Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #85823 next resume »»
CONTACT INFORMATION:
View contact information...

Citizenship Romanian
Date of birth 24.06.1962
Marital Status Married
Military Service Obligation Regulated

WORK EXPERIENCE
Date (from - to) 2008 -2009
Name of company Italia ADRIATIC LNG TO PLATFORM with EXON MOBILE
Type of business or sector Construction and commissioning
Occupation or position held ELECTRICAL AND INSTRUMENT FOREMAN
Main activities and responsibilities -I supervise the personnel of subcontractor, organize and coordinate the personal activity.
I was coordinating subcontractor personnel to:
-Pulled all electrical and instrument cables (LV, MV) glanded and terminated.
-Installed all circuit breakers in Switchgear room and connected.
-Verifying that all items of equipment associate, materials meet the agreed electrical specifications.
-Pulled and connected hardwire for PAGA(communication)
-Checks and remedial works as per attached punch list.
-Air tubing/cable support and complete air tubing to valves.
-installing, connecting and checking smoke detectors by stations and substation ;
-installing and checking lighting and ventilation system;
-checking the electrical equipments and the connection in power station;
-installing in position analytical instruments and safety devices:
Ĕ flame detectors (flammable gas);
Ĕ toxic gas dectors;
Ĕ smoke detectors;
Ĕ infra-red detectors, transmitter and receiver(DET-TRONICS);
Ĕ heat detectors (linear detectors).

- Sign off of MCR¡¦S(Mechanical Completion Records) when all items from punch list are completed with all documents (electrical drawings, protocol test)

WORK EXPERIENCE

Date (from - to) 2007 -2008
Name of company electrical supervisor in Saudi Arabian Saipem LTD to water injection pumps Stations

Type of business or sector Hawiah Site Office Saudi Aramco Khurais Project WIPS
Occupation or position held Electrical and Instrument Supervisor
Main activities and responsibilities -I was direct line responsibility for subcontractors¡¦ personnel; I organized and coordinated the activity subcontractors.
-Ensuring the electrical works assembles or fabrications are executed in accordance with the drawings documentations and specifications with company procedures and quality practices.
-Update drawings, specifications etc. to reflect ¡* As built¡¨.
-Coordinated construction projects in revamping gas turbines, new gas turbine (Novo Pignone), new UPS and other modifications in switchgear room (new circuit breakers) and control building (new power panels).
-Coordinated subcontractor personnel to:
-Make it cable trench between gas turbine and new UPS, between new UPS and switchgear room to MSS and control building.
-Pulled all electrical cables (LV, MV) and terminated.
-Installed batteries and cable laying and termination.
-Installed all circuit breakers in Switchgear room and connected.
-Verifying that all items of equipment associate, materials meet the agreed electrical specifications.
INSTRUMENT
-Instrument junction box
-Cable checks sheet record.
-Fire and gas detection system I.T.R/s

WORK EXPERIENCE
Date (from - to) 2006 - 2007
Name of company Russia with S.E.I.C (Sakhalin Energy Investment Co.Ltd.) client, Royal Dutch / Shell Group, Mitsui & Company and Diamond Gas-Mitsubishi Corporation and Gasprom to LNG SakhalinII-100 Mw power plant.
Type of business or sector OPF Construction Site.Nogliki.Sakhalin Island
Occupation or position held ELECTRICAL AND INSTRUMENT INSPECTOR QA/QC
Main activities and responsibilities Inspection for electrical packages; Give instructions to and assist the personnel performing the work; I participated in three party walkdown with QA/QC Electrical Inspector and construction supervisors for making of punch lists; Inspection for electrical items such as power& control cables, glanding, cable trays, dressing cables, wiring, earthing, lighting, motors, relay, switches, control panels, heat tracing, transformers in accordance with the drawings, documentation and specifications with procedures and quality practices; Sign off of MCR¡¦S(Mechanical Completion Records) when all items from punch list are completed with all documents (electrical drawings, protocol test, technical query); I made inspection to Loop Check team; loop check, loop folder documentation, for data transfer to client. Instrument installation check, wiring termination, cabinet panel wiring. Check instrument loop functionality to Plant DCS system, to F&G & ESD system, KKK Siemens, HIMA and Analyzer loop signals to DCS. I worked with HART Rosemount 375 Communicator, and FLUKE 744.
Inspection instrument cables installation, instrument cables terminations on control room panels. Inpection for pull and connect fiber optic patch cords, Ethernet and ModBus cables between various vendors control cabinets and Plant DCS system (Honeywell TPS).
Inspection to HVAC system and fire and gas system.
Supervising all checking testing necessary to complete works, including documentation; Check all according to specification for electrical and instrument installation; I participated to toolbox every morning and inspected the quality of work on day to day basis, sign work plans for construction; Apply quality standards.
Short description of equipment on drilling or workover rig / ship / others

Date (from - to) 2005 - 2006
Name of company Saipem, Nigeria
Type of business or sector commissioning on YOHO FIELD PROJECTS PLATFORM
Occupation or position held SENIOR ELECTRICAL AND INSTRUMENT TECHNICIAN
Main activities and responsibilities Commissioning activity for electrical equipments of a marine platform: punch lists; Check of lighting systems; Meager of cables (meager isolation resistance); High potential test for electrical cables; Test running battery & battery monitoring devices; Test running all equipments(motors, transformers, compressors, turbines-generators); Electrical equipments: MCC (motor control center)-made by Cutler Hammer-U.S.A, ATS (Automatic closed transition Transfer &bypass-isolation Switch)-made by ASCO-U.S.A, Over current relay-made by Basler electric-U.S.A; Sync-check relay -made by Basler electric-U.S.A; Under voltage relay-made by Basler electric-U.S.A; Low voltage 480V-SWG(Switch Gear)-made by Powell electrical-U.S.A; Middle voltage (4160V)-SWG -made by Powel electrical-U.S.A; Multilane -protection relay; Generator differential relay-type BE-1-87G Made by Basler Electric; Differential relay made by ABB Power T&D Company Inc; Power transformer 2500 KVA made by Prolec-4160v/480v; Isolate transformers 480V/208V made by Square D Company; Battery Monitoring Devices-BVS-SE-made in U.S.A Powell Electrical; Compressors gas -made by Novo Pinione; SWG (switch gear)-made by Powell Electrical; Instruments of measurements: Fluke(clamp meter, multimeter),meager(1KV-5KV), DCS(distribution control systems); ESSDS(Electronic safety shutdown); UPS(Uninterruptible power supply); PAEAS(Public address and emergency alarm system).
Commissioning for instruments apparatus ; analytical instruments and safety devices flame detectors (flammable gas):infra-red detectors, transmitter and receiver, infra-red point type (DRAGER): heat detectors (linear detectors; toxic gas detectors
Short description of equipment on drilling or workover rig / ship / others

Date (from - to) 2004 - 2005
Name of company GLOBAL PETROPROJECTS SERVICES A.G, Nigeria
Type of business or sector Electrical Construction Department and Commissioning Department;
Occupation or position held SENIOR ELECTRICAL AND INSTRUMENT TECHNICIAN
Main activities and responsibilities Installing instruments apparatus in the field; installing glands in substation for electrical and instrumental cables; connection electrical and instrumental cables in substation after connecting-up by station; compressors gas -made by Novo Pinione; SWG(switch gear)-made by Powell Electrical; installing the heating treys on pipe line station and valves; pulling and dressing cables for power and control; connect cable ground, montage instrumentation cables treys; installing, connection and checking electrical equipments by station (panels, drawers, switches); installing, connecting and checking motors, transformers and measurement with meager (1000v--2500v); installing and connection the cables and the electrodes for cathode protection; installing, connection and checking smoke detectors by stations and substation; installing and checking lighting and ventilation system; checking the electrical equipments and checking the connection in power station. Power distribution equipment, electrical motors and controllers, performing diagnostic tests and troubleshooting system faults and failures, of all electrical equipment down to the component level. installing instruments apparatus in the field; installed in position analytical instruments and safety devices flame detectors (flammable gas):infra-red detectors, transmitter and receiver, infra-red, heat detectors (linear detectors; toxic gas detectors (DRAGER); smoke detectors; - planting and termination instrument and power cables in lighting system, heat dressing, HVAC system and fire and gas system
Short description of equipment on drilling or workover rig / ship / others

Date (from - to) 2001 - 2004
Name of company CCC Saipem Consortium
Type of business or sector UNIT2, UNIT1(KARACIAGANAK), UNIT1-AESHZI and ATRAU(terminal point)
Occupation or position held SENIOR ELECTRICAL AND INSTRUMENT TECHNICIAN
Main activities and responsibilities Complete construction and erection of industrial units including electrical works, instrumentations and start up operation. Connections electrical cables (montage glands:20,20s, 40,50,50s);connecting cable ground; connecting instrumentation cables (glands:16/20,20,20s),supports electrical cables treys; connections battery and battery Monitoring Devices-BVS-SE-made in U.S.A Powell Electrical, montage electrical and instrument equipments; montage transformer of high and low power (tools safety; test separators line of high power and checking up P.R.A.M.(meager); for down transformers will make oil test and check up silicate(color);energizing loop and testing with clamp meter (Fluke);loop tester LT 7 (Fluke);calibration the circuit breaker with CB3 (Fluke) installing accumulators in special room-station; installing the heating treys on pipe line station and valves; installing the cables and the electrodes for cathode protection; installing instruments apparatus in the field; installed in position analytical instruments and safety devices flame detectors (flammable gas):infra-red detectors, transmitter and receiver, infra-red point type (DRAGER): heat detectors (linear detectors; toxic gas detectors (DRAGER); smoke detectors; unit I Aeshzi and ATRAU Terminal - planting and termination instrument and power cables in lighting system, heat dressing, ventilation, Raychem Method. Made mounting position on panel for power, lighting and instrumental junction-boxes. Done pre-commissioning for these equipments.
Short description of equipment on drilling or workover rig / ship / others

Date (from - to) 2000 - 2001
Name of company SC SELTECO SA CAROM ONESTI
Type of business or sector
Occupation or position held ELECTRICAL TECHNICIAN
Main activities and responsibilities power(connecting-up and disconnecting switches of 6 kv and 0.4 kv). supervision by electrical installation and auxiliary circuits. Reparations, checking and maintenance at motors, switches, drawers and transformers. connecting and disconnecting the motors and measurement; resistance of insulation with meager or 1000v or meager of 2500 v; checking periodic the installation and control apparatus. Start, stop and checking the lighting system.
Short description of equipment on drilling or workover rig / ship / others

Date (from - to) 1981 - 2000
Name of company Borzesti 2-CONEL S.A.BUCHAREST
Type of business or sector steam power plant
Occupation or position held ELECTRICAL TECHNICIAN
Main activities and responsibilities Reparations and maintenance the electric installation of high, average and low voltage; Reparations, checking and measurement the electrical equipments(drawers, motors, generators, switches, transformers), connections electrical cable and of instrumentation to(motors, transformers). reparation and checking lighting system and ventilation.
Short description of equipment on drilling or workover rig / ship / others

EDUCATION AND TRAINING
Date (from - to) 2005
Name of organizations NUTEC Rotterdam
Type of educations or training BOSIET (Basic offshore safety induction and emergency training)
Certificate Number
Validation of Certificate 2009

Date (from - to) 4 years education
Name of organizations Energetically High School
Type of educations or training High School Courses
Certificate Number Graduation diploma
Validation of Certificate Unlimited

LANGUAGE SKILLS
MOTHER TONGUE Romanian

OTHER LANGUAGES English Russian
Reading skills Good Good
Writing skills Good Good
Verbal skills Good Good

TECHNICAL SKILLS AND COMPETENCES
Type of rigs Marine platform
Type of Top Drives
Type of draw works
Type of mud pumps
Type of drilling equipment / workover equipment / cranes / engines / generators / others

Other technical skills

PC skills Operating Systems: MS Dos, Windows 95, 98, 2000, XP, Utility Programs: Fox Pro;
DRILLING / WORKOVER / OTHER EXPERIENCE
Years Months Years Months
Rig Manager Onshore experience 24
Daily Toolpusher Offshore experience 1 6
Night Toolpusher Top Drive experience
Driller Rig Mechanic
Assistant Driller Rig Electrician
Derrick man Crane Operator
Floor man Others (please specify)
Others (please specify) Others (please specify)

View contact information...
«« previous resume next resume »»
Search Results (Resumes 851 to 900 of 3118)Go to Search Parameters...
Brief Description
I am a civil engineering diploma holder with 8 years exp.in high rise residential and commercial buildings.
Several years of experience in CAD drafting in wood carpentry including 10 months work in Middle East, at present I work as Bulk Handling Design Engineer in a European company, part of my work is to design bulk handling system of cement cargo ship and supply vessels including loaders and unloaders,
Advanced skills for professional design in 3D (Autodesk Inventor 2009)
Master Electrician
+16 yrs of experience in EPC/PMC, TPI Quality control & in Construction Companies. Having well experiences for various stages wise Inspections involving Pressure Vessels, Storage Tanks, A/G & U/G Piping & Structural Steel Works. (ONSHORE & OFFSHORE).
Sr. project engineer
Sr. Geotechnical Engr, Design and Construction of Underground Structures, Mgmt of Multidisciplinary Projects, Numerical Modeling, Rock Mechanics, Ground Support Design, Tunnel Inspections, Hands-on Experience in Applying FLAC, FLAC3d, UDEC and 3DEC Codes in Design, Work Under NQA-1 Q A Program
Field Construction Engineer
Facilities Construction Planner and Overseer
Free! Program Director Construction Large Projects SE Asia Hotel, Embassy, High Rise, Medical, Retail, Data Facilities, Power, Roads, MEP Thailand Vietnam Korea Philippines
-Primavera (Deep knowledge and experience) / SAFRAN planning program / AutoCAD 2-D (Professional use) /
Proactive HSE expert with 13+ years expertise encompassing HSE in Oil and Gas Construction; accustomed to project Management and coordinating resources effectively to achieve targets within often stringent constraints. Energetic, dynamic, relishes challenges and demonstrates indepth analytical Skill
Field Tech Mechanic
Graduate Mechanical Engineer with ASNT level-2 NDT and CNC part programming .
Qualified Civil Engineer (BE Hons) having Experience in Excecution, Planning, Billing, Monitoring. Currently working with GMR (Badrinath) Energy Ltd.as an Executive -Civil (site) on a 300 MW Hydro Power Generation Project
BE IN MECHANICAL ENGINEER. I HAVE 2 YEARS EXPERIENCE IN STRUCTURAL STEEL ERECTION
15 years in Fabrication, Construction, Installation, Hook-Up , Pre-commissioning, commissioning works of offshore Process platform, jackets,decks,bridges, modules, laying of sub-sea pipeline, Graduate Engg, Piping Engg,CSWIP3.2, B'Gas, API510, 653,570,ASNT LevelI, AUT Interpretor, IRCA Lead Auditor,
Engineer (Insulation, Painting, Fireproofing, Hvac, Scaffolding & Refractory)
Construction Engineer with core skills in Project Management, Contracts, Facilities and Value Engineering
I have a lot of years of hands on experience in the plumbing industry I can lead large groups of technicians effectively through out all phases of any construction project. I strongly believe that I can easily handle any job regardless of size
Project Planning & Coordination, Cost Control & material Procurement
Resume consist of Personal Data, Employment History & Field of experience.
To Pursue a Challenging Career in Project Management, Engineering, Construction, Oil / Gas and Power Generation related work Offshore or Onshore.
Tendering & Proposals, Estimation, Project Planning, Quantity Surveying
I have completed B.Tech in the field of Electrical Electronics Engineering at 2009 and I also completed Diploma in the same field at 2005. I have a year Experience in Government Electricity Department at 2005-2006 in Puducherry, India. I attached my CV for your kind considerat
Have a vast professional experience in road construction; Can handle high pressure with ease and open mind • have handled various critical and challenging projects from design stage to implementation stage and ensured that the projects gets implemented as per specification in stipulated time with
I am Nechifor Cristinel. I worked in power plant, refineries, oceanic platform with different operations for electrical maintenance, commissioning, construction as electrical technician , electrical inspector or electrical supervisor last time.
Process Engineer - Oil&Gas - Sulphur - Refinery
AutoCAD, ADT,3 DS Viz, MSOffice, C, C++, Unix,ProE
My qualifications are reinforced by over 20 years of Industrial Insulation as a front line supervisor. Multi-tasking for the past 5 years as a Painting Supervisor as well as Insulation Supervisor, has expanded my talents to a broader range that may well serve you better.
Engineering, cadd designer, autocad, microstation
Industrial Engineer, with more than 9 years Experience in Planning and Cost, in EPC and developmental projects, both onshore and offshore. Worked in Oil,Gas,Petroleum and Automotive field.
Highway Laboratory / QC Manager with 25 years experience in materials
Senior Weld Mgr / Engineer. I have for decades specialized in providing management support for the implementation of Best Weld Practices and the establishment of Weld Process Controls. I
Contract working, supervision of dam construction, geological worlks etc.
Electrician and editor of substation
BS biomedical engineering, looking for a job where i can use my knowledge and skills to overcome the problems.
I have done the project for International Power name "Feasibility of Electrical Energy Saving at HUB POWER station. and I can design different kinds s controlling circuits by using microcontroller,PLC and VFD.
A position of significant responsibility that builds upon extensive experience in construction management, expertise in managerial skills and cost analysis. Ultimate goal is to grow within and with the progressive organization that provides excellent career advancement opportunity
I AM A LAND SURVEYOR WITH CERTIFICATE QUALIFICATION.I HAVE 8 YEARS WORKING EXPERIANCES AS A LAND SURVEYOR IN CONSTRUCTION AND TITLE WORK IN MALAYSIA AND OVERSEA.
Repair & maintenance of plant & equipments used in construction, knowledge in overhauling of engines used in construction equipment, maintaining & preparing all technical reports related to plant
Over twenty-five years experience in Project/Construction Management in an Engineering Procurement and Construction Management environment, specializing in Project Controls, Planning and Scheduling. Project Controls background includes EP, EPC and EPCM.
Diploma in Mechanical/materials management with 17 Years expereice in Material Controlling and Piping looking for employment with reputed organisations.
Electro-mechanical overhead crane repairman
Estimating,Quantity Surveying, Project Planning & Project Management
Piping Designer PDS CAD
Rigger, works well at height
Basic education:College of Business Administrartion, Secondary ed. of engineering. Advanced sch: WTA ind.eng.; ISO Quality systems; Turu col of econ. int.marketing; Different schooling in marketing/sales. Lang.: ENG;RUS;FIN; EST. PC-MS Office; MS Project;ind.controllers user interf. Driv.Lic ABCE
I am a senior attending California Polytechnic University, Pomona, and I will be completing my Bachelor’s degree in Mechanical Engineering, along with a Minor in Materials Engineering Sciences, in the fall of 2009. I am currently seeking an internship or entry level position.
Mechanical Master, Master Gasfitter
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   [ 18 ]   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com