I, Beaumont,TX
Project Controls Manager (409) 980-5597
Marceldine Madenwald
CB&I Beaumont, TX
Project Controls Cost Manager (409) 980-6717
David Pelc
United Space Alliance, Houston, TX.
Planning Manager (281) 282-5694
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 2001 to 2050 of 3092)
Go to Search Parameters...
Brief Description
Project Manager / Finance Management
22 YEARS POWER, PETROL-CHEMICAL, AND REFINERY INDUSTRY
10 Plus years Developing and maintaining EPC Schedules Utilizing Primavera Softwares
ISO Implementation, Documents, Records, Archival Management, QA Manager, Writing Technical Documents, Auditor
Tendering & Estimation, Proposals Preparation, Contracts Engineer
Fourteen years of consistent and solid work experience in the field of Instrumentation, out of which the past ten years are in the Middle East. Certified in Instrumentation Mechanism by the Government I.T.I. from T.R. Pattinam, Karaikkal, Pondicherry, India during the year 1990-92.
Certified Safety Professional with over 20 years experience, in multiple industries, including oil and gas, medical, transportation, environmental and manufacturing.
Electrical Engineer / Site Engineer / Supervisor / Draftsman
Quality Control professional
Rotating & reciprocating equipment technician
Maritime chief engineer with more than 20 years on bord sea-going ships and 7 years as HVAC Technician and Electrician for shore-based companies,searching now a shore based job in accordance with education and experience.
Architectural Technologist student seeking summer employment Some construction experience good AUTOCAD skills
Refractory field engineer, 40 years global experience in refractory/furnace construction in a variety of industries inc. aluminium, copper, iron&steel, cement, glass, petrochem, & industrial waste
Structural Steel Detailer, Tekla v15, Pro Steel v17 Auctocad 2008
Senior Geoenvironmental Engineer (Contaminated Land, Geotechnical) with over 5 years UK experience
Qualified, results-producing Management Professional with experience steering and directing all aspects of operations, administration, budgeting, and equipment maintenance. Successful in managing multiple projects with compelling priorities involving program development.
Professional Land Surveyor
Electrical Engineer and Computer Sciencer
Twenty years experience in global recruitment of oil & gas people: including manpower planning for companies such as AkerKvaerner, ConocoPhillips, Exxon, KBR, Fluor, Shell, Technip and Woodside for oil & gas projects in Australia, Brunei, Indonesia, Malaysia, Singapore and Korea.
Electrical-Mechanical Engineer graduate from National University of Engineering with experience on electrical distribution projects and projects execution in the oil and gas industry. I have the ability to interact and communicate with all disciplines in the engineering field. I am competent in work
Multi-skilled engineer
I am a qualified Metallurgy and Materials Engineer with international research and training experience. I am a person with strong organizational skills and am very confident in analyzing and solving problems with positive outcomes. My past studies in Metallurgy and Materials Technology and the resea
Proficient in reading mechanical drawings and designing using Auto Cad, CATIA, NX-IDEAS.Strong Technical writing and presentation skills along with good hold in MS - Office.Master of Engineering (G.P.A - 10.33 out of 13)(2008- 2009)University of Windsor.
Summary of Qualifications: Proficient in this engineering software: 3D - PDS Equipment, Piping modeling/design,Isogen, SmartPlant Review, Microstation, AutoCad. Industries: Nuclear, Energy, Power, Petroleum / Refinery, Chemical, Logistics, Transportation, Manufacturing and Defense.
I am working as welding inspector in oceanreeng ois project Ras Gas. And befor date of 28 april 2007 working with EIL project Burj Dubai Development & GRAVITY BASE STRUCTER IN DUBAI DRY DOCKS.
Civil/Structural/ Architectural Designer with extensive knowledge of petrochemical and oil and gas industry. Expertise in 3d Bentley Structural and knowledgeable in Staad Pro
Develop and Execute marketing strategies/plans by analyzing current business situations in order to meet group's business objectives and also to maintain and increase sales. (Advertising/PR/Events/Promotions/Exhibitions/Market research)
Mechanical Engineer, technical support
Eco-friendly Architect, Revit, Autocad, 3D max, SketchUp, Photoshop, Flash, Coral-draw, Illustrator, Rhino3D.
E&I Construction Supt.,Inspector, Commissioning Eng. 30 years plus experience, in various industries, at various supervisory levels.
Instrument Engineer and technician with 27 years experience in design, installation, commissioning, start-up, operations and maintenance of oil and gas facilities worldwide.
Sales, Engineering Project Manager
12 Years of experience in the Project Management, Planning, Controlling, Production and Material Management
15 years experience in erection commissioning and maintenace of field instrumentation , DCS, PLC, SCADA ,VFD, LT PANELS , in petrochemical, steel, pharma,copper plants
I am Mechanical engineering graduate with 18 years of experience with the Project Management & execution, Procurement & Contract Management. Executed Tendering, Commercial Evaluation, Negotiation, and Contract Administration for mega projects in Hydrocarbon and Oil & Gas sector. Involved in Concept
Mining and geological engineer from the university of Liege with a specialization in geophysical methods and geotechnics.
Project Manager, Field Engineer, Commissioning Electrical Switchgear
ISO/ASNT certified Vibration analyst ,More than three years of engineering experience ,Analytical skills and self learning ability,committed to any work unconditionally,Able to work under pressure,Able to liaison between technical groups ,Proven ability to improve efficiency
Free!
Varied and broad experience in construction, on/offshore projects, mechanical & piping, shipping, logistics, materials and QA-QC all mainly in the oil & gas industry for over 35 years. Countries worked: Eq/Guinea-Nigeria-Egypt-Ivory Coast-India-China-Canada-Spain-Holland-UAE-Oman-Qatar-Malaysia-Indo
Total eleven years of experience in Refineries/Petrochemicals, Chemical & Oil Port Terminal, Offshore Platform projects etc. Presently working with Foster Wheeler, Singapore and Previously worked for prestigious organizations like, Technip-France, Snamprogetti SpA-Italy, Indian Oiltanking, Indo Gulf
Experience in Instruments of PERKIN ELMER and applied bio-system, installation, commissioning, maintenance, and calibration of various instruments;
Applying for the post of safety officer in your esteemed concern
Academic Background:M.Sc.Tech. (1987), Applied Geology, Indian School of Mines, Dhanbad, India. Expertise: Engineering Geology and Rock Mechanics in the field of rock engineering
Over 20 Years Industrial, I&E Commissioning Field Service Engineer /Electrical Start-up Engineer
I am Tank and piping/pipeline / structure Superintendant
Environment, safety, health, quality, security, international, lean manfuracturing, construction, operation, management
A Buyer /Expeditor with 18 years Gulf experience
Welding Engineer, ASME,AWS D1.1, Welding Inspection, Welding supervision
Familiar with all steps of equipment, structure fabrication and piping installation as pertinent specification, document control, subcontractor management knowledge, claim representation and site safety conception.
I'm the Safety Manager for the company I'm with now...
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
[ 41 ]
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com