Go to Job Seeker's Center »»
Misco Jobs
Employer's Center
  • » Employer’s home
  • » Feedback
  • » Help
  • » Search Resumes
  • » Post Jobs
  • » Edit/Delete Jobs
  • » Resumes by E-mail
  • » Log In
  • » Register as Employer
  • » Lost Password
  • » Contacts
  • » Job Seeker’s Center



  • exploration
  • geologist
  • business
  • training
  • development
  • health
  • siting
  • mechanical
  • energy
  • experience
  • electrical
  • licensing
  • operations
  • mining
  • environmental
  • learning
  • maintenance
  • equipment
  • drilling
  • construction
  • management
  • design
  • process
  • safety
  • engineering

Project Control, Planning and scheduling, project manager, Primavera

« previous resume next resume »
Information:

Posted: 03 Jan 2010
Brief description: Project Control, Planning and scheduling, project manager, Primavera

Resume description:

I am a graduate in Industrial Engineering. Over 12 Years various international experience in EPC, EPCM, industrial, infrastructure, revamps, turnaround, shutdown, power, utilities and construction Projects.

Project Control, Project planner and scheduler, cost, shutdown/turnaround Planner in Petro Canada Montreal refinery and Shell -Scott ford — hydrogen manufacturing (HMU) unit in Edmonton and Toronto.

Project planner / scheduler / cost in petrochemical, GEE gas power plant (492 MW), T-Jetty renovation, offshore projects, pipe lines, tank farm construction (20,000 To 1,000,000 M3), and shipbuilding projects in shipyard in overseas.

Excellent knowledge of engineering, procurement, construction, commissioning and Engineering disciplines dependencies and logics, work breakdown structure (WBS), Project Breakdown Structure (PBS), Planning and evaluation of schedule, activity float and utilization of critical path method (CPM), SPI, CPI, prepare schedules, understand budgets, Cost, activity coding, man-hour performance systems, Earned Value reports and other elements of overall project monitoring, Implementation of project control procedures and systems in large scale projects and also experience as production, steel, material planner in manufactures.

Proficiency in computer applications; Primavera (P7, P6.2, P6.1, P6, P5, P3E/C, P3E/P4 and P3.1), Ms Project, Ms Office and Performing Pertmaster 8 based schedule risk analysis.

Preparedness Project Management Professional (PMP) courses, Earned Value Methodology and project management course In Germany and in Delft University in Netherlands.

Professional Engineering Ontario Licensed (P.Eng.)
Pursuing PMP exam with expected completion 1st quarter of 2010.

My resume describes various experiences that I have to offer. At this stage in my career I would like to see myself handling a new challenge and contribute to the company's growth and advancement.
It would be a great pleasure for me to start working with your company.

I am able to relocation.
I would appreciate an interview at your convenience, where I can explain my skills in greater details.

Thank you in advance for your time and consideration.

Best Regards,

Touraj Zakeri P. Eng.

-Enclosure

Touraj Zakeri P. Eng.

HIGHLIGHTS OF QUALIFICATION AND EXPERTISE

  • B. Sc. in Industrial Engineering, Over12 years various international experiences in EPC, EPCM projects, Engineering experience in Oil, Gas, Power, Offshore, Revamps, Turnaround, Shutdown, Power, Utilities and Infrastructure projects.
  • Extensive experience in Project Controls; Planning & Scheduling, Cost, resource levelling and analysis, cost control, EPCM progress, performance measurement, utilize WBS, PBC, CPM, Cash flow, Milestone, Earned value analysis and risk analysis.
  • Proficiency in computer applications; Primavera 7, P 6.2-P6.1-P6-P3EC-P3.1, Pertmaster, MS Project, MS Excel, Word, PowerPoint.
  • Proficiency in Project Management Systems, Earned Value Methodology, SPI, CPI and risk analysis.

Professional Experience

Mar.2009- Present MMM Group Ltd, Toronto, ON o Mississauga Bus Rapid Transit Project -BRT / Project Control Planner, Scheduler Budget: $320 million-CAD

Responsibilities include;

  • Develop detailed Engineering, Contracts, Construction schedule using Primavera 7, P6.2, based on project scope and key milestones as 30%, 60% and 90% design submission.
  • Establish the BRT project baseline and obtain client (City of Mississauga) approval.
  • Develop detail engineering cash flow, track job hours, budget in schedule using Primavera 6.2 and provide man power histogram and man-power density analysis.
  • Prepare and issue Bi-weekly update schedule and cost report including CPI, SPI, S-curves, schedule lookahead, baseline variances, impacts/risks and monitoring and reporting critical paths & schedule performance.
  • Participating in project team and discipline leads bi-weekly meeting.
  • Engineering & construction resource planning, levelling and man-power density analysis.

2007 — Mar.2009 BANTREL Co. / Bechtel, Toronto, ON o SUNCOR/Petro Canada Montreal Coker / Senior Planner / Scheduler (May.08- Mar.09) Budget: $1.5 Billion-CAD
o Petro Canada Montreal refinery revamps / Planner / Scheduler (Aug.07- Apr.08)
Responsibilities include;
  • Developed the Level III schedules for Front End Engineering Design (FEED), Detailed Engineering, Procurement, Module fabrication and Construction for delayed Coker (EPCM) phases by Primavera6.2.
  • Developed the Level III schedules for revamps unit and refinery shutdown.
  • Engineering & construction resource planning, levelling and man-power density analysis
  • Monitoring and reporting critical paths & schedule performance.
  • Presentation of schedules to management and the Clients, including critical paths, limitations, resource usage profiles, potential delays and proposed planning solutions.
  • Preparation and analysis of commodity curves for engineering release, fabrication and construction & installation.
  • Progress, performance reporting, earned value analysis and Assessment of cost and schedule impacts of major scope changes.
  • Prepared and issued bi-weekly updated schedule and cost report including CPI, SPI, schedule lookahead, baseline variances and impacts/risks and monitoring the critical paths & schedule performance and trending.
  • Page 1
Project Planner, Scheduler, Primavera 7, P6.2, P3EC **Touraj Zakeri P. Eng.** Oil, Gas, Power, Utility, EPCM, EPC Project

2006 — 2007 TIC-Canada Inc.(International Oil, Gas, Power) Edmonton, AB o Shell-HMU- Scotford Upgrading Expansion1 / Construction Planner/Scheduler Budget: $84 Million-CAD
Responsibilities included;
  • Developed level 3 to level 5 schedule (CWP to IWP) schedule using P3EC and P5.
  • Updated and monitor Primavera schedules, Evaluation of the productivity.
  • Provided variances from baseline and issue delta report for Module yard and construction activities.
  • Developed WBS and packaging strategies, and setting-up commitment/contract packages.
  • Development of cost baselines and monitoring and reporting variations.
  • Assessment of cost and schedule impacts of major scope changes.

2004 — 2006 Vosta LMG / Sadra Inc Joint Venture (Oil, Gas, Offshore) (Netherlands-IRI-EMU)

o Module Fabrication / Lead Planner/Scheduler Budget: 120, Million Euro + $80 Million o Landing Crafts 1400 DWT / Lead Planner/Scheduler Budget: 50 Million-Euro
Responsibilities included;
  • Developed EPC schedules with emphasis on project target, Milestone and material delivery dates for managing overall project resources and scope requirements budget and cost.
  • Utilized WBS, Weight Factor, Project Breakdown Structure (PBS) and Evaluation of Schedule float and utilization of Critical path (CPM)
  • Updated and Issued Primavera Schedule, Monitored contract requirement list (CDRL), Issued the weekly and monthly progress reports and S-Curves.
  • Follow-up the procedures, procurement of bulk material, long lead equipments and modules (purchasing, transportation, unloading and ware hosing).

2000 — 2004 General Electric Europe (GEE) & Moshanir (Gas Power Plant) — Overseas o 4 Unit Gas Power Plant & Combined Cycle / Project Planner/Scheduler Budget: $300 Million o Substation (Transmission / Distribution)
Responsibilities included;
  • Developed and Prepared EPC turnkey project schedule using Primavera for gas power plant and substation, ranging between 500 MW to 1000 MW including all industrial and non-industrial building and foundations such as Turbine Generators, Transformations(main, station and Auxiliary), stacks, control buildings, Turbine Hall, cable and pipe trenches.
  • Developed and Prepared the WBS and schedule for heavy construction containing 32 foundations ranging between 350 to 1000 Tons, Concrete foundation and steel structure of an administration building, Substation, Cable & Pipe trenched, Mechanical, Electrical Installation, commissioning and start-up.
  • Prepare and maintains weekly Project Review Action Lists, Monthly, Weekly Report for Owner and Clients.
  • Constructed schedules for managing overall project resources and scope requirements, budgets and cost. Utilized (WBS), weight factor, PBS and evaluation of schedule float and utilization of CPM. engineering (Basic & Shop), procurement, construction details
  • Reviewed the subcontractors Invoices and compare with progress for confirmation.
  • 1997 — 2000 Indamine Shock Absorber Mfg. under the license of Armstrong of England o Industrial Engineer, Production Planner, Inventory control, Steel Planner
Responsibilities included;
  • Prepared Material requires Plan (MRP), balanced the production line, time and motion study using M. O.S.T and M. T.M method, Increased production by 10%.
  • Developed and implement new product costs, layout, flow charts, assembly equipment, work instruction.
  • Page 2
Project Planner, Scheduler, Primavera 7, P6.2, P3EC **Touraj Zakeri P. Eng.** Oil, Gas, Power, Utility, EPCM, EPC Project

Education

1993- 1997 Bachelor of Science (B.Sc) Industrial Engineering (Planning & System Analysis)

2005 Ship Building Project Management Course In Germany

Project Management Professional course In Delft University In Netherland

Professional Affilications

P. Eng. license -100138731

PURSUING PMP, with expected completion 1st quarter of 2010

Certification And Membership


  • B. Sc. in Industrial Engineering (Planning & System Analysis) 1993 -1997 (4 years university).
  • Ship Building Project Management and Project Management Course in Germany & Delft University in Netherland.
  • Ontario P. Eng Licensed
  • Member of PMI # 1144994.
  • Member of AACEI # 48715.
  • Member of OCEATT # 851921.
  • Construction Safety Training System Certificate (CSTS-V3.2) # 2028905.
  • Internal auditing Certification for ISO 9000:2000 & Kaizen Certificated.

Computer Applications

  • Proficiency in computer applications; Primavera 7, P6.2-P6.1-P6-P3EC-P3.1, Pertmaster, MS Project, MS Excel, Word, PowerPoint.

Contact information:

« previous resume next resume »

Construction resumes »
Engineering/Technicians

Resumes: 451 — 500 of 2050

Posted   Description
16 Mar 2010 Graduated Industrial Engineer (1993). Professional experiences on project planning, scheduling and control of EPCM projects. industrial mining & metal proj (9 ys), building construction proj (3.3 ys), infrastructural and construction Proj (4.4 ys). professional on Primavera (P6) & MS Project
12 Mar 2010 I&C DCS field engineer
03 Mar 2010 An experienced electrical engineer with varied experience in the oil and gas/petrochemical/construction industries. Functional expertise in facilities management, project management/engineering, materials specification and procurement, sales, marketing, business development educated to HNC level
02 Mar 2010 Contracts & Subcontracts Administration & Management. Award & Post-Award Contract Activities; putting Contract into force. Contracts Planning, Scheduling and Progress Monitorin. Contracts Commercial and Financial Matters, Invoicing, Change Orders, Claims etc.
23 Feb 2010 Engineer with training in accountancy, financial and business management. Reliable and hardworking person with experience health and safety, project management. Skilled in Microsoft Excel, Word, PowerPoint, Visio, FLAC, GeoSlope, DIPS, Sage payroll and Sage Line 50. Fluent in Russian and 4 West Afr
23 Feb 2010 Project Engineer PS
22 Feb 2010 Corrosion, Cathodic Protection, Material Selection
16 Feb 2010 Welding Inspector Level 2 (CSWP 3.1)
16 Feb 2010 Over 3 decades in the Power industry. Construction, Start Up and Commissioning
15 Feb 2010 More than 25 years experience in electrical/HVAC fields in construction, commissioning, maintenance, training oil&gas projects.
13 Feb 2010 I am EPA Certified and I have plenty of years experience.
10 Feb 2010 Experienced mechanical supervisor/ planner/ superintendent
09 Feb 2010 Circa 30 years work experience (15 years Middle-East / Africa)
08 Feb 2010 Serving Oil & Gas sector for more than 11 years with QA/QC/Inspection domain. Graduate Mechanical Engineer, Completed Post Graduate Diploma in Piping Design Engineering, IRCA certified QMS lead auditor, CSWIP 3.1 welding Inspector, ASNT levelI in RT/UT/MT/PT,
05 Feb 2010 Safety Supervisor with 8 years and 9 months experienced which involved in process, power generation, commissioning and offshore. Qualified safety officer from Malaysian NIOSH-2007. Holding a competency of marine engine driver, boiler engine driver and gas turbine engine driver from Malaysian DOSH
05 Feb 2010 I have over 25 years experience in the Mechanical Engineering field; and I am also well versed in the areas of HSES (Health, Safety, Environment and Security) issues in conjunction with government and company guidelines. I have considerable experience in dealing with mechanical piping and rotating a
30 Jan 2010 Construction, Commissioning, Training and Completions Engineer, Attended and supervised all related static equipment erection such as columns, vessels, shop fabricated tanks, filters, and all related rotating equipments installation such as process fans, pumps and drivers.
30 Jan 2010 I am working in Railway for the past 27 years and I am highly proficient in project management, preparing methods statement for track works, and execution of various track works/track laying. Appreciable knowledge in Designing of permanent way, laying and maintenance of ballas
29 Jan 2010 FPSO and offshore instrumentation specialist with over 20 years experience. Past 7 years working for international FPSO company in various locations around the world.
27 Jan 2010 I&C Engineer
25 Jan 2010 Mining geotechnical engineer
22 Jan 2010 QUALIFICATION BE MECHANICAL WITH CERTIFIED WELDING INSPECTOR+NDT II
22 Jan 2010 My experience in many fields of Engineering and CAD applications with knowledge of machined, sheet metal and plastic parts and assemblies makes me a flexible Engineering Designer.
13 Jan 2010 Experienced engineer, mainly Piping Stress in the Nuclear, Refinery, Oil&Gas — Off/Onshore (Flowlines), Pharmaceutical, Pulp & Paper and FPSO industries.
Other experience in Management, Construction, Maintenance, Verification, Projects and QA
13 Jan 2010 Twenty five years Management experience in the Mining, Quarry & Heavy Civil Construction fields both surface and underground.
10 Jan 2010 Buidling services design, construction and project management
08 Jan 2010 Project coordinator
06 Jan 2010 Two years as an Associate Engineer at Worley Parsons involved with the wiring of relay panels, back checking of drawings, updating nameplates and one year experience as an Applications Engineer at Chloride Power Protection doing quotations and reviewing specs for clients and reps, setting lead times
06 Jan 2010 HVAC, Plumbing and Fire Protection Design and Management complete
03 Jan 2010 Project Control, Planning and scheduling, project manager, Primavera
30 Dec 2009 I did my training with Caterpillar. (Thos Barlow & Sons, South Africa) I specialized in industrial transmission, hydraulic and injector pumps whilst doing my apprenticeship & training. As a Journeyman I was sent out as a field serviceman doing repairs, maintenance, analytical inspection and power ge
30 Dec 2009 I did my training with Caterpillar. (Thos Barlow & Sons, South Africa) I specialized in industrial transmission, hydraulic and injector pumps whilst doing my apprenticeship & training. As a Journeyman I was sent out as a field serviceman doing repairs, maintenance, analytical inspection and power ge
29 Dec 2009 Power plant maintaince and eposs passed exams
13 Feb 2012 Over 15 years of mechanical equipment design, installation/maintenance experience in large industrial settings such as oil and gas — gas gathering centers, refinery, crude oil processing, LPG & LNG projects
28 Dec 2009 I am a well-rounded coal mining engineer w/ 10 yrs of direct experience (19 overall), looking for an opportunity to help a company become more profitable. With a BS in Mining Engineering from the Colorado School of Mines, I have been taught how to think analytically & examine mining systems.
28 Dec 2009 Farhan Juratli, LEED-AP Has over 15 years of experience in the District Cooling & HVAC industry out of which 5 years have been as Senior Technical & Projects Engineer at Carrier Dubai.
27 Dec 2009 Practicing Professional Civil Engineering as Project Manager, Construction/ Site Engineer, Material Engineer, Quantity Surveyor/Engineer since 1990 (i.e. Nineteen years). Worked on Planning, Survey, Identification, Feasibility Study, Formulation, Design Review, Detailed Design, Scheduling, Estimatn
26 Dec 2009 Practicing Professional Civil Engineering as Project Manager, Construction/ Site Engineer, Material Engineer, Quantity Surveyor/Engineer since 1990 (i.e. Nineteen years). Worked on Planning, Survey, Identification, Feasibility Study, Formulation, Design Review, Detailed Design, Scheduling, etc
24 Dec 2009 Senior draftsman
12 Dec 2009 Dynamic, highly motivated professional, seeks position as a transportation engineer/planner in a challenging environment where I can apply my specialized technical and academic skills.
11 Dec 2009 A Hydrographic Surveyor with extensive experience in varied Hydrographic/Marine tasks and looking for a challenging and rewarding position where my knowledge and 24years work experience can be shared and enriched looking forward for the opportunity where I can improve my quality, professional skil
10 Dec 2009 Results oriented techno-managerial professional backed by strong academic credentials, offering a distinguished career donning leadership roles in Project Management of Painting, Coating & Blasting Operations, Quality Management, Installation & Commissioning and Maintenance & Operations of Coating
09 Dec 2009 Direct project and construction experience with heap leach, tailings storage facilities and process plants including construction management, quality assurance, and project and quantity/cost controls.
07 Dec 2009 Electro/ Mechanical Technician
05 Dec 2009 AUT CSWIP Level II, CSWIP 3.2.2, BGAS Gr 2, AWS-CWI, Level II in RT, UT, MPT & PT
03 Dec 2009 Commissioning / piping engineer, BSc, 15 years experience Approved to work in Canada, US, Europe and Singapore
25 Nov 2009 Skilled profesional in construction and building maintenance
23 Nov 2009 Almost 28 years working in EPC at OIL & GAS.
13 Nov 2009 US and overseas QA/QC project supervisory experience in the construction, petroleum, mining, wind power and aerospace industries. I am a CWI, Level II in MT, UT, PT and RT film interpretation. Past project duties and responsibilities have included review of purchase orders and exceptions, quality as
10 Nov 2009 Experience in Project Management and Marine Construction
«
»
1 ... 6 7 8 9 10 11 12 13 ... 41
 

Advanced Search Parameters (Click here to show/hide search parameters form)

Experience:
Categories/Regions:
Selection:
of the words


Copyright © 1999 — 2011 Misco Jobs. All rights reserved. Contacts: support@miscojobs.com.