Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #39708 next resume »»
CONTACT INFORMATION:
View contact information...

PROFILE
Organized, detail–oriented and excellent trouble shooter
Developed Operating Security Limits (OSL) for the Ontario Bulk Electricity System (BES)
Provided market/security limits to the System Control Center (SCC) on a 24x7 hours basis
Provided security limits for the present and the future outage schedule to the Outage Integration Office.
Analyzed short and long term outage schedule and identify security concerns.

EXPERIENCE AND ACCOMPLISHMENTS
Nov 2002 - present: Self employed as PTI/PSS/E consultant and new generator connection assessment consultant.
Using PTI/PSSE Transient and Linear Analysis Programs I have calculated EIGENVALUES of a group of generators. The eigenvalue results will be used to design and tune the respective power system stabilizers (PSS). Recently completed various connection reliability and connection assessment studies for the IMO/IESO.

1980-2002 Independent Electricity Market Operator (IMO), Ontario
Using PTI/PSSE Load Flow and Transient Study programs and based on the existing guidelines (PPG), which include voltage, transient, relay margin, thermal, load (mw, mx) etc criteria calculated OSL for the following Ontario system interfaces:

- East-West Transfer West vs. Ontario-Manitoba Transfer East
- Ontario-Manitoba Interconnection Flows.
- Sudbury Flow West
- Sudbury Flow West (Local)
- Kenora Local Area Inflow
- Lakehead 230/115 kV Transfer
- Transfer West of Mackenzie
- Transfer East of Mackenzie

* Provided short term planning studies to the Planning and Technical Depts.
* Prepared test procedures for new generating station.
* Retrieved and analyzed power system disturbance data.
* Designed coded and tested large loadflow data conversion program

ADDITIONAL EXPERIENCE
1974-1980 Ontario Hydro
In the IT area designed, coded and tested real time Power System Data Logging and Reporting (PSDLR) functions:
- MW Accumulator Function
- Hearn Gas Consumption Function
- Beck Forebay Water Levels Function
- System Flow Sheets Function
- Hourly Production Data, Daily Energy and Peak Function
- Unit Setup and Unit Limitation Function
- Morning Report Function

Supervised staff, prepared software related documentations and PERT
charts, maintained software etc.

EDUCATION/ PROFESSIONAL DEVELOPMENT
M. Sc. Electrical Engineering (Diplom Ingenieur)
Technical University, Munich, Germany
Professional Engineer, Ontario

References: Available on request. Status: Canadian Citizen and as per the NAFTA agreement I need a simple TN-1 visa to work in the USA.

Below is the IESO web site for the new generation connection planning study prepared by me for the engineering and consulting company Kestrel Power Engineering Ltd. This study has been approved and published by the IESO (Ontario). To see my report, please refer to the APPENDIX 1.

http://www.ieso.ca/imoweb/pubs/caa/caa_SIAReport_2004-128.pdf

Note: I am providing below the details of my extensive Outage Coordination, Integration and Management experience:

Here in Ontario we apply an Outage Coordination procedure called the WINTOP, i.e.: Weekly Integrated Transmission Outage Plan. This plan has several levels:

Level I: The real time BES (Bulk Electricity System) operations including the forced outages. In case of forced outage, immediate emergency operating limits are provided by the outage coordination to the system control operators and after performing studies these limits are updated.
- Level II: One week or 7 days period, starting every Friday. In this time slot, using all the approved outages the BES 'operating window', FERC:889:TTC/ATC, is calculated. No outages are accepted from the field in this period. Using
- PTI/PSSE transient, voltage and thermal studies are performed
- Using the market rules, the BES demand and the resources are also established.
- Level III: Five weeks period. In this period all the BES security related outages are identified and resolved. Outages from the field may be accepted. BES operating window is calculated and updated as required. Majority of the outages are processed, finalized and approved in this period.
- Level IV: Six week to two years period; Major Power System component changes such as
- HV transformer replacements, which may require extended outages, are processed and approved. In case of extended outages (> 6 weeks) the ABB EMS software may need modification because some extended outages (i.e. Critical Elements) may degrade the definition of the normal system and n-1 system. This period also covers small system upgrades and short term system planning items such as adding reactors and/or capacitor banks etc.

The above WINTOP plan is also a part of the IMO/IESO Market Rules, FERC:888/889. The whole WINTOP process is fully computerized and there are about ten participants located in the various geographic location of the BES who use this process. All these participants, (i.e. field/regional office and construction staff, generating stations, weather office, control room, outage coordination, MISO, NYISO, studies section etc.) must follow their fixed time to enter and update the WINTOP file. Generally the WINTOP process, regular face to face meetings are not required. However, there are the weekly meetings, next to the control room, to finalize the available transmission (FERC:TTC/ATC), the load forecast, the required resources (i.e.: IESO generations(MW & MX) plus imports from NYISO, MISO etc.) and the market prices for the next 48 hours of the market. For the IESO's 48 hours real time demand and the market operation please see:

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1 to 50 of 1120)Go to Search Parameters...
Brief Description
Free! Twenty five years of mining and construction experience in both surface and underground. Lead Quality Engineer for MTA East Side Access NYC. Chief Inspector for Construction Management on The Heartland Corridor Project in West Virginia. Chief Inspector for the city of Atlanta on the West Area CSO.
Free! Experienced hard working Geologist, Underground and open pit experience, Resource development modelling and drill program design and implementation, Very experienced mapping and strong structural background.
My techanical abilities in the use of Primavera and my leadership skills may be of significant interest to you. Upon review of my qualifications I think you will find that I would be a very valuable member to your company.
Manager of milling department woodworking division, wood lamination, sawmill manager, lumber quality checker, logs scaler.
Maintenance Planner / Scheduler
Dedicated, creative individual with broad experience in project controls and project administration demonstrating interpersonal and organizational skills, with a proven ability to learn and adapt to change efficiently.
electrical/mechanical superintendent/ project manager
Electroplating and running chemical an run test on them and check qc on parts
For the past twenty two years I have pursued a career as a Linesman, acting principally as a team player with additional professional duties.
Thirteen years of problem solving, decision making, upward career progression and increasing responsibility. Extensive hands-on experience administering, planning and managing operations in the following functional areas: facilities management, project supervision, procurement, staff development, bu
Procurement & Contracts Expertise
Project Manager: Responsible of the coordination and execution of the following projects: • Warehouse Management System (Oracle WMS) • Overall Revision to the actual ACP Master Catalog . Inventory Re-engineering Program
I have worked many years in the construction field and I have knowledge of all aspects from ground breaking to completion.
Working field superintendent
-Has wide working knowledge and experience on automotive production line.
Cement Production Supervisor // Senior Cement Process Engineer //
Surface Sciences, Polymer Chemistry and Physics, UHV Techniques, Materials Sciences, Thin Film, Single Crystal.
Results orientated, hands on multitasked, multifunctional, dedicated manager. experienced in materials. Systems, logistics, & operations management. I am the go to guy to save you from losses in time or money. Please e- mail or call me so we can get together on filling your current opening.
I am 46 years old, hardworking and trsupervision. Seeking permanent employment overseas. ie: Dubai.ustworthy. My attendance is 100%, never having had any sick time from my work in 25 years of full time employment. I can use my own initiative, and am able to work without supervision.
Experienced General Manager with Emphasis on Sales and Operations
heavy equipment mechanic
• Perspective gained through advancement from field operations, through front-line supervision to senior staff management and administrative positions.
Executive Director, Operation In Charge, Managing Director
Free! Experienced Project Manager, Divisional Manager, with a proven track record of success in Construction, Interiors and Finishing works. MEng Degree Mechanical Engineering, ILM level 5 Diploma in Management,CITB Appointed Persons.IOSHI Certified.B S Construction Health and Safety
Safety Management Position
Operate a machine on a assembly line, especially operate a automatic welding machine.
Civil engineering design consultant and project management professional
27 year veteran contracts manager , civils and epc specialist
Remote Site Expert : Global Experience.
Project engineering which involves inspection of instruments like control valves, on off valves, valve actuators, various type of analyzers etc.
Senior executive with 17 years experience with MEP, design build, G .C., PM firms and owners side construction. New business operations, new division creation with demonstrated success in entrepreneurial environments. Projects consisting of ground up construction, renovations, commercial
I have been working in Kingdom of Saudi Arabia FOR 18 years as grader operator. And now i want to work in Canada as grader operator.
Mechanical Engineer 22 years experience design, projects
10 years experience 7 years in paksitan & 3 years in dubai & i have the bachlor of arts degree & some diplomas in health safety & envoirnments.
Experience Surveyor
Executive Management level experience and expertise
Over 23 years of rich experience in Technical Training, Erection & Commissioning, Production Planning and control,Safety,Environment,Health, and Quality in the fertilizer industry and Petrochemical industry seek suitable new assignments in Training and Development in Fertiliser,Petroleum,Petroche
Extensive experience in the construction industry in the field of architectural and civil/structural works of residenses, townhouses, condominiums and commercial buildings including interior and exterior finishing details. A highly motivated project supervisor, proven ability to solve site problems.
Looking for growth
31 yrs. old, 13 yrs heavy equipment accident free operation including all dozers, graders, scrapers, etc etc. Currently mainline hoe operator (345bl) thousands of hours roadbuilding, loading trucks and laying pipe. Extensive experience with gps and laser grade systems. Ability to cut grade.
HSE
Diploma in Civil Engineering (3 Years)
Transmission Planning Engineer, BES Operations Engineer, PTI/PSSE Consultant
as per attached
June 2003 ©¦EPresent Company: JGC Corp Location: China Position : Schedule Controller May 2002 ¨C March 2003 Company: FAFCO Location: Saudi Arabia Position : Planning & Scheduling Engineer
35 continuous years of national and international commercial construction experience
Experienced in power plant operations and startup.
Geodesist/Land Surveyor/Geomatics/GIS consultant
Power Generation- Twenty-eight years experience of Construction, Startup & Commissioning, Operations & Training for Combined Cycle Units, Coal Fired and Nuclear Steam Supply Systems (NSSS) & Balance of Plant (BOP) Systems as Lead Mechanical, Lead I&C, Lead Operations and Startup Plant Manager.
All type of Light & Heavy Lifting & Transportaion job
[ 1 ]   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23  
Seach Parameters

Change search parameters...
CATEGORIES: Operations;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com