Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #86545 next resume »»
CONTACT INFORMATION:
View contact information...

Shaw Group/Stone & Webster Asia Inc. (SWAI), Hong Kong
Project Controls Manager/Client-China Light & Power~Exxon Mobil
Oct 2008 – Feb2009
Responsible for/Managing (around 8 SWAI Project Control personnel) in a EPCM role-Planning (Primavera P3), Cost Control/Forecasting, Contract Administration, Accounting departments for SWAI at Castle Peak Coal Fired Power Station (4x800mw supercritical coal plants)-scope of work included emission controls-FGDs (Flue Gas Desulphurization), SCR/BOFA (Selective Catalytic Reduction/Booster Over Fire Air) and other related work to make plants environmentally compliant by Feb 2011. Oversight, Due Diligence over EPC Contractors' Project Services function-by Streamlining EPC Scheduling (by assuring proper Planning, Reporting, Trending, Criticality), Cost Control, Contract Administration, Coordination-SWAI/Contractors
-and assuring Tools/Processes/Procedures are in place to optimize Project Controls efforts.
Siemens Energy Inc., Orlando, Florida, USA
Planning/Scheduling Engineer/Client-GenPower LLC (Massachusetts)
June 2008 – Sep 2008
Planning/Scheduling for Commissioning a 695 megawatt supercritical coal plant in Maidsville, West Virginia- meetings with Vendors~ collection/entry into P3 of scope/sequence of commissioning activities from Vendors and Siemens, aiding in Integrating commissioning schedule with Master Schedule.
KJO (Kuwait Joint Operations-Saudi Aramco/Kuwait Oil Company), Cairo, Egypt
Project Controls Specialist/Business Administrator (Key KJO Team Member)
Oct 2007 – Dec 2007
Responsible for/Managing (around 10 KJO personnel) in a PMC role-Planning (Primavera P6), Cost Control/Forecasting, Contract Administration, Procurement, Document Control (Primavera Contract Manager/Expedition) departments for KJO at main Contractor's Offices in Cairo for US$772 Million Al- Khafji (Saudi Arabia/Kuwait partitioned zone) Offshore project. Oversight, Due Diligence over Contractor Project Services function, Business Administration for KJO-by Streamlining EPC Scheduling (by assuring proper Planning, Reporting, Trending, Criticality), Cost Control, Procurement, Contract Administration, Document Control (initiated reduction of duplicate/superfluous paperwork by 30%); Coordination with Engineering & Procurement (ENPPI) and Fabrication/Installation Contractors, KJO Site Installation Team.
Alstom Power, Zurich (Baden), Switzerland
Senior Project Planning Engineer (Lower Level Executive MK03)
May 2007 – Sep 2007
Strategic Planning/Scheduling, Project Controls, Monitoring, Forecasting, Trending, Reports, Client Coordination (P3-Ver. 3.1, P3e/c-Ver. 5.0; Alstom's EPC Tool Set, Progress Supporter, MS Office)- Combined Cycle Projects (particularly Staythorpe UK Power Project-containing Alstom's GT26 Combustion Turbine machines)-on International Ventures with a US$ value of circa 1.7 Billion.
Riley/Babcock Power, Charlotte, North Carolina, USA
Manager, Project Controls
December 2006 – May 2007
Guided, Mentored and Supervised Project Controls Personnel working on Power Plant Betterment/Environmental Modification Projects (FGDs, SCRs) out of Riley/Babcock Power's Charlotte, NC, USA office. Also, hands-on Strategic Planning & Scheduling/Monitoring on an Earned Value basis (P3-Ver. 3.1), Cost Forecasting/Financial Control (Deltek's Costpoint software), Reporting/Trends, Risk Management, Contract Administration, Client Coordination.
Siemens Power Generation, Orlando, FL, USA
Part Time Project Controls Consultant/Self Employed
September 2005 – November 2006
Responsibilities included Analysis of Delays postponing completion of project according to Baseline Program for the Kirkuk Iraq Projects (Simple Cycle Project - Siemens V64/V94 machines); including Schedule Analysis, Resources & Equipment/Material Usage/Forecast review, Subcontractor Execution & Implementation Plan examination, aiding in the Financial/Commercial Impact studies and preparation of relevant Reports to be used as a basis for Claims Presentations (Client – US Aid/Bechtel International). Self Employed – Day Time Internet Stock /Currency Investment Trader for Personal Income/Earnings enhancement.
Senior Project Controls Engineer (Project Controls Manager)
January 2000 – September 2005
Developed summary & detailed EPC/Eqpt.Supply schedules for Simple & Combined Cycle Power Plants upto 600 MW (Including Industrial Steel/Concrete Structures-Generation/Control Room Buildings & Field Erected Tanks), maintained/monitored schedules, aided in selecting General Contractors' Lead Project Controls Representative and continuously guided/mentored General Contractors' Project Control function, reviewed/assured adherence to commercial, financial and technical aspects of LSTK/T&M Contracts by Clients/Consultants/Contractors/Vendors, provided corrective action/recommendations & developed/monitored cost/schedule forecasts & variances for Domestic/Int'l projects (P3-3.1, Primavera Enterprise 5.0 for Power/Process and E/C, MS Office, Lotus Notes, SAP R/3 4.6-Finance Module). Was Presented several Performance Awards and Citations.
Black & Veatch/Black & Veatch Pritchard, Overland Park, Kansas, U.S.A.
Senior Planning/Scheduling Engineer
March 1996 - December 1999
Developed summary EPC & Start-up/Commissioning Power Plant schedules for various technologies at domestic/international locations (Including Industrial Steel/Concrete Structures-Generation/Control Room Buildings & Field Erected Tanks), and specifically developed, maintained & monitored detailed EPC schedules for Pulverized Coal, Simple & Combined Cycle Power Plant projects (upto 600MW) & SCR Modifications in Indonesia, Pakistan, Korea & the USA (P3 2.0b & 3.0, B&V's Powertrak Scheduling System, Lotus 1-2-3, MS Office). Was Presented Performance Certificate. Tenure included working @ Black & Veatch/ Pritchard as a Sr. Project Controls Engineer on major Petrochem/Oil & Gas Projects-including "Coke Gasification to Ammonia" and LNG Plants-domestic/overseas.

Gulf Consolidated Contractors, Doha, Qatar
Project Services Supervisor (Project Controls/Quantity Surveying)
May 1994 - May 1995
Prepared and monitored computerized schedules (Primavera Project Planner-P3, Lotus 1-2-3, Microsoft Office) for construction control of LNG (Liquefied Natural Gas) infrastructure development project for Qatar Petroleum (QP) at $5 billion LNG plant at Ras Laffan. Attend progress review meeting, formulate weekly progress reports, prepare interim valuations for ongoing projects, tenders for submission to prospective clients, and follow up post-tender enquiries and submittals; supervised Project Services function.
Humphreys & Glasgow, Bombay, India
(Subsidiary - Jacobs Engineering - USA; Affiliate - Humphreys & Glasgow, UK)
Principal Planning Engineer
November 1993-December 1993
Produced feasible Project Programs - Engineering and Construction - using precedence network techniques with specific regard to contractual requirements, milestones, time and resource limited scheduling and carried out performance monitoring for this DEG (Diethylene Glycol) to TEG (Triethylene Glycol) conversion construction project costing $50 million using P3.
Independent Project Controls Consultant/Contractor, Bombay, India
January 1992-October 1993
Worked as Independent Project Controls Consultant/Contractor – providing services to Manufacturing/Industrial/Commercial facilities' EPC Firms, General Contractors, Owners (Turnkey Projects ranging from $5 Million~$50 Million)-individually handling planning/scheduling, estimating, quantity surveying and commercial/cost control.
Saline Water Conversion Corporation (SWCC)
Al Jubail Power/Desalination Plant, Jubail, Saudi Arabia
Planning Engineer (Area Planning - Scheduling Engineer/Acting Superintendent)
March 1988 to October 1991
As Area Planning Engineer mainly accountable for comprehensive co-ordination of major overhauls and plant betterment outage inspections of boilers/turbines/desalination units and auxiliaries (Including Industrial Steel/Concrete Structures-Generation/Control Room Buildings & Field Erected Tanks) - Phase 1 Operations - 6 x 60 mw oil/gas fired steam turbines, 2 x 30 mw gas turbines & 5400 cubic meters per hour water production (MSF). Identification organization, computerization of work scope & schedules to meet time/manpower restraints on overhauls (Primavera, Visischedule, Lotus, dBase IV).
Supervising & guiding 1 foreman/2 planners in cost engineering and planning, scheduling, coordinating corrective, preventive and modification maintenance activities for assigned areas - Ph.1 Power/desal plant & associated auxiliaries.
As Acting Planning Superintendent (2 mths. of tenure) developed site wide Plant Outage Program (for the period June '89 - May '93), for 10 x 120 mw, 42,000 cub. mt. / hr (Phase 2 units) & 6 x 60 mw, 5400 c.m./hr (Phase 1 units) - fossil fired/MSF - a long range turnaround/overhaul/outage and cost control plan for power/ desal units classifying critical activities to bring outage inspection program on track. In the same capacity served as Plant Insurance/Claims Administrator, addressed work areas causing departmental conflict and focused management's attention on crucial issues thus aiding in productivity improvement/budget savings. Supervised 15 planning personnel.

Public Service Company of Colorado/Xcel Energy
Fort St. Vrain Power Plant, Platteville (Denver), Colorado, U.S.A.
Scheduling Engineer (Nuclear Production Dept. - "NPD" - Preventive Maintenance Coordinator/Environmental Qualification - "EQ" - Scheduler)
December 1985 to December 1987
As NPD Preventive Maintenance Coordinator (12/85 to 12/86) was responsible for complete coordination, administration, and implementation of a plant wide preventive maintenance program which maintained qualification of equipment per NRC (Nuclear Regulatory Commission) guidelines. Wrote and implemented NPD procedure "Preventive Maintenance Planning/Scheduling Implementation" at this $300 million/330 mw HTGR (high temperature gas reactor). Activities centered on developing maintenance data base on PPMIS (Power Plant Maintenance Information System - IBM 8100 mainframe) and scheduling/monitoring activities on PREMIS PMS.
As EQ Scheduler/Overseer (12/86 to 12/87) developed/scheduled engineering work packages (manual/PREMIS) for deficiency correction on environmentally unqualified equipment per NRC guidelines & coordinated (on shift/2 other supervisors) planning, engineering, contractor manpower & quality control efforts toward scope completion.

Stone & Webster Engineering Corp., Boston, Massachusetts, U.S.A.
Beaver Valley Power Station # 2, Shippingport, Pennsylvania
Field Planning Engineer (Area Planning-Scheduling Engineer/Milestone Cost-Scheduling Engineer)
December 1981 to October 1985
As Area Planning/Scheduling Engineer (12/81 to 12/82 & 12/84 to 10/85) responsible for Construction Planning/Scheduling of piping- mechanical, civil, electrical, insulation, instrumentation activities for assigned areas - Service/Control/Turbine buildings, using S&W's PMS-4/CMS scheduling-monitoring information systems at this $3 billion /880 mw PWR (Pressurized Water Reactor) nuclear power plant. Other activities included Level III contractor schedule validation, critical path analysis and bulk commodity installation monitoring. In the capacity of Milestone Cost/Scheduling Engineer (12/82 to 12/84) prepared studies (CPM schedules/ reports) relative to specific detail design, construction, procurement and startup which directed the completion of commodity installation to support system turnover, testing and milestone acceptance.
Davy Powergas, Bombay, India
(Subsidiary - Davy International, UK now Kvaerner John Brown E & C, U.S.A.)
Site Supervisory Engineer
August 1977 to August 1978
Major duties involved preparing/updating project schedules, developing quantities/costs and ensuring their accuracy with project documentation. Periodically monitored and analyzed costs/variances and provided corrective action. Expedited delivery of equipment and material from vendor through installation and aided in engineering - construction coordination efforts at this $50 million polystyrene manufacturing construction project. Aided in the design of Industrial Steel Buildings (with paneling) for this project before taking the project to the field and coordinating their erection.
EDUCATION/ M.B.A., Management, August 1981
TRAINING Southern Illinois University, Carbondale, Illinois, USA
(Graduate Assistant, School of Physics & Engineering)
B.S. Civil Engineering, April 1977
Indian Institute of Technology (I.I.T.), Kharagpur, India
I.S.C.E. (High School Cert-sponsored by Cambridge Univ., England), April 1969
St. Mary's High School, Mumbai (Bombay), India
Professional Training
Construction Project Simulation Workshop & Construction Management
Systems (CMS) -- Stone & Webster Eng. Corp.
PREMIS -- Project Management/Scheduling System -- Public Service Company of Co.
QRS --Maintenance Planning & Database System -- Saline Water Conversion Corporation
PRIMAVERA PROJECT PLANNER / PRIMAVISION -- Certified -- Evans Tech. Inc.
Several Training Certificates/Courses taken at Black & Veatch, Siemens Westinghouse (among others) in Project Controls,
Project Management, Business Process Management, Contracts Administration, HSE, Operations & Maintenance.
Evaluated/Provided Recommendations for P3e-Primavera Enterprise Program-@ Siemens Westinghouse. Sr. Project Controls Engineer on "High Desert" & "Silverhawk" (@ Siemens Westinghouse)-Power Magazine's "Power Plants of the Year-2003/2004".

.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1051 to 1100 of 3125)Go to Search Parameters...
Brief Description
Piping detail, scheduling, field work and design in refineries, chem plants offshore prouction platforms, onshore and offshore oil drilling rigs sugar mills using acad,( short term cadworx,rebis, smartplant) and on the board
LAND SURVEYOR
Seventeen years experience in electrical engineering design, construction supervision, commissioning & start-up for major international EPC and Consulting firms specialized in power generation, T & D grids, oil and gas petrochemical fields
Summary of Qualifications,Combined experience in Industrial Refrigeration Technician / Electrician Technician in the Pharmaceutical Industry,Petro chemistry, Building Management System (BMS), Ship Systems, Maintenance and Troubleshooting.
Design engineer
25+ yrs progressive exp. as a Sr. Supervisory Planning/Scheduling & Project Control Engr/Mngr with Risk/Contracts Exp, Int'l w/Utilities, EPC Firms/Consultants, Turnkey OEMs and Constructors within the Energy Sector. P3 Ver.3.1, Primavera P3e/cVer.5, 6.2,Pertmaster, Claim Digger, MS Office, Acrobat
Fifty Years Total Experience in process engineering and technology development. Including More Than Twenty Years Process Engineering Experience on petroleum refinery, oil & gas production and petrochemical projects. Experience includes process simulation software Hysys/Pro II/Dynsim/Aspen.
The majority of my 15 years of experience has been applied to inspecting in-service pressure equipment and piping in a refinery setting. I am an excellent communicator with exceptional organizational skills geared toward inspection, NDE planning and crew leadership.
Mechanical Engineer with over 20 years experience in major Oil & Gas Construction and Maintenance. 12 years in Project Management, 10 years in Pre-commissioning/Commissioning and Start up of various facilities, 12 years in Installation, 11 years in QA/QC Inspection.
Chief Engineer (Manager) in Technical Office for a large construction progect :High Rise building, Under ground Metro line, Industrial projects, Preparing and checking structural shop drawings with B.B.S., Coordination, Methods for constructions, using ISO 9000 - 2000 Prep. of Claims and V.O etc.
Senior Planning Engineer well versed with Primavera, Suretrack, MS Project
Technical office Manager.
Urban Roads and Highway design, Traffic and Transportation planning
Contract Negotiations, Quantity Surveying, Project Handling & Project Implementation, Project Co-ordination
Civil Engineer from REC Kurukshetra, India. Working as Assistant Manager (Civil) with Larsen & Toubro Limited - ECC Division
multi skilled engineer
To offer services as Senior piping designer for onshore and off shore oil and gas projects by using PDMS & PDS 3d model system
TO WORK AS A HVAC SALES MANAGER IN A CHALLENGING HVAC INDUSTRY.
International Weldig Engineer (IWE) , CSWIP 3.1 and Level II(two) Pt,Mt,Ut and RT
Experienced Industrial Structural Engineer - concrete, steel - 20+ years, UK & US codes
7 YEARS OF RIGGER EXPERIENCE
Diploma In Mechancial Engineering+NEBOSH Level-3+Environment, Health and Safety Management Specialist Certification from NASP of USA+ ISO 14001:2004 & 9000:2000 Certified Lead Auditor with 15 Years Experience in Oil&Gas as HSE Advisor/Engineer/Supervisor/Coordinator/
Mechanical Engineer Professional experience of 35+ years in Engineering and Project Management
KEY RESPONSIBILITIES :1. Transmission engineering in designing backbone links,2. Transmission network design, link budgeting for transmission links,4. Planning of STM-1 Ring Network in City and Backbone to have a Reliable Network with a uptime of 99.99%,6. Microwave Projections for the additional Si
Landscape Arch with varied experience of the micro and macro level design and execution of private and govt. projects
To secure a challenging position with a dynamic organization which will enable me to apply my education and creative skills to the benefit of the organization?
Planning Engineer, Certificate of degree Dr. of Philosophy
Professional graduate engineer experienced in Facilities Management, CMMS implementation and application, Technical Writing. Recent 16 months in Kazakhstan. Interested in contract work (rotational or short-term)
I am a Mechanical Engineer with around 9 years of experince, with knowledge in construction project manage. Desing of wellhead equipment, and drilling equipment, certified in none destructive examination.
I have done my M.S.(Control System Engineering) from Texas A&M University-Kingsville with G.P.A as 3.9 /4.0. I am looking for a job of control System Engineer. I have work experience of 1 year and 4 months. I am willing to relocate anywhere in USA. Thanks Rajesh
15 years of experience in repairs and maintenance to construction plant and machinery and 10 years at supervision/managerial level Plant predominantly Caterpillar
Skills: Contract Negotiation, Quantity Surveying, Project Handling & Project Implementation, Quality Control, Co-ordination with various agencies involved in project
Experience in quantity surveying, site supervision, planning, designing over water and over land structures.
I am a Naval Architect and Marine Engineer whom objective is to provide engineering solution in a merit driven environment with an opportunity for career development to face present and future challenges.
Looking for a position with an established engineering company, utilizing previously learned skills
I am a Mechanical engineering diploma holder, over 15 years of experience with CSWIP Plant Inspector, CSWIP 3.2, AWS CWI and ASNT LEVEL II in RT, UT & MT, with valid UAE driving license.
Senior Structural Designer whom has been on both sides of construction. I started out on the tools and made my way into the design and engineering. Please review the letters of reference on my website. My background has always been an asset in the design office.
I have bachelors in mechanical Engineering and Masters in Petroleum Engineering.I have working Experience in Pipe line and EPC Companies
MEP Manager with 14 years of int'l exp. in construction. Verify design, construct and commission. Executed prestigious & high rise buildings project which MEP works value in excess of US$380 M. Supervise and coordinate work acc. to contract ,budget, time, co. procedures & ensure client satisfaction.
Mechanical Draughtsman (AutoCAD,AutoCAD Inventor.)
responsible for the day-to-day operation and control of a CISCO based communications network.
Estimation and Costing,variationsnad claims,Monthly Progressive Bill preparations
A Wide experience in drafting in major of civil works, structural, mechanical, Piping & Instrumentation and architectural drawings, 8 years of overseas experience,Overall 15 Years of working experience in civil, structural, mechanical, piping, and architectural firms
More than 13 years post qualification experience out of which 7 years in Occupational Safety and Health, (4.5 years in oil and gas sector) interested in the development of modern techniques in the construction and oil field industry
Bachelor of Science in Civil Engineering
Rotational Power Infrastructure Manager & International Quality and Safety Systems Management
Civil Engineer, Civil maritime engineer
Computer ?Automation & Controls Engineer
PROFILE: Proficient in shuttering works, Steel reinforcement & fabrication, pipe fittings
I am a Senior Planner/ Project Controller with certified versatile capabilities and experiences in different fields of construction, including, but not limited to, Building construction, massive civil work, industrial construction, petrochemical construction, commercial complex and high rise buildin
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   [ 22 ]   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com