1.Senior Welding Inspector International Certification - CSWIP 3.2 -TWI, UK
2.Welding Inspector International Certification - CSWIP 3.1-TWI, UK
3.Welding Inspector Certification by MIGAS- B4T-Bandung, Indonesia
4.NDT International Certification - Radiographic Interpreter PCN RI Level-2 – BINDT, UK
5.NDT Certification International UT, MT&PT ASNT Level II - Certified by ASNT Level-III
(ID 145394)
6.Cathodic Protection Level 1-Engineer by CSWIP International Certification
7.Piping Inspector International Certification API-570 Certified By MIGAS
8.Aboveground Storage Tank Inspector Training International Certification API-653
Certified By MIGAS
9.Remaining Life Assessment (RLA/RBI) special for Refinery Inspector International
Certification
10.Coating Inspector - INDOCOR Level-1 and Level 2
11.Auditor (Quality Management System ISO 9001: 2000 – RABQSA)
12.Drilling Supervisor W203-IADC WellCAP (Well Control Accreditation Program)
International Certification or Well Control School for Drilling
13.BOSET (Include HUET, Sea Survival, Basic Life Support, and Basic Fire Fighting),
Safety Training International Certification
14.Confined Space Safety Entry & Permit to Work Certification by British Safety Council &
IKS
B. EDUCATION BACKGROUND: PETROLEUM ENGINEER TRISAKTI UNIVERSITY IN INDONESIA
C. SUMMARY OF QUALIFICATIONS
Having more than 12 (twelve) years Experience at Oil & Gas Company, Fabrication, EPC (Engineering Procurement Construction), Petroleum, Refinery, Petrochemical and Chemical Company for Construction, Engineering, QA/QC Department. Responsible Supervision, Engineering, Inspection, Expediting & Purchases. During The Time I Have Experiences for Position QA/QC Engineer & Inspector (Welding, NDT, Piping, Structure, Mechanical, Painting, Storage Tank, E&I Inspector) Construction Supervisor and Field Engineer of Fabricated and Installation or Hook Up Jacket, Module for FPSO, Module for LNG, Pipeline, LNG Plant and Refinery, Demolition, Restoration & Modifications Platform Onshore & Offshore Fabrication Oil and Gas Project.
D. SKILLS:
* Knowledge of Construction Activities, Work Pack, QA/QC Inspector/Engineer, Production
Engineer
* Knowledge of windows Application, Microsoft Office, Corel Draw, Adobe, Auto Cad,
Photoshop and Internet research
* Excellent in English both oral and written
* Knowledge of Code ANSI, AWS, API, DNV, ASTM, ASME, BS, NACE, DIN, JIS, AWWA, ISO, NEN,
NFPA, etc.
E. PROFESSIONAL WORKING EXPERIENCE
1. Period: Augustus 05th, 2008 – Dec, 2008
Company: DPS Bristol (M) Sdn Bhd
Position: QC Inspector
Project Description:
: RUBY FIELD DEVELOPMENT FPSO PROJECT – VENDOR FABRICATION in Singapore
For Fabrication GAS LIFT COMPRESSOR & DEWPOINT PACKAGE at East Asian Energy
Fabrication AIR COMPRESSOR at GLOBALTECH Fabrication, CONDENSATE SUB
COOLERS at HEATEC JIETONG Fabrication, RUBY COMPRESSORS Engineering Design by FLOTECH and Fabrication at MTQ Vendor Fabrication in Singapore (Onshore).
2. Period: June 05th, 2007 – July, 2008
Company: TANKER PACIFIC OFFSHORE TERMINALS PTE.LTD
Position: QA/QC Multi Discipline Inspector
Project Description:
: COOGEE MONTARA DEVELOPMENT - FPSO PROJECT- Fabrication of 13 Modules
Top Side at Global Process System Pte.Ltd (GPS), Batam Island –Indonesia (Onshore)
and Hook Up Top Side, Fabrication Interface Module of FPSO, Fabrication Utility &
Facility of Marine-FPSO at Jurong Shipyards. Pte.Ltd.- Singapore (Onshore & Offshore).
3. Period: October 01th, 2005 – May 30, 2007
Company: FOSTER WHEELER WORLEY PARSONS JV
Position: QA/QC Verification Inspector and Construction Supervisor
Project Description:
: WOODSIDE ENERGY NWS LNG Phase V Expansion Project - Fabrication of 77 Module
LNG Refinery at J. Ray McDermott Batam Island, INDONESIA (Onshore) to be installations in of Burrup Peninsula, Karratha Northern Australia.
4.Period: March 7 th, 2005 – September 28 th, 2005
Company: UNOCAL INDONESIA / CHEVRON INDONESIA
Position: Field Engineer & Construction Supervisor
Project Description:
: Chevron Indonesia-Melahin & Kerindingan Platform Project - Demolition, Restoration,
Hook Up, Installation and Repair Piping, Structure, Vessel, Mechanical and Installation
Pipe Line at Melahin & Kerindingan Platform–East Kalimantan Sea, Indonesia (Onshore &
Offshore).
5 Period: Jan 07th, 2005 – March, 2005
Company: PETROSEA/CLOUGH OFFSHORE
Position: QA/QC INSPECTOR (Structure, Piping, Mechanical, Welding, NDT & Painting)
Project Description:
APN Development Project ( Brownfield ) – BP West Java Ltd:
Installation and Hook - UP Module 1,2,3 & 4, Installation Mike-Mike's Cooler MMC-C-001-BX
& MMC-C- 001-AX, Mike-Mike Flow's Cooler MMF-AX & MMF-BX, Modification and Installation Piping Systems, Structure and Riser Pipeline for Mike-Mike (MM) Platform at Ardjuna Field – West Java Sea, Indonesia. (Onshore & Offshore)
6. Period: February 8th, 2004 – Jan, 2005
Company: PT. IKPT ( Inti Karya Persada Tehnik )
Position: QA/QC Engineer/Inspector (Structure, Piping, Mechanical, Welding, NDT &
Painting)
Project Description
: 1. Flare Gas and Hydrogen Recovery System Project– Refinery NEDO UP V Pertamina"
Balikpapan –Kalimantan, Indonesia (Onshore)
2. BETARA COMPLEX DEVELOPMENT (BCD) PROJECT PHASE 3- Plant & Pipelines
Project, PetroChina International Jabung Pte. Ltd. Tanjung Jabung-Jambi Sumatera,
Indonesia.(Onshore)
3. TUBAN AROMATICS PROJECT- Plant & Pipe line for Project Trans Pacific Petrochemical
Indotama (TPPI). Tuban-Surabaya (Onshore & Offshore)
7. Period: December, 2003 – February, 2004
Company: PT. PARANADA EKAYASA
Position: QC Inspector (Piping, Pipeline, Structure, Mechanical, Welding & NDT)
Project Description: Pipe Line Project South Jambi "B" SHALLOW GAS PROJECT - CONOCOPHILLIPS" Dia. 8" x 17. Km Flow Line Teluk Rendah Gas Plant- Geger Kalong 4 Field Riser and Dia. 6"x 2.4 Km Geger Kalong 4 Well Head- Geger Kalong 3 Well Head and Construction, Installation of Gas Plant at Geger Kalong Teluk Rendah South Jambi, Sumatera-Indonesia. (Onshore)
8.Period: February, 2002 – December, 2003
Company: J. Ray McDermott
Position: QC Inspector (Structure, Piping, Mechanical, Welding and NDT)Fabrication
Project
Project Description
: 1. ConocoPhillips Belanak Field Development-FPSO Project, Fabrication at J.Ray Mc
Dermott Batam Island, Indonesia (Onshore)
2. JVPC Project-Vietnam, Fabrication Jacket and Topside at J. Ray McDermott Batam
Island, Indonesia (Onshore)
9. Period: December, 2000– January, 2002
Company: PT. GEOSERVICE. LTD
Position: QA/QC Engineer/ Inspector
Project Description: Repair Platform, Riser Platform AW&BW Project and Repair Jack Up – Jack Rig Taurus Platform Project at Madura Sea-Offshore, Java- Kodeco Energy, Co.Ltd.(Offshore)
10 Period: Augustus, 1999 – November, 2000
Company: PT. GEMILANG ENGINEER
Position: QC Inspector (Pipeline Project – Offshore)
Project Description
: Maxus Southeast Sumatra B.V- Sub sea Pipeline Installation Project - 16" x 12.7 mm Pipeline Installation North East Intan A to Intan BPC, 16" x 12.7 mm Pipeline Installation Krishna A to Krisna B, 16" x 12.7 mm Pipeline Installation Widuri B to Widuri C, And for Project Pipeline at Krishna Field, Intan Field and Widuri Field –Offshore Maxus-Sumatra Sea-Indonesia (Offshore)
11 Period: January, 1998 – July, 1999
Company: PT. WIJAYA ENGINDO NUSA
Position: QC INSPECTOR (Welding, Piping, Structure & NDT-Onshore)
Project Description:
1. LNG BONTANG TRAIN-H EXPANTION PROJECT - BONTANG, EAST KALIMANTAN INDONESIA.
2. LNG BONTANG. Turn- Around Warranty Project for Train "G" project,BONTANG, EAST-
KALIMANTAN INDONESIA
12. Period: February 1997 – January, 1998
Company: PT. CITRA BUANA INDOLOKA
Position: QC Inspector/ Engineer for Integrated Drilling Service Inspection–(Onshore
Offshore)
Job Description
1.Fabrication, process for threading pipe and Equipment for drilling & production
* Drill Pipe Ø 5" OD PPF 19.5 thickness G.105 R.2 IEU Specification 359
* Threading Casing / Tubing and Coupling
* Float Shoes to Casing, Stab-in Float to Casing, Casing Hanger to Pup Joint
* Wire line equipment, Fishing tools, X-Over, MPA Packer and Drill pipe, Reda pump, Drill
Pipe, Well head and Christmas tree equipment, Casing, Tubing and Protector, Rock Bit,
Control Valve
2.Integrated Drilling Service Inspection – RIG SRD # 66 (Mobile Rig RR 550 Rig Ranger –
Skytop Brewster 110 Ft 550 HP)
PT. Elnusa Drilling Service, EDS Yard, Prabumulih, South Sumatra – Indonesia
* Check to the document e.g. inventory data sheet, specification, certificate and internal inspection report, Witness rig-up and rig-down Mobile Rig RR 550 Rig Ranger
* Perform visual inspection of main mast + "A" frame substructure, substructure, carrier rig, hoisting system, rotating system, circulating system, blow out preventing (BOP)
system, engine, operating station and safety device
* Inspection & Make Surveillance report and NCR 's to finding all fabrication report to
QA/QC manager and Client representative
F. DUTIES AND JOB DESCRIPTION
1.QA/QC Engineer and Inspector for Welding, NDT, Piping, Structure, Pipeline and
Mechanical
Duties and Job Description:
* Review contract doc, specifications, procedures client etc...
* Review inspection and testing plant ( ITP ) for ITP piping, ITP structure, ITP
pipeline and ITP mechanical
* Check & review drawings - P&ID (Piping & Instrument Diagram), piping plant, isometric drawing, structure drawings, pipe support drawing and pipeline drawing )
* Prepared, check or review works pack & GOC (Guidance On Certification) to mechanical, piping, structure or project executions plant is a process that has been developed as a result of Engineering Technical Integrity into the design, drawings, planning, certification, construction, commissioning, maintenance and operational activities of a facility
* Check & review installations schedules project
* Knowledge, check & review task risk assessment, ensure extent of hazards and minimize risk by appropriate, measure as stated in TRA Level.1and 2, JSA, work permit, TRA
procedure
* Prepared, check & review doc calibration equipment in use project specification
* Review WPS & PQR according with standard are used (piping according to with standard
ANSI B 31.3 (328.2), ASME Sec. IX, structure according to with standard AWS D.1.1 Sec.
5.2, pipeline according to with standard ANSI/ASME B31.8, DNV OS-F101 & ASME Sec. IX)
* Conduct welder qualification or recruit welder who has valid qualification to the approved WPS, witness Welder test & review welder certificates
* Review & check procedures NDT according with standard AWS D. 1.1
* Verify bulk material and inspection receiving material of piping, structure and
Mechanical (rotating equipment of fin fun coolers, motors to fin fun coolers, pumps and static equipment of pressure vessels, exchanger, storage tank & boiler)
* Inspection and verify or ensure correct material grades, dimension, marking, finishing as per requisition, specification, purchase order and or applicable code and
International standard (ASTM, ASME, API, MSS, BS, NACE, AS, etc…)
* Check and verify allocate storage area, ensure suitable protection from damage or contamination, transfer material ID,
* Review material traceability, Inspection release report, and review mill-certificated doc of vendor to piping material according to with requisition, project specification, purchase order, for Consumable Control, Ensure correct batch number, Ensure appropriate storage & issue
* Ensure flange alignments are correct; all stud bolts have equal threads exposed through nuts and Torque up all stud bolts as per bolt torque requirements, in the correct sequence.
* Verify material OS & D raised by contractor due to material deviation and work out with
Field Engineer to solve the problems
* Verify material Carry Over raised by contractor due to material deviation and work out with Field Engineer to solve the problems.
* Verify, Inspection Test and Calibration for Valves ( Pressure Safety Valve "PSV",
Control Valve, etc..), Flow Elements (FE), Pressure Gauge, Thermo Well, Flow
Transmitter, and other equipment E&I
* Inspection, Verify, Review and Make Surveillance report & NCR 's to finding all fabrication and erection about Material, Welding, NDT, Piping, Mechanical, Structure &
Testing, Report to QA/QC Manager and Client Representative.
* Review & Approve Site & Field Engineering Query and FI (Field Instruction), Methods
Statement.
* Review AQIS (Australian Quarantine Inspection Service) specification & enforce implementation in Batam, Conduct and Verify site surveillance to ensure AQIS
preparation requirement is carried out by contractor if required specification.
* Consolidate all surveillance finding and short out for problem resolution and rectification through Project Management.
* Final inspection shipment module as per AQIS (Australian Quarantine & Inspection
Service) procedure to conduct Final Pre-shipment inspection of shipped to ensure fitness to AQIS requirement if required project specification.
* Before Welding Inspection:
- Check & marking Weld number, Welder ID number (stamp number) from Isometric drawing and structure drawing, Welder ID number (stamp number) from welder register, Ensure dimensional check (Circumference, ovality, Straightness, Local Dent, end of bevels, end perpendicularity and Length) of steel structure shall be conform to AWS D1.1
(Structural welding code), Piping shall be conform to ANSI/ASME B31.3 & ASME II
the following tolerance which are mentioned in client's specification, and Pipeline shall be conform to ASME B31.8 & DNV OS-F101
- Pipe spools fit up and Installation: Check acceptable fit up & dimensional tolerance,
Check pipe run alignments.
- Steel Structures fit up and Installation: Check all dimensions on new structure for installation existing structure, Check acceptable fit up & dimensional tolerance.
- Check storage (oven) and check consumables material electrode as per wps used.
- Check Preheat according to WPS.
* During Welding Inspection:
- Check the weather condition and provide the protection in around area welding, check the welding position as per wps used and correct the welder identification
- Check the welding parameters used (Voltage, current, and travel speed as per wps to avoid metallurgical effect on the weld metals.
- Monitoring the preheat maintenance by looking at minimum temperature as per wps used
- Check the consumables condition during welded, check storage and stop welding if the welder using different electrode than recommended by wps or issue the NCR
- Check the inter pass temperature the recommended by wps, Check the inter run cleaning and check for method of cleaning whether by brushing or grinding and the type of tools involve during cleaning.
- Perform visual inspection on the root to ensure the welder produce a sound root and adequate penetration.
- Check the removal condition allowed for distortion control (removal jig and fixture)
- Check safety during welding, Maintain the logbook daily of welding record.
- Monitoring welding habitat (if requirement at offshore installation of welding procedure)
* After Completed Welding Inspection:
- All weld 100% visual inspection, Acceptable reinforcement, Undercutting within tolerance to piping according to with standard ASME Sec. IX, ASME B31.3, Project and
Client Specification and to Structure according with approved WPS, standard AWS D1.1 (
Non Tubular Sec.8.15.1 & Tubular Sec.10.17.1 ) Project and Client Specification
- Weld Traceability Record: Record weld and welder ID (number), Record consumable symbol,
NDT record, Hydro test record, and PWHT record.
- NDT (where required): Check NDT personnel qualification, Request NDT, 100% NDT of tie-
in points/butts with activity by NDT Company, Interpretation film Radiography, and NDT
report.
* In the event of repair:
- Report to the higher authorities regarding the extent and severity of the repair,
Liaise with Engineer for the repair procedure
- Marking or Monitoring of defective are for repair, Carry out the repair of welding as per procedure and check, Verify and Monitoring repeat all activities or duties before, during, and after welding
- Witness and Monitoring the NDT if any, Collect the data and result and submit to higher authorities
* Pressure Testing:
- Review pressure testing is with submit draft test pack for project and client acceptance, prepare test packs for pressure testing, prepare piping for testing as per approved test packs by submitted NDE clearance, prepare piping test clearance record.
- Review, Verify, Monitoring, Inspection and Witness Procedure and Pressure Testing
(Hydro Test, Pneumatic Test), Flushing, Air-drying, Chemical Cleaning Bolt Torque (
Flanges Management), Punch list & Line reinstatement.
- Witness Pressure test piping system with activity by vendor according to with standard
ANSI B31.3 (354.4.2), project and client specification (Pressure Testing Procedure)
- Monitoring and review daily hydro test report.
* Surface Protection (Painting, Coating & Insulation):
- Verify, Monitoring, Inspection surface treatment that is surface preparation painting repair and touch up by paint, according to standard, Project & Client Specification
(Painting, Coating and Insulation), review and monitoring daily coating and painting report.
- Compile all painting report and ensure that all QC documentation are signed off for mechanical certificate to certification documents
- Visually inspect, verify, inspection and monitoring that all surface performed to ensure that proper conditions necessary for painting exist
- Confirm that environmental requirements for blast cleaning are met, Verify that surface preparation and surface profile are met, Verify that cleaned surface has been kept free of contaminant, Verify that storage, mixing, thinning and application of primer, intermediate and finish surface are in accordance with paint manufacture instruction,
Verify that surface not to be coated are masked off and Verify Dry Film Thickness
. Completions:
- Confirm As-Build Condition is Recorded, Prepare, Review & Sign of all outstanding record and issue Release Certificate within doc Completed Punch List & Completed NCR's
- Review & verify with client all works completed successfully and ensure that report/record as per project certification.
- Review & compile all fields piping record for project data books (PDB) or project documentation.
- Check and review PCM (Project Certification Management) system or GOC (Guidance On
Certification), Dossier or Manufacture Data Record (MDR)
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 351 to 400 of 1135)
Go to Search Parameters...
Brief Description
Material Controller/ Expeditor
E&I Construction Supt.,Inspector, Commissioning Eng. 30 years plus experience, in various industries, at various supervisory levels.
Oil & Gas Exploration Project Manager - Spring Creek, Nevada resident - Forest Service, BLM , Tribal, State & Federal liason experience
Instrument Engineer and technician with 27 years experience in design, installation, commissioning, start-up, operations and maintenance of oil and gas facilities worldwide.
12 Years of experience in the Project Management, Planning, Controlling, Production and Material Management
Project Manager, Field Engineer, Commissioning Electrical Switchgear
Free!
Varied and broad experience in construction, on/offshore projects, mechanical & piping, shipping, logistics, materials and QA-QC all mainly in the oil & gas industry for over 35 years. Countries worked: Eq/Guinea-Nigeria-Egypt-Ivory Coast-India-China-Canada-Spain-Holland-UAE-Oman-Qatar-Malaysia-Indo
Purchaing, Procurment, Supply Chain Management, Materails, Inventory
Over 20 Years Industrial, I&E Commissioning Field Service Engineer /Electrical Start-up Engineer
Environment, safety, health, quality, security, international, lean manfuracturing, construction, operation, management
A Buyer /Expeditor with 18 years Gulf experience
I am a hardworking, motivated aboriginal seeking an entry level position on an oil rig. I have obtained certificates such as WHIMS, H2S alive, and standard first aid.
Principal Environmental & Safety Consultant, oil, gas, mining & major projects; EIA, EMS, Environmental risk etc, climate change, HAZOP, HAZID, Safety managment etc experience. Relocating to Vancouver. Has right to live and work in Canada
Instrumentation
I am graduated with M.Sc.Applied Geology with Specialization in Geophysics. I have completed my Internship with Oil and Gas development company (O.G.D.C) in geophysical data interpretation of oil well. I have also worked on different softwares like Golden software (surfer 8), Didger, QuickSyn.
Project Manager - Sales - Technical
Education:B.Tech (Civil), Pondicherry Engineering College, Pondicherry Univercity, in 1997. Skills: AutoCAD, MS Office, MS Project and Primavera. Trainings Undergone: Green & Red Code Accrediation program by CED, JAFZA
Over twenty years of experience
Mining Engineer with 20+ years experience, Supervisor of Drilling Crews, great work ethic, will meet deadlines and bottom line, effective team builder
QA/QC Engineer & Inspector for (Welding, NDT, Piping, Structure, Mechanical, Painting, Coating, Storage Tank, Electrical & Instrument) , Construction Supervisor and Field Engineer
Safety, Health, Quality, Environmental, Waste management, training, investigations, incidents, orientations,contractors, oil and gas, chemicals, construction, hazop, hazards, emergency response, job observations, near misses, safety alerts, hazard communications
Procurement & Supply Chain Management
MS-GIS, International MBA, Fluent english and spanish, basic Arabic
Civil Engineer To render quality service to the company that I may be a contributory factor in achieving the company’s objectives.
Extensive skills in composites, operations management, plant management, as well as manufacturing of high speed offshore vessels.
I have over 20 years in the underground profession and I am looking for some company that can utilize my experience.
Twenty-six years experience in most aspects of oil and natural gas production, processing, and transportation.
High Skills in Plant Management, Maintenance, Engineering, Training &Technical Support.
Project Engineer/ Program Manager/ Controls Engineer
PE in Mining, Environmental & Civil Engineering with 26+ years experience in surface coal mining management, engineering & environmental. I've held positions up to and including Vice-President of Operations. Well experienced in open pit dragline & truck/shovel operations. Well organized.
Project Management, Oil & Gas Industry, Civil Costing, Planing and Estimation
Quailty Coordinator, Welding Specialist, Safety Training Coordinator, Operations Coordinator Prefer Former CIS Russia, Kazakhstan
Professional Qualifications: BE Sales & Marketing Open, City & Guilds Mechanical Technician,ONC Pipe Maintenance & Instillation,NVQ Level I, II, III Quality Auditing,Diploma supervisory management Team Leadership I & II,
Corporate Executive in Information Technology with extensive international experience in Systems/Product Architecture (Analysis & Design), Program/Project Management, Business Continuity Disaster/Recovery Planning, Technical Service Delivery & Support, Technical/Operations Management
Mechanical Technician for oil and gas rotating equipment Electro Mechanic Technician for Domestic and Industrial HVAC Equipment.,NDT UTI and MTI LEVEL – II (Welding non destructive testing),
Apprenticed rigger with vast skills gained over 28 years,qualifications = resin socketing,crane/winch operator deck foreman,lifting gear coding,inspection ,certification.rig mechanic,rigging instructor
Post Graduate Diploma in Indstrial Engineering, INDIA with past 4+ years exp. in Oil & Gas Industry
Experienced offshore Client Representative and qualified Hydrographic surveyor; with Master's ticket, NEBOSH, MCSE .
Project Management / Inspection / Procurement / Quality Assurance
Power Plants Commissioning , Operation, HRSG Commissioning
over 11 years of heavy equipment operation experience in multiple industries.
Piping Supervisor : Large bore & Instrument pipework/ Oil&Gas/ Nuclear/ Refinery/Offshore and Abroad
Miner
Cost Estimating, Project and Contract Management, Planning/Scheduling, Project Controls and Finance
Free!
Over 10 years Project Management, Engineering and Construction experience, Confident using Autocad, sketch-up, Microsoft office and Coreldraw to complete projects successfully , Skilled in drafting and preparation of shop drawings , A hardworking individual that enjoys new challenges , Can offer sal
Nanagement engineer power utilities oil gas construction
Regional Manager for GSM site construction, Registered Civil Engineer, AutoCADD detail supervisor
Results-Driven Leader/Senior Executive, BS/MS/PhD work ChE, MBA, PE, 25+ years experience
Maintenance, water purification, reverse osmosis, materials, logistics, management
I have 18 years experience in the oil field on drill rigs also have 10 years experience as caterpillar mechanic I have computer, construction,electrical,plumbing skills and I am very safety minded
1
2
3
4
5
6
7
[ 8 ]
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Seach Parameters
Change search parameters...
CATEGORIES:
Operations;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com