SUMMARY OF WORK EXPERIENCE:
More than 21 years of combine technical work experience in fabrication, construction, erection & installation on both offshore and onshore. Inclusive are mechanical equipment, piping / pipeline, structural steel, civil & architectural. Work related such as construction coordinator, project management, consultant, engineering & supervision work project related to oil & gas, offshore facilities, petrochemical plant, refineries, power plant, pulp & paper mill, industrial building & major facilities. Organization and balancing of contractor manpower, equipment, material resources in liaison with the client or owner. Plan, execute and control work activities in accordance with approved drawings, work procedure & specification required by the project. Such as: API, ANSI / ASME, BS, JS & AWS.
EXPERIENCES:
15 November 2003 – 11 July 2005
EMC Construction
Sta. Rita / San Lorenzo 1, 500MW CCGT Maintenance
Philippines
Construction Manager
By having multi-discipline skill I have experienced to lead construction team.
Controlling of construction progress to be ahead of the project schedule and prepared constructions procedures.
Overhead management for staff assignment to various project, and for hiring & firing of construction staff.
Attending managers meeting & coordinating to each department and client regarding construction, maintenance including QHSE for our people.
01 December 2002 – 31 October 2003
Tripatra-Gulf Consortium
PGN Gas Transmission and Distribution Project
28" dia. Pipeline from Indonesia to Singapore
Offshore – 276 km & Onshore – 207 km
Indonesia to Singapore
Construction Coordinator
Project Management and Consultant for the Panaran and Pemping Station.
Responsible for ensuring all of the construction activities are in accordance with the approved procedures and project standard.
Ensuring that various department are fully briefed for each daily activities.
Do & prepare punch list, site memo & give verbal instruction for piping, mechanical, structural and civil works to be coordinated & to expedite to be finished by Contractors such as: HYUNDAI, NACAP / THIESS, NPCC, BOSKALIS & PUNJLLOYD as per given schedule by PGN / PMC.
15 August 2001 – 30 October 2002
Halliburton (Kellog Brown & Root)
ESSO, Exxon Mobil, Petronas & Chevron
Chad – Cameroon Development Project 30"
& 18" dia. 1, 070 km. or 663 miles pipeline from
Chad to Cameroon, Central Africa.
Kome, Chad, Central Africa
Construction Manager (TCN/FILIPINO)
Construct facilities, fabrication & installation of process piping, pipelines, wellhead flow lines, piping hook up & dress up connections.
Meeting with Esso & Exxon Mobil for various reports and project schedule for the additional work to be given to KBR Halliburton.
The project is to develop the oil fields in Chad (US$ 1.5 billion) & construct a 1,070 km. pipeline to offshore oil loading facilities going to Cameroon Atlantic coast (US$ 2.2 billion) and World Bank is the financier.
23 January 2001 – 31 July 2001
Ballast Nedam International
First Gas Philippines
San Lorenzo 500 MW Power Plant
CCGT Project
Philippines
Structural Superintendent
Establish with subcontractors and maintain effective work teams to complete their assigned tasks on time meeting defined budget of quality requirements.
Review of the specification, drawings, technical instruction, TO, Quality System document (Work Methods) during work preparation stages.
11 April 2000 – 07 January 2001
EMC Construction
First Gas Philippines
San Lorenzo 1, 000 MW Power Plant, CCGT Project, Philippines
Construction Manager
Implementing & formalized project plan schedule which includes site monitoring.
Check and monitor the progress & maintain against plan.
Conduct the daily coordination meeting considering the work priority in terms of overall project schedule & look for the security of my people that takes priority.
16 March 1998 – 28 March 2000
Klockner / ROH Joint Operation
PT. Tanjung Enim Listari
Musi Pulp & Paper Mill Project
(Pipeline and Processing Plant)
Sumatra Selatan, Indonesia
General Superintendent (Consultant / Advisor)
In charge for the monitoring of the daily distribution of our people and responsible for the acceptance of the CWSI (Civil Work Site Instructions) follow up & expedite the erection of structural steel.
Structural steel support for mechanical & piping erection or installation.
Prepare as built drawing for piping field run (small & large bore).
Attending meeting with PT. TEL Client (weekly & monthly)
Drawing to be issued to our sub contractors (John Holland, Ballast Nedam, Thiess Engineering and Truba Jurong).
20 May 1997 - 27 February 1998
Kiewit Holt International
California Energy & Halliburton
Pipeline 750 km – 28" dia. pipeline
80 MW Geothermal Power Plant
(Deing, Patuha & Bali)
Central Java, Indonesia
General Superintendent
Night shift general superintendent of wellhead pad & pipeline works for gathering system.
Supervised 200 Indonesian crafts of multi-discipline in all areas separated about more than 10 km each.
The work consisted of activities such as civil, structural and pipelines construction, modification and installation of equipment tanks, pressure vessels etc. expedite the works in all areas to meet with deadlines, and to achieve high work output so that all areas were carried out satisfactory.
21 November 1996 – 30 April 1997
Commonwealth Asia Pacific Ltd. Pte.
Pt.Kiani Kertas
Bleached Kraft Pulp & Paper Mill Project
(Pipeline and Processing Plant)
Kalimantan Timur, Indonesia
Chief Piping Engineer & Inspector
Site checking, to identify the problem that causes the low productivity ratio deficiency on piping installation.
Prepare memo FWO, EWO, or site instruction to be closely coordinated to Beloit Corporation for site adjustment, modification, revision, deletion, or as built drawings.
Involved in inspection, line checking, punch listing and testing of pipe spools.
Responsible for progress update report, pump alignment release notice and documentation.
05 January 1995 – 13 October 1996
Japanese Gas Corporation
Bakrie Kasei Corporation (PTA & CTA Project)
Bakrie Diafoil I-F Project (Plastic)
PT. ASC Project (Asahimas Subentara Chemicals)
Merak & Anyer Indonesia
General Superintendent
Chief of Steel Structures & Civil works on CTA & PTA Projects.
General Superintendent for Industrial Building in Indonesian Film Project.
14 October 1993 – 30 November 1994
PT. NISCONI/TOYO ENGINEERING
PT. Chandra Asri Petrochemical Complex Project
(Biggest ethylene plant in the World)
Cilegon – Indonesia
Piping Design Engineer
In charge of coordination closely with TOYO Engineering Designers for the changes of the drawings based from revision made by TEC.
Site modification etc.
Responsible for the computation of dia – inch cutting length of pipe and material take off.
Site checking to identify the problem that causes the low productivity ratio deficiency on piping installation.
Do the daily and monthly progress report to forecast the anticipated problems for smooth execution.
Lead the daily schedule meeting with the attendance of all concerned contractors for area wise.
Schedule the coordination and discussion of piping prefabrication and material verification etc.
04 March 1991 – 30 September 1993
Euro Mechanical & Electrical Contractors Co.
LNG Plant, Sulphur Plant, ADMA OPCO, D & D Plant Project
ADGAS Pipeline
Das Island, Abu-Dhabi
United Arab Emirates
Project Engineer
Supervision and check the dimensional control items and if fabricated within the contract specification tolerances.
Supervision on welded joint numbers if in accordance with the standard specification and that if satisfies the stipulated requirements.
Inspection and check of D & D project. (Dehydration/Desalting Plant).
Demothballing and re-commissioning works which consists of heat exchangers, valves, pipelines works, fire heaters plus the installation and hydro testing.
Support shall conform to the codes and standard, such as ASME, API, ASTM & AWS collect data from P & I D drawing etc. Involved in data captured and inputting via terminal to the teroman computerized maintenance system.
27 February 1990 – 02 March 1991
JAC Construction
Batangas, Philippines
Caltex Refinery, LMG Chemicals, & Industrial Buildings
Philippines
Construction Manager
Coordinating and attend meeting with the client which regards to the daily progress report & status of structural, piping electrical, civil and mechanical projects as a construction manager.
Presiding the daily coordination meeting, weekly, and monthly.
Conduct actual field monitoring and prepared working drawings for Caltex Refinery and LMG Chemicals.
Prepare inspection report, estimating and others.
Attend the weekly Managers meeting etc.
22 February 1989 – 23 February 1990
Mohammad Al-Mojil Est. & EEI
Riyadh Petromin Refinery
Yanbu Petrochemical Plant
Glycol & Ethylene Plant
Riyadh, Yanbu, Dammam, Abquik, etc.
Kingdom of Saudi Arabia
Structural & Piping Engineer
Expose in process and utility line.
Being familiar with the use of codes and standards.
Do the daily accomplishment report, documentation, crane utilization report, estimating & material take off.
Supervision of maintenance work such as dismantling and cleaning of heat exchanger's construction of pipe supports such as dummy leg support, vessel pipe guide, floor support, anchor support, etc.
05 January 1988 – 24 December 1988
A.G. & P. Co. (Atlantic Gulf & Pacific Co.)
ONGC Project of India
(Oil & Natural Gas Commission Complex Project)
Philippines
Piping / Pipeline Inspector & Engineer
One year experienced on site and fabrication yard as Piping Engineer.
Conform to the drawings and standard, specifications the prefabrication, Inspection, installation & erection of pipe spools.
Being familiarized with drawings and different specification to be coordinated with supervisors and fitter foreman for some difficulties in structural and piping works
Preparing drawings for offshore facilities, piping for the as built, revision and tie-installation. Assures that the fit up of structural members, pipe supports and pipe spools shall conform to the approve drawings by the A.G.& P. standards.
02 October 1985 – 28 December 1987
EEI & Braun Transworld Corporation
Kuwait National Petroleum Company
Refinery Modernization Project
(Up grading Pipeline and Processing Plant)
Mina Ahmadi & Mina Abdulla
Shuaiba, Kuwait
Piping & Structural Engineer
Supervised 142 to 172 people as a Piping and Structural Engineer.
I do the S.E.R. (Site Engineering Request) daily crane utilization report for 45 to 150 tons cranes, inspection for acceptance.
Tracking and expediting of pipe spools and structural steel materials.
Materials take off from the drawing's including pipe field support for process line and utility line.
At site I do the S.E.R., sketch and draft' the structural obstruction which are commonly causes the problem for the completion of the installation of piping at unit 148 C-utility 148 process from area A, B, C,D,E,F & G other unit and area, In-charge for Level 1 up to Level 4 (Both for Piping & Structural).
25 May 1984 – 20 September 1985
JAC Construction
Caltex Batangas Refinery, LMG Chemicals
Philippines
Project Engineer
Coordinates with superintendent and fitter supervisor or foreman for some rectification to be followed before welding and fitting.
Prepares inspection for Caltex Refinery and LMG Chemicals Expansion.
Conduct actual field visual inspection survey for the preparation of working drawing for Caltex Modification and LMG Expansion.
I visit the job site to see the progress of the project and assist in tracking and expediting of materials, necessary for the said project.
Study and identify problems that causes the low productivity ratio deficiency of steel erected and familiar to interpret blue print of isometric, orthographic drawings, basic rigging, spool computation, material take off, estimating etc. which is necessary for the said project.
TRAINING AND SEMINARS ATTENDED:
1.Health Awareness Training Program
Kellog Brown & Root / N'Djamena, T'Chad Africa
2.Project Development Management
Philippine International Multi – Purpose Cooperative of Overseas Workers / Riyadh, Kingdom of Saudi Arabia
3.Countryside Entrepreneurship Development Program
Department of Trade and Industry / Lipa City, Batangas Branch, Philippines
4.ADMA – OPCO LNG & Desalination Project (Dehydration & Desalting Plant)
Das Island, Abu – Dhabi, United Arab Emirates
Safety Training, Operating of Breathing Apparatus & First Aid Course, Sponsored by Abu Dhabi Marine Operating Company
JOB SKILLS: OTHER SKILLS:
Construction Manager Computer Literate:
Project Engineer MS-Word
Construction Engineer E-mailing
Construction Coordinator
Piping / Pipeline Engineer or Superintendent Driving
Structural or Civil Engineer
Inspector (Piping, Structural & Civil)
Quantity Survey Engineer (Estimator)
General Superintendent
Project Coordinator
EDUCATIONAL ATTAINMENT:
University: University of Batangas (Philippines)
(Formerly Western Philippine College)
1979 -1984 (GRADUATED)
B.S. Civil Engineering
College: P.B.M.I.T.
1977 – 1979
Technical Electricity
High School: Saint Theresa's Academy
1973 – 1977 (Graduated)
Elementary: Bauan West Elementary School
1967 – 1973 (Graduated)
PERSONAL DATA:
Upon request
Language Spoken & Written: English / Tagalog / Malay / Bahasa Indonesia
CERTIFICATES & REFERENCE: (Upon Request)
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 351 to 400 of 995)
Go to Search Parameters...
Brief Description
Totally, more than 18 .6 years of experience in Diversified Fields, of which 15 years in Retail Trade in a Service-Related industry & 3.6 years in Wholesale Trade.
Provide Project Control Scheduling Support
Experienced Drilling Manager / Supervisor, BS Mining engineering, 20+ years in non-oilfield drilling, international drilling management and accomplished mud engineer.
Process Operator Experience
Over 25 years of design and engineering experience; providing design, engineering and management services for a variety of projects and fields. Expertise includes estimating, conceptual and finalized layouts, piping design, instrumentation, process, P&ID development, sizing/specifying/requisitioning
Surveyor, QC, upstream, oil, gas, seismic, geophysical, exploration, production, pipeline, module, construction
Electrical maintenance / commissioning Engineer
With several years of experience in the projects field, and acknowledged success as a Senior Maintainability & Operability Design Coordinator / Maintenance Manager, Plant Maintenance Planner and Mill Maintenance Supervisor demonstrating key leadership, interpersonal, and communication skills, I am e
Inspeection and repairs Daf Trucks, Matlab, Simulink, Excel, MS Word
9 Yrs Experience in Oil & Gas Estimation, Civil Construction, Architectural Facades, Construction Chemicals.
Operation Manager, Project Manager, Senior Engineer, Offshore / Marine / Subsea, Geotechnical , Civil, & Geological, Client Rep, Oil & Gas, Construction
NCCCO certified crane/heavy equipment operator and CDL driver
Exceptional Facility and Construction Management Executive
Free!
Geologist/Engineer with diverse experience, skills, and modern education. 2 Years experience in Africa (2006 -2008) working as Hydrogeologist/Water engineer *(Liberia and Darfur, Sudan).
21 years EPC experience Reading and Interpreting Contract Drawings, Defining Project Scope, Creation of EPS/OBS/WBS, Performing Detailed Quantity Surveys, Cost Estimating, Identifying Resource Requirements, CPM Scheduling, Cost/Resource Management & Implementation of ANSI/EIA-748-A EVMS Guidelines.
Environmental Engineer - Oil, Gas & Mining. Extensive experience in Design, Construction, EPC, EIA & Environmental Consulting, HSE Management Systems Development, Regulatory & Community Affairs, Corporate Social Responsibility, Environmental Policy
Experienced maintenance, field service manager with exceptional people skills.
Looking for Electrical power job anywhere.
Highly motivated and result driven maintenance engineer with more than 22years of continuous experience.
Extensive experience & strong, decisive, and profitable leadership in utility & pipeline design,construction & maintenance management. Keen financial, negotiating, and strategic planning performance. Consistent and measurable gains in operations, safety, quality, efficiency and productivity.
Government Contracts Financial Executive
I'm mechanical engineer specialized in hydraulic and pneumatic installations, with a large experience in design, maintenance, reparation for this equipments in various industry(civil, constructions, marine, production)
15 Years in Procurement/Shipping/Logistics/Import Export
A senior professional with 22+ years of rich experience in Project Management, Inventory Management, Operations Management, Documentation Management; presently associated with Voltas Ltd, Qatar; seeks senior level opportunity preferably in on shore - off-shore oil/gas projects.
Computer, Cement Plant, Program (Excel,Word.Power Point,Autocad)G.P.A 3.4,Good Comunication,ect
A Certified PMP and a Civil Engineer with Experience as a Project Controls Engineer in International Projects in the Middle East with experience in Primavera Project Planner 3.1, Expedition, P3e 4.1 as well as using Database Mgmt Software such as Access. In addition to my site experience
Project Manager / Product Manager with excellent people skills
Proactive management professional with solid business/technical leadership in the oil and gas area. Team builder and problem solver with proven track record of invigorating organizations. Has international contacts, exper. in complex contract negotiations, project planing-design-financing.management
Professional engineer with wide ranging international experience in project, engineering, reliability, business development, sales and commissioning of refinery.
TECH DOCUMENT CONTROL MANAGEMENT, PROJECT SUPPORT & COORDINATION, EDMS..ETC
Desired position would include supervisor for heavy construction, roadwork, landfills, underground utilities, and technological construction.
I have over 20 years in the Electrical field,with at least 9 years in I&E inspections new and pre construction projects.
Planning and supervision of on and off shore construction and logistical projects in remote areas of S.E. Asia for over 20 years. Cable Landings and burial works, diving training and operations, marine operations, oil and gas exploration support activites.
A broad professional knowledge and experienced in Civil QA/QC and Field Engineering Construction in infrastructure, defence and oil/gas/petrochemical plant construction projects.A broad professional knowledge and experienced in Civil Field Engineering Construction in infrastructure, defence and oil/
I am a highly motivated and ambitious Senior Electrical Engineer who worked in Emirate , Saudi Arabia , Kuwait , Iraq & Lebanon since 1994 and interested to pursue my future professional career in your company. The scope of work I am looking for is a job in the field of Residential Industry ,
Over 26 years experience of Gological Explorations for various minerals in Government Sector. Now seeking for an upward change.
Telecommunications Professional Engineer with strong analysis capability, deep knowledge on telecommunications networks and telecom business processes. Outstanding operating, managing and administrative skills. Proficient usage of office utilities and advanced expertise with excel macros.
Proven and effective manager of comlex products. Can build successful project and resource teams. Decision maker, optimistic and hard working. Analytical and innovative. Referred to as the "Go to problem solver".
Account Management - International Department
As you will see from my attached RESUME, I am an Indian citizen, and have a Bachelors degree in civil engineering, which I have passed in first division with distinction and I have 9 years experience, in positions of Project Manager, Project Engineer & Site Engineer.
MSc Engineering / Business Development / Project Management /Energy field/ Gas&Oil/Power/Heat Transfer/Cooling Condesing Plant/
Supervisor / Foreman / Project Manager
Strong sense of customer service ,Good organizational skills ,Supervisory experience in Catering and Camp Maintenance
Marine Engineer from Greece, Languages: Arabic, English, Greek, Italian. Experience = 16 Y. Eni Oil Co. Ltd.1/6/ 1999. Title Senior Plant technician, skills: Microsoft word, excel, Amos, Internet
A Certified Explosives Supervisor offering 20 years of proven experience, having strong track record of generating extraordinary performance in drilling project; aspiring for a challenging position as an Explosive Supervisor in the Mining Sector
Seeking a Management position where my considerable experience and knowledge of Construction civil estimating and project management that can be fully utilized to help drive employer profit margins and complete contracts on time.
By having multi-discipline skill; I have 21years of combine technical work experience in Project Management/ Consultant/ Coordinator/ Advisor/ Engineering/ Fabrication/ Construction/ Erection/ Installation & Maintenance work on both offshore & onshore.
Chemical engineering background with site experience including site engineering, commissioning, performance testing, and construction.
15 years construction and maintenace experience in electrical and instrumentation relating to the oil and gas indusrty. Other skills and experience gained in the last 5 years through construction supervision and project mamangement are piping, mechanical and civil disciplines.
Project Manager, QA/QC Wireless Telecommunications
1
2
3
4
5
6
7
[ 8 ]
9
10
11
12
13
14
15
16
17
18
19
20
Seach Parameters
Change search parameters...
CATEGORIES:
Operations;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com