Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #77261 next resume »»
CONTACT INFORMATION:
View contact information...

Project Manager. Civil-Structural Engineer. Lead Planning Engineer

Professional Construction management, supervision and design of Industrial Complex
Experience and Facilities such as Oil Refineries, Floating Platform Storage & Offloading (FPSO), Offshore Oil Platform, Power Plants, LPG Treating Plants, Manufacturing Facilities and Factories, Commercial and Condo Buildings (Reinforced Concrete and Structural Steel Buildings), Land Development, Roads & Drainage, Piers and Harbors, Dams & Spillways, Bridges and Piles Driving Works, Structural Steelworks and Survey Works.

Other experiences - Contract Review and Evaluation, Planning and Scheduling (using Primavera Project Planner Version-3.1 & 6), Cost Engineering & Estimates, Quantity Surveying, Bid evaluations, Structural Engineering (using computer software such as STAAD3/PRO, SAP 2000, & ETABS), Detailed Engineering Design and Front End Engineering Design, Geo-technical Engineering, etc.

Professional Philippines Institute of Civil Engineers (PICE): Member – 1985 to Present
Memberships Geodetic Engineers of the Philippines (GEP): Member – 1995 to Present
Association of Structural Engineers of the Philippines (ASEP):
Member – 1985 to Present

Education Bicol University College of Engineering, Legaspi City, Philippines Graduated with the degree of Bachelor of Science in Civil Engineering 1981-82

Completed with the course of Civil Engineering Technology (Building) 1992
The ILO – Association of Japan Inc. / International Skill Cooperation Center
Ohsaki Institute of Construction Technology, Tokyo, Japan

Professional Passed the Licensure Exams for Civil Engineer – 10th Placer
Qualifications Passed the Licensure Exams for Jr. Geodetic Engineer

Computer Literacy STAAD-PRO 2005/2007,SAP 2000, ETABS Ver. 8,
Primavera Proj Planner P3 & P5.0/P6.0, Pertmaster Risk Analysis,
Primavera Expedition/P3e Enterprise / Sure Trak Project Manager
Microsoft Project Prof./ Excels / Word / Microsoft Point

Professional Experience
(As Project Manager, Design Manager, Civil - Structural Engineer, Lead Planning Engineer)

COMPANY: CHIYODA –HYUNDAI CONSORTIUM
Project: Qatar Pearl GTL-FGP Project
QPG Site Office, P.O. Box 12051
Ras Laffan, State of Qatar
Dates - From June 11, 2008 to Present
Position - Lead Scheduler /Assistant Planning Manager
Duties - Work as Area-C Lead Scheduler / Asst. Planning Manager; planning and scheduling on the procurement, construction, pre-commissioning and commissioning of Feed
Gas Preparation Unit(FGP) that will support and feed gas to main GTL /LNG Processing Plant.
- Planning and scheduling the interfacing works within the areas of the GTL / LNG
Processing Plant (Total of 9-Contract Package Areas in the Plant)
- Monitor project progress using the computer softwares, i.e.,CPMS (Construction Progress Monitoring System), and Primavera Project Planner(P3.1 & P6 version)

COMPANY: CONSOLIDATED CONSTRACTORS COMPANY W.L.L
Project: Rabigh Independent Water Steam Power Plant Project (Rabigh WSPP)
Rabigh Olefins Plant Project (Ownwer: PetroRabigh)
Rabigh, Saudi Arabia
Dates - From October 20, 2006 to February 15, 2008
Position - Lead Planning Engineer
Duties - Work as Planning Head - Mechanical Section, supervising and managing group of planners/schedulers for the planning and scheduling on the procurement, construction, pre-commissioning and commissioning of Steam Power Plant (9-
Boilers/9 x 390 MW Steam Turbine) and Desalination Plant that will generate power and water supply for Rabigh Olefins Petrochemical Plant.

COMPANY: SAMSUNG HEAVY INDUSTRIES
Project: PM2 / Production Div. 2 / Fabrication Shipyard Dock 3
Jangpyeong, Geoje City, South Korea
MODEC STYBARROW FPSO LNG Project (from Jan.'06 to Aug. "06)
LUNKOYE(LUN-A) Topside Sakhalin II,
Phase 2 Development Offshore Project (from October 2005 to December 2005)
Dates - From October 7, 2005 to August 24, 2006
Position - Planning Engineer
Duties - Planning and scheduling of FPSO and Topside Construction i.e., from Basic
Engineering Design, Construction Drawings, Procurement, Production /Fabrication
(Cutting, Outfitting & Hull Assembly), Construction(Blocks Assembly and Intergration),
Test/Commissioning, and Delivery.
- Planning and scheduling for the mechanical completion works (MC Packages) & Commissioning of the fabrication and installation of LUNKOYE (LUN-A) Topside for Sakhalin II Phase 2 Dev. Project.

COMPANY: RANHILL PETRONEEDS JOINT VENTURE
RANHILL ENGINEERS & CONSTRUCTORS SDN BHD
21th flr Empire Tower, No. 182 Jalan Tun Razak 50400
Kuala Lumpur, Malaysia
Project: Melut Basin Oil Development Project (Upstream)
Four(4) Pacakge Projects are: Palogue Field Production Facility / Al Jabalayn Central Production Facility / Operation Base Camp /Produced Water Pipelines -250 Kms & Raw Water Pipeline Project (45 Kms) & 8MW Combined Cycle Power Plant, located in Palogue & Al Jabalayn, Khartoum, Republic of Sudan
Dates - From August 1, 2004 to September 15, 2005
Position - Project Control Engineer / Planning Engineer
Duties - Work as Lead Project Control / Planning Engineer for the Four(4) Package
Projects which includes planning and scheduling, contract management, coordination, monitoring, setting up controls for the engineering, procurement, construction and commissioning (EPCC) of upstream crude oil production (dewatering/pre-heating/chemical treatment) facilities for Al Jabalayn Central Processing Facility(CPF) and Palogue Field Production Facility(FPF), and other utilities such as the Power Plant (8MW Combined Cycle), Water Treatment Facility, Raw Water Pipelines & Produced Water Pipelines, and Operation Base Camp.

COMPANY: YANBU STEELCOMPANY (Formerly PDM - SAUDI ARABIA)
P.O. BOX 30075
Madinat Yanbu Al Sinaiyah
Kingdom of Saudi Arabia
Projects Involved: Different Saudi Aramco Projects such as Medina Bulk Plant Project,
And many Other Tanks Constructions for Bulk Plants & Tank Farm
Projects; Jubail United Petrochemical Plant(JUPC) Projects; Saudi
Arabian Fertilizer Company (SAFCO) Projects, Arabtank Terminal Ltd,
Saudi Arabia Mobile Refinery (SAMREF), Saudi Yanbu Petrochemical
Plant (YANPET), Gulf Farabi Petrochemical Company,etc
Dates - From May 14, 2003 to May 14, 2004
Position - Scheduler / Estimator
Duties - Planning, scheduling and setting up cost control on the fabrication (pre-engineered)
and construction of different storage tanks and its appurtenances, pressurize vessels, drums & internals, piping lines and structural works for petrochemical plants, oil refinery, desalination plants, etc.
- Estimates, quantity take-off and cost estimates, cash flows, schedules, manhour cost estimates, equipments utilizations, prepare vendor documents, and other sublet documents, etc. of different storage tanks (plate / structural materials & other tank appurtenances) such as Naptha Storage tanks, Kero Tanks, Diesel Tanks,etc.

COMPANY: ICC-IMPSA CONSTRUCTION CO. / CBK POWER LTD.
Caliraya-Botocan-Kalayaan Hyrdroelectric Power Plants Project, NPC Compound,
Kalayaan, Laguna, Philippines
Project: The Build, Rehabilitate, Operate, Transfer (BROT) & EPC Project
Caliraya-Botocan-Kalayaan Power Plants Complex
National Power Corporation
Dates - From April 3, 1999 to July 31, 2002
Position - Design Manager (Civil-Structural) / Sr.Civil-Structural Engineer
Duties - In-Charge of all the detailed engineering design for the rehabilitation of different facilities of the Caliraya-Botocan-Kalayaan Hydroelectric Power Plants(HEPP), which includes the rehabilitation of Steel Penstocks and accessories from intake to surge tank, then to bifurcator, then to power house; additional steel structures, equipments and transformer foundations, dams and spillways, roads and drainages, bridges, etc.

COMPANY: TECHNOSERVE INT'L CO. /JGC PHILIPPINES
TIC Bldg, 1606 Trade St. cor. Investment Drive,
Madrigal Park, Ayala-Alabang, Muntinlupa City, Philippines
Project: Caltex-Owned - LPG Treating Facilities Upgrade Project,
Caltex Oil Wharf & Pipelines Project,
White Oil Pipelines Project
Shell-Owned - TCCU Fuel Efficiency & Mixed Xylene Project,
HCS Rundown Manifold Project
KERO Hydro Sweetener Modification Project,
NAIA JOCASP Aviation Fuel Storage Project
British Petroleum- Bataan Polyethylene Plant Project
Dates - February 2, 1997 to March 15, 1999
Position - Project Control Manager / Sr. Project Engineer
Duties - In-Charge of the project control engineering on the front end engineering design and detailed engineering design, procurement of the lead equipments & instruments, and management for the above-mentioned projects.
- Review and technical auditing of different designs for civil, mechanical, process, instrumentation, electrical plans and design output based on the internationally accepted standard codes and specifications such as ASME, API STD 650/12F, ACI, AWS, AISC, ASCE, JIS, British Standard (BS) Code / BS 5500, etc.
- In-charge for the preparation of the engineering and construction proposals which includes planning and organizing the proposal team, review of the bid documents, contracts and other bid conditions; cost estimates and preparation of all items included in the Technical Proposal and Commercial Proposal for the proposed EPCC Projects

COMPANY: JGC CORPORATION - SONATRACH
Project: LPG Recovery Project
Hassi Messauod, Algeria
Dates - July 11, 1995 to November 28, 1996
Position – Planning Engineer
Duties - Planning and scheduling on the construction of Administration building, control house, and switch gear building, equipment foundations/pump foundation, gas turbine foundation, tanks & vessels foundations, cable trenches, slab works, and other accessory offsite works
- Planning and scheduling for the construction and erection of equipments such as cryogenics storage tanks, drums, vessels, heat exchangers, coolers, and its stairs and platforms, booster pumps and surge pumps, etc.

COMPANY: CONSOLIDATED CONTRACTORS INT'L CO. (S.A.L.)
Project: Adgas Third LNG Train Project
Das Island, Abu Dhabi, U.A.E.
Dates - February 21, 1994 to January 19, 1995
Position - Project Engineer / Planning Engineer
Duties - Supervision, planning and scheduling on the construction of civil structures and mechanical equipments erection and installations included in the LNG Process Facilities-Train 3, i.e. structural foundations for cryogenics storage tanks, vessels and drums, pumps, heat exchanges, air coolers, air compressors, boilers, gas turbine generators, etc.

COMPANY: OVERSEAS OHSAKI CONSTRUCTION CORP.
Ermita, Manila, Philippines
Project: Ohtsuka Manufacturing and Polytechnic of the Philippines Project, Cabuyao, Phils.
Ciudad Del Sol Townhomes Project, Taytay, Rizal, Philippines
10-Storey Ferguzon Bldg. Project, Ermita, Manila
Dates - September 28, 1992 to October 31, 1993
Position - Project Manager
Duties - Management, supervision, design and construction of the manufacturing facilities such as the production bldg, administration bldg, canteen bldg, generator house, and warehouse bldg for the Ohtsuka Manufacturing & Polytechnic of the Philippines
- Management, supervision, design and construction of the subdivision, i.e. land development and earthworks, housing units, roads and drainage, bridges and river rip rapping, elevated water tank, deep well drilling, water distribution system, and electrical distribution system for the Ciudad Del Sol Townhomes
- Management and supervision in the construction of the ten (10) storey building from bored pile works, foundation works, concreting and rebars works, plumbing and architectural works

COMPANY: OHSAKI CONSTRUCTION CO. LTD / TAIYO CONST.
Yoyogi, Tokyo, Japan
Project: Fourteen (14) Storey Lions Mansion Condominium Project
Higashi, Chiba-ku, Japan
Dates - September 6, 1991 to August 27, 1992
Position- Asst Project Manager / Trainee
Duties - Site management and supervision and assist the Japanese Project Manager on the management for the construction of the fourteen (14) storeys Lion Mansion Condo-
Building.

COMPANY: TRESTECH DEVELOPMENT CORP.
No. 51 Gil Puyat Avenue Cor.Dian Street,
Makati City, Philippines
Project: Nabua Public Market Project, Narvacan Public Market Project
Narvacan Storm Drainage, Roads & Bridge Construction Project
Dates - February 7, 1990 to August 30, 1991
Position - Project Engineer /Structural Engineer
Duties - Overall supervision and management, inspection and monitoring on the construction of public markets facilities which includes buildings, bridges and main storm drainage roads and drainage, mechanical and electrical system, water tanks and water distribution system, water treatment, oil & water separator
- Structural design of different vertical and horizontal structures based on ASME, (mechanical designs), API STD 650/12F (tankages), ACI (concrete structures), AWS /

COMPANY: PEOPLES RUBBER MFNG & STEELWORKS
No. 40 Asian Road, Canumay East, Valenzuela,
Metromanila, Philippines
Project: Paracale Mines Vents Shafts and Winder House Project
ASTRA Pharmaceutical-Steel Building Project
People Rubber Fabrication Shop
Dates - February 2, 1988 to February 5, 1990
Position - Civil Engineer / Estimator
Duties - Supervision on the erection of structural steel members of ventilation shafts and winder house for the gold mine pits, construction of water distribution pipelines, water treatment facilities and its pipelines, pumps and motors.
- Quality inspection of different shop fabricated steel structures, Steel Oil Well Rigs, Pipe spools & manifold, and fittings, pressurized tanks and vessel, storage tanks, etc. based on ASME CODE Sec. VIII Div. 1 & 2, American Welding Society (AWS), American Institute of Steel Construction (AISC) Code, American Petroleum Institute (API 650/12F) Code, British Codes for Steel Structures & Pressurized Vessels

COMPANY: ENGINEERING EQUIPMENT INC.(EEI) / KUWAIT NATIONAL
PETROLEUM CO.(KNPC)
Project: Mina Al-Abdullah Oil Refinery Project (KNPC-BTC PROJECT )
Fahaheel, State of Kuwait
Dates - December 8, 1985 to December 15, 1987
Position - Field Engineer
Duties - Supervision, planning and scheduling on the construction of civil structures and erection of mechanical / process equipments for the oil refinery / crude desalting and crude distillation unit, i.e., pre-heaters, furnace, feed pumps, reactors, pressurized vessels, drums, fractionators, heat and air exchangers, air fan blowers, booster pumps and surge pumps, and other equipments included in the oil refinery.

COMPANY: ATLANTIC GULF & PACIFIC CO. OF MANILA (AG&P) -KUWAIT NATIONAL PETROLUEM CO. (KNPC)
Project: Refinery Modernization Project / Further Upgrading Project
Mina Al-Ahmadi, State of Kuwait
Dates - November 19, 1983 to August 29, 1984
Position - Field Engineer / Rigger Chargehand
Duties - Assigned in the Erection Section of JGC Corporation- estimates and take-off materials and internal parts for vessel, reactors, heat exchangers, fractionators, drums, tanks, pipe racks, elevated pipelines and pipe spools, etc.
- Prepare materials and accessories needed for the erection of vessels and tanks, reactors and towers, fractionators, air-fan blowers, heat exchangers, condensers, and other equipments included in the oil refinery.
- Inspection, monitor, and supervision on the installation of vessels and drum internal parts, prepare punch list for final inspection and for pre-commissioning.

COMPANY: AG & P – MARINDUQUE MINING & INDUSTRIAL CORP/
NATIONAL POWER CORP/ BATANGAS MARINE FABRICATION YARD(BMFY)
Project: MMIC Coal Conversion/Nickel Mining Project, Nonoc Island, Surigao City
Calaca-Batangas Coal –Powered 300MW Thermal Plants Project
Calaca, Batangas, AG&P Batangas Marine Fabrication Yard
Dates - November 9, 1982 to November 11, 1983
Position - Field Engineer / Draftsman
Duties - Assigned in NPC 300mw Thermal Plants -supervision, planning, scheduling, and inspection for the construction of coal unloading piers and harbor, sea wall abutments, sea wharf and jetty, mooring dolphins and conveyor foundations.
- Assigned in Batangas Marine Fabrication Yard – Supervision, planning of fabrication of floating vessel such as barges, tug boats, ship steel hull assembly and accessories, floating oil rigs, top sides and jackets and other accessories. Supervision on the construction of the desalination pond and water separator, chlorinator house, water treatment pond, and reinforced concrete water tanks.
- Assigned in MMIC-Nickel Mining Project-Supervision, drafting, planning, scheduling of the construction of FOSTER WHEELER boiler and structural steel house, burner piping, and soot blower piping/ boiler parts.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 151 to 200 of 1119)Go to Search Parameters...
Brief Description
I am a master electrician with 35 plus years in the management of large construction projects. I have over three years experience working in Iraq, working with many different cultures and in adverse conditions.
Twenty five years experience in ten manufacturing sites with four integrated major and three independent oil companies. Responsibilities include Unit Operator through Refinery Manager, and span operations, maintenance and technical departments. Steady promotion and career growth.
SAP knowledge,Material engineer,controller.Thorough knowlege of Isometric drawing,fabrication,material manual,and inventory.oil and gas field,gulf and offshore experience.
Crawler Crane Operator
Over 6+ years experience in Content Management. Professional Proofreading, Editing, Writing, Documentation using various editing tools as Framemaker, Latex, MS-Word.
HSE-Process Safety Manager/Specialist with wide experience of petrochemicals HSE management, PSM (Process Safety Management) including Permit to Work, Accident Investigation, etc., Environmental Management System/ISO 14001 implementation, Capital Projects Safety, Environment, and Fire protection
My major responsibilities are Core Photography, Core Slabbing ,Core reservation and Storage Services ,Lithology rock description ,Real time monitoring of drilling parameters, preparation of formation evaluation logs, identification and classification of samples
.
Operate excavter and haul trk experiance loading haul trks as well as some dozer exp also have Pa class A CDL
B.S Industrial Engineering capable of Production Planning and Controlling
Hardworking and sincer attitude. I am graduate in commerce stream.
Over 25 years of progressive mining industry experience with significant achievements in management of mine development, engineering and operations. Proven track record of delivering results and affecting change.
As an experienced civil/Building engineering (more than twenty years) I am willing to participate in your construction projects.
20+ years of international experience in the study, process design, engg., procurement & project management & operations. Having led multifunctional teams for EPCM for hydrometallurgical( Leaching, SX-EW), benificaition & pyro( Smelter & Electro refining) for copper, Cobalt, zinc and lead metals.
Deck foreman/Rigger
Discovered 2 World Class & 2 Medium Size ore deposits - base and precious metals, gold, platinum, iron, open pit, under developed contries, Spanish, Portuguese, English, reg mining engineer & geologist USA & Brazil, Central & South America, Africa, Amazon, excellent Vice President, General Manager
Hands on
-Primavera Scheduler -SAP Experience -MS Office SME
Quantity Surveyor (Civil OR Joinery), Site Supervising, Read Drawings, Design for Interiors, Computer knowledge.
I have wide experience (more than 22 Years) in Maintenance & Project field in Ammonia Refrigeration Plant, ice-cream, Dairy & Pharmaceutical Industries.
Heavy Equipment Operator
20+ years of experience working in Materials Management, Inventory Control, Materials Planning Scheduling & Logistics, in both home office and field site locations on the construction of large petrochemical plants, natural gas plants, electrical power plants, and mining facilities.
Hardworking, motivated and responsible individual with 4 years experience in construction and operating heavy equipment currently seeking a rewarding opportunity within a reputable company. Current Class 5 Operator’s License. Seeking a Class 3.
Open Pit Slope Design, Tailings Dams, Plant Foundation Investigations, Earthworks
Diploma in Mining Engg, AMIE Sec A&B in Mining Engg from IEI.
-Planning and scheduling using Primavera Project Planeer P3.1 &P6, Microsoft Project Professional / Structural Engineering Design Using Computer Softwares such as STAAD-PRO 2007, ETABS, SAP2000
Experience, professionalism, skills, physically fit, able to work long hours in tough environment and stressful conditions, availability for traveling abroad.
Seeking position as HSE/Training/Emergency Management for Petrochemicals or Refinery Operations
Transformational Human Resources Manager with strong business orientation and multi-site experience in a broad range of HR Generalist functions including recruiting, staffing, talent development, HRIS, organizational development, staff management, and many others.
LARGE AND STRATEGIC PROJECTS MANAGEMENT - BUSINESS AND OPERATIONS MANAGEMENT
Senior mining professional with global risk management experience identifying and managing risk in mining operations and related construction projects
Graduate Mining Engineer with MBA & First Class Mine Manager's Certificate having 22+ yrs. Hard Rock Large Highly mechanised hands on experience in Mine Operation, Drilling & Blasting, Mine Planning, Contracts Management, Waste Dump & Haul Road, Mine Dewatering
12 years experience in all aspects of telecommunications. Excellent written and communication skills. Highly organized. Ability to work on multiple assignments. Excellent problem solving skills. Able to meet deadlines and schedules. Start of to completion of projects to include ordering, insta
Motivated, proven performer with a 17 year record of demonstrated success in Operations Management, Project Management, Distribution/Logistics Management, and Mechanical Engineering across multiple fields from Military Operations, Municipal Management, Telecommunications, Software Development, Call
Versatile geoscientist/hydrogeologist with over 18 years professional experience. Looking for challenging and exciting opportunities world-wide. Fields of interest: groundwater resource exploration, development and management; groundwater/hydrogeological characterization and modeling.
E&I Superintendent with a broad spectrum experience of electrical, instrument, and mechanical engineering acquired throughout a thirty year career. 27 years of my experience represents working directly for the Client within the O&G industry, on multi-discipline task force projects, including PMT.
Nineteen (19) years experience in the construction industry including two (2) straight years in Saudi Arabia with an outstanding performance. Exposed to various fields (Construction of Roads & Bridges, Hotel, Residential, Commercial and Industrial buildings including Oil & Gas Industry) in Civil En
Professional Engineer experience in cleanroom design, construction, installation, testing and commissioning of cleanrooms (HVAC and architectural) for semi-conductors, pharmaceuticals and laboratories.
I have over ten years in the asphalt plant field. I am willing to relocate to just about anywhere in the world for the right job
Free! As a thorough and outgoing leader known for getting the job done, I am committed to the highest performance and standards. I draw out the best in others, bringing quick resolution to challenging situations. I take good care of my teams, treating them with respect and training them for success.
Seeking full time employment with a construction company who is need of a Loader Operator. Doesn't matter where I'm willing to move.
Master's in Engineering and MBA + 28 years Global Multidiscipline Projects Engineering Management Experience
Global Sourcing, Program Management & operations management specialist with over 16 years of experience with ITES Consulting (4 years plus) & manufacturing industries (12 years. Contributed to improve profitability of various business organizations through “Spend Management” & “Supplier Relationship
Experienced construction project manager with a finance and business management background.
Instrument Supervisor
Over 20 yrs of exp in upstream O&G. 7yrs offshore, from construction of offshore platforms, hook up and commissioning through to start up and steady state production. Strong HSE focus (previous role in charge of offshore platform), strong hardware completion and handover exp. LNG experience.
OBJECTIVE To obtain a Full Time Position as a Project Manager, Construction Project Manager, Site Manager, or Site Superintendent in the Wireless Industry.
BS Chemical Engr. with 15 years onshore/offshore oil/gas production engineering support, facilities planning and design, capital project development and economic evaluation, operations, process simulation/optimization, commissioning, construction and maintenance. Also trained young Saudi engineers
•Extensive ex-patriot experience in international, supply chain, logistics, inventory management, and project management across Asia, China, and Europe.
Situations that may be transformed to improve define the main objective of my professional profile, problems that demand critical analysis, evaluation of variables, and proposition of novel solution strategies to overcome them. I am much motivated, well prepared, and ready to learn more everyday.
1   2   3   [ 4 ]   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23  
Seach Parameters

Change search parameters...
CATEGORIES: Operations;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com