Power Transmission Line & Lighting of Highways (design overhead lines, instillation, maintenance, modeling, coupling, pipeline, cable size, poles, illumination (lux) & cd/m2 calculation) (Refer to Publication Section)

Electrical Design & Low Voltage System (main & sub-main, sizing of cables, voltage drop calculation, design drawing for power, telephone, computer, fire alarm, central clock, TV, lighting, security & Audio Visual)

* Subbiah Rd 73 Km (300 kV)-Feb. 04-Kuwait
* Pipeline Coupling (Paper)-May 03-Australia
* New Overhead T.L Design- Oct.02 Australia
* EMF & Qaseem T.L 380kV-March 02 - KSA
* Pinjar Overhead TL 330 kV-Jun 01-Australia q Anwar Center Project-June 04-Kuwait q Kuwaiti Club for the Deaf-April 04-Kuwait q Jarrah Group Project-Feb. 04-Baghdad q Ministry of Defense-August 97-Yemen q Karrada Project-June 95-Baghdad

Low Frequency Electromagnetic Field (Transmission Line) Environmental Radiation Effects on Human Health/ Mitigation Solutions (EMF calculation & measurements, programming, numerical techniques)

* Mitigation Techniques-Sep.04-Kuwait
* Physical measurements-April 04 – Kuwait
* Optimization Techniques-Feb 03-Australia

University Lecturer-A/Professor (electronic & physics, high-voltage power transmission line, Pipeline, EMF field, power system, numerical techniques, logic systems & design)

q University of Western Australia - School of Electrical, Electronic & Computer Engineering - Energy System Center- Australia q Employment:

* Aug.04-Present (Electrical Power Consultant/ Associate Professor-KISR "Kuwait Institute for Scientific Research"-State of Kuwait).

* July 03-July04 (Project Manager/Senior Consultant Engineer-PACE "Pan Arab Consulting Engineers"-State of Kuwait).

* Feb. 03-June 03 (Assistance Professor-Energy Systems Center-University of Western Australia-WA-Australia).

* May 99-Jan. 03 (Power System Laboratory Demonstrator, Technician & PhD Student- University of Western Australia-WA-Australia).

* July95-Dec.98 (Power System Engineer/Technical Manager-Low and High Voltage Design, Power Transmission, OHTL, Transformers, Generators & Motors - Zubaidi Agencies & Marketing Consultancy-R.O.Y).

q Awards & Career Achievements:

* University Postgraduate Award (UPA)-University of Western Australia, Australia, Jan. 99.

* Second Place Prize Paper Award in Paper Title of "A Quantitative Study on the Feasibility of Electromagnetic Field Reduction by Phase Relocation in 3-Phase Systems" NAPS USA Oct 02

* Travel Award in Paper Title of "Temperature and Earth Resistivity Effects in Calculation of Electromagnetic Field Using Three-Point Formulae Based on Finite Difference Method ", AUPEC 2002 (Australasian Universities Power Engineering Conference), Monash University, Melbourne, Australia, Sep. 02.

* Session Chairman in TENCON2002, China, Nov. 02.

* IEEE Region 10 Student Paper Competition in Paper Title of "Numerical Techniques and Experimental Results for Evaluating the Electromagnetic Field Coupling Between Power Transmission Line and Pipeline", Center for Artificial Intelligence and Robotics, University of Technology, Malaysia, Kuala Lumpur, May 03.

* Ranked the (1st) out of (33) graduates at University of Technology, Baghdad, May 95.

* Special Courses at Organizational and Staff Development Services, University of Western Australia, School of Electrical, Electronic & Computer Engineering, Australia, 99-02.

q Publications

[1] M. A. Elhirbawy, T. T. Nguyen, L. S. Jennings, W. W. L. Keerthipala, "Calculation of Electromagnetic Field Established by Power Transmission Line Using Finite Difference Techniques" IEEE CCECE 2002, Vol. 1, p.p. 311-316, May 2002, Canada.

[2] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Variable Step Size for Calculation of Electromagnetic Fields of Power Transmission Line Using Finite Difference Techniques " IEEE TENCON'02, Vol. 3, p.p. 1830-1833, October 02, Beijing, China (Session Chairman).

[3] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Un-Symmetric Vectorized Sparse Solver And Finite Difference Method For Solving Electromagnetic Field In Long Conductor " IEEE EMC Europe 2002, Vol. 2, p.p. 1047-1052, Sep.02, Sorrento, Italy.

[4] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "A Quantitative Study on The Feasibility of Electromagnetic Field Reduction by Phase Relocation in 3-Phase Systems " NAPS 02, Vol.1, p.p. 21-28, State of Arizona U.S.A (Prize Paper Award).

[5] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Boundary Conditions Around Discontinues Conductors Points for Calculation of the Electromagnetic Field in 3-Phase Systems " STCEX 02, Vol. 2, p.p. 114-121, Riyadh, Saudi Arabia.

[6] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Temperature and Earth Resistivity Effects in Calculation of Electromagnetic Field Using Three-Point Formulae Based on Finite Difference Method " Proc of the AUPEC Australasian Universities Power Engineering Conference, Monash University, ISBN 0-7326-2206-9, October 2002, Melbourne, Australia.

[7] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Finite Difference Method Simulation and Important Factors Affecting the Electromagnetic Fields Established by Electric Power Transmission Lines", Proc of the IUPEES2002, Inter University Postgraduate Electrical Engineering Symposium, October 2002, Perth, Australia.

[8] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Optimization of Transmission Line Phase Position for Electromagnetic Field Mitigation In 3-Phase Systems", 7th IASTED International Multi-Conference, Power and Energy Systems, PES 2003, Vol. 1, p.p. 406–411, February 24-26, 2003, ISBN 0-88986-335-0, ISSN 1482-7891, California, USA.

[9] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Numerical Techniques and Experimental Results for Evaluating the Electromagnetic Field Coupling Between Power Transmission Line and Pipeline", 7th IASTED International Multi-Conference, Power and Energy Systems, PES 2003, Vol. 1, p.p. 412 to 417, February 24-26, 2003, ISBN 0-88986-335-0, ISSN 1482-7891, California, USA.

[10] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Practical Results and Finite Difference Method to Analyze the Electric and Magnetic Field Coupling Between Power Transmission Line and Pipeline". (IEEE Region 10 Student Paper Competition) (ISCAS2003) Vol. 3, p.p. 431 to 434, May 03, ISBN 0-7803-7762-1, IEEE Catalog No. 03CH37430C, Bangkok, Thailand.
[11] M. A. Elhirbawy, "A Quantitative Study of the Electromagnetic Field Coupling Between Electric Power Transmission line and Railway" The Canadian Conference on Electrical and Computer Engineering, Vol. 1, p.p. 269 to 374, May 2003, ISBN 0-7803-7762-1, IEEE Catalog Number 03CH37430C, Montreal, Canada.

[12] M. A. Elhirbawy, "Simulation of Voltage Distribution Calculation Methods Over a String of Suspension Insulators", IEEE/PES Transmission and Distribution Conference and Exposition in Energy Delivery and Services, September 2003, ISBN 0-7803-8111-4, IEEE Catalogue Number 03CH37495C, Library of Congress 2003107837, Dallas, Texas, USA.

[13] M. A. Elhirbawy, "Investigation on the Characteristics of A String of Insulator due to the Effect of Dirt", IEEE/PES Transmission and Distribution Conference and Exposition in Energy Delivery and Services, September 2003, ISBN 0-7803-8111-4, IEEE Catalogue Number 03CH37495C, Library of Congress 2003107837, Dallas, Texas, USA.

[14] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Electromagnetic Field Coupling Between Single Phase Power Transmission Line and Telephone Cable" IPEC2003, The 6th International Power Engineering Conference, ISBN 981-04-8705-3, Nov 2003, Singapore.

[15] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Variable Step Length Finite Difference Methods for Calculation of the 3-Phase Electromagnetic Field in the long Conductor Approach" Taylor & Francis Group Electronic Journal, UK.

[16] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "Phase Position and Phase Relocation for the Feasibility of Electromagnetic Field Mitigation" ACTA (Scientific and Technical Publishing Company), International Journal of Modeling and Simulation, p.p. 121 to 130 Volume 24/Number 3/2004, ISSN: 0228-6203 (205), USA.

[17] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, "New Formulation Based on Finite Difference Method for Solving Electromagnetic Field in 3-Phase Systems ". A journal paper submitted to IEEE Transactions on Power Delivery, North America.

[18] M. A. Elhirbawy, L. S. Jennings, W. W. L. Keerthipala, and "Finite Difference Method Effective Tool for Analyzing the Electromagnetic Field Coupling" A journal paper submitted to (IJEEE) International Journal of Electrical Engineering Education, UK.

[19] M. A. Elhirbawy, A. Qabazard, L. S. Jennings "Electromagnetic Field Coupling between Electric Power Transmission line and a Pipeline in 3-Phase System" A journal paper submitted to (KJSE) Kuwait Journal of Science and Engineering, Kuwait.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1651 to 1700 of 3123)Go to Search Parameters...
Brief Description
Fresh Structure Engineer from Nirma Institute of Technology, Ahmedabad, India
Civil engineer exp. in buildings, bridges, highways, airports, marine works, wastewater treatment plants. Exp. in all aspects of the industry including design, tender, project management, contract administration, claims avoidance, performance monitoring, quality, safety.
Respected sir I would like to inform you that, presently pursuing Master of Engineering in Indian Institute of Science, Bangalore. I will complete my Master degree in the month of June 2004.
I am looking for a position as a Civil Engineer in the Building and Construction sector.
Education May/June 2002 J.N.E.C. Aurangabad. Bachelor of Engineering (CIVIL) Passed With 1st Class Computer MS OFFICE Knowledge AUTOCAD 2000
5+ years experience in construction field which includes maintenance of heavy earth moving equipments and heavy vehicles.
Maintenance Manager with BSEE degree & current MSHA electrical cards with hands-on experience in all aspects of mechanical, electrical, and hydraulic systems.
27 years experience primarily in oil & gas EPC/EPCM Project controls, Contracts, project management and engineering.
16 years exp. in Design/Drafting, Softwares AutoCad 2004, Microstation J/V8, IRASB, AutoCad Overlay, HVAC system layouts Duct layouts, Equip,Layouts, Utility/Fire prot.sys layouts,Steel Structural detail drgs, Familiar in Int.stands.Exp.in High Rise, Industrial/Commercial Bldgs, Housing, Airports
Entery level AutoCad Drafter/Desingner. Associates of Aplied Science in Computer Aided Engineering and Design, work expierence includes construction and mecnanical background.
MEP Manager ,MS Office & Internet,AutoCAD,Communication ,Negotiation,Co-Ordination &Organization,Effective Time & Coast Management Skills
Electrical engineer with experience in oil field electrical construction works. Possess IRCA cerification for Quality Management System and MS project and autocad 2000 certification
46 years international experience in EPC project management in oil, gas, power, petrochemical plants, refinery, iron and steel plants, mining, mineral processing plant and infrastructure design and construction. Activities include FEED to project delivery for greenfield and brownfield projects.
Civil Engineer with seven years experience in project control, construction and management of civil works for the most important projects in Ecuador, including oil and gas companies, power plants, access roads, fiber optic, pipelines. I am willing to travel anywhere.
I&C Technician with geothermal experience
QC Engineer/Inspector (Piping/Welding) with CSWIP 3.1
Manager of Metallurgy, Process Engineering, Project and Construction Management.
21 Years Experience in EPC/LSTK Project estimation, proposal, marketing, planning, project procurement and project management for Refinery, Petrochemicals and Fertilizer Plants like Ammonia, naphtha Cracker, PTA, Hydrocracker, DHDT, Sulphur and other units. Presently working with L&T, india.
Worked as a Engineer Projects & Purchase.
I have 3 yrs of experience in multi-storey constructions.
ARCHITECT WITH 03 YEARS INDUSTRY EXPERIENCE
Project Management and Mining Engineering Professional with 19 years experience
QA/QC/Inspecion/Metallurgical Engineer
BACHELOR OF ENGINEERING in ELECTRICAL AND ELECTRONICS ENGINEERING, EXPERIENCED IN SUBSTATION AUTOMATION AND OPERATION SYSTEM
An ambitious and highly skilled Quality engineer with extensive experience in quality engineering, ISO certification, production, management, product development and launch, and customer support.
Self-motivated young competent Mechanical Engineer with nine years experience with Oil companies and leading construction and contracting firms. Have proficiency in independent project execution. Possessing a Diploma in Mechanical Engineering. Able to independently plan, and execute Projects related
Microstation CADD Civil Engineer Utilities Specialist and GIS
Quality control and quality assurance of control systems and networking
Power Transmission Line & Lighting of Highways (design overhead lines, instillation, maintenance, modeling, coupling, pipeline, cable size, poles, illumination (lux) & cd/m2 calculation)Low Frequency Electromagnetic Field (Transmission Line) Environmental Radiation Effects on Human Health/ Mitigatio
Post Diploma In Automobile Enginee (4 1/2YRS) / Experience 17Yrs / Commercial Vehicles, Construction & Mining Equipments - Maintenance Management, Service Maanger, Workshop Manager, etc.
I've been working as HSES Advisor more than 7 years in different oil& gas projects such as LNG OP-s,Offshore and Onshore Pipe laying operations,platform constructions, Flotel, diving operations etc.
Versatile, knowledgeable, exploration geologist
2 years of experience in Automotive & Power Industry, Cae ,TYRE, Design engineer, R&D
Construction & maintenace of installations, equipment and systems in hazardous areas (explosive gas atmosph.); Maintenance of el. equipment, installations in petrochemical industry.& el. Equip., systems in El.Power Plant ; Training el.personnel for preventive & predictive el. maintenace programs
Field Engineer / Estimator / Senior Piping Designer / Squad Lead-Checker
SAP MM Module
An experienced multi-disciplined electrical engineer with 28 years experience in the oil and gas(onshore and offshore), petrochemical, construction industry with functional expertise in project management, materials specification and procurement, sales distribution, marketing and business developm
civil engineer having a good knowledge of computers
Engineer’s degree in mechanics Speciality: “Construction and exploitation gas and oil pipelines, gas storages and petroleum storage depots”
Power generation, substations, transmission and distribution, circuit breakers, machines, service, plants, computer.
To acquire a technical/management position where engineering experience and managerial skills will significantly contribute to use the skills obtained through my experience and qualifications to benefit my employer and grow my self with organization.
Instrument Technician with 19 years experience, trade and some college. Computer literate. Can do any of maintenance, planning, construction, installation, supervision, pre-commissioning, QC, calibration, documentation, faultfinding, wiring, loop checks, and more.
Well-rounded professional office/field experience in project controls, process engineering, environmental engineering, construction, management, sales, and business consulting. Industries: oil and gas, federal government contracting, residential construction.
Sr. Project Controls Planner/Scheduler
Project Management, Cost Control, Estimating
Over 19 years in Oil and Gas and Petrochemical Projects involved in Mechanical Completions, Pre-commissioning, Commissioning, Operating and Training. I have good experience in Gas Treatment and also have good Offshore experience.
Heavy Lift / Rigging Superintendent, Rigging Engineer, Rigging Supervisor
A degree holder in Mechanical Engineering from University of Malaya,Kuala Lumpur.Have been involved in the construction & operation of power plant almost 1.5 years.Have ASNT Level 2 Qualification in PT & MPT and PCN Level 2 in RI & UT
16 yrs Experience in E&I of Oil/Gas/Petrochem/Metal/Cement industires, direct and EPIC
Highly qualified Project Management Professional offering more than 20 years of project and construction management experience in managing and administering complex engineering and construction projects. Results focused and effectual leader with proven ability to set up project management systems
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   [ 34 ]   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com