Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #87225
next resume »»
CONTACT INFORMATION:
View contact information...
Career Objective: To secure a management position in a high growth company with considerable advancement opportunities. Ideally, in an oil and gas development capacity with an emphasis on strategic planning.
Job Summary: Having a 9 years in abroad and 3 years in local of various construction experienced in the oil, gas and power industry.
Exposure in engineering works,piping design, piping installation, mechanical equipment installation (rotating and static), and storage steel tank field fabrication and inspection. Possess sound knowledge of standards such as ASME, ANSI, ASTM and API
codes.
Professional Qualification: Mechanical Engineer
EMPLOYMENT HISTORY:
ľ Position: Piping Supervisor
Company: Tecnimont SpA
Inclusive Date: July 04, 2009 -
Project: Poly Olefins Unit, Product Handling and Marine Works
Borouge 2 Project, Ruwais, Abu Dhabi UAE
Duties:
Supervise and coordinate the activities of sub-contractors. To ensure that works meet s all practical requirements of productivity, quality and contract target completion. Ensure that all works been carried out as per design used by the sub-contractors on site. Ensure that all activities including erection works are carried out in a safe manner. Coordinate and plan to provide continuous working to meet time lines schedule.
ľ Position: Mechanical Supervisor
Company: Hanwha Saudi Contracting
Inclusive Date: January 31, 2009 - May 5, 2009
Project: Power and Desalination Plant
Ma¡¦aden Project, Ras Az Zawr
Duties:
Supervise and monitor daily activities of Sub-contractor for the installation of rotating equipment including water storage tanks erection and piping. Ensure that the installation of all equipment are as per design and specification. To ensure safe and effective execution of construction work as per HSE rules and regulations. Ensure that the alignment of all rotating equipment are acceptable and within the tolerances. Push and motivate men to achieve the integrated completion time schedule. Strictly enforce company rules and regulations, quality and safety policies.
ľ Position: Static Equipment Supervisor
Company: Chiyoda - Technip Joint Venture
Inclusive Date: June 7, 2007 - August 31, 2008
Project: Qatar Gas II LNG Onshore Facilities Project
Ras Laffan Industrial City, Qatar
Duties:
Supervise and monitor the Sub-contractors installation activities of all static equipment at site on day to day basis and responsible for the planning of activities as per plan and schedules. Establish and maintain timely completion of equipment installation activities as per project time lines. Monitor and record daily work accomplishment. To ensure that work is completed on time with all quality and safety requirements. Maintain close liaison with engineering department as well as with sub-contractors to ensure continuous and efficient operation. Investigate and resolves construction problems in conjunction with other engineering and technical personnel. To carry out any other duties whenever it is required.
ľ Position: Senior Mechanical Engineer
Company: Mohammad Al-Mojil Group
Inclusive Date: May 19, 2006 - May 5, 2007
Project: Mono Ethylene Glycol and Polyethylene Oxide
Saudi Arabia
Duties:
Provide day to day technical supports for the mechanical and piping department. Liaise with the mechanical supervisor to ensure works are carried out safely and efficiently in a competent manner. To attend and witness any testing as required in the codes and standards, including static and rotating alignment readings or any other mechanical checks. Follow up and monitor day to day site activities including paper works. To ensure safe and effective execution of construction works. To provide full technical support to construction personnel in terms of procedure and specification. See to it that the installation of mechanical equipment such as static and rotating are as per drawing and specification. Perform piping and related engineering calculations. Assist discipline Engineer to spooling and weld mapping. To prepare and update progress and status reports for engineering. Prepare and close out of punch lists for piping and mechanical equipment. Prepare methods of statement or work procedure. Including the design of underground water lines and fire fighting system and layout for temporary facilities.
ľ Position: Mechanical / Piping Engineer
Company: Malaysia Marine and Heavy Engineering Sdn. Bhd.
Inclusive Date: April 21, 2005 - February 24, 2006
Project: Marine Conversion and Shipbuilding Division (FPSO
Project)81700 - Pasir Gudang, Malaysia
Duties:
Performed piping design for oil and gas FPSO project. Performed material takeoff and develop cost estimating activities. Provide support for any field engineering changes, implementation, and verify deliverables on various project to ensure good quality. To liaise with clients and sub-contractors in executing the project. Supervision of works of the sub-contractors. Review documents of piping prior to commence for fabrication.
ľ Position: Field Piping Engineer
Company: Daewoo Engineering and Construction Co. Ltd.
Inclusive Date: June 21, 2003 - June 21, 2004
Project: LNG Project
Duties:
Review of project piping layouts based on piping and instrument design diagram. Prepare work procedure and specification. Preparation of isometric drawings and review the same for preparing the work plan. Coordinate with other engineering discipline to solicit any inputs or changes in engineering design to finalize piping design layouts. Perform piping and related engineering calculation. Perform weld mapping and spooling. Prepare Hydro Test Packages. Line Checking or Punch Listing. Able to prepare pipe rerouting drawing or modification.
ľ Position: Piping Supervisor
Company: Mitsubishi Heavy Industries
Inclusive Date: April 8, 2001 - October 8, 2002
Project: Steam Power Plant Project
Saudi Arabia
Duties:
Responsible for the planning and control of daily work activities of piping installation. Implement plans and schedules as directed by immediate superior. To withdraw materials needed in the job and delegates manpower. Push and motivate men to attain schedules and productivity target. Monitor daily work accomplishments and take action to unfavorable deviation. Strictly enforce company rules and regulations, quality and safety policies.
ľ Position: Piping Charge hand
Company: Consolidated Contractors Company
Inclusive Date: April 17, 1997 - October 20, 1998
Project: Yanbu Petrochemical Project
Saudi Arabia
Duties:
Responsible for the daily works activities such as installation of pre-fabricated piping. Assigned trade persons in each activity. To ensure that the time schedules will be achieve. Follow-up and withdraw materials needed in the job. Reporting of daily progress. Be sure that tool box talk could be done prior to start the job. Maintain housekeeping on work areas for safety of the tradesmen.
ľ Position: Mechanical Site Engineer
Company: Roos Industrial Construction Inc.
Inclusive Date: August 4, 1996 - February 20, 1997
: 100 Mega Watts Diesel Power Plant Project
Philippines
Duties:
Responsible for the installation of all equipment such as, diesel engines, pumps and piping. To ensure that all mechanical equipment are carried out in a safe and efficient manner and schedules as set out in the integrated plan. Ensure that all work complies with contract, quality policies, procedures, and project specification. To engage with construction personnel for the development of construction work packs. Provide engineering supports and guidance to construction personnel. To liaise with construction supervisor to ensure that installation meet with the standards specification. Performed piping layouts for connection to equipment. To attend meeting with client to resolve technical issues. Prepare modification drawings of piping. Supervision and monitor of manpower and of works accomplishment.
ľ Position: Draftsman / Designer
Company: Gulf Steel Factories
Inclusive Date: December 2, 1994 - June 30, 1996
Doha Qatar
Duties:
Responsible for designing of aluminum windows, doors and curtain walling. Create shop drawings of steel and aluminum with complete details for fabrication. Prepare quotation for aluminum windows and doors including curtain walling.
ľ Position: Field Piping Engineer
Company: Methaphil Inc.
Inclusive Date: March 23, 1993 - November 31, 1994
Project: Filipinas Shell Petroleum Project
Philippines
Duties:
Assist construction manager in field project supervision. Coordination of field works and monitoring of project execution performance. Prepare and update progress and status of construction activities. Monitoring of piping installation, mechanical equipment including piping fabrication. Prepare procedures or method statement. Prepare modification and rerouting drawings. Punch listing to ensure piping appurtenances are in accordance to specification. Prepare hydro test packages.
ľ Position: Field Engineer
Company: Cimelec Industrial Construction Inc.
Inclusive Date: August 1, 1992 - January 8, 1992
Project: Coca Cola Plant Shut Down Project
Bacolod City, Philippines
Duties:
Assist the construction manager in field project supervision. Coordination of field works and monitoring of project execution performance. Conduct inspection of piping installation, machineries including piping fabrication. Prepare modification drawings. Punch listing to ensure piping and appurtenances are installed in accordance to drawing and specification.
ľ Position: Plant Mechanic
Company: Atlas Fertilizer Corporation
Inclusive Date: April 20, - June 15, 1992 (2 mos.)
Project: Sulfuric Acid Plant II Project
Toledo City, Cebu, Philippines
Duties:
Work involves, aligning of all machinery. Recondition of speed reducer. Reinstallation of rubber conveyor including rollers and reconditioning. Repair of bucket elevators and pillow housing blocks. Repair valves and plate fabrication.
ľ Position: Millwright
Company: Toledo Pioneer Integrated Group Construction Inc.
Project: Philippine Phosphate Project
Isabel Leyte, Philippines
Duties:
Works involves, aligning of rotating and static equipment. Vessels, feed fan cooler, reactors and turbine alignment. Heat Exchangers, Oil and Water Separator, Silencers. Diesel Engines and plate fabrication.
School Attainment:
ľ Course: Bachelor of Science in Mechanical Engineering
[University of the Visayas (Cebu City, Philippines -
1986 to 1991)]
Personal Data:
ľ Marital Status: Married
ľ Date of Birth: March 02, 1967
ľ Computer Skills: MS Word, MS Excel, Power Point, Auto Cad 2007
ľ Trainings: Personal Safety and Social Responsibility
: Medical Emergency
: Fire Fighting
: Personal Survival
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 501 to 550 of 3118)
Go to Search Parameters...
Brief Description
I AM AN ELECTRICAL ENGINEER FROM PAKISTAN WORKED IN MIDDLE EAST CONSTRUCTION COMPANIES
past 10 yrs in India and Gulf countries as an Electrical Engineer in electrical field & Plant (construction) R O Plant , Batching Plant, Asphlt Plant,
I have 13 years of experience in Mechanical Field as Project Manager in a project of special equipment which is a multimillion Dollars project supervised by me from 2001 to 2004 and have experience in Budgeting, Coordination, Project Management, Planning & Scheduling, Presentation, Construction & Lo
I have directed diverse construction sites, being in charge of but of 300 people, and controlling great projects of construction
Experience in the Power, Water and Wastewater automation and process control. Designing and developing automation solutions for PLC/ SCADA systems. Project management of automation and Telemetry projects. Leading role in design, engineering, testing and commissioning
Extensie background in instrumentation and analyzers. Lots of CEMS experience.
Fourteen years Welding/Materials/NDE experience in fossil power industry, oil&gas industry, engineering, fabrication and construction
Currently Sr. piping designer on Bentley 3d and piping design checker. Experienced in all areas of piping Including high temperature and high pressure piping systems, lined and jacketed pipe, stress analysis, p&id’s, specifications, process, utilities, sulfonation, pharmaceutical, pharmaceutical val
I'm an Electromechanical Engineer with 5 years of related experience within the UAE and GCC.
Mechanical Engineer with over 15 years of technical business experience with emphasis in cost control projects.
Ability to manage multiple tasks in a pressured environment.
I am hvac engineer
Water/wastewater treatment engineering study, design, modeling, operation optimization for municipalities,oil &gas, refinery,power and petrochemical plants.
Civil engineering
Have nine years of experience, in surveying and site Co-Ordination in construction industry.
Civil engineer with surveying, mining, and GIS experience
Field Service Technician, Electrician, Machine Repair, PLC Programming, Electrical Systems Design, Welding, Installation.
Well Qualified, Skilled & Experienced proffer in Design, Consultancy, R&D in Civil, Structural, Geotechnical, Architectural and Industrial Engineering
Civil engineer with 14 years experince (12 in saudi arabia). Skills include estimation, quantity take off, quotation requests, negotiations with suppliers, preparation of technical submittals, work progress reports, co-ordinations etc
About 9 yrs experience in the Feasibility Design, EIA Study, Detail Design and Tendering and awarding of Contract and construction supervision and quality control in hydropower projects
Mechanical Engineer with over 16 years experience within the hydrocarbons onshore & offshore, mineral processing and manufacturing industries. Degree & trade qualified experience includes, engineering design, construction, shutdowns, commissioning and maintenance. Over 10 years of on-site constru
I am a hardcore professional with a Mechanical Engineer and more than 15 years multifaceted exposure in the Oil & Gas, petrochemical field. I was working with Brunei shell Petroleum for SAP implementation, and Petronas Gas Bhd, Malaysia, as a Maintenance Planning Executive in abroad.
An experienced civil and structural engineer. Strong background in steel & concrete structures and in marine engineering and hydraulic projects. Advanced Geotechnical knowledge. Design and supervision of construction.
I have Thirty (30) years of experience in the surveying field, to include Boundary surveying,
Piping engineer
Project Engineer
Graduate Quantity Surveyor/Estimator, 10 Years Experience with B.Sc., AAIQS, ICIOB and MA Cost E.
DIPLOMA IN CIVIL ENGINEERING, CURRENT POSITION- LEAD STRUCTURAL CAD TECHNICIAN AND COORDINATER, SKILLS- AUTOCAD, REVIT STRUCTURE, MS OFFICE,CADS RC.
Executive Management level experience and expertise
Allround scaffold expert
Expert for OSP Survey, Planning, Design, Implementation and coordination
Over 15 years international experience in ectromechanical, power transmission OHL and Cable Engineer
14 years experience in piping, pipeline and mechanical engineering within the oil and gas and petrochemical industries. Experience of all project phases including Estimation, Front – End Engineering, Detailed Design, Construction and Commissioning.
I have varied Experience of Project management & Execution of RCC framed structured high-rise Petrochemical building, Power plant Buildings, Heavy Rotating & static Equipment foundations, erection of related equipments, refinery civil & steel structural works etc.
Mechanical Engineer, Engineering Management, Project Engineer, Reengineering, TQM, Activity Based Accounting System, Production Planning & Scheduling, Budget Controlling, ARIS Toolset, Access
ASNT NDT LEVEL 3, INSPECTION ENGINEER ,WELDING INSPECTOR,PAINTING INSPECTOR
High Voltage Electrical Testing and Commissioning and Electrical Start-up
UK degree in Land Surveying. Experience in railways, civils and site management.
Electronic and communication
Creation of master data's for material master, purchasing and maintaining of information records
outdoor field technician
MCSE, CCNA, ITIL,System Administrator, Windows Server 2003,2008, MS Exchange Server 2003, 2007, ISA Server, SharePoint,
Passed professional architectural licensure exam- 16th place, Graduated College with Latin Honors (Cum Laude), graduated high school and elementary with honors, proficient with autocad and microstation.
Plant construction field that utilize my experience, skills and education, Contribute to growth of the Corrosion preventive coatings, Industrial Hot and Cold Insulation onshore, offshore,Petro chemical plants, oil refinery, power plants and commercial projects
15-years Professional Experience in Contract Department (QS), Planning & Scheduling, Construction & Testing, Oil & Gas Fields, Fertilizer & PTA
I have had acquired a sound knowledge of engineering principles with emphasis on designing and exposure of mechanical equipment and piping system installation. In addition, I have excellent knowledge in codes and standards such as asme, astm and api. Expertise includes,To attend and witness any test
A. CIVIL STATUS DATAS
Engineer for Power System Analysis, SCADA/EMS chief engineer
repairing,overhaulilng,diagnosing,servicing and troubleshooting of heavy duty machines,and other equipment.
Civil surveying engineer can work as cheif surveyor & site manager
First
1
2
3
4
5
6
7
8
9
10
[ 11 ]
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com