Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #69563
next resume »»
CONTACT INFORMATION:
View contact information...
•11 years Managing Director and Senior Design Engineer for an ASME code fabrication job shop that specialized in manufacturing large pressure vessels, piping systems and automated process equipment.
•14 years International project management experience in design, construction, automation, start up commissioning, problem resolutions, operations training, security and HSE and for new Petrol Chemical, Semiconductor Fab, Pharmaceutical, coal fired, combined cycle and nuclear power plants.
•10 years China/Asia Project experience as Owner’s representative, Project or Construction manager, Commissioning or Start-up problem resolution engineer, also Supply Chain management.
•20 years of accomplished Automation and Lead I&C skills, including design, programming, and problem resolution for PLC, DCS, and SCADA systems.
•25 years experienced in many conventional and modern state of the art Water & Waste treatment technologies for the removal, exchange, and quality control of organics, inorganic and radionuclides
•25 years managing large project teams and or working single-handed for many types of project disciplines and situations associated with design, welding and fabrication, heavy and technical lifting, HSE, Hazop, Hazmat, construction, automation, start-up commissioning and client turn over.
•25 years working on Domestic and International, multi million & billion US dollar project contracts for many of the worlds largest onshore/offshore Oil & Gas, Petrol Chemical, Power Generation, Semiconductor, Pharmaceutical and Food & Beverage industries.
Education: •1977 Naval Schools: 1986 BSME University of Southern California
Hull Maintenance Technician phase1 & 2, normal maintenance and battle damage emergency repairs, Basic Electricity & Electronics, Welding & Fabrication, including Underwater: Welding, Fabrication, Repairs, Demolitions, Tactics and Communications.
Ship board Boiler and power generation operations, repairs and maintenance.
Ship board Water & Waste Treatment and Purification Systems
Nuclear, biological and chemical weapons, effects and counter measures. (NBC Warfare)
Native English speaker, also conversational in Mandarin Chinese, and Spanish.Using computer I can read, write and translate to produce documentation in all above languages.
Engineering and Fabrication:
Design engineer and QA/QC in accordance with ASME code sections 1, Parts A, B, C, and D of 2, 4, 5, 8 Division 1 and 2, 9, 10, B311- 3, and WCR.. NBIC, Repairs and alterations Use many types of country standards ANSI (American), GB (Chinese), JIS (Japanese), DIN (Germany), EUS (European), and ISO standards. High technology materials, alloys, plastics, and linings. Safety and QA/QC inspection procedures for welding, fabrication, machining, and surface protection. Tool, die and mold making for NC and CNC machining and injection molding processes. Process piping for corrosive, toxic, radioactive, non toxic, chemical, industrial, water, waste, sanitary, high purity, and ultra pure service. High temperature and pressure, jacketed and double containment process piping, monitoring and sampling systems. Continuous and batch, reactors, columns, and tanks. Single and multi phase, vacuum, heat, pressure, vibrating, rotating, equipment, and controls. Special hazard isolation areas and clean rooms. Separation, ion exchange, filtration, membrane, Electrodeionization (EDI), catalyzed and noncatalyzed reduction and oxidation process systems.
Employment Experience
Bayer Technology and Engineering Services / Bayer, Shanghai Integrated Sciences Site
5/2006 – Present Construction Manager SPC2 / LOG2
This is a expansion project for a new optical electronics grade polycarbonate production and logistics facility. 80 % of detailed engineering was performed in Germany and the reminder finalized on site. I am in charge of CSA , Mechanical Equipment Installation, Heavy & Technical lifting, Piping, E&I, Tracing and insulation contracts. This includes writing bid tender technical scopes of work, execution strategies, work flows, test specifications and system turn over requirements along with China Government Authority requirements, and inspections. I am in charge of contractor evaluations and selection, construction schedules, onshore / offshore procurement, site temporary facilities and warehouse.Materials management system, along with the many project, equipment and piping problem resolutions required to finalize the remainder of engineering and PDS model during construction.I was also responsible for establishing and approving the site security, work permit, and HSE plans and procedures.
BSF/ CSPC Nanhai and Shell Petrochemical Plant/ Guangdong, China
8/2005-3/2006 Project Engineer/Commissioning Engineer
Commissioning of the low olefins plant (LOP) east section, this consisted of Ethylene, Propylene and LPG spheres, the transfer piping systems, pumps, fire and safety protection systems, and vent gas piping system to the site flair. After completion of the LOP section, I was moved to the Slops system and assigned as the system commissioning lead for the Slops plant area. The Slops area handled all waste water and waste oil form the site. The Slops had several problems that required design, and construction changes and modifications prior to commissioning. My duties included working with engineering and system suppliers to recommend, finalize and execute design changes and repair deviations. I worked with the Chinese subcontractors to commission the drain systems, CPI separator system, Slop tanks including N2 blanket system, Waste water transfer to the effluent treatment system, Slop Oil transfer system, Truck loading and unloading systems, Hydrocarbon transfer to the Solid Waste Incinerator system and Vent Gas compressors systems. I was also responsible for the installation, and functional DCS test of the toxic, combustible gas and fire safety systems. Both plant locations required the installation and commissioning of utilities from battery limits to the individual systems. Utilities consisted of Cooling Water, Nitrogen, High and Low pressure Steam, Plant and Instrument air, Plant and DI water, Fire steam snuff, and Fire water and foam systems. I inherited from engineers that left the project; the continuous contaminated drain system (CCD), the Rain water and Sanitary lift station systems. We use the WinPCS software project control system to schedule, track, document and complete work for the entire project. This included Punch lists, inspection hold points and completion check sheets, walk downs and final system turnover to the client. As the lead commission engineer in charge of my systems, I was responsible for scheduling all subcontractor work and equipment, vendor site work, overseeing and approving all works, verifying punch list items were cleared and signing check sheets of completed works and final ready for service system turn over to the client.
Zenon Environmental Corporation/ Global Hub Material & Supply Sourcing
8/2004 – 8/2005 (China/Asia Supply Chain Director)
Contract position was established to help the Zenon corporation decrees costs but maintain or increase profits by qualifying China / Asia material suppliers and fabricators. Also to secure offers from different economic zone locations for a new Zenon facility in China.
CEEDI a Government owned Chinese Design Instituted (CDI)
2/2004 – 8/2004 I was a consultant for the formation of a new Environmental Division to I acted as project director for a new environmental division. I and helped the CDI form and employ new technologies and modern methods of project organization and management.
From 4-2001 – 2/2004 I was employed by GE Power Systems on a contract basis.
GE/ Pfizer Pharmaceuticals / FDA Plant / Singapore
(Senior Project and Commissioning Engineer / Client Consultant)
I was the project manager and on site technical advisor to Pfizer for all GE supplied Generation and Purification equipment. This was a new Pharmaceutical Utility, OSP-1 and Dispensary water process equipment and distribution piping system.
GE/MSD Pharmaceuticals/ FDA Plant / Singapore
(Senior Project and Commissioning Engineer / Client Consultant)
I was the project manager and on site technical advisor to Merck for all GE supplied Generation, Purification and DI equipment. This also was a new Pharmaceutical Utility, OSP-1 and Dispensary water process equipment and distribution piping system. This also included a DI water system with electro deionization (EDI) and DI storage.
Both above Pharmaceutical projects were located in Singapore across the street form each other. The construction of equipment in the US and Canada took place at the same time. The commissioning schedule was staggered with Merck taking place 6 months before Pfizer. I was on site in Singapore for both projects for almost 2 years and managed and oversaw site construction sites for both plants at the same time. I attended weekly design reviews and fabrication progress meetings. I was present with the client at factory acceptance tests prior to equipment being shipped to the site. I instructed local contractors and oversaw equipment installation. I performed mechanical and automated start up commissioning, assisted in process problem resolutions, performed operator training and stayed on site as technical advisor through all procedural ( DQ, IQ, AIQ, OQ, Shake down rehearsals, and PQ) the Performance Quality is the final FDA review qualification.
GE/ABB Lumus Global / Oil Refinery / Sines, Portugal
(Project Problem and Financial Resolution Engineer) Inspected local contractor installed equipment for compliance with GE specifications. Generated a punch list of corrections, missing parts and suggestions to solve scope gapes. I helped to resolve PLC and DCS automation scope gape. Met with Client and Customer to have change orders approved, resolve back charges and retained payment issues. Met with ABB in the Netherlands office to assure release of the agreed to project funds.
GE Hsin Tao / Combined Cycle Power Plant / Taiwan
(Senior Commissioning Engineer) Oversaw the site construction and installation, performed all installation inspections and start up commissioning of a 2 train Demineralizer and waste neutralization system. I also assembled, debugged and commissioned the PLC, and PLC back up systems, 2 graphical operator interfaces, Ethernet workstations and DCS interface. After the system was in full Auto and making spec water I spent the last 2 weeks on site training the plant chemist and local operators.
GE/CANDU Qinshan Nuclear Power Plant / Haiyan , China
(Senior Commissioning Engineer)
Inspected local contractor installed equipment for compliance with GE specifications and generated a punch list of corrections. Reviewed with operations the sequences for the process instrumentation controlling the UF, RO membrane, Demin, chemical feed and waste treatment installations. Retuned to site 3 months later and commissioned the PLC and HMI work station and trained local operators.
Motorola / MOS-17, BAT-3 Semiconductor Fab / Tianjin, China
9/1999 – 3/2001 Water and Waste Project Director/Client Contact
As site project director I was the single point of client contact on site for all contracts and change order business. I hired and managed all expats, Malaysian and local Chinese subcontractors for the installation and start up a semiconductor fab. Work included design, and fabrication of all water and waste systems, site construction, installation and automated commissioning. Scope of contract work was a site filtration building, Industrial and fluoride waste treatment building, UPW pretreated, make up, primary and polish equipment installed in the fab building. Also included the high purity distribution loops and laterals for all the tools and rooms in the fab. Our original 2 contracts were 22 million USD however with expansion that Motorola designed and based on our performance of existing contract work I was able to help obtain 2 more contract scopes of work for a total of 49.3 million USD. Motorola MOS-17/ BAT3 was a 3 billion US dollar world-class fab, the first of its kind built in China.
Bechtel / Power Plant / Meizhouwan, China
3/1999 - 9/1999 Commissioning Engineer / Problem Solver
Start up commissioning of raw water, Demin make up water plant.
This project site had a typhoon cause a landslide in to the make up water reservoir and changed the water quality. As they civil works for the clarifier and gravity filter had just been completed my first site responsibility was to test the new reservoir water quality and turbidity, then determine a fix or on site retrofit of the clarification and gravity filter system to achieve the desired water quality and flow demand. I also established new chemical feed dosing parameters to correspond to the retrofit. Debugged and commissioned the control system including created new HMI screens and interfaced pretreatment, Demin, and waste treatment control systems to the Bailey DCS.
Graver , Hua Yang Power / Zhangzhou Houshi Power Plant /Xiamen, China
1/1999 - 3/1999 Senior Commissioning Engineer
Oversaw the final installation, performed the start up commissioning and control hardware and software debugging for a 3 train Demineralizer unit and waste neutralization system.
Raytheon UEI / Power Plant / Zhuhai, China
6/1998 - 1/1999 Senior Site Construction and Commissioning Engineer
Oversaw the construction and installation of an automated make up water system, and a 3 unit 4000 gpm mix bed ion exchange sphere condensate polisher and regeneration system, the chimerical injection feed system and site water quality laboratory. I performed the start up commissioning and control hardware and software debugging for all systems after installation. Note some of the 16 PLC control panels and 2 HMI workstations were damaged during overseas shipment.
I had to buy local replacement parts, rebuild the control panels and work stations, then rewire, test and reprogram them at the site. After the systems were commissioned I trained local operators on the plant operation and maintenance.
Black & Veach / Power Plant / Nantong, China
8/1997 - 6/1998 Senior Site Construction & Commissioning Engineer
Long term project 10 months on site overseeing site location construction, installation of equipment and controls, performing start up commissioning of a automated powdered ion exchange condensate polisher and regeneration system, chimerical injection feed system and the site water quality laboratory. I also performed the automation commissioning and software debugging for all systems after installation. Trained local operators on the plant operation and maintenance for 2 phases of a 4 unit 350 mega watt power plant in the Jiangsu providence of China.
Mektron / Ion -Exchange Waste System / Kashima, Japan
5/1997 - 8/1997Commissioning Engineer
I performed the automated start up commissioning for a zero discharge ion exchange based plating bath, rinse water recycling system. I also at site designed and installed a remote modem connection on a DH485 network so that system PLC / HMI could have program changes made from anywhere in the world via phone.
Wrigleys Gum / Automated Gum Base filter/ Edison, New Jersey
7/1996 – 4/1997 Turnkey EPCC Project Manager/Engineer)
Turnkey project: I designed engineered and subcontracted fabrication at my Bakersfield USA location. Tested and then shipped and commissioned the equipment at the customer’s New Jersey location. The system was a automated batch heat controlled gum base filter. I also wrote the system PLC program, operation and maintenance manuals.
Chevron USA / Waste Treatment Plant /Lost Hills, CA
1/1996 – 7/1996 Turnkey EPCC Project Manager
Turnkey project: I designed, engineered and oversaw fabrication and installation of an automated solid waste de-watering plant. I also wrote the system PLC program, operation and maintenance manuals.
Samsung / Semiconductor Fab / Austin, Texas
7/1995 - 1/1996Senior Commissioning Engineer
Start up commissioning and operator training of 30 million in ultra pure water, process equipment for a new Semiconductor Fab. Equipment scope of work included site filtration, waste treatment, UPW pretreat, make up, primary and polishing process equipment. Note: Samsung was a 1.3 billion USD dollar installation.
Glegg Water/ Bechtel / Calama, Chile
12/1994 - 5/1995 Commissioning Engineer
Oversaw construction and installation of equipment and controls. Performed the start up commissioning and control program debugging, for an automated reverse osmosis water plant at a copper mine in the Chilean mountains. Stayed on site after commissioning to train local operators.
1/95 - Present Consulting & Engineering Services
Self Employed Owner/General Manager
P.O. BOX 3262 Bakersfield, CA (also registered company in China)
Duties: USA and international, (Canada, Europe, ASIA and South America) projects.
See above project descriptions
Self Employed: Owner/General Manager
2000 Mineral Court Bakersfield, CA
5/83 - 6/90 Hedrick Portable Welding and Structural Design.
2/85 - 6/90 Formed Hedrick Chemical
6/90 - 6/94 Merged both companies into one, Water Treatment Equipment. Same address. Duties: Sell, design, engineer, quote, fabricate, and install automated process equipment, including new industrial water and waste treatment systems. New construction, repairs, retrofits, rentals and maintenance of process equipment. ASME code engineering, fabrication and inspections. Pilot tests, laboratory analysis and studies. Sales and service of media, membranes, ion-exchange resins and custom blended chemicals. We were a ASME code job shop with U, S, PP, and R stamp authority;
My business was located in the heard of California’s largest oil production fields so our primary clients were the major Oil & Gas Corporations. Every day I sent welding and maintenance crews to various oil leases, refineries, cogeneration and petrol chemical plants. From this work we were able to obtain many shop contracts to retrofit or supply new equipment packages. After selling the business in 1994, I have been traveling the world as a project manager, commissioning engineer, , technical or project problem resolution consultant. I have tried to maintain the same common sense values I leaned as a business owner for all my international project work
4/81 - 2/83 Futura Metal Technologies 1709 Junipero Ave Ventura, California.
Company shut down. Duties: Lead welder/fitter class A ASME code shop fabrication of offshore platforms, jack ups, semi submersibles and offshore structures such as living quarters, galley, rotorcraft delivery platform, pipe racks, supports and special mooring. MOPU, FPSO, and FSO. Offshore emergency repairs and underwater welding.
Please consider my qualifications with regards to any of the following carrier positions or contract project opportunities you may have for: Project Director / Manager, Construction, Engineering, or Commissioning Manager. Automation Manager or Lead I&C Engineer Start Up, Process or Lead Problem Resolution Engineer.
I am problem solver that gets things done! I specialize in problems solving strategies, contract negotiations, keeping work on schedule, accomplishing work as per project specifications and obtaining final client sign offs. I also have a talent for identifying special project needs, and opportunities.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 251 to 300 of 994)
Go to Search Parameters...
Brief Description
I have been working in the mining industry for the past 29 years. I have gained a large amount of experience using several types of mining equipment over the years. I have been commended on my attention to detail, safe work practices and team work. I know I would be an asset to your company.
12 years of experience on Intergraph EDMS/CAD System, specially PDS & Smart Plant products administration; at present working as EDMS Engineer in Sabic, Saudi Arabia since April-2001. I am going to be released by end of 2007; please find my CV attached herewith.
Captain looking for a challanging position shore based as Marine/HSE Superintendent- Manager. I am an unlimited Master Mariner and I have recently achieved a MSc in Marine Operations and Safety Management.
I am a Senior Process Engineer in oil & gas systems. Along my 18 years experience in the field, I have held a number of positions going form operation to project execution and management and process engineering activities. I am fluent in English, French and Arabic.
Industrial Electrician by trade who is now working as a Commissioning Operations Maintainer in Explosives and LNG facilities.
Supervised main LNG works from Administration and Utility Area
A qualified engineer with an exceptional and extensive track record in managing large maintenance infrastructures systems for diverse industrial setups
Have sound understanding in Geology. Graduate in Geology. Doing Post Graduation(final year) in Geology. Done field work. Computer-friendly.
* PROJECT / PROGRAM MANAGEMENT * OPERATIONS * ENGINEERING *
Procurement Professional with International experience in Purchasing, Logistics, and Inventory.
Logistics, Procurement and Materials Manager (Supply chain)
Procurement Manager with over 15years Multidisciplinary experience, providing Managerial, Engineering, Information Technology for onshore/offshore rigs and office operations in Procurement, Warehousing and Logistics.
A project management and business development professional with extensive experience in bid management through to contractual completion. An impressive record in winning new business, and managing and completing projects on time and under budget.
Contracts Manager in switchgear environment (ABB) - manage 5 Project Managers - Engineers in switchgear and associated equipment projects.
Contracts & Global Procurement Manager, Change Agent, Systems Initiation, Strategic Sourcing, Seasoned Negotiator, Proven Organizational & Team Leadership, Collaborative Mgmt. Style, Broad knowledge of OEMs & Suppliers, Contractor Oversight, Systems & Procedures, Middle East Mega-Project Experience.
Supply Chain, Manufacturing Manager with 14 years of experience. MBA and Industrial Engineering degrees
I am a mining engineer and also has a masters degree in urban and regional planning.
Over 16 years experience in the field of I&E and telecommunications more focus on project preparations, execution and commissioning. oil & gas industry projects and operations (UAE), power plants, telecommunications and bio-medical equipment. Having 6-yrs are on the supervisory level capacity, 8 on
20+ years in administrative field, ie. human resources, managerial, recruiting, exec. assist, proficient in Microsoft Office 2007
Mining Engineer with 35 years experience as a manager and superintendent in open pit, open pit casting, and underground mining in operations, engineering, maintenance and construction. Extensive oversease experience in North America, South America, and Indonesia.
He has more than 25 years of experience; from his current work in hydrogeological and hydrochemical assessment, environmental monitoring, and capacity building. He has managed many projects as well as acted as team leader on various project components.
I am a Project Controls Manager currently based in Saudi Arabia with over 20 years experience in the Oil and Gas, Construction, Mining and Property Development industries. Now looking to relocate to Malaysia, or Singapore.
Maintenance Manager Engineer Middle East Experience, Looking for work in UAE
Experienced offshore Client Representative and qualified Hydrographic surveyor; with Master's ticket, NEBOSH, MCSE .
Tim Sweeting has been working in environmental and HSE management since 1994, mostly in oil & gas developments. His broad expertise design, construction and operations, auditing, waste management, pollution prevention and managing client/contractor relationships. MSc and professional memberships.
Project Management, Oil & Gas Industry, Civil Costing, Planing and Estimation
I am a highly motivated Operations Manager and am always ready for a challenge. I have extensive experience in management and I am actively seeking a position that fits my skills and experience. Please review my resume to see further details of my experience. I am self moti
Handling key customers like Saudi Aramco, Sabic Affiliates, Saudi Electricity Company, Saline Water Conversion Corporation, etc in the western region of Saudi Arabia related to Sealing Solutions.
MECHANIC/WELDER/GENERAL MAINTENANCE & REPAIRS
I have 25 years of multi disciplined, design, engineering, and project management experience with very strong automation skills. I am highly experienced with specialize, automated process equipment systems for Oil & Gas, Petrol Chemical, Power Generation, Semiconductor,Pharmaceutical,Water & Waste
My skills make me a leader no matter what job or position, I'm successful........thanks!
Looking for career enrichment opportunities in Sales & Marketing, Business Development, Technical Services, Operational Manager, or Telecom commercial consultant with a frontline organization
Project control engineer with experience in planning and cost engineerig fields.
I have worked in the Petrochem/Oil and Gas industry for 20 years. Vast knowledge of all support qualifications, document control, purchasing, expediting and subcontracts work.
I am college educated in business and looking to make a change in my career. I am tired of the business environment that I am in and am seeking something more physical demanding. I played 4 years of college baseball where I was exposed to loads of teamwork.
I am a bachelor degree holder in engineering, with vast experience in oil and gas construction projects on rotating/static equipment erection and installation, equipment inspection , operation and maintenance.
Versatile Procurement, Subcontracts & Facilities Manager with over 20 years experience in multi-contract project environments
A proactive leader with extensive reliability centered maintenance management and hands-on experience in the repair, overhaul and troubleshooting of mobile equipment, initiate change and reengineering of quality improvement processes while maintaining a positive, safe and productive environment.
In-service / shutdown inspection of most of the static equipments in a plant, such as pipe works, pressure vessels, hydrogen crackers, reactor vessels, storage tanks, reformer tubes, risers, topside structures, well head parts, valves, etc. , Inspection of all plant construction related activities
4 years of experience as a PRODUCTION ENGINEER.
Supervision, planning, scheduling, coordination, maintenance (prevantive & breakdown), budgeting/forecasting, optimum inventory management, resource development & deployment, utilities etc.
Experienced commissioning Engineer in gas turbine plants
More than 20 years E&I experience of Maintenance & Commissioning within the Oil & Gas Industry. Enjoy working as part of a team but I can also operate independently when required. Self-motivated, resourceful, adapt quickly to new working environments, easily integrate into multi-cultural operations
Planning / Project Controls Manager , PMP certification, Primavera 3.1 / 6 professional user, Civil Engineer, Cost Control and Claims experience
Project Manager/Construction Supervisor/Contracts Manager/Claims Manager/Cost Engineer/Construction Manager/Site Supervisor/Civil Engineer/Quantity Surveyor etc.,
Multi lingual professional with MBA in Supply Chain Logistics. A proven effective communicator and negotiator with extensive experience in field operations supporting military, humanitarian and commercial operations.
Project management, commercial management quantity surveying
Rotating Equipment Repair and Refurbishment of Rotors and other Internals of Compressors, Steam Turbines, Gas Turbines and Screw compressors. Over 10 years with OEM worshop as Works Manager of Service shop and Head of Technical Services. An ASME Authorized Global Training Instructor.
Electrical and Instrumentation Technician/Engineer with significant experience in Construction, HUC and Maintenance in the Petrochemical and Oil & Gas Industries at Technician or Engineer levels for companies with several large development projects ongoing at once.
Engineering/Operations professional with sixteen (16) years of experience managing multi-disciplined projects.
1
2
3
4
5
[ 6 ]
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Seach Parameters
Change search parameters...
CATEGORIES:
Operations;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com