CONTACT INFORMATION:
View contact information...
Marital Status: Single
Nationality: Nigerian
Date of Birth: 8th April 1979
Diving Licence: - Full UK Licence
WORK EXPERIENCE
1. October 2008 – January 2009. Gleeds Management and Construction Consultancy Tunbridge Wells Kent UK.
Position: Quantity Surveyor
* I assisted in managing costs on a wide variety of new building projects and structures, such as residential developments, schools, offices and factories.
* Responsible for undertaking costs analysis for repairs and maintenance of projects
* Actively involved in carrying out feasibility studies, risk and value management, cost control, tenders and contract documentation.
* Identified, analysed, and developed responses to commercial risks
* In charge of writing progress reports, evaluation of completed works, arranging for payments while ensuring that health and Safety regulations are met at all times.
2. June 2008 – September 2008 GLEEDS (PFI/PPP sector Gleeds Management Services Limited) London UK
Position: Project Manager
* I functioned as a Project Manager within GLEEDS PFI department over a four month period during which I worked with a team of three Project Managers on the 'Building School for the Future' scheme for Kent County Council in Maidstone (KCC),
* I was responsible for managing area data sheets of the drawings, room data sheets, ICT part and LCT
* I liaised with sub-contractors on behalf of KCC to ensure accurate drawings, schedules, tools, as well as Health and Safety issues are properly designed and carefully followed.
3. January 2006 – July 2008 Gleeds Management and Construction Consultancy Tunbridge Wells Kent UK.
Position: Quantity Surveyor
* Assisted in establishing client's requirements while undertaking feasibility studies of projects
* Prepared early stage budgets and detailed cost plans while performing risk and value management
* Advised my employer on various procurement strategies and ensured proper communication is achieved with the procurement department when requesting quotes
* Prepared tender and contracts documents including bill of quantities. I also ensured cost control processes where in place before, during, and after all projects
* Tasked with preparing cost plans for tender
* Actively involved in the establishment of financial control systems
* Excellent working within allocated budgets and still achieving expected results.
* Proficient in providing advice on contractual claims and variations
* Developed skills in problem analysis and report writing
* I have been involved in tendering and valuation of local contracts on different projects
* I have carried out extensive work on major projects in new buildings and fit outs in London and South East England. These ranged from £2million - £18million.
* I was tasked with the pre-qualification of suppliers, the creation of bidder's lists and the preparation of contractual terms and conditions in the preparation of tender documents.
4. Oct. 2000 – Aug. 2005 Lexibus Engineering Group, Rivers State, Nigeria.
Position: Project Manager
* Actively involved in Residential and Commercial land development projects.
* I designed the schematics for a Storm water project which involved dividing the storm water shed areas, calculation of maximum and minimum flow rate, determination of the storm drain pipe sizes and slopes, surface water drainage slopes as well as determining locations of the storm drainage inlets.
* Street design: determined elevations of centreline curb & gutter and back of walkway; designed gutter slopes to ensure storm water flow. Sewer and waterline design: determined locations, slopes and connections; decided fire hydrant and manhole locations. Street lights location and design.
* I worked with a team of Contract Administrators in the preparation of Contract Documents for an upcoming major phosphate production project in Port Harcourt.
* I was tasked with the preparation of an Environmental Impact Report (EIR), construction of water pipeline, pumping station, treatment plant, and various ancillary buildings and facilities Improvement and plan checking for various Public Agencies.
5. Jan. 2000 – Aug. 2005 Lexibus Petroleum Services Limited, Port Harcourt, Rivers State, Nigeria.
Position: Offshore Project Surveyor
* Responsible for Barge move survey support services for (OCIP project), ExxonMobil (Nig.) Unlimited.
* Survey support for Pipe Trenching project (BTIP) for Shell Petr. Dev. Company (SPDC) East, Nig
* Involved in creating survey support for underwater Pipeline inspection Services for ExxonMobil
* In charge of site survey operations for Chevron Texaco (Nig) Ltd.
* Involved in survey support for soil sampling operation for ExxonMobill Producing Unlimited.
* Provide Pipelying survey operational support for Chevron Texaco (Nig) Ltd.
* Responsible for all 8" Pipe Field Maintenance Services FMS for ExxonMobill Producing Unlimited.
* Supervised the construction of Phase II Gas Turbine (SCPP) at SPDC Industrial Area.
Setting out of drainage pattern
Cable route setting out operation
Levelling operations within the facility
Turbine engines and panels Installation task
Setting out of foundations and retaining walls
* Managed Computations and Map making using MicroStation software (CADD)
* Lead process piping and plant layout designer / 3D cad modeler/piping checker/Drafting QA/QC
* SHELL FORCADOS YOKRI INTEGRATED PROJECT (Onshore and Offshore interphase). Nigeria
* SHELL UTAPATE FIELD DEVELOPMENT PROJECT. (Subsea pipeline study/drawings) Nigeria
* SHELL KOLO CREEK RUMUEKPE PIPELINE 20" x 33 Km. (River and roads crossings) Nigeria
* Preparation of PDFs, P&IDs (PEFS/UEFS)
* Preparation of 3D plant and piping model to issue plot plans and equipment layouts
* Piping General Arrangements. Including piping and equipment sections and piping details.
* Piping isometrics and BOMs annotations and generation. Piping spooling for fabrication.
Piping design for turbine and compressors including structural steel supports.
* Provide 3D models, sketches and drawings to assist the skids manufacturers with fabrication.
* Lead trainer for 20+ local Nigerian drafters and 6 local Nigerian piping designers with 3D Rebis software.
* Lead designer for the preparation of Technical Tenders. Inspection of the Plant, Piping, Structural, Equipment of facilities and projects such as:
EIU SHE Revamp project.
ExxonMobil (5 offshore platforms) Nigeria
Bonny flow station project.
Shell SPDC (30,000 bbl/day flow station) Nigeria
Cawthorne Channel Project.
Shell SPDC (5 flow stations and utilities) Nigeria
Idu Field Gas Recovery and Plant Revamping.
NAOC Agip (flow station, pipeline and utilities) Nigeria
* Involved in Pipeline Routing 12" MP Between Bagi To Ibewa Alinmen for Elf (Nig) Ltd
* Responsible for As-Built Survey of 30MW Gas Turbine Facilities.
* Detail of Ibewa Production Centre for Elf (Nig) Ltd
* Supervised the pipeline Route 12" HP from Bagi to Obite Alignment (Part 1& 2)
* PI/FP Survey of SPDC SCPP (Gas Turbine 3) Site (SPDC)
* Plan and Profile of Pipeline for NAF Base Refuelling Facilities for Aero Contractor (Nig) Ltd.
* Involved in the Construction/Burial of 2" PVC Water-Pipeline for SPDC.
6. Dec. 1998 – Jan. 2000 Niger Delta River Basin Development Authority (NDBDA) Rivers State, Nigeria.
Position: Project Planner
* I was in a team of professionals in the delivery of a feasibility study in the regeneration of Port Harcourt town. This included the design, drafting and processing of full set of plans for two 36-inch diameter potable waterline projects.
* I was responsible for the preparation of Engineer's Cost Estimate, Technical Specification, Bid Documents and Storm Water Pollution Prevention Plan (SWPPP).
* Reviewed civil plans outlined for the project execution.
* Applied all the instructions and specifications stipulated for the project execution in order to take advantage of available resources allocated.
* Reported on a weekly basis, civil works progress and on site tests on a monthly basis to be addressed in the staff meetings.
* Coordinated the civil works scheduled for each week.
* Verify incoming supplies allocated to the project ensuring the quality standards.
* Civil work output analysis.
* Evaluated the personnel under my supervision.
* Monitored civil works accomplished on a regular basis according to closing dates for each work site of the project.
* Coordinated maintenance activities and routines related to equipment used.
* Recorded all information as detailed as possible related to asphalt mixture controls and pre-mixed concrete placements.
* Verified the compliance of quality standards and procedures for activity releases with respect to each of the work sites of the project.
* Carried out the daily schedule related to concrete demand to accomplish weekly project targets.
* Supervised the administrative personnel appointed to the project.
* Civil project reporting with respect to civil scheduling, materials allocated, supplier's performance and work progress ensuring the compliance of quality standards.
7. April. 1997 – Dec. 1998 Eko International Bank (Building and Engineering Department) Lagos, Nigeria.
Position: Building Engineer
* Managed, directed and administered the international sales effort for a large national plumbing and waterworks supply company which included sales and invoicing, purchasing, inventory management and administration, letters of credit negotiation.
* I opened new markets and negotiated exclusive agreements with sub contractors and suppliers. I was solely responsible for managing the site activities to fulfil the project target with ensuring that all installations are according to standards and specifications.
* I was involved in monitoring and supervising of onsite works including labour force and subcontractors.
* Ensured accurate drawings and quantities of material are on hand and carefully followed to maintain standards and achieve target. I was also responsible for the daily preparation and update of site progress reports.
* I openly communicated with other departments for any variations or modifications of works which led to other additional responsibilities as a QS Engineer.
* I designed and processed full sets of plans of 60% and 90% submittals for a Traffic Calming Project. I effectively managed the role of a Construction Manager for a Street Improvement Project and got involved in preparing Engineer's Cost Estimates, Technical Specifications and Bid Documents.
8. Nov. 1996 – April. 1997 H F P Nig Ltd Civil and Building Engineering Contractors Lagos, Nigeria.
Position: Trainee Quantity Surveyor
* I was directly responsible for all aspects of supply and delivery on site, a case in point was the supply of 200KM of Medium voltage transmission line, this included electric poles, cables, hardware and accessories.
* I was solely responsible for supply and delivery logistics, this role involved the coordination of suppliers, plant inspections, ship chartering, loading and off loading responsibility, the hiring of cranes, trucks and barges for the movement of equipment to various locations. I ensured all equipments and tools required were delivered on time and within budget, which positively affected the overall project completion timescale.
SCHOOLS ATTENDED
1. 2005-2006 MSc Project Management for Construction, University Of Brighton, Brighton UK. Accredited by the Chartered Institute of Building (CIOB) & Royal Institute of Charted Surveyors (RICS). Emphasis on human resources management, construction law, contract procedures, construction technology, procurement method, cost and financial analysis, benchmarking in construction Introduction to project management techniques in construction, including organizational structures for project delivery, construction contracts and documents, cost estimating and bidding planning and scheduling, cash flow analysis, project tracking and control, introduction to construction processes: excavation and site works, foundation layout, concrete form design, concrete, steel, timber, and masonry construction; project planning, scheduling, and control; construction safety.
2. 1999-2004 BEng (Hons) Civil Engineering, Federal University of Technology Minna, Niger State. Accredited by the Nigeria Institute of Engineers.
3. 1995-1997 OND Building and Quantity Surveying, Federal Polytechnic Ado-Ekiti, Ekiti State. Accredited by the Nigeria Institute of Building (NIOB) & Nigeria Institute of Quantity Surveying (NIQS).
PROFESSIONAL MEMBERSHIPS
* Charted Institute of Building (CIOB) United Kingdom.
* Association of Project Management (APM) United Kingdom.
* Royal Institute of Charted Surveyors (RICS) United Kingdom.
* Institution of Civil Engineers (ICE) United Kingdom.
SPECIALISMS SKILLS
Benchmarking, Cost Management, Life Cycle Costing, Project Management, Risk Management, Value Engineering
COMPUTER SKILLS
Auto CAD, Arch CAD, Pertmaster, Primavera, Prince2, SAP, MS Office and MS Projects
HOBBIES
Tennis, Foot Ball, Swimming, Travelling & Listening to Music.
REFERENCES
Will be provided on request
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 901 to 950 of 3119)
Go to Search Parameters...
Brief Description
Mechanical Master, Master Gasfitter
Dynamic, highly adaptive professional offering 20+ years’ experience.
Technical /Project Engineer
Electrical Engineer in profession, Knowledge in instrumentation and control, Design and trouble shoot's motor control, can do hard wirings,
AutoCad 2007, Sketchup, Inventor, SolidWorks
B.Tech in Biomedical&Instrumentation,Currently doing MS in Electrical Engineering in Wright State University,Skill:Analog and Digital Circuits,Medical Instrumentation,MATLAB,Assembly language programming for micro controllers,Microsoft Office
A Software Developer, Programmer, DB/Network Administrator in an organization seeking extraordinary track of experienced producing business solutions, and ability accomplishing multi-task job-related duties as assigned.
14 Years Experience in Piping in the field of Oil & gas Industry
BE - Civil - Primavera expert
Has an eleven year experience in the field of Project and Construction Management including but not limited to Quantity Surveying and Field Inspection.
New self-motivated and determined Graduate with great credentials looking for a full time, challenging and rewarding Civil/Structural Engineering Position.
Certificate for draughting position. i have been working since 2004 till 2009. i can draw building plan example structural, architure etc. i also can dram 3D drawing using autocad.
Electrical / Instrumentation Controls Designer with Intools, Autocad, & Microstation
diesel equipment mechanic
Sr. E&I designer with over 20 years field engineering experience. US & Canadian citizen/
HSE Engineer-a good educated, skilled and experienced individual on construction, fire protection and safety operations aspects, attained from exposure in different industry, hard working individually and in team, friendly and outgoing, self-motivated and well- organized
B.E Metallurgy & Materials Engineering . I am motivated with good interpersonal skills and communication skills. I try to give my best at what ever I do. I can be a good team member as well as a good team leader as per the requirement.
Alex is a Licensed Civil Engineer by the Philippine Regulation Commission. He graduated Bachelor of Science in Civil Engineering as Cum Laude (Academic Honors) at Central Luzon State University. He is knowledgeable in AutoCAD and STAAD and also on all Microsoft Office Applications.
Mechanical Engineer, Autocad, Pro/Engineer, Six Sigma, Planner, Supervisor, Microsoft Office, FE / EIT Exam, Primavera, Thermal-Fluids, Dynamics, Energy, Mechanical, Electrical, Materials
Survey Engineer 10 Years Experience in Land Surevy
Commissioning of Electrical, Electronic control, Instrument and Safety System
Develops schemes and prepares engineering plans for the Fiber In The Loop Networks (FITL) of various key business clients using SDH transmission solutions.
Educational Details: Diploma in Civil Engineering-1999 (Part time)
My experience in construction 6 years with contactor company.
experience in electrician and maintenance and mechanic
I'm an ambitious self-motivated professional,I'm well motivated, I've got a strong desire to succeed, and I'm always ready and willing to learn new information and skills.
Eleven years in various industries enables me to bring a vast knowledge base to any employer. Recent challenges included working in construction with HVAC, fire sprinkler and electrical installations. I use AutoCAD and interpret blueprints. Willing to relocate.
I am a graduate (M.S - Civil Engineering, EIT certified), aspiring to serve the construction industry with a vision to innovate new techniques in my field. The Masters Degree with Structural emphasis, the experience in Geotechnical field and my achievements may be of interest to you.
11 years experience in the construction industry Interested in international Opportunities
I am pursuing a position as a Civil Engineer involving design and/or project management. I am seeking to develop my Civil Engineering career and obtain a Professional Engineer license.
COMPUTER GEOLOGIST Databases, GIS & 3D Modelling Project & Quality Management
CFD (Computational Fluid Dynamics), Multiphase/Multi-component flows, Fluid Flows, FSI (Fluid Structure Interaction), ASI (Arbitrary Sliding Interfaces), Heat Transfer, Thermal engineering, Design/development, Combustion, Chemical/Reaction Kinetics and Chemical simulation, PhD, Mechanial Engineering
Structural design engineer
Favourite Subjects: Manufacturing processes and Strength of Materials, Ansys, Autu CAD, Basics of C
I am looking job in instrumentation field as instrument SUPERVISOR/INSPECTOR/SR.TECH
Contracts Engineer
Analytical, Numerical, Organizational, Computer skills.
Mechanical Draughtsman / Cadd Technitian. / Mep Draftsman / Mep Co-ordinator.
Personable, work hard, and fast learner
Senior CMMS Engineer and Business Process Engineer with expertise in Oil & Gas plant Enterprise Asset Management with extensive experience in Maintenance, Material Management and Procurement; plant data collection and quality check.
Looking for a challenging position in the field of Civil Engineering, Construction Utilities.
10 years experience in engineering & design of material handling equipments like coal handling, MSW handling etc.
Successfully completed the Final Bill of Saudi Riyal 120 million Steel Plant project (Civil Works) with the Main Contractor Awabeded Ssang Yang- Korea and successfully completed the Internal Audit before the External Audit to obtain ISO 9002 Certification for Company's Quality System.
Global experiance in the construction field from horizontal to vertical projects and from start to finish level.
Around 8 (plus) years of experience in various fields such as Project management, Project execution, Project Co-ordination, Industrial
I am a CWI, Level II in MT, UT, PT and RT film interpretation. I have US and overseas QA/QC project and manufacturing supervisory experience in the construction, petroleum, mining and aerospace industries. References and copies of certs. will be provided upon request.
Comprehensive practical and commercial experience since 1997 in every aspect of cathodic protection systems on all types of structures, comprising detailed design preparation / engineering calculations and Preparation of proposals with design etc.
I have served 20+ years in the Marine Corps and possess great Manager skills. I have an active Top Secret/SCI Clearance. Security+ certification (Network Security). I am looking to make a difference in the Civil sector as I have in the military.
-fabrication procedures (elaborate and implement) cutting, rolling, bending, drilling, grinding, welding, visual inspection, etc.-WPS and PQR elaborating in accept with ASME Sect.9 and EN 287+288 -technical drawing analyze for fabrication :assembly, materials necessary, order or erectionWelders/fitt
More than 30 years experience as a Contract Engineer, Contract Administrator and Quantity Surveyor, including expertise in Project and Construction Management; working with Oil Companies, E.P.C. Contractors and Consultants on a variety of Oil & Gas, Petrochemical, Building, Civil and Power project
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
[ 19 ]
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com