CONTACT INFORMATION:
View contact information...
Personal data
Nationality: Egyptian
Military Service: Completed.
Marital Status: Married, Two Children
Education: Graduated from Industrial Institute, Tanta, Egypt.
Birth day: 14/3/1962
E-mail: Atefabuelfotouh@yahoo.com
Experience
From July.2007 to the Present Time
Mechanical General Forman.
Kharafi National, 360 Kuwait Mall.
Responsibility
All Fire Fighting, Water Supply and Drainage which include direction to the work force coordination and planning of all the equipment installation start up of all the Mech. Equipment.
The scope of the project include Pump Room, Summersapul Pumps, Generator System, Fire Hydrant
, Gate Valves, Fire Fighting System: F.C.S, F.H.C & Sprinkler for Mall and Car Park, Water Supply
System and Drainage System.
From Aug. 2003 to July. 2006
Mechanical Supervisor
ABB SUSA Inc
Beni Suef Middle Egypt Water and west water Treatment Plants
Responsibility
All yard Pining, mechanical installation. This included direction to the work force, coordination and planning of all equipment installation, start-up, testing and commissioning.
The scope of the project including row water pump station, flucholter system, filter system, back wash system, chlorine system, high lift pump station, fire system, yard Piping, sluice & slide gates, and Trash racks. Bar screen, two high lift Pump station Conveyor, over head cranes, Aerators system, clarifiers system, gravity thinkers system, non putapl water system, generator system, Filter system and HVAC system.
From Aug. 2001 to Oct. 2002
Mechanical Superintendent
The Morganti Group Inc.
Nuweiba WWTP Facilities and Pump Station.
Responsibility
All mechanical installation. This included direction to the work force, coordination and planning of all equipment installation, starts–up, testing and commissioning.
The scope of the project included five complete pumping station, generator system, sluice & slide gates, and support system, HVAC system, Basket screen, bar screen jip crane, potable water pump station and Yard piping
From July 2000 to Aug 2001
Mechanical Supervisor
++ DAELIM
[Midor] Middle East Oil Refinery ($ 1.5 BILLION)
Responsibility
Coordination and planning for all mechanical equipments at units 11, 14, 15 & 45
This included pumps & Air coolers alignment, louvers, towers, heat changers, Compressors. Decoking systems & fourn, overhead Cranes, vessels, pre-com, commissioning, and start up.
From July 1997 to July 2000
Mechanical Supervisor
ABB SUSA / Dillingham J.V.
Suez Pumping Station Rehabilitation.
Responsibility
All mechanical installation. This included direction to the work force, coordination and planning of all equipment installation, starts–up, testing and commissioning.
The scope of the project included five complete pumping station, generator system, sluice and slide gates, and support system, HVAC system, Trash racks and bar screen.
From July 1995 to July 1997
Shift Engineer
ABB SUSA Inc.
Suez WWTP and Pump Station.
Responsibility
Supervisor for corrective and preventive of maintenance for all mechanical equipment and vehicles, Spare parts turn over.
From April 1993 to July 1995
Mechanical Supervisor
ABB SUSA Inc.
Suez WWTP and Pump Station.
Responsibility
All mechanical installation. This included direction to the work force, coordination and planning of all equipment installation, starts–up, testing and commissioning concerns.
The scope of the project included a complete pumping station, generator system, sluice and slide gates, and support system, HVAC system, Trash racks and bar screen, and aerators.
From May 1991 to April 1993
FAB Workshop Supervisor
ABB SUSA Inc.
Abu Rawash WWTP
Responsibility
Fabrication All Pipe Support and repair of form works, equipment and related sub-structure.
From July 1988 to May 1991
Mechanical Supervisor
SAE-SADELMI Inc.
ZENEIN WWTP REHABILITION
Responsibility
Installation of three pumping stations and all related equipment's, overhead cranes, air compressor, ductile iron piping, test and commissioning and start-up.
From July 1984 to July 1988
VEROCHTAL Co.
Project No. 1
Foreman
Erection of steel bridge of Duke and Steel Bridge of Throat, Cairo.
Project No. 2
Foreman
Installation of Cost Iron Pipe Factory at IMBABA, installation of mechanical workshop, overhead crane, 3 l machine for fabricating pipes different sizes.
Project No. 3
Foreman
Helwan National Cement Factory
The work included fixing the crusher, conveyor belt, screens and overhead cranes
.
Project No. 4
Foreman
The work includes fixing of pump Station, Sluice and Slide Gates and Trash racks. REFERENCES AND CERTIFICATES WILL BE PROVIDED UPON REQUEST
View contact information... |