Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #81591 next resume »»
CONTACT INFORMATION:
View contact information...

Position: Project Controls Manager
Date of Birth: 27 October 1953
Nationality: British
Qualifications: MBA (Open)
MAPM: Full Member - UK Association of Project Managers (1992)
IPMA: Member: International Association of Project Managers
Summary of Key Experience and Responsibilities

GENERAL

25+ years Upstream Project Controls Management across all stages of Oil & Gas E&P Business Process Life Cycle:

(Feasibility /Technical/Economic/ Risk Analysis, Conceptual Design, Detail Design, Procurement, Fabrication, Installation, HUC and ongoing Asset Integrity Maintenance)

Extensive Client/PMT/EPMC experience in:
Oil & Gas EP Greenfield & Brownfield Fixed Platform, Subsea and FPSO incl development of FDP's, PEP's and EPIC Projects (Planning, Cost Control, MOC and Risk Analysis)

Interfacing Corporate and Project Environments on:
Fixed and Floating hardware with optimal SURF as Asset Solutions for major Operating Companies to enable direct and enhanced hydrocarbon recovery.

PROGRAMME / PROJECT CONTROLS:
Development of:
Work Breakdown Structure (WBS), Cost Breakdown Structure (CBS) Risk Breakdown Structures (RBS), Critical Path (CPM)
Networks for optimising Cost Time Resources (CTR), Schedule / Cost Risk Identification and Risk Mitigation (QRA) models'

Providing the basis for:
Business and Project Control Templates in single and multi-project (Programme Management) environments with varying contracting strategies'

Implementation and Monitoring of
Programme / Project Schedule baseline by physical progress capture, earned value analysis, variance analysis, float trends Predicted Time/Cost over / underruns, resource conlflicts/ saturation and overloads with corrective mitigation of same by resource smoothing and re-analysis of Critical Path at contractually agreed periods with clients or stakeholders

PROGRAMME / PROJECTS PERFORMANCE REPORTING:
Development Implementation and circulation of:
Daily/Weekly/Monthly/ Quarter / Year-end cyclic & close out Programme / Project reports with auditable quality assured (QA) statistics, graphics and textual content as per QMS Reporting Procedures
Corporate audience Level 1 Monthly / Fiscal Year / 2 & 5 Year rolling horizon reports within mission and vision objectives.
Corporate / Project Safety / Schedule / Cost Performance Indicator calculations and reporting.
Contract / Project reporting cycle calendar commitments Textual, tabular and management graphics presentations, facilitated progress / performance / continuous improvement plans

Fully conversant expert user level with:
PRIMAVERA P3,P3/e,P6, Monitor Management Systems (I-suite), ARTEMIS, OPENPLAN (OPP), Microsoft Project 2007, PERTMASTER, @RISK)

Special interest in
Development/ Implementation of Cost / Schedule Integration (C/SCSC) and EVMS methodologies as working Project Management techniques to enhance Project Controls
Services to decision making processes

Sept 2008- Present

WorleyParsons – Singapore
Project Controls Manager (Major Projects)
 Shell LNG
 ExxonMobil SPT (Parrallel Train)
 SRC
Multi- project EPCM Planning, Cost Control & Cost / Schedule Risk Analysis.
Diverse portfolio but only one New Business Development Prospect (SRC) – FID now deffered until 2010
Multiple Subsea FEED studies with acquistion of INTEC
Reporting to Singapore Country Manager and Manager of Projects

Apr 2008- Set 2008 Head of Planning & Risk Management Premier Oil (BV) – Ho Chi Minh City – S.R. Vietnam
Lead Planning & Risk Analysis processes on CAPEX/DRILLEX $1.04BN USD Greenfield WHP + FPSO + Future Subsea Tie-Backs in Development Phase through the Capital Value Process to Sanction Gate and into Execution Phase – this for the Chim Sao Block 12W Prospect in Vietnam.
Produced special Cost / Schedule Risk Analysis (using Pertmaster v.8) to produce p10, p50, p90 cost/schedule reports for Stakeholders to aid investment decision process to Project Sanction and provide Baseline Execution Schedule and Class 3 Cost Estimate.
Planning Management Development Phase and bid selection process to RFA involving 3 EPCI contractors for Fixed Facilities and 5 FPSO Charter Party contractors with optimised SURF and provision for future Subsea Tie-backs
Development of Level 3 Planning CPA Networks in Primavera P6 and Pertmaster for transition from Development to Execution Phase.
Reporting to Development Manager

Senior Project Controls Consultant Carigali-Hess Operating Company – Petronas Towers - Kuala Lumpur - Malaysia
Contract in Kuala Lumpur developing and managing Integrated Planning Team for Offshore Greenfield and Brownfield developments 3 x WHP + Processing Platform retrofit + Subsea Tieback studies (joint - CAPEX ~$1.1BN) within MTJDA (Malaysia Thailand Joint Development Area)
Target Production upgrade from 400mmscfd to 930mmscfd output by Jan 2008.
Also Business Process, PEP and FEED Planning for possible Phase 3 (2007-2012) with subsea tie-back options
Review and Analyses of Contracts programmes and schedule including delay assessments and reporting.
Reporting to Head of Project Engineering and MTJDA Shareholders Committee

Apr 2006 to Apr 2007: Project Services/Planning Manager
Shenhua International / AMEC IPMT – Beijing (China)
Programme Management proposals for new business Dvelopment (4 x LNG Terminals) in China
Planning Management for control of Execution & Implementation Phases of $1.8 BN NCPP (Coal - Syngas – Methanol – Propylene – Polypropylene) Project with aggressive time-schedule constraints - via AMEC (China) IPMT on behalf of Shenhua International.
Use of Primavera P3 for Project WBS, Integrated Planning & Scheduling and also
Reference Convero Project Management System (Cost Planning & Change Control).
Monthly Progress Reporting to SNCG Corporate and AMEC China Regional Directorate.
Managing IPMT Planning Team over Execution & Implementation Phases
Reporting directly to AMEC Project Controls Director
July 2003 – Mar 2006: Senior Project Controls Manager QG2 / Exxon Mobil LNG Project (Japan)
Client International Project Controls Manager Consultant based in Yokohama - Japan
Projects Control of $4.2 BN EPC Contract (2 x 9.8 MPTA Trains) on behalf of QG/Exxon Mobil with CTJV (Chiyoda / Technip Joint Venture)
Planning and Controlling Cost / Schedule on behalf of XOM Business Management Group and Implementation of MOC Processes to monitor scope deviation.
Use of Primavera P3 and SAP JVA for Schedule / Cost Control.
Production of Monthly Report to Venture Management & Excom
Responsible for managing PMT Project Controls Team in Japan
Reporting directly to Business Manager & Venture Controls Manager

Jul 2003 – Jul 2004: Lead Planning Engineer TECHNIP Aberdeen & Cairo for BG Egypt
West Delta Deep Marine Concession - Simian/Sapphire Fields Development NNM Platforms with complex Subsea Infrastucture
Managing schedule-driven EPIC Projects Planning for $750MM subsea (SURF) element of $1.4BN Simian/Sapphire Field Development to recover 800 mmscf/day of Gas in West Delta Deepwater Egypt for Burullus (BG Egypt)
Planning and Controlling Contract Master Schedule on Primavera P3e at Level 3.
Controlling 9 EPIC sub-contractors in Europe, Egypt, Brazil, Mexico and London
Managing Project Schedule/Risk to maintain critical path to 1st Gas 2005.
Using latest Planning techniques proactively as management tool for monitoring forecasting of schedule deviation and aid corrective decision making
Reporting directly Technip / BG Project Directorates (Aberdeen Paris Cairo)

Jun 2002 – Jul 2003
Deputy Head Project Management Services – Shell EP Projects SHELL INTERNATIONAL EXPLORATION & PRODUCTION The Hague
When based in The Hague – Shell Technology Exploration & Production
Projects Management - Cost Planning using P3e and SAP for E & P Upstream projects (mainly Deepwater FPSO & SUBSEAs asset solutions) for Major CAPEX projects ($800MM-$2.8BN USD)
Achieve maximum ROACE across Deepwater EPIC contracts placed by Shell EP. (Major Projects Portflio CAPEX $18BN USD)
When based in Houston - Shell Deepwater Services
Optimal Deepwater FPSO + SURF asset solution for West African Block OML 118
Plan / Cost Schedule & Reporting, Contract Control of Shell Bonga SW Deepwater FPSO + SUBSEA Facility - Base Case was New Build FPSO – Design was Bonga "clone" Topsides, Mooring & Installation with optimised SURF.

Dec 2000 – Jun 2002: Head of Project Planning - Specific Brownfield Projects Wood Group (N.Sea UK & Dutch Sectors) Aberdeen
BP Amoco North Sea Greater Forties Later Life Projects Planning. (SUBSEA solutions)
BP Amoco North Sea Power Project – Development Planning.
NAM HiCAL Fields Gas Evacuation Upgrade Projects – Planning & Cost Control of Integrated Services Contract (EPC) to manage Subsea Field developments obtaining optimal Gas Recovery by upgrades to extend field production life.
Software: Controller for Oracle, Microsoft Project 2000, and MS Office.
Reported to Corporate Planning Manager and Integrated Services Team.

Apr 1998 – Sep 2000: Senior Planning /Cost Engineer HALLIBURTON (KBR) Alliance with CHEVRON / AMEC
Conducted the Planning for CHEVRON ALBA PHASE II refurbishment. (TCE £74mln)
Appointed to accelerate existing CMS to perform time / cost optimisation and completion of contract milestones within Level 1 Field Planning constraints and ensure completion dates were in compliance with offshore hook-up and commissioning programme to meet critical 1st Gas dates.
Software: Primavera P3 v2 for Windows, Microsoft Project 98, and Excel 97.
Also maintained Project /Corporate Performance Measurement indicators.
Reported to Halliburton Project Management and Corporate Planning.
Apr 1997 – Apr 1998: Lead Planning Engineer Consultant TOTAL OIL MARINE / J R McDermott JV (Singapore)
Development of Contract Master Schedule (CMS) Logic, Time & Resources to facilitate Projects Control and reporting mechanism for 2 Fields: TOTAL YADANA Greenfield Surface and Subsea and TOTAL BONGKOT Brownfield developments
FEED Singapore / Fabrication Indonesia / HUC Thailand Bongkot Brownfield -TCE=US$200mln
Planning software: Artemis 7000 v7.6.3, Primavera P3 v2, Excel
Oct 1996 – Apr 1997: Head of Project Planning & Cost Reporting
SHELL / AGIP / SAIPEM JV - Port Harcourt – (Nigeria)
FEED Plan / Cost & Contract Control / Reporting for the Soku Gas Plant Contract in Nigeria. (TCE=US$ 1.1 BN).
Oct 1994 – Oct 1996: Planning Manager NORSKE HYDRO / SHELL / AKER-KELLOGG - Troll Phase II (Norway).
Planning, Control and Reporting on the infrastructure development for Major Process Equipment installation for the Troll Phase II Gas Gathering Plant at Sotra near Bergen in Norway. TCE= 233Bn Kroner (£2.33BN).
Level 2 Contract Control and Level 3 ""working" CMS Development & Control using Artemis 7000. for precedence network analysis and scheduling.
Reported to Norwegian Consortium (Norske Hydro /Shell).
Mar 1993 – Oct 1994: Senior Planning/Cost Control Engineer MOBIL NORTH SEA LTD – (Aberdeen)
Employed to accelerate the development/implementation of IPCS (Integrated Project Control System) to model cost/schedule trends based on offshore man-hour liquidation on Beryl Field Subsea tie-backs and Process Platforms modifications.
The system was designed to model plans at Level 3 on OPENPLAN and use the results of network analysis as the "phasing" element for cost (earned value) reports via the COBRA module providing Project Managers with 'snapshot' trends and forecast over/under runs on time or cost.
Nov 1992 – Mar 1993: Deputy Head of Integrated Operations Planning (OPS/2) BRUNEI SHELL PETROLEUM CO. Sdn Bhd – (Brunei)
Short term contract to initiate new department within Shell Brunei for development and production cross-business function Integrated Plans: - 90-Day Plans/ 2 year rolling horizon Integrated Plans to facilitate 5-year Corporate Plan with specified mission/vision objectives.
Reported to Shell Brunei Senior Management and Shell International Petroleum (SIPM) for Programme Proposal approvals.
May 1990 – Mar 1993 (cont'd):

May 1990 – Mar 1993 Senior Planning Engineering Consultant (FEED) McDermott Engineering (EUROPE) Ltd for SHELL EXPRO (Aberdeen)
Seconded in October 1990 from Shell Expro Northern Business Unit to McDermott Engineering (Europe) after award of Engineering Services Contract (ESC) for Shell Expro Northern Fields in the North Sea.
Subsequent analysis of FEED (Front-End Engineering Design) planning data by developing Business Control Templates using Precedence Logic Networks for: Project Life-cycle models, critical path analysis, what-if scenarios, resource scheduling / optimisation, man-hour / cash flow (S- Curves), progress monitoring /updating and periodic network re-analysis resulting in monthly cost and plan reports production on OPENPLAN

Senior Planning Engineering Consultant
SHELL EXPRO - NORTHERN BUSINESS UNIT (Aberdeen)
Was responsible for all FEED / Detail Design Planning of Shell Northern Fields Platforms Brownfield scopes.
(3month/1year/5 year plans with TCE= £600m). - Interface with Operations.
Development of Corporate Plans to outsource all MMSC functions into an ESC / Joint Venture environment for 5 year asset management programme.
Development and implementation of planning and control procedures.
Responsible to Shell Northern Business Unit Manager.
Nov 1986 – May 1990: Principal Planning Engineering Consultant
TRAFALGAR HOUSE (CJB) - LONDON and GLASGOW
EPIC Project Control - development of BP Bruce Field. Jacket & PUQ Topsides.
Software: Extensive use of ARTEMIS 7000 for precedence network preparation, analysis, updating and reporting.
Responsible to BP Senior Project Directorate.
1981 – 1986: Senior Planning Engineer/ Deputy Planning Manager HOWARD DORIS (STRUCTURES) - SCOTLAND & LONDON
Major North Sea hardware (Jackets & Topsides) construction planning with special responsibility for claims analysis/ preparation and client interface.
Extensive use of ARTEMIS for precedence/arrow networks, logic-link barcharts, CTR catalogues and other documentation specified in ITT (invitation to tender).
1972 – 1981: Planning Engineer BROWN & ROOT Highland Fabricators (Nigg, Scotland)
Planning & Scheduling the fabrication of nodes, pile guides tubulars and other components for inclusion major North Sea hardware.
BP Forties (Alpha & Charlie), Magnus, were the major contracts of the period
.
Computer Skills: Workstation Platforms: Windows Professional / Xp LAN and WAN architectures.

Specialist: Primavera P3, P3/e, P6 Artemis, Monitor i-suite, Openplan/Cobra, MS Project 2007, SAP/R3 (PS, FI, JVA), @RISK, Pertmaster V8.10

Common Operating Environments: Microsoft Office XP (Word, Excel, Outlook, PowerPoint, Visio etc.), Microsoft Sharepoint
E-Mail: MS Outlook, Lotus Notes. Utilising Internet, Intranet and Extranet environments

View contact information...
«« previous resume next resume »»
Search Results (Resumes 51 to 100 of 1130)Go to Search Parameters...
Brief Description
All type of Light & Heavy Lifting & Transportaion job
Primavera Project Scheduler
Hi Please consider my resume for future construction Procurement positions.
OBJECTIVE: To secure a position with a company, long term, that will allow me to use my over 24 years of experience in construction to benefit the company fully.
Experienced project manager in landscape sectors, 25 years practical management experience in commercial and residential fields including high-end, M.Sc. and B.Sc. horticulture, M.B.A. pending
Land Surveyor
Graduate With @.5 Yrs of Sales Experience
Estimator in Interior Fit Out/ Buidling Construction
Subject : Applying for the Land Surveyor post
ERP, Consultancy, Movex, HumanResources Implementation, Payroll Implementation, Managment, Consulting Services, Independent
Construction Manager / Superintendent /Commercial
Multi-talented/Multitasker - Facility / Safety Management, Hazardous materials Paramedic, trainer, Construction/General Industry background, Environmental compliance
Seasoned construction manager with over twenty years of progressive experience in commercial and industrial construction on both U.S. and worldwide projects in the following industries: Automotive, Semiconductor, Chemical, Cogeneration, Commercial Building, Food and Beverage, Institutional, Hospita
Developed and managed concurrent design engineering initiatives, product development/validation, preparation of specifications and operational documents. This includes, power distribution, Air and water treatment, ISO 9000, ISO 14000, NEC, UBC, NFPA and Title V compliance.
A visionary and holistic manager who's widely exposed to sales and marketing, management, operations, distribution, business development, and strategic planning. An exemplary leader with all-round capabilities and have proven track records in increasing revenue, market share, and profitability.
Very dedicated, Hardworking, energetic, creative Tunnelling Operator/Engineer have 11 years experienced in Micro Tunneling. Presently working in Kuwait and willing to relocate anywhere in the world.
I have eleven years of experience in Construction, Oil & Gas industries and in other fields too. Good knowledge in Logistical support, Materials Management, Supply Base Operations, Onshore Coordination and in other logistics aspects too.
Power sector professional with over 20 years of experience in O&M of thermal power plants
20+years of open pit mining and process experience in lime, cement, aggregate and industrial minerals. Registered Professional Engineer, former Director of Operations for a $220,000,000 industrial minerals division. Trained in ISO, Lean, Total Quality Management and other methodologies.
Over Ten (10) Years of solid working experience in the sales and customer service environments for Radiology Equipment & Spare parts, Laboratories Equipment & Accessories, Nuclear Medicine, and QC/QA Test Tools. Maintain excellent customer service skills and a proven record as a top sales performer.
20 yrs exp residential contractor
25+ years Upstream Project Controls Management across all stages of Oil & Gas E&P Business Process Life Cycle:
Selling Skill, IT-Presales, Management
Facilities Construction Planner and Overseer
Free! Program Director Construction Large Projects SE Asia Hotel, Embassy, High Rise, Medical, Retail, Data Facilities, Power, Roads, MEP Thailand Vietnam Korea Philippines
Over 16 years of experience in leadership roles within complex operations, supervising diverse teams and managing challenging programs/assignments within U.S and international locations
Highway Laboratory / QC Manager with 25 years experience in materials
Carrying out surveys of plant & buildings in relation to existing or proposed instrumentation and controls. Writing of reports.
QA/QC Supervisor, Welding Inspector
Highly Skilled Professional
Major skills are in construction and people management
Free! HSE Manager - Value Assurance Manager - Asset Integrity Manager
Logistics 10+ years experience including: Commercial (Mining) project logistics; Humanitarian aid ; and, Military. Transportation & Distribution management; Warehousing; Purchasing. Fluent in both English and French; and computer literate.
• 16years of work experience in India/Indonesia in Welding, QC and Site/Construction management in EPC turn key projects (Polymer, CTA, PTA, and Steel). • CSWIP 3.2 Senior Welding Inspector •ASNT NDT Level III in RT, PT & MT •Computer literate in Project Management tools.
Heavy Equipment Operator with 30 years experience both underground and open pit
-fabrication procedures (elaborate and implement) cutting, rolling, bending, drilling, grinding, welding, visual inspection, etc.-WPS and PQR elaborating in accept with ASME Sect.9 and EN 287+288 -technical drawing analyze for fabrication :assembly, materials necessary, order or erectionWelders/fitt
Drafter, Designer, AutoCAD, Revit, CADD Manager, VB, VBA, AutoLisp, Access database, MS Office
Cost/Budget Controls Manager
Degree Bachelor of Science in Mechanical Engineering
I have 29 years of management and engineering experience. Excellent references available.
30 years experience in civil and horizontal projects
Free! Bosun experience -aboard an ammunitions ship ,underway replenishment tanker in support of the Irag war - 2002 2003. Navy Bosun’s Mate - refrigerated stores ship - fleet oiler 4 years.
Mining Shaft Supervisor, Equipment Operator, Maintenance Supervisor
Professionally qualified and highly experienced mechanical engineer offering 25 years experience in managing electro-mechanical projects and operations & maintenance of real estate properties.
15 years experience in implementation & maintenance of ISO 9000 QMS, Internal Audits, preparing QA/QC procedures, Quality control in construction of Tunnel, sewer/storm water pumping & lift stations, drain & sewer pipelines, Cross regulators/falls, siphons, bridges.
multi skilled engineer
I cut my teeth doing underground Fiber Optic lines in Newport News and have been in the industry since. I've run every underground utility outside of Natural Gas. I have dedicated my life since I was 18 to learning this work and have become well versed in it. I've spent the last year operating the E
Document Controlling, Secretarial,Administration
Civil Engineer, Civil maritime engineer
Seeking Project Engineer or Sr Process Engineer position worldwide based out of Houston Texas
1   [ 2 ]   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23  
Seach Parameters

Change search parameters...
CATEGORIES: Operations;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com