CONTACT INFORMATION:
View contact information...
OBJECTIVE
To pursue a challenging engineering career under Project Controls / Project Management Cadre in a leading organization of repute to make use of acquired knowledge, skills, abilities, share passion and reveal capabilities, in succession expecting better opportunities for competitive job, career growth path, venue to obtain valuable skills and extend knowledge.
CAREER SUMMERY
Mechanical Engineering Graduate with Five years of project controls experience on EPC / O&M / Shut Down/ Manufacturing projects in Oil & Gas, Petrochemical and General Engineering Industries. Expertise in planning, scheduling, progress reporting, proposal/ tender project planning, bidding, change management, subcontractor administration and contract management with a proven ability to lead and motivate multicultural teams, plan and execute complex programs and provide Clear and accurate reports, statistics and presentations to stakeholders.
ORGANISATION EXPERIENCE
ƒ° Working as Planning Engineer at M/s. Costain Abu Dhabi Company W.L.L, (www.costain.com) since March 2009.
ƒ° Worked as Schedule Engineer at M/s. CTCI Overseas (Thailand) Company Limited (CTCI Corporation) from October 2007 through February 2009 on Project Basis (www.ctci.com.tw).
ƒ° Worked as Planning Engineer at M/s. Gulf Petrochemical Services Trading L.L.C (GPS), Oman from August 2006 to September 2007 on Contract Basis (www.gpsoman.com).
ƒ° Worked as Engineer (Production & Planning) at M/s. Kerala Electrical and Allied Engineering Co. LTD (KEL, ISO 9001:2000 Electromechanical firm, RDSO Approved.) from 18 April 2005 to 15 may 2006 (www.kelindia.com).
ƒ° Worked as Mechanical Engineer (Foundry) at M/s. Kerala Electrical Limited from May 2004 to April 2005.
PROJECT EXPERIENCE
ƒ¶ Buried Pipeline Replacement Project (BPR) ¡V Storex Area Das Island: Complete Replacement of Entire Filling and Suction Pipeline Network for Crude Oil Storage and Export Areas (Storex 15 Nos Cos Tanks), Mechanical and Piping work of 26KMs of 42"/48" Burried Pipelines and associated Pipeline Integrity, Electrical, Instrumentation and Civil Works.
Position: Project Planning Engineer.
Period: June 2009 to till date.
Employer: M/s. Costain Abu Dhabi Company W.L.L (Division of Costain Oil & Gas, Manchester, UK).
Project Title: Buried Pipeline Replacement Project (BPR)¡V Storex Area Das Island, AbuDhabi, UAE.
Owner/Client: Abu Dhabi Marine Operating Company (ADMA-OPCO), Offshore Projects, Abu Dhabi, UAE.
PMC: W.S. Atkins Middle East Inc.
Scope: Engineering, Procurement, Construction and Change Over of Crude Oil Pipeline Networks.
Position Responsibilities on Buried Pipeline Replacement Project BPR¡V Storex (Offshore Brown Field Project):
* Reporting to Construction Manager. Holding interface meeting with discipline lead engineers.
* Schedule Construction/Change over activities to ensure Business Risk based on agreed Tank Outage/Shut Down timings.
* Preparation of Micro Plan, Weekly Planning, Forecast, 3 week Look Ahead and 90 days rolling look ahead schedule.
* Estimate, Plan, schedule, track & control (Construction, Changeover and Commission) by Primavera P6.
* Progress update for Weekly, Monthly Reports, Invoices and Schedule Control. Project Presentation to Mgt/Client.
* Attending weekly, Daily and Project Specific Meeting with PMC/Client and respond to minutes of meeting.
* Coordination with Engineering, Procurement department and Vender to make sure deliverables match site required date.
* Prepare progress control logs for justify Level1-Level5 progress calculation to PMC/Client on weekly / Monthly basis.
* Analysis of fully resource loaded Schedule for Variation, Critical Path Study, time based resource levelling and tracking.*Portfolio Management ¡V Various Prestigious Contract Proposals & Planning Works ¡V Tender Department.
ƒ¶ Portfolio Management ¡V Various Prestigious Contract Proposals & Planning Works ¡V Tender Department.
Position: Planning Engineer ¡V Project Proposals.
Period: Since March 2009.
Employer: M/s. Costain Abu Dhabi Company W.L.L (Division of Costain Oil & Gas, Manchester, UK).
Proposal Project: 1.LNG Plant Overhaul & Tain-3 Shutdown 2009-10 (35days), ADGAS, DAS Island.
2.Integrated Gas Development Project ¡VIGD (Technip/ Costain) ¡V ADGAS, DAS Island.
3.Tank Farm (11+12 Tanks) Refurbishment Project (2009- 2012) ¡V Takreer, Abu Dhabi.
4. Storex ¡V Buried Pipe Line Replacement (42"), ADMA- OPCO, Das Island Abu Dhabi.
5. Cos Tank (3 Nos) Refurbishment Project, ADMA-OPCO, Das Island Abu Dhabi.
6. EPC-Sour Gas Boosting and Dehydration Unit,ADCO, UAE.
7.EPC Fire Water Line Extension & Hydrants Project- ADGAS, Das Island, Abu Dhabi.
8.EPC for Locker Room Building, Takreer Ruwais Refinery, Abu Dhabi, UAE.
9.EPC & Renovation of Workshop Building, Zirku Island, Zadco, Abu Dhabi (ADNOC).
10.EPC - Condensate Diversion Pipeline Habshan Project- GASCO, Abu Dhabi.
11.EPC Flare Modification & Deck Replacement, ADMA-OPCO, Das Island, Abu Dhabi.
12.EPC & Rehabilitation of 19 Nos of Substations(2009- 2012), Takreer Refinery.
13.EPC & Rehabilitation of 2 Nos of Gas Fired Heater, Takreer Refinery, Takreer Ruwais Refinery, Abu Dhabi, 14.Rehabilitation and Roof Replacement of 56 Nos of Equipment Shelters,Takreer Ruwais Refinery, Abu Dhabi,
15. Trim Line Replacement Project ( Train 1,2,3 )GASCO
Owner/Clients: ADMA-OPCO, ADGAS, GASCO, ZADCO, ADNOC,ENOC and Takreer Refinery, Abu Dhabi, UAE.
Scope: Engineering, Proc., Construction & Startup of Projects/ Long Term Maintenance Contracts.
Ħ *Propane De Hydrogenation Project: Hydrocarbon Plant EPCS for Fractionation Area, Reaction Area, Caustic Spent, Flare Derrick, Knockout Drum, Water Tank, ISBL, OSBL, PR, Substation, Control Room, Metering, Offsite Piping, Logistics and Common facilities-480 MUSD, 6.822 x1006 Mhrs, 24x1003 m3 Conc, 580x1003 DB, 4500 T stl, 800 ea equips
Position: Project Control Engineer.
Period: October 2007 to February 2009 (17 Months).
Employer: M/s. CTCI Corporation.
Project Title: Propane DeHdrogenation Project at Map Ta Phut Industrial Estate, Rayong, Thailand.
Consortium: CTCI-Shaw Stone & Webster International Inc.
Owner/Client: Ptt Co. Ltd (HMC Polymers Co. LTD).
PMC: Bechtel International, Inc.
Sub Contractors: CN, PACN, TSS,TWC,TCC,BSP, Emerson, Mammoet, KNM, Petrochem, Sealand,Sunpower,Bitech, TRV, JST, Vipco, Promech, Shedden Udhe (Off-plot pipelines 2",4" & 6" 13.5 Kms).
Scope: Engineering, Procurement, Construction and Startup of Propane Dehydrogenation Plant.
Position Responsibilities on Propane De Hydrogenation Plant Project (PDH):
* Reporting to Project Control Manager and Site Manager. Holding daily interface meeting with discipline lead engineers.
* Preparation of Weekly Planning, Six week and 90 days rolling look ahead. Weekly Schedule presentation to Owner/PMC.
* Estimate, Plan, schedule, track & control (Construction, turnover, to commission) by Primavera P3 V3 (L3: ~8600 acts).
* Review and integrate subcontractors (L3-L5) Spread Sheet/MS Project schedule inline with baseline and suit to P3 Target.
* Plotting of S Curves and Histograms for each discipline/System/WBS key measuring unit's Planned Vs actual progress.
* Prepare control log for Con, M.C, T.O and comm. Conduct time scaled data, Pivot, network, float & deviation analysis.
* Compilation of weekly and monthly descriptive/photo report/presentation/summary reports for progress and forecasts.
* Conduct earned value and critical path analysis, specifying KPI`s and efficiency rating of discipline and project phases.
* Weekly project data collection, compilation of appraisal guide, dissemination of progress report to Projects/Owner/PMC.
* Collating information and documents from Engg./ Proc. and forecast activities/ fixing construction sequence as per DTS.
* Progress update and stage control, align execution schedule by up-keeping of P3 Database and maintain accurate budget and related quantities and cost by timely updating of PES. Chronicling of project period performance on weekly.
* Deliver information about threats to progress, critical path, Problem areas, major issues, Payment milestone, variants solutions and other critical data for formulating/establishing well timed and effective remedial and mitigation action.
* Creating stand alone program for each discipline/WBS to meet Department/Discipline requirement inline with baseline.
* Weekly Schedule Updating, Modifying, maintaining and changing with respect to ECR, FCR, FTR and change of Scope.
* Attending weekly, monthly and specific site progress review meeting with Client, Sub contractors, leaders and dept head.
* Scope Verification and Control, Resource Selection, Cost Control & Valuation, Drawing Control and takeoff measurement.
* Organize conference call, explanation meeting, liaison with client, consultant & subcontractors.
Ħ General Maintenance & Pipeline Integrity Management on Gas Transportation Facilities of Oman Gas Company (20M$).
Ħ EPC for Instrument Gas Backup and UPSS Project: Up-gradation of OGC's 12 Nos of Gas Supply Station (5M USD).
Position: Planning Engineer (Core Team).
Period: March 2007 - October 2007.
Employer: M/s. Gulf Petrochemical Services & Trading LLC (GPS), Oman.
Projects Title: 1. O & M - General Maintenance and Pipeline Integrity Management.
2. EPC for Instrument Gas Backup and UPS System.
Owner/Client: Oman Gas Company S.A.O.C (OGC).
Sub Contractors: IOGS, IMG, Clock Spring, Stopaq, Velosy, TRE, Al Ansari, Arabian LLC.
Scope: EPC, Limited Operation and Maintenance - General Maintenance and PIM over 5 OGC Regions and about 3500 Kms of Gas lines (Whole Oman), Multi discipline Maintenance work on 30+ PRT/PLS/RPLM Station Facilities, 100+ BVS, Spur line extension works, ROW: EPC for OGP Facility/ station extension, EPC for pipeline project, EPC for Hot Tapping and Spur lines & EPC-Conversion Instrument Gas Backup& UPS System.
Position Responsibilities on EPC-IGB & GTF- PIM of OGC:
* Reporting to Project Manager and Corporate Planning Engineer of Oman Gas Company.
* Maintenance Plan - Routine, Nonroutine works Weekly, Monthly, Quarterly & Yearly and updating of project schedule.
* Work study, Site Study and Maintenance estimation for non routine Work ¡V Multi Discipline proposal to Client.
* Project Planning using Primavera & MS Project. Job order updating, Prioritizing, Scheduling and execution.
* Scope Verification & Control, Resource Loading, Cost Control & Valuation, Drawing Control and takeoff measurement.
* Lead Pipeline Integrity Team- Viz. Internal and External Corrosion Monitoring, Coupon Retrieval, Cathodic Protection,
IP Verification, Hot Tapping, Pigging, Auto UT, SCADA, IMG Repair, Pipeline rehabilitation, Grit blasting, coating etc.
* Lead Maintenance Team ¡V Viz. Trap, Valve, ESD device, Launcher, Receiver, Vessel, Separators, Filters, Heaters etc.
* Lead Mechanical Crews - Viz. operating Block Valve Station, Pressure Limiting Station, Pressure Reducing Terminals.
* Lead Civil Crews for Pipe Laying, ROW, Padding, Civil Extension works, Pipe Excavation, Wadi washout works etc.
* Lead Pipe Line Maintenance Crews ¡VInternal and External Coating, Application of GRE Epoxy, Stopaq, Clock Spring.
* Pipeline Integrity works on live line 6", 8", 10", 12", 16", 20",24", 32", 36" and 42" Gaslines total of ~3500 Kms.
* Preparation of Monthly Reports, Weekly progress report, Field Measurement & Test Report and Daily Log.
* Supportive Service on Design, Selection, Procurement, Installation and Commission of Pipeline Equipments.
* Invoicing, abstracting measurement, preparation of bill of quantities & interim running bills and evaluation.
* Attending explanation meeting, liaison with client, consultant & subcontractors. Respond to minutes of meeting.
ƒ¶ Sohar Aluminum Smelter Project - Green Anode Paste Plant¡V Civil & Mechanical Construction (Bechtel, USA & Solios Carbone, France) Paste Plant, Substation, Pot Line, Smelter, Coke Unloading Hopper, Boiler room etc.(2.5M OMR)
Position: Planning Engineer
Period: August 2006 - March 2007
Employer: M/s. Gulf Petrochemical Services & Trading LLC (GPS)
Project Title: Sohar Aluminium Smelter Project ¡V GAPP at Sohar Industrial Area, Sultanate of Oman.
Owner/Company: Sohar Aluminium LLC, Sultanate of Oman.
EPCM Contractor: Bechtel & Co. USA.
Client: Solios Carbone, France.
Sub Contractors: AMA Co. BSE, Behrain, L&T Electromech, Arabian LLC, Al Ansari LLC, RMD Shutters.
Scope: Construction of Green Anode Paste Plant, Liquid
Pitch Facilities, Cooling Tunnel, Boiler Room,
Substation, Coke Silo, Coke Unloading Hopper, Ball
Mill, Green and Backed SiloPipe Racks, Cable Racks,
Coke and Recycled Tower, Pot Line, Settling Tank etc.
Job profile At Sohar Aluminium Smelter Project:
* Reporting to Project Manager and Construction Manager and conducting planning and progress meeting.
* Project engineering- Primavera P3, Estimation, Costing, Planning, Scheduling, Execution, Scope verification and control.
* Creating, Updating and Maintaining Level 1 -4 Master baseline and running schedule. Up keeping of P3 database.
* Develop and compile of Progress Calculation Sheet, Prepare Price Reports for various activities involved in the Project.
* Scheduling of Resource, Material procurement, Inspection, Drawings & Document Control. Work, Time & Cost estimation.
* Implement forecasted resultant trends, smoothening, risk analysis(CPM) and recovery techniques in running project.
* Preparation of delivery, Mob & demob schedules of Equipments, Plant, Men and Material coordination at site.
* Work reporting, updating schedule, preparation histograms, Planned Vs Actual Progress, S-Curve & 3 week look ahead.
* Preparation and Up keeping all reporting requirement of Clients - daily, weekly%, monthly and projects specific reports.
* Abstracting measurements, preparation of bill of quantities & interim running bills, evaluation and Invoicing.
* Attending explanation meeting, liaison with client, consultant & subcontractors. Respond to minutes of meeting.
Ħ Angolan Alternator Project (Angolan Railway): Production of Power Alternators & Regulators (KEL).
Position: Production & Planning Engineer (M/C Shop)
Period: April 2005 - May 2006
Employer: M/s Kerala Electrical and Allied Engineering Co. Ltd. Kerala, India.
Project Title: Angolan Alternator Project.
Client/Customer: Integral Coach Factory (ICF) / Angolan Railways.
Tech Consultant: EVR, France and D&D KEL.
Scope: Design, Manufacturing, Testing, Installation of Brush
Less DC Alternator (BLDC) and Electronic Rectifier and
Regulator Unit (ERRU/RRU) of 12.5 Kw, 25 Kw & 60 Kw for
Rail coaches.
Ħ Regular Production: Production of Heavy duty (Multi Rated) alternator, rotating/static equipments & components, Industrial castings up to 10 T ( Grey & SG Iron) for Indian Railways, ICF, RCF, BEML, BHEL, CGL; Defence, Aviation, Space, Automobile & General Industrial Applications.
Position: Mechanical Engineer (Foundry)
Period: May 2004- April 2005
Employer: M/s Kerala Electrical and Allied Engineering Co. Ltd.
Clients: Railways, BEML, BHEL, ISRO, CGL, HMT, Qetcos; Defence,
Aviation, Power Plants, Automobile.
Scope: Design & Manufacturing of Industrial castings (Automated
& manual), Pulleys, Gears, Machine Beds, DT & NDT testing, patterns, Metallurgy study, analytical services, Soil & Chemical Labbing.
EDUCATION DETAILS
Course: Degree (B.Tech) in Mechanical Engineering.
University / Institute: Kerala University www.keralauniversity.edu
Year of Study % / Class: 2000-2004 (4 Yr)
Course: Post Graduate Diploma in Petroleum Exploration.
University / Institute: Annamalai University, Directorate of DDE, Tamil Nadu, India. www.annamalaiuniversity.ac.in
Electives / Subjects: Occurrence of crude oil, Geological, Physical Explrn.& Drilling, Geologging, Testing for oil/gas Well completion & Production., Resrvr. Modeling & Enhanced Oil Recovery.
Year of Study % / Class: 2004-2005 (1 Yr.) First
Course: Post Diploma in Software Technology.
University / Institute: BSS (Promoted by Govt. of India & Empanelled Agency, Govt. of Kerala).
Year of Study % / Class: 1999-2000 (1 Yr.) 72% First
Course: Diploma in Contracts Management.
University / Institute: National Institute of Labour Education and Management (NILEM ), Chennai, India.
Year of Study % / Class: 2005 67% First
Course: Various Certificate Course in Project Planning and Project Life Cycle Management.
University / Institute: CMCS, Abu Dhabi, UAE (PMI Reg. Education Provider, PAR & PSP PMI-REP1492-102).
S.V Infotech, Quilon, India. Project Control Department In-house Training ¡V Costain, CTCI, GPS & KEL,Oracle University, Dubai, UAE.
Electives / Subjects: Primavera (P6.2.1/P6 Client Server/P5 P4/P3ec/P3.1/P3)
Oracle University Course-Client Server
MS-Project(Release 2007/'05/'03/'00)
Year of Study % / Class: 2003-2009 First
Course: Certificate Course in CADD.
University / Institute: Micronet Computer Education(Authorized Trainer).
Electives / Subjects: Auto Cad.
Year of Study % / Class: 2004 (1 Yr.) First.
Course: Pre Engineering Pre-Degree (10+2). Kerala University.
University / Institute: FMN College, Kollam. www.fatimacollege.net
Year of Study % / Class: 1996-98 (2 Yr) 60% First
Course: 10th STD (SSLC). Board of Public Exams, Kerala.
University / Institute: Govt. Model Boys HS.
Electives / Subjects: Subject of SSLC (Science Group).
Year of Study % / Class: 1995 71%, First
PERSONAL INFORMATION
Age, Date of Birth & Sex: 29, 25-May-1980, Male.
Religion, Cast: Islam, Muslim.
arital status: Single.
Father's Name: Haji.S.Lilar Musaliar.
State of Domicile: Kollam, Kerala.
Nationality: Indian.
Driving License No.: Q 7498/'00, LMV (Indian).
Language Proficiency: English, Hindi, Malayalam and Tamil.
Hobbies: Listening Music, Cricket, Traveling, Computer.
.
SKILL SETS
* Experience in Computerized Office Automation applications viz. MS Windows, MS-Word, Excel, Power Point, Primavera P6.2.1/P6.0/P5/P4/P3, MS-Project V.2007-2000, WinPcs, AutoCAD, MS-Access, Pacer, SAP, CMS, PageMaker, Photoshop, Ideas 8i, Pro-Plan, inventory, store & material Mgt, administration, time keeping application tools & Internet Applications (Excellent in PC Application skills).
* Overall EPCCM project management experience in Pipeline project, Petrochemical and general industrial projects.
View contact information... |