Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #86832 next resume »»
CONTACT INFORMATION:
View contact information...

Career Objectives
Sr Management Position – Projects, Engineering & Maintenance (E & I)
Oil-gas, Petrochemical, Manufacturing & process plants, Green / Brown field projects

Key Expertise

Experience - 16years
Selection, Installation, Operation and maintenance of Electrical HV/LV equipments such as 2 Bay 132 kV switchyards, Transformers, Circuit breakers, Protection relaying, Substation automation, UPS, HT/ LT Motors up to max 15MW, HV DG sets, ATEX duty Motors, Lighting
Ability to review, recognize and analyse Electrical fault level, short-circuit calculations, Load flow, Transient studies, Voltage regulation, Synchronism with local grid, relay curves and settings.

Process Automation: Programming and Operation of CNC, VFD drives 700kW. Siemens S7 and Rockwell PLC. Process Automation, Control valves overhauling and calibration, Robotics.

O&M of HVAC: York / Mcquay Chillers, Package, Centralised AC and AHU of Buildings and Substations.

Role played in E&I Engg & Maintenance
Development or updating the standards, specifications, Drawings, method statement and JHA (job Hazard analysis)
Development and Ensuring implementation of reliability based PM and predictive Maintenance programs.
Up keeping history of equipments and Analyzing MTBF of equipments using tools like Maximo.
Identifying, Troubleshooting and solving problems with viable solution as per standard QA/QC techniques
Review and prepare CAPEX and consumable budgets.
Planning and execution of annual turnaround jobs / major jobs
Interface with third parties (consultants, OEM, Vendors, test agencies) including inter-departments, local authorities
Identify the need of training among staff and ensure its implementation.
Encourage staff for generating "Continuous improvement task" attitude.
Familiar with industrial codes and standards

Role played in E&I Project/Operation Management
Conceptualization, FEED, Feasibility studies, Planning, Execution and commissioning of E&I projects
Prepare detailed scope of work, Equipment selection, cost element, scheduling, team building, HSE management, material resource.
Providing inputs to external consultants/Service providers
Foreseeing and Identifying project risk and opportunities, generating possible solutions.

Projects Handled: Oil-Gas, Non-ferrous metal, Float Glass, chemicals and Cement plants
Completed Major Greenfield and Brownfield projects from start to finish:
1) Recent: OryxGTL Comprehensive E&I Maint+Construction Project Worth US$ 15 Mn Team Leader
2) State of art Klopper mirror plant (Float Glass) worth US$ 3 Mn Team Leader
3) Praxair Inc. World' largest cryogenic plant 6000TPD Worth US$ 50 Mn Team Member
4) Conversion from relay logic to PLC operation (HeavyChemical) worth US$ 2 Mn Team Member
5) Installation of Wagon tippler & stacker-reclaimer (Cement Plant) worth US$10 Mn Team Member

Computer Skills
A-Cad2006, MS Windows, MS Project, Rockwell PLC Software, SAP3, Maximo@ & Procurement@

Salient Achievements
Oryx GTL Qatar Accomplished successfully annual E&I turnaround Feb08 for E&I.
Birla Copper Commissioned and carried out plant performance test with Mitsubishi for 2.4 MTPA smelter plant
Guardian Inc. Reduced Silver consumption of worth US$ 73K by adapting simple techniques at Mirror sprayer.
Taken preventive measure to have DG startup in power black-out and saved US$ 400K.
Praxair Oxygen Inc. Successfully resolved design problem of Surge Arrester in 2X15MW, 11kV motors.

Special Training and Certification Courses
- EDSA training at Larsen and Toubro
- Rockwell (Allen-Bradley) PLC 5/20,5/30 Maintenance and troubleshooting.
- H2S/BA Awareness, CO Awareness, Confined space, Basic fire fighting, Adv First aid
- Signature Analysis - Vibration Technology ( IRD - INTEK )
- HV Electrical Supervisory License
- Chartered Member – Indian Institute of Engineers

Qualification and Personal Info
Education: B. E. (Electrical), 75%, 1991 from Govt Engineering College - Ujjain (India )
Personal: Male, Married, Indian national, 42 years, Two school going children.
Valid GCC Driving Lic: Qatar
Valid GCC Visa: Yes, RP Visa in Qatar with family status, NOC available
Availability Immediate
References Mr. Anirudh Gharote, Head E&I Reliability, Praxair Inc. India ( Anirudh_Gharote@praxair.com )
Mr. SB Mishra, Head Lowerline Production, Guardian glass, UK ( mishrasb@rediffmail.com )

Employment Summary
OryxGTL Project, RLIC, Qatar (Sponsor–Kentech), Dec'06 till date, E&I Superintendent
Responsible for execution of comprehensive maintenance project for Power/Distribution Transformers, 11kV VCB/SF6 CB, meter Calibration, HT/LT Motors overhauling, control valves overhauling, HVAC, Lighting and E&I construction
Prepare/ Review Scope of work, Resource Planning, schedules, Selection of Team, HSE requirements, completion reports and invoicing.
Cost control, Spare parts and material Inventory control, Vendor and subcontractors development.
Accomplished jobs to a major annual turnaround for E&I, HVAC in Feb08

HINDALCO Aditya Birla Group Copper Smelter – India Jan'06 – Nov'06 Manager ( Elect )
Responsible for overall elect maintenance and post startup equipment reliability of 250K MTPA Copper smelter plant, H2SO4 plant and refinery which is comprised of Siemens 45MVA MV/LV Switchgears, Arc Furnace transformers, Wet ESP, HV/LV Motors, 11kV, 7.7MW Motor, 700kW VFD, Transformers and Utilities.
Executed annual shutdown activities and Plant Performance test with Mitsubishi - Japan
Team Management for the strength of 35 Engineers and technicians

Guardian Inc. Float Glass Div – India Jan'00 – Mar'05 Executive (E & I)
Team Leader to accomplish a US 3$ mn worth Project of setting up E&I of Klopper Mirror plant
Coordinated consultants/suppliers to Retrofitting of a 11kV/415V substation to meet load extension requirement
Testing, Commissioning and training on Rockwell PLC, logic sequence, VFD, CNC, Servo drives operations
Associated in Ribbon loss troubleshooting for Hot end (Furnace), Sand beneficiation plant,
O&M of 132kV switchyard, 200kVA UPS, 2X2.5MW 11kV DG with grid synchronizer
Maintenance and troubleshooting on PLC, process automation, control and instrumentation
Developed new techniques to cost saving project of Energy conservation and PF improvement

Praxair Oxygen Inc.- India Apr'97 - Jan '00 Site Elect Engr
IInd Lead Team Member to a Greenfield Projects to setup one of world' largest Oxygen plant
Installation of 50MVA MV Substation with 3 nos 15MW Siemens Synchronous motors.
Review drawings of PID, SLD, short circuit calculations and relay settings.
Installation, testing and commissioning of HV / LV Motors, Transformers, DG sets, VFD, MCC etc.
Spares & Inventory management. Adapting indigenization techniques to reduce manufacturing cost
Installation & maintenance of UPS, EPABX, LAN, PA system, security alarms, EOT cranes, lighting

GHCL LTD- India, Soda Ash Plant Mar '95 -Apr'97 Sr Engineer (E)
- CAPEX -Conversion of electrical relay operations to Siemens S5 PLC for Vertical Kiln operation.
- Preparation and Implementation of preventive and predictive Maintenance programs for HVAC/Electricals.

Birla Cement Works- India Jan '92 to Mar'95 Asst Engineer
Involved in commissioning of Wagon Tippler, Coal Stacker and reclaimer supplied by L&T.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 201 to 250 of 1132)Go to Search Parameters...
Brief Description
Situations that may be transformed to improve define the main objective of my professional profile, problems that demand critical analysis, evaluation of variables, and proposition of novel solution strategies to overcome them. I am much motivated, well prepared, and ready to learn more everyday.
Mechanical Engineer Rotating Equipment, Pumps, compresssors, gas turbines, and diesel engines, Oil & Gas, LNG, Projects
Over 35 years experience in operating heavy equiptment. Can operate expertly all sizes Dozers, Loaders, Pans.excavators on Cats pc235 - pc3855B, Komtasos, pc 400 - pc12507, Hitachi, pc450- Ex1900, Hyundai pc360-R500 , loaders110 Trojan to WA 600 w/ a 20 ton lift, Willing to travel abroad.
Electrical Project Planning Engineer (Primavera P3 & P6) with MBA Degree
Project, Project manager, maintenance, maintenance manager, production, production manager, mining, heavy equipment
Controls Engineer, ControlLogix, Manufacturing Engineer, Engineering Manager, PLC Programming, Robotics, Machine Vision
Mechanical foreman and non-destructiv testing inspector
Front line supervisor, to train the trainer, mine development jumbo lead hand, OH@S,first aid certificate
Marine chief engineer(unlimited)- shipbuilding supt, A team player,good manmanagement qualities,likes to involve in a project from concept to completion within strict time/budget controls.
Need a hot new job - crane operator
I have been working in the mine industry for the past 30 years. Recently reassigned to site services for DeBeers Canada Snap Lake Project. Currently gaining experience on the several sizes of Komatsu loaders, Bobcat, Dozers, Water and Fuel Truck.
Many years of experience, very detailed orientated.
MEP Manager ,MS Office & Internet,AutoCAD,Communication ,Negotiation,Co-Ordination &Organization,Effective Time & Coast Management Skills
Senior Manager looking for a new challenge with expectations of executive advancement upon successful proof of capabilities
Manager of Metallurgy, Process Engineering, Project and Construction Management.
Project Management and Mining Engineering Professional with 19 years experience
I have 35 years experience in the security field.
An ambitious and highly skilled Quality engineer with extensive experience in quality engineering, ISO certification, production, management, product development and launch, and customer support.
Versatile, knowledgeable, exploration geologist
Senior Project Management, Profit and Loss, Project Planning, development and execution. Consultancy in the areas of safety, risk management, and techncal writing and editing. Major contract administration for a multi-national firm in Saudi Arabia on two different assignments.
Approximately 3 years experience in Production Planning, Scheduling & Inventory Control, ERP(BaaN)implementation, Production, Manufacturing, Industrial Engg., Production Management, Process Re-engg., Product Development, Product Costing.
Well-rounded professional office/field experience in project controls, process engineering, environmental engineering, construction, management, sales, and business consulting. Industries: oil and gas, federal government contracting, residential construction.
Former Australia SF; SAS Regt. 19 yrs int'l experience, 3 yrs Regional Manager China & Sth EA. Strategic planner drawing on yrs in difficult & demanding environments.
Sr. Project Controls Planner/Scheduler
Total Experience of Eighteen, encompassing as a professional experience in Project engineering for Major Construction Projects in the Middle East & India.
Over 19 years in Oil and Gas and Petrochemical Projects involved in Mechanical Completions, Pre-commissioning, Commissioning, Operating and Training. I have good experience in Gas Treatment and also have good Offshore experience.
16 yrs Experience in E&I of Oil/Gas/Petrochem/Metal/Cement industires, direct and EPIC
Operation Manager for Corrosion Engineer & Inspector
Logistics and Procurement Specialist
Computer software knowledge: Supervisory Control and Data Acquisition (SCADA) software’s - iNEXUS Pro, - Wonderware inTouch, - iFIX Intellution, Echelon Lonmaker for Windows, LNS DDE, PC literate - Microsoft Office, Windows, VPN – Virtual Private Network and IE
H.S.E. Part 1 Air Diver
Management Professional 20+ yrs exp.
Comprehensive international leadership in Environmental, Health, Safety and Sustainability. Extensive experience in Asia with top multinational firms. Excellent cross-cultural skills in Indonesia, Singapore, Malaysia, Thailand, Philippines and China. Speaks Bahasa Indonesia conversationally.
Planning, Scheduling and Cost Control Engineer
Control & Instrument Commissioning / Maintenance Engineer 01.10.2006
having 5 years expreience in construcion safety, managing toll operation, and also having one year experience with indian army.
Free! I have 16 years post qualification experience as a Project Engineer, project Controls engineer, Cost Engineer, Planning and Scheduling engineer. I have worked both on opeerator's team and contractor side. My experience spanned through deepwater projects in oil and gas industry, EPC projects etc
NEBOSH Health & Safety General Certificate
Mechanical and Production Engineer with 20 years of mechanical design, project engineering and management experience in England, Chile, Argentina, Peru, Cuba, Canada, USA and Australia, fully bilingual in English and Spanish.
Offshore Production Operations & Offshore Construction Operations
15 years of experience in design, technical assistance and consultancy for railways, highways, motorways, bridges, metallic structures, consolidation of slopes, arrangement of platforms. Experience in setting out, cost estimates and materials engineer.
Construction Manager/ Plant Maintenace Manager
I have expertise in general operations, contract administration, budgeting and human resources, among others. I have years of experience working with the public, business owners, managers and government officials. In addition, I have on-the-ground experience in public works, drilling and pipelines.
Project Manager/Manufacturing Manager/Site Safety
Manage the Camp Administration,Team work skill,having attitude to manage.Result oriented & communication skills that to share to others
ETAP Power System, PLC, NEC, ANSI, IEEE, NEMA, IEC, electrical testing & commissioning, Over twenty (20) years of hands-on experience focusing on High Voltage (HV) and Low Voltage (LV) Power Distribution System, project management, electrical engineering design, project coordination and supervision
Experience/Knowledge in: * Classification Survey * Statutory Survey * Ship Operation/Management/Audit * Shipbuilding * Ship Repair/Modification * Ship Design (Computer Aided-2D & 3D, Structural & Mechanical) * Quality/Safety Management & Certification * International Standards * Project Management
More than 15 years of environmental / safety experience in mining industry; 1.5 years of experience in exploration by drilling as geologist; 2.5 years of experience in exploration by drilling as environmental / safety specialist
Business Management professional - travel, tourism, travel e-commerce and travel process outsourcing
A qualified and internationally experienced Mechanical Engineering professional graduated from Kirikkale University (Kirikkale/TURKEY) with a Bachelour of Science Degree in Mechanical Engineering in June 1997 followed by a Master of Science Degree in Mechanical Engineering from Texas A&M University
1   2   3   4   [ 5 ]   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23  
Seach Parameters

Change search parameters...
CATEGORIES: Operations;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com