Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #18098 next resume »»
CONTACT INFORMATION:
View contact information...

OBJECTIVE
Seeking a position to utilize my professional knowledge and experience, through the highest level of commitment, towards an organization's growth and profit

PROFESSIONAL QUALIFICATION
1998 January - B.Sc. (Chemical Engineering)
Institute of Chemical Engineering & Technology,
University of the Punjab,
Lahore, Pakistan.

PROFESSIONAL MEMBERSHIP
Pakistan Engineering Council – PEC, CHEM / 4331

TRAINING COURSES
Course of PLANNING & SCHEDULING organized by DESCON Engineering Ltd.
Primavera Training- Project planning & Scheduling (601/602/603) 1998

Training Program about the awareness of ISO 9000 by DESCON Engineering Ltd.
Project Management courses / Software 1998
DESCON Engineering Ltd. (In-house training)
Workshop on Activity Based Costing 1998
Training of loss prevention coordinator 2000
- H2S Awareness and Escape 2001
- Negotiation Skills
- Development Skills
Workshop on Effective Team Building & Leadership 2001
Computer Networking Essentials for Young Managers 2002

COMPUTER SKILLS
Comprehensive working experience on the following software:
Primavera Project Planner ver 3.1b
MS - Project 2002
MS - Office 2000
MS – Word
MS – Excel
MS - Access
MS – Power Point

PROFESSIONAL EXPERIENCE
October 2003 – Till – Present
PRESSON DESCON INTERNATIONAL (Pvt.) Ltd.,
Lahore- PAKISTAN

Principal Engineer Planning
Currently working as a Principle Engineer Planning for PRESSON DESCON INTERNATIONAL (Pvt.) Ltd
Monitoring and Scheduling the REHMAT DEVEPLOMENT Project Phase – I & II
Developing progress reports for Petronas Garigali Pakistan Ltd. (PCPL) on weekly and monthly basis.
Monitoring for the JABO PRODUCTION SEPARATOR Project.
Working on different Proposals and making Plans for the bids.

January 2003 – To – October 2003
CONTROL APPLICATIONS & EMIRATES (CAE)
Abu Dhabi – U.A.E.

Senior Planning & Cost Engineer
Worked as Sr. Planning Engineer, Cost & Schedule and Monitoring work
Worked for Zirku Supervisory Control System Project and developing cost basis monthly and weekly reports to monitor an EPC (Engineering, Procurement and Construction) project for Honeywell & Zakum Development Company.
Worked for Invensys Project for different off shore platform, NPS, WIP, WSP, SSP, GTP, PGP and generate monthly reports and schedules.
Developed the EPC schedules and preparing cost & monitoring setup for different proposals.

June 2002 – TO – February 2003
PRESSON DESCON INTERNATIONAL (Pvt.) Ltd.,
Lahore- PAKISTAN

I/c Planning & Cost Control
Worked to develop the Project Management Systems for Budgeting, Planning and Scheduling for the projects of PRESSON DESCON INTERNATIONAL (Pvt.) Ltd., Head Office
Monitored the Bhit Gas Development Project - Building Works, Sawan.
Worked as I/c Planning, cost & Schedule for the Mazarani Gas Field Project, an EPC Project for Pakistan Petroleum Ltd.

July 2001 – TO – May 2002
DESCON Engineering Ltd.
Lahore, PAKISTAN.

Proposals Planning Engineer
Worked to analysis the Proposals Planning and cost effect of the projects with DESCON Engineering Ltd., at Head Office.

April 2000 – TO – June 2001
BOROUGE Petrochemicals Projects, DESCON Engineering Ltd.
Ruwais, Abudhabi, U. A. E.
For BOROUGE (UAE) / BECHTEL at Borouge Petrochemicals Project
For (TECNIMONT Spa.) Mechanical and Electrical discipline for Tecnimont Project

I/c Planning and Scheduling
Worked as I/c planning for cost & schedule to prepare budgets, schedules, and monitor the cost & progress for the project
Developed Level II, Level III and Level IV plan for measuring the progress through P3.
Responsible for planning progress on daily/weekly/monthly basis, cost & progress monitored in the construction of the project*
Prepared and Monitored the four-week look-ahead plan for cost and progress analyzing the material, drawings and available works front
Provided Field Engineering support, Document and Data Management during the execution phase*
Approved the Method Statements, Procedures, Inspection and Testing Plans (ITP, S) and Hydro Test pack by the client for execution.

April 1999 – TO – April 2000
ASAB Gas Development Project, DESCON Engineering Ltd.,
ASAB, Abudhabi, U. A. E.
For Abu Dhabi National Oil Company ADNOC (UAE) / SNAMPROGETTI Spa/ HYUNDAI

Planning & Cost Engineer
Responsibility included preparing control budget for the project, and establishing cost monitoring system as well as Progress measurement and monitoring system. Responsible of Planning & schedule on daily/weekly/monthly basis and reporting status on versus plans for schedule and cost.
Prepared and Monitored the four-week look-ahead plan for cost and progress analyzing the material, drawings and available works front
Developed the cash flow forecast and updating cost reports to the management*
Handled Field Engineering Issues and maintaining the record according to the company and client requirement and to fulfill the requirement of ISO 9001.
Approved the Method Statements, Procedures, Inspection and Testing Plans (ITP, S) and Hydro Test pack by the client for execution.
Prepared Master Hydro testing Plan for all the lines of the gas plant.
Coordinate with client for preparation of pre commissioning packages for Turbines, pumps, vessels and heat exchangers.
Supervised pre-commissioning activities like flushing, reinstatement and final check for box up.

September 1998 – TO – April 1999
Attock Oil Refinery Up-Gradation Project, DESCON Engineering Ltd.,
Attock Oil Refinery Rawalpindi, PAKISTAN

Planning & Cost Engineer
Worked as a Cost & Planning Engineer at Attock Oil Refinery Up-Gradation Project, Rawalpindi with SANZO MATSUI ENGG. Corporation - JAPAN. Took Care of Cost & Schedule Planning and Monitoring for Mechanical (Equipment & Piping), as well as Electrical Scope of work, progress of that project.
Prepared weekly and monthly schedules and cost reports preparation and submission to Client and in house management*
Monitored of the cost & Progress on weekly basis.
Invoiced to Client on monthly basis for the project.

I/c Hydro Testing & Chemical Cleaning Process
Worked as an I/c Hydro Testing and monitor the Chemical Cleaning Process of CS pipelines of the Project. I/c Pre – Commissioning*
Worked for the Project Pre-Commissioning activities as an in-charge.

March 1998 – TO – August 1998
DESCON Engineering Ltd., Head Office,
Lahore, PAKISTAN.
Worked as Assistant Engineer in Project Monitoring & Construction Department (PMAC) and did Estimation of Resources, budgeting and monitoring of cost & schedule of the Projects.
Contributed in the development of Bidding System in Information Technology Services Departments (ITS).

May 1997 – TO – October 1997
FFC – Jordan Fertilizer Complex Project, DESCON Engineering Ltd.,
Bin Qasim, Karachi, PAKISTAN
Worked on internship and took contribution to define Project budget and expense head in the system.
Worked on project budgeted vs. actual cost on cost center and expense head wise and generated reports for the project.
Worked on analyzing and controlling of the Cost of the Project.

August 1995 – TO – September 1995
Pak – China Fertilizer Ltd.,
Haripur Hazara, PAKISTAN.
Worked as Training Engineer at
Ammonia Plant
Carbon Dioxide Plant
Urea Plant
Water Treatment Plant
Utilities
Responsibilities covered equipment such as Fired and Waste Heat Steam Raising Boilers, Associated Water Treatment Plant and Gas Turbine, Air Compressors and Cooling Water Systems.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 101 to 150 of 1132)Go to Search Parameters...
Brief Description
I have around 15 years experience as a machine operator on 180 360 degree machines also dozers and dumptrucks. Also as foreman with a groundworks contractor and two years as assistant plant manager with a plant rental company. I am looking for similar work at home or abroad.
Camp Boss
1st class Mechanical Engineer from reputed Institution, preferably specialization in Thermal Power Plant, having PG Diploma in Thermal Power Plant Engineering from National Power Training Institute, Neyveli Lignite Corporation, TamilNadu., 19 years thorough exposure in Mechanical System of Thermal P
I have 28 years experience in finance, project control, scheduling and material control working on DoD projects and private sector manufacturing companies in and out of the U.S.
Certified Project Management Professional (PMP from PMI, USA) has extensive experience in technical, commercial and quality management aspects of the construction projects.
Monitoring and Scheduling the Projects
Over ten years experience in Cement Process Production and Quality Control XRF
My career as an Consultant has provided me opportunity help the client to expand revenue growth, reduce operating costs and improve overall productivity. I also learned the importance of work in a team where one can produce work within the tight deadlines and to obtain results under pressure.
11 years experience including 5 years in developing countries, in the areas of pavement design, costing, construction using Asphaltic Concrete, sprayed seals, crushed aggregate basecourse, water bound Macadam and concrete, highway maintenance, road asset management
Drilling Consultant, Operations Manager, Directional coordinator, Directional driller
Detail oriented Construction Project Manager with over 10 years of experience with Federal and Private Contracts
Senior Certificate
Lead Offshore/onshore Pipeline Systems Project Engineering team
I would like to continue working in the safety and environmental field. My stronger attributes are in the safety field, but I do have several years experience dealing with environmental issues.
JOHN MARDEN - MARKETING AND NEW BUSINESS DEVELOPMENT LEADER
Project Manager, Mechanical Engineer with 20 years experience in Gas Turbine Industry
B.Tech Engineer with an heavy equipment experience.
A Chemical Engineer with 10 years of experience in Procurement in Oil/Gas and Minerals Industry
SUPERVISOR AUTOMOTIVE FACTORY, RESIDENTUAL / COMMERICAL SUPERINTENDENT
I am Rosalie A, Aguzar proficient in Architectural Plans using Autocad with basic knowledge on 3ds Max (Architectural Design), Revit 2009 & Sketchup.
Project Interface Manager, Stategy Planning, Engineering/Projects Development/Management/Controls
Continuous opportunity for professional development in the field of Manangement and Business Administration, Banking and Marketing as well as Procurement and Logistics.
management experience of a wide variety of environmental projects including international HSEMS, development and implementation of environmental management systems, development and provision of audits and training courses.
Highly Experienced Operations Leader with expertise in guiding fundamental growth in the heavy equipment and manufacturing industries.
Manager of Projects; Operations manager for OSV,DSV AHTS etc. Construction manager;Workshop manager
MSc. Civil Engineer, major: Land Surveying; 19 years experience of cadastral (legal) and public utilities and road surveying and topographical mapping
Performance driven professional with expertise in telecommunications, construction, and project management
Three year full time diplome in Mechanical Engineering and have six year experience in Repair and Maintenance of heavy earth moving equipments
US and overseas QA/QC project supervisory experience in the construction, petroleum, mining, wind power and aerospace industries. I am a CWI, Level II in MT, UT, PT and RT film interpretation. Past project duties and responsibilities have included review of purchase orders and exceptions, quality as
Please Contact ASAP
ECT in Electronic Engineering with 11 years experience in the Electrical Industry. Experienced and trained on LM2500, LM6000, TM2500s, GE frames T1/T3; PBX; GPS; Digital Switches; Nortel DMS 250/500 certified; Allen Bradley, Siemens, Fanuc, MarkV ,MarkVI,Woodward and Bachmann PLCs; COAX cable test a
Nuclear Operations Supervisor. Supervised operations ensuring safety of personnel and equipment. Supervised maintenance operations on I&C equipment.
Experience includes Cost Engineering, Electrical/Instrumentation Estimating, Construction Electrical Engineering and proprietary software support. Duties include reporting of various kinds, forecasting, change management, staffing plans, cash flows and more.
I'm 36 years old Mongolian man. looking for mining operations job. Such as mine foreman, mine planner, translator
A suitable engineering responsibility to help the Afghan reconstruction processes or assist the US Army Corps of Engineers in Afghanistan or Central Asia.
NCCO/NAHETS Certified operator. Northern California College of Construction Grad
It is with great interest that I am forwarding my resume for your consideration. My record of academic achievements and professional career history, demonstrates attributes that make me a valuable employee.
A self motivated metallurgist who is presently working with Ispat Metallics India Ltd (Ispat Group) as Engineer production, has wide range of experience in commissioning and Operations including excellent exposure to Level 2 models, wishing to pursue his career in an environment where his technical
Project engineering/managment
Mechanical?Electrical Engineer,Steel Expert,Steel Plant operation Incharge Marketing & Sales Incharge ,QMS,EMS.OHSAS Regd Lead Auditor,MBA9Business Admin.Professional Doctorate in Environmental Management.,Handled Projects as well as Maintenance,Director,European Quality Body,Managing Directoer Asia
Scaffolding Manager
Electrical Project/Construction Management
Project Engineer, Assistant Project Manager, Architect, LEED AP, BIM
Engineer with Business management,
Estimator, Project Manager, Project Engineer, Construction Administrator, Architectural Designer, CAD
Has 15 years of top, diversified logistics/operations management experience.
Work on a farm all my life, I went to school last year for heavy equipment
Experienced Buyer/Purchaser, very versatile background from different countries and industries.
19 years of experience as a Camp / Accommodation-Facilities Management (Staff Welfare Operation and Maintenance) in Oil & Gas, EPCC, Company (Road & Bridge, Electro-Mechanical Contractor.
I am a master electrician with 35 plus years in the management of large construction projects. I have over three years experience working in Iraq, working with many different cultures and in adverse conditions.
1   2   [ 3 ]   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23  
Seach Parameters

Change search parameters...
CATEGORIES: Operations;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com