Bachelor of Science in Electric Power and Machines Engineering. Cairo University, 1992.

PROFESSIONAL ASSOCIATIONS MEMBERSHIP

Registered Professional Engineer in the Association of Professional Engineers and Geoscientists of Saskatchewan, Canada

SUMMARY OF EXPERIENCE

Seventeen years experience in electrical engineering design, construction supervision, commissioning & start-up for major international EPC and Consulting firms specialized in power generation, T & D grids, oil and gas petrochemical fields. Participated in large projects in the Middle East, Canada and North America involving design and commissioning of EHV/HV equipment up to and including 400 kV systems, power transformer systems, large generator protection systems, plant & utility electrical distribution systems, medium and low voltage switchgear and MCC systems, relaying and metering system, critical AC and DC systems and emergency generating systems.

COMPUTER SKILLS

* Experienced in using power system analysis software ETAP.
* Offer computer knowledge using Microsoft Access, Word, and Excel.

EXPERIENCE

SAUDI ARAMCO/JACOBS SAUDI ARABIA 2005-PRESENT

Electrical Engineering Specialist

* Assigned as the Electrical Specialist for Saudi Aramco Project Management Team overseeing the Out of Kingdom detailed design activities of the Safaniyah Wet Crude Separation and Water Disposal Upgrade Project (value of the project exceeds US $ 250 Million). This Project electrical scope of work involves the addition of new 230 kV GIS substation and 230/13.8 kV substation complete with protection, control and SCADA RTU systems.
* Review Contractor's electrical engineering activities and provide guidance to execute various electrical activities such as power system studies, equipment specification and selection.

Lead Electrical Engineer Saudi Aramco In Kingdom Project Management Services Program

Responsibilities:

* Technical responsibility for the development of electrical engineering design associated with Project Proposals. Major design activities include extension of 230 kV GIS substations, 230 kV XLPE insulated power cable, HV substation control and monitoring equipment, large adjustable speed drive systems and ETAP power system studies for power generation plants.
* Preparing Expenditure Request Estimate for the electrical portion of the Project.

Projects

* Saudi Aramco Safaniya Water Disposal Project FEED
* Saudi Aramco Shaybah 250 MBCD AXL Crude Expansion and Power Generation Island FEED
* Saudi Aramco Khurais, Phase II, Shy 1 NGL Pipeline Capacity Increase Using Adjustable Speed Motor Driven Pumps FEED
* Saudi Aramco Manifa Arab Heavy Crude Increment Project FEED

JACOBS CANADA INC. Calgary, Alberta 2005

Lead Electrical Engineer Suncor Firebag Power Generation Plant

* Developed the electrical FEED phase for a 400 MW power generation facility and its associated 260 kV switchyard. The power generation island is a part of a CAD$ 2.5 Billion SAGD heavy oil extraction project.
* Carried out transient stability study for the proposed power generation facility after its integration with the Alberta Interconnected Electrical System.
* Prepared the Project Electrical Design Basis Memorandum and developed Functional Specifications for the power generation plant.

ELECTRICITE DE FRANCE, POWER SYSTEM & TRANSMISSION ENGINEERING DEPARTMENT DUBAI, UAE 2004- 2005

Principal Resident Engineer Substations, Emirates National Grid Project

Responsibilities:

* Assigned as PRE S/S to supervise the detailed design engineering phase, construction supervision and commissioning of the following three 400/220 kV GIS substations associated with the Emirates National Grid project:
o DEWA Dubai 400 kV "H" Substation. Main Contractor TM T & D, Japan.
o TRANSCO Abu Dhabi 400 kV Taweelah Substation. Main Contractor Sumitomo, Japan.
o SEWA 220 kV Sharjah Sajja Substation. Main Contractor, VATECH, France.
* Attended 400 kV GIS & associated accessories factory inspections in Japan.
* Develop monthly progress reports for each S/S and report to resident EDF Project Manager.
* Participate and offer engineering solutions during technical review meetings between utilities and S/S Contractors.

FLUOR DANIEL INTERNATIONAL LTD., AL-AHMADI, KUWAIT 2003- 2004
Kuwait Oil Company PMC

Senior Electrical Engineer

Responsibilities:

Front End Engineering Phase

* PMC HV power system specialist. Duties involve developing power system studies for 132/11 kV GIS substations required to feed Kuwait Oil Company (KOC) industrial loads and preparing ETAP model for KOC main 11 kV distribution substations in North & South East Kuwait.
* Liaise between KOC & MEW (Ministry of Electricity & Water) in regard to developing scope of work for 132/11 kV GIS substations assigned to supply KOC facilities.
* Develop project start-up activities such as preparing Electrical Scope of Work for Kuwait Oil Company upstream oil and gas production projects and produce project specific work instructions.
* Develop list of project related electrical deliverables. Prepare start & finish dates for electrical activities and establish key milestones. Utilize logic sequence for activities based on project Level 1 schedule. Update schedule at agreed intervals showing completion status against each deliverable and activity. Adjust manpower levels to suit.
* Estimate project manhours and produce manhour summary based on estimated manhours and proposed schedule. Review actual scope of work against proposal and revise manhour estimate as required.
* Carry out conceptual and frond end engineering design of electrical systems associated with oil drilling projects, oil gathering centers, gas booster stations and pipelines throughout Kuwait for Kuwait Oil Company.

Detailed Engineering Phase (PMC for KOC)

* Participate in Lump Sum Turn Key Contractors project tender evaluation team.
* Supervision of Lump Sum Turn Key Contractors during projects detailed design execution. Duties involve review & approval of design related documents and drawings.

Commissioning/Start-UP Phase

* Prepare list of electrical equipment requiring FAT.
* Approve electrical equipment factory inspection & testing plan.
* Participate in electrical equipment factory witnessing tests on behalf of KOC.
* Develop electrical commissioning scope of work for project commissioning contractor.
* Review & approve test forms for electrical equipment prepared by commissioning contractor.
* Propose technical solutions to problem areas (deficiencies) that are raised by commissioning contractor.

Projects:

The value of the following projects supervised total in excess of US $ 500 Million:

* Installation of Gas Booster Station 131 and Interconnecting Lines with Gathering Centers and BS-130 (LSTK Contractor Snamprogetti, Italy)
* Burgan "B1/B2" 132/11 kV GIS Substation & Effluent Water Disposal Plant in SE Kuwait (LSTK Contractor Dailem, South Korea)
* Replacement of North Kuwait Crude Oil Export System (LSTK Petrofac, Sharjah UAE)

JACOBS CANADA INC., Calgary, Alberta, Canada 1998-2003

Senior Electrical Engineer

Responsibilities:

* Conceptual and preliminary design of simple & combined cycle power generation stations and gas processing facilities.
* Conceptual, preliminary and detailed design of utility HV substations up to 240 kV, HV underground cable distribution systems, SCADA/RTU and communication systems.
* Prepared electrical systems studies including comprehensive short circuit and protection coordination studies, load flow studies, equipment sizing studies, motor starting studies, D.C. systems capacity studies and emergency power system studies.
* Designed power plants protection and metering single line diagrams.
* Developed protection relay logic diagrams for generators, HV substations and associated transmission systems.
* Prepared AC and DC schematic diagrams for protection, control and metering panels.
* Prepared schematic and wiring diagrams for 13.2 kV, 4.0 kV process motors.
* Designed electrical hazardous area classification drawings for gas processing plants. Selected the electrical installation methods in hazardous locations taking into account HAZOP studies recommendations.
* Prepared purchase specifications and data sheets of major electrical equipment such as HV substation equipment, isolated phase bus duct systems, MV switchgear, generator step-up and station service transformers.
* Carried out electrical equipment proposal evaluation and followed up selected suppliers.
* Supervised construction of HV substations, overhead distribution systems, generation systems and electrical distribution systems for power generation and gas processing plants.
* Developed commissioning and start-up activities schedule including progress reports. Participated as a site-commissioning engineer in the commissioning of large generator protection and control systems, distribution substations up to 240kV, all aspects of large industrial electrical distribution systems and emergency generating systems.

Projects:

* ExxonMobil, LaBarge Acid Gas injection (AGI) and Cogeneration Project, Wyoming, USA
* Edmonton Power Development Corporation (EPCOR) 500MW Genesee III Steam Power Generali Plant Project, Genesee, Alberta, Canada
* Transalta Chihuahua 325 MW Combined Cycle Power Plant Project, Samalayuka, Mexico
* TransCanada Energy Company, Bear Creek 85 MW Cogeneration Project, Alberta, Canada
* Aux Sable Liquid Products, Inc., Aux Sable Liquids Extraction Plant, Morris, Illinois, USA
* TransAlta/Air Liquide, Dow Fort Saskatchewan 130 MW Cogeneration Project, Alberta, Canada

ANSALDO ENERGIA Genoa, Italy, 1995-1998

Intermediate Design Engineer

Basic Design Phase Responsibilities:

* Conducted short circuit calculation study for power stations.
* Conducted grounding system calculation study for power stations.
* Designed block logic diagram for steam generator control back-up desk, MV switchgear, 6.6kV blackstart generator and automatic transfer systems.
* Performed basic study for the routing of HV (220 & 66 kV), cables in power block and substation areas, taking into account civil and mechanical interfaces. Issued the first M.T.O. for these cables.
* Structured MV and LV switchboards & MCC's according to the power plant electrical load list.

Branch Office Beirut, Lebanon

Resident Engineer

Detailed Design Phase Responsibilities:

* Headed staff of seven assigned to develop the detailed engineering design phase.
* Prepared progress reports to Home Office and offered technical assistance to resident Project and Branch Managers.
* Prepared MV and LV cables sizing calculation tables.
* Prepared termination diagrams for control, signaling, interlock and measurement cables for MV and LV switchboards, gas and steam turbines generating bays including 220 kV GIS substation protection panels.
* Designed lightning protection layouts for power block, fuel oil and water treatment zones.
* Developed start-up one line diagrams for First and Second Generating Units.

Projects:

* Zahrani and Beddawi Combined Cycle Power Plants (2x450 MW), Republic of Lebanon (Main Contractor: ANSALDO Energia ƒ{ Siemens Power Generation Consortium)
ƒ{ 650 million dollars US turnkey project consisting of two combined cycle power plants each comprised of two Siemens V92.4 165 MW gas turbines and one 150 MW ANSALDO steam turbine, 220 kV GIS substation 66 kV AI Switchgear and 33kV metal clad substation.

ENGINEERING FOR THE PETROLEUM & PROCESS INDUSTRIES "ENPPI" Cairo, Egypt, 1992-1995

Design Engineer

Responsibilities:
* Designed one line diagrams for offshore & onshore gas compression stations.
* Produced hazardous area layouts for gas compression stations.
* Conducted lighting level calculations for process and control areas.
* Conducted emergency generators sizing calculations.
* Supervised field construction and participated in commissioning and start-up activities.

Projects:

* Sumed Pipeline Throughput Achievement
* Gulf Of Abu Qir Phase II Topside Facilities, Mediterranean Sea

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1051 to 1100 of 3123)Go to Search Parameters...
Brief Description
Piping detail, scheduling, field work and design in refineries, chem plants offshore prouction platforms, onshore and offshore oil drilling rigs sugar mills using acad,( short term cadworx,rebis, smartplant) and on the board
LAND SURVEYOR
Seventeen years experience in electrical engineering design, construction supervision, commissioning & start-up for major international EPC and Consulting firms specialized in power generation, T & D grids, oil and gas petrochemical fields
Summary of Qualifications,Combined experience in Industrial Refrigeration Technician / Electrician Technician in the Pharmaceutical Industry,Petro chemistry, Building Management System (BMS), Ship Systems, Maintenance and Troubleshooting.
Design engineer
25+ yrs progressive exp. as a Sr. Supervisory Planning/Scheduling & Project Control Engr/Mngr with Risk/Contracts Exp, Int'l w/Utilities, EPC Firms/Consultants, Turnkey OEMs and Constructors within the Energy Sector. P3 Ver.3.1, Primavera P3e/cVer.5, 6.2,Pertmaster, Claim Digger, MS Office, Acrobat
Fifty Years Total Experience in process engineering and technology development. Including More Than Twenty Years Process Engineering Experience on petroleum refinery, oil & gas production and petrochemical projects. Experience includes process simulation software Hysys/Pro II/Dynsim/Aspen.
The majority of my 15 years of experience has been applied to inspecting in-service pressure equipment and piping in a refinery setting. I am an excellent communicator with exceptional organizational skills geared toward inspection, NDE planning and crew leadership.
Mechanical Engineer with over 20 years experience in major Oil & Gas Construction and Maintenance. 12 years in Project Management, 10 years in Pre-commissioning/Commissioning and Start up of various facilities, 12 years in Installation, 11 years in QA/QC Inspection.
Chief Engineer (Manager) in Technical Office for a large construction progect :High Rise building, Under ground Metro line, Industrial projects, Preparing and checking structural shop drawings with B.B.S., Coordination, Methods for constructions, using ISO 9000 - 2000 Prep. of Claims and V.O etc.
Senior Planning Engineer well versed with Primavera, Suretrack, MS Project
Technical office Manager.
Urban Roads and Highway design, Traffic and Transportation planning
Contract Negotiations, Quantity Surveying, Project Handling & Project Implementation, Project Co-ordination
Civil Engineer from REC Kurukshetra, India. Working as Assistant Manager (Civil) with Larsen & Toubro Limited - ECC Division
multi skilled engineer
To offer services as Senior piping designer for onshore and off shore oil and gas projects by using PDMS & PDS 3d model system
TO WORK AS A HVAC SALES MANAGER IN A CHALLENGING HVAC INDUSTRY.
International Weldig Engineer (IWE) , CSWIP 3.1 and Level II(two) Pt,Mt,Ut and RT
Experienced Industrial Structural Engineer - concrete, steel - 20+ years, UK & US codes
7 YEARS OF RIGGER EXPERIENCE
Diploma In Mechancial Engineering+NEBOSH Level-3+Environment, Health and Safety Management Specialist Certification from NASP of USA+ ISO 14001:2004 & 9000:2000 Certified Lead Auditor with 15 Years Experience in Oil&Gas as HSE Advisor/Engineer/Supervisor/Coordinator/
Mechanical Engineer Professional experience of 35+ years in Engineering and Project Management
KEY RESPONSIBILITIES :1. Transmission engineering in designing backbone links,2. Transmission network design, link budgeting for transmission links,4. Planning of STM-1 Ring Network in City and Backbone to have a Reliable Network with a uptime of 99.99%,6. Microwave Projections for the additional Si
Landscape Arch with varied experience of the micro and macro level design and execution of private and govt. projects
To secure a challenging position with a dynamic organization which will enable me to apply my education and creative skills to the benefit of the organization?
Planning Engineer, Certificate of degree Dr. of Philosophy
Professional graduate engineer experienced in Facilities Management, CMMS implementation and application, Technical Writing. Recent 16 months in Kazakhstan. Interested in contract work (rotational or short-term)
I am a Mechanical Engineer with around 9 years of experince, with knowledge in construction project manage. Desing of wellhead equipment, and drilling equipment, certified in none destructive examination.
I have done my M.S.(Control System Engineering) from Texas A&M University-Kingsville with G.P.A as 3.9 /4.0. I am looking for a job of control System Engineer. I have work experience of 1 year and 4 months. I am willing to relocate anywhere in USA. Thanks Rajesh
15 years of experience in repairs and maintenance to construction plant and machinery and 10 years at supervision/managerial level Plant predominantly Caterpillar
Skills: Contract Negotiation, Quantity Surveying, Project Handling & Project Implementation, Quality Control, Co-ordination with various agencies involved in project
Experience in quantity surveying, site supervision, planning, designing over water and over land structures.
I am a Naval Architect and Marine Engineer whom objective is to provide engineering solution in a merit driven environment with an opportunity for career development to face present and future challenges.
Looking for a position with an established engineering company, utilizing previously learned skills
I am a Mechanical engineering diploma holder, over 15 years of experience with CSWIP Plant Inspector, CSWIP 3.2, AWS CWI and ASNT LEVEL II in RT, UT & MT, with valid UAE driving license.
Senior Structural Designer whom has been on both sides of construction. I started out on the tools and made my way into the design and engineering. Please review the letters of reference on my website. My background has always been an asset in the design office.
I have bachelors in mechanical Engineering and Masters in Petroleum Engineering.I have working Experience in Pipe line and EPC Companies
MEP Manager with 14 years of int'l exp. in construction. Verify design, construct and commission. Executed prestigious & high rise buildings project which MEP works value in excess of US$380 M. Supervise and coordinate work acc. to contract ,budget, time, co. procedures & ensure client satisfaction.
Mechanical Draughtsman (AutoCAD,AutoCAD Inventor.)
responsible for the day-to-day operation and control of a CISCO based communications network.
Estimation and Costing,variationsnad claims,Monthly Progressive Bill preparations
A Wide experience in drafting in major of civil works, structural, mechanical, Piping & Instrumentation and architectural drawings, 8 years of overseas experience,Overall 15 Years of working experience in civil, structural, mechanical, piping, and architectural firms
More than 13 years post qualification experience out of which 7 years in Occupational Safety and Health, (4.5 years in oil and gas sector) interested in the development of modern techniques in the construction and oil field industry
Bachelor of Science in Civil Engineering
Rotational Power Infrastructure Manager & International Quality and Safety Systems Management
Civil Engineer, Civil maritime engineer
Computer ?Automation & Controls Engineer
PROFILE: Proficient in shuttering works, Steel reinforcement & fabrication, pipe fittings
I am a Senior Planner/ Project Controller with certified versatile capabilities and experiences in different fields of construction, including, but not limited to, Building construction, massive civil work, industrial construction, petrochemical construction, commercial complex and high rise buildin
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   [ 22 ]   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com