CONTACT INFORMATION:
View contact information...
Date of birth: 01.07.1964
Nationality: Indian
Professional Qualification: Bachelor's Degree in "Civil Engineering"
University /Year of passing: Bangalore / 1987 January
Driving Licence: U.A.E.Driving Licence
Computer Knowledge: MS Word,MS Excel, MS Project
-----
Summary of Experience: I'm a graduate Civil Engineer with nearly 18 years experience in the Construction of Sewerage, Drainage, Sewage treatment plant, 880 MW, 800 MW Power stations, Major Pumping stations of Sewerage/Drainage/Portable water/ Seawater, Heavy industrial structures, Piling, Desalination Plant, High quality RCC Structures and Roads.
I am nearly 16 ½ years in the Gulf out of which 13 years with Multi national Consultants and 3½ years with an international Contractor.
--- Career Summary
2002 October-Continuing: "Montgomery Watson Consultants" Abudhabi,UAE
2000 January -2002 October: " Fichtner Consultants " Dubai,UAE
1995 September-2000 January: "K.Home Consultants Ltd" Dubai,UAE
(Flour Daniel Group)
1992 May - 1995 September: "Montgomery Watson Consultants"
Dubai branch - 1994 March to 1995 September
Bahrain branch - 1992 May to 1993 November
1988 October - 1991 November: "A.A.NASS Contracting Co" Bahrain.
1987 January - 1988 October: "Roopa-rekha-Consultants",India
Detailed Professional Experience
I. 2002 October-Continuing: "Montgomery Watson Consultants" Abudhabi,UAE
Position Held: "Resident Engineer"
Project No 1: cost UAE dhs 35 millions,Abudhabi Sewage Projects Committee, contract no 1142/2, Includes construction of 4 No Pumping stations, 85 no Manholes, Hundreds of Road gullies, Hundreds of Inspection Chambers, Laying of pipes of dia 150 mm to 1200 mm. Pipes used are pvc/AC/GRP/slotted pvc…etc.
Project No 2: cost UAE Dhs 115 Millions,Abudhabi Water & Electricity Authority, Contract No.G1077. Contract includes construction of Major portable water reservoirs of capacity 7.5 million gallons each and construction of major pumping station and all associated pipe lines, associated structures, control building. etc
Nature of Duties on above projects are Contract Administration, Construction supervision by leading a site engineers team, Drawing Review, Shop Drawing Approvals, Answering technical queries, Progress review, Approving Inspection Test Plans(ITP),Material approvals, attending meetings, final site inspections, co-ordinating with batching plant. Contractually issuing Engineer's Instructions and Memos with and without cost implications, monitoring the progress and target dates, preparing minutes of meetings, Approving monthly interim valuation, invoices, Issuing Payment certificates, provisional acceptance certificate, Final acceptance certificate, quality control with an ISO certified multinational Consultants.
II. January 2000 --- 2002 October: With " FICHTNER CONSULTANTS "Dubai,UAE
Position Held: "Resident Civil Engineer"
Project No1
Project Cost: $ 500 Million
DEWA'S (Dubai Water&Electricity Authority) 800 MW Power Station "K"phase II
Main Contractor: ENEL/ FISIA (ITALY) CONSORTIUM
Contract contained 880MW Power station which have Overall 60000 cu.m RCC Works
And 4500 MT of structural steel works. Civil & Structural works for 3 No Gas Turbines (GT),2 No Back pressure steam Turbines, 3 No Desalination units together of 40 million gallons per dayControl/Service/GIS/Water treatment Buildings,Sea water Pump station which includes dia 2000 mm GRP intake pipes (3No's),Control / GIS for Desal area,Many Fan/Stack/Transformer Foundations all associated drainage/sewerage lines/ Roads.
Project No 2
Project Cost: $ 250 Million
DEWA'S (Dubai Water&Electricity Authority)400 MW Power Station "D"phase II
Main Contractor: HYUNDAI CONSORTIUM
Project includes Repowering to existing power station by adding 3 No's Gas Turbines ( G.T.Building)3 No's Waste heat recovery Boiler's,400 KV Gas insulated Switchgear Bldg,-400 KV GIS Control Building, Piling 1400 No's of Dia 600 mm TO 1400 mm All associated Roads, Drainage and building woks.Contract contained Civil & Structural Works for above items.Overall RCC works 35,000 Cu.mts and 2500 MT of structural steel work.
My Nature of Duties on above projects are Construction supervision by leading a site engineers and surveyors team, Drawing Review, Shop Drawing Approvals, Answering technical queries, Progress review, Approving Inspection Test Plans(ITP),Material approvals, attending meetings, final site inspections, co-ordinating with batching plant. Contractually issuing Engineer's Instructions and Memos with and without cost implications, monitoring the progress and target dates, preparing minutes of meetings, Approving monthly interim valuation, invoices, Issuing Payment certificates, provisional acceptance certificate, Final acceptance certificate, quality control with an ISO certified multinational Consultants.
III 1995 September – 2000 January: K.Home Engineering Ltd., which merged with "Flour Daniel Corporation"
Position held: "Senior Civil Engineer"
1. "Falcon Project" of US $ 500 million.
Contractors: Al futtaim TARMAC,Al naboodah LAING,Alhabtoor Murray & Roberts,etc
Part of Civil and structural works for which I was responsible on this project are as follows.
Overall 80,000 cubic metres of R.C.C. Works and 3500 MT structural steel works for the sub-structure and super structure of the following structures.
Sewage Treatment plant for DUBAL Operations and Residential areas,Construction of Hopper tank, Buffer Tank, Holding Tank, Irrigation Storage Tank, Aeration Tank, Sludge Settling Tank etc.Sewerage & drainage projects: Construction of pumping stations, manholes & inspection chambers,Layings of 2 Kms pressure pipeline, Ø 150mm to Ø1000mm gravity lines, pipes used are uPVC/AC/GRP,Potrooms 5A & 5B which are 850 meters long, had 240 potcells heavy foundations, operation's slabs, structural steel works,Primary, Secondary and buffer silo's A&B. Fume Treatment Plants A&B,380 V Switch Houses A&B, 11/3.3 KV H.V. Sub Stations A & B, Crane Gantry Rails at North and South ends,Office and control buildings,Alumina Tanker unloading stations A&B, Crane Maintenance workshop,Tool room and oversize tap bath stores A&B, Lunch rooms and Latrines, Bus bar trenches and cable drawpits,Drainage and sewage pipe line of about 4 kms of dia 150 mm Upvc to 450 AC pipes, Pumping stations and Manholes construction
Inter connected roads and culverts,Court yard slabs covering 5000 sq.m.approx.
Pipe rack foundations,Piling 1400 No's (600 mm TO 800 mm).
2."Condor Project" of US$725 million.
Contractors: Al futtaim TARMAC,Al naboodah LAING,Alhabtoor Murray & Roberts,etc
Part of Civil and structural works for which I was responsible on this project are as follows.Total RCC works are about 35000 cubic meters on the following projects.
Sewage Treatment Plant Expansion Works, Sewage & Drainage Projects:Construction of Pumping Stations, manholes, inspection chambers,Laying of gravity sewer of Ø150mm to 600mm pipelines,Laying of 2 kms pressure pipelines,Pipes used are pvc/AC/GRP
Anode Baking Kiln No.4 (new),Anode Baking Kiln No.1 (Major Refurbishment),Substations 644 & 680 (Building Nos.),MCC Rooms 681, 682, 645 & 651 (Building Nos.),High quality offices for Central Control Building (Building No.646),Primary and secondary silos (Piling & Construction),Internal Roads, Rodding room upgrading.
My Nature of Duties on above projects are Construction supervision by leading a site engineers and surveyors team, Drawing Review, Shop Drawing Approvals, Answering technical queries, Progress review, Approving Inspection Test Plans(ITP),Material approvals, attending meetings, final site inspections, co-ordinating with batching plant. Contractually issuing Engineer's Instructions and Memos with and without cost implications, monitoring the progress and target dates, preparing minutes of meetings, Approving monthly interim valuation, invoices, Issuing Payment certificates, provisional acceptance certificate, Final acceptance certificate, quality control with an ISO certified multinational Consultants.
1992 May -1995September: Montgomery Watson Hawksley Consultants" Position held: "Assistant Resident Engineer"
in Dubai & Bahrain branches.
Dubai branch: On the following projects: 1. Contract DS 71/1 Al Rigga & Al Muteena Sewerage & Drainage Project:: cost Dhs 55 million.Civil works on the above projects are Construction of 3 no pumping stations,125 no manholes, Hundreds of road gulleys, hundreds of inspection chambers and house connections. laying of GRP/AC/Upvc pressure/gravity pipes ranging from 150 mm to 1200 mm diametre. Laying of pipes by open excavated trenches, by thrust boring methods and by Microtunnelling methods.
Bahrain branch on the following proejct: Contract 74-1/3 trunk sewer for Bahrain Public works department,Cost BD 6 million (UAE Dhs 60 million) Bahrain which inlcudes the following:Dia 450 GRP pressure main laying (1500 metres long),Gravity sewer laying of dia 600mm to dia 900mm GRP/AC Pipes.Construction of major pumping station, Construction of 85 No. manholes.
Nature of duties on the above projects are Construction Supervision by leading a team of inspectors, Site Inspection, responsible for setting out, Quality Control. Issuing memos and agreeing day work measurement sheets. Assisting the Resident Engineer in finalising monthly interim valuations, etc.
1988 October -1991 November: A.A.NASS Contracting Company, Bahrain
Position held: "Site Engineer"(Civil) on following projects
Project 1. Cost BD 4.5 millions(UAE dhs 45 million). Ras Romman Sewerage and drainage project Consultant: Watson Hawksley Consulting Engineer
For PWD Bahrain which includes the following: Construction of 800 No. Road gullies, 1800 inspection chambers, 25 manholes, 3 pumping stations. Laying of gravity sewer line of dia 150mm to dia 600mm clayware pipes. Laying of uPVC gravity drain pipes of dia 150mm to 300mm.Laying of uPVC pressure main line of 350mm dia for 1.5 km long.
Project 2.Cost BD 3.5 millions(UAE dhs 35 millions).Salmabad sewerage project for PWD, Bahrain.Consultant: Gredeco Ansari Consulting Engineer. which includes the following: Construction of 10 Nos pumping stations.Laying of 4 km gravity pipeline of dia 150 mm upvc to 600 AC Pipes and 700 mts of pressure pipeline of dia 150 mm.
Project3.Cost BD 5.2 millions(UAE dhs 52 million).Hoora sewerage & drainage project III
Consultant:Dar al handashah & partners.Which includes construction of 8 no pumping stations,125 no manholes,1100 road gullies.pipes used are 450 mm t0 1000 mm.(AC/GRP).
Also laying of 3 kms pressure pipe of 300 mm upvc.
4."800MW Gas & Stream turbine combined cycle Power station.
Project cost $340 million.Consultant - "Ewbank Preece Ltd.".Civil works on this project are construction of Gas/Stream turbines buildings, 132 KV Switch-gear building, Control Service building, 16 metre high Air condensor columns, boiler foundations,, internal roads, potable water/drainage pipes laying. Manhole and Pumping station construction
1987 January - 1988 October: Roopa Rekha Architects & Consultants,Nandyal. A.P India
Position held: "Civil Engineer (site)"
On construction of Housing Board Colony.(75 Villas).
View contact information... |