CONTACT INFORMATION:
View contact information...
Position Applied: PIPE FITTER / PIPE FABRICATOR
WORK EXPERIENCES
PIPE FITTER / PIPE FABRICATOR LAMPRELL ENERGY Ltd.
May 3, 2006 – Present Jebel Ali, Freezone P.O. Box 17642 Dubai, United Arab Emirates
- PIPE FITTER in fabrication of spools, erection of pipes on modules and fit up stainless pipes, carbon steel pipes, copper, nickel pipes, galvanized pipes on designated area of modules for offshore projects of Saipem.
PIPE FITTER / PIPE FABRICATOR QATAR SHIPPING COMPANY
October 28, 2003 – September 2005 OPQL – ISND II Expansion PS IK Project
Mesaieed, State of Qatar
- PIPE FITTER/FABRICATOR in fabrication of 8-leg jacket, flare tripod supports, flare bridge supports, erection and fit up diagonal bracing of jacket for offshore projects.
PIPE FITTER / TRI-TOOL OPERATOR COFRA thru F & E Philippines
January 2000 – January 2001 ANACO, Venezuela
- PIPE FITTER and lead Venezuelans in fabrication of spools according on isometric drawing on fabrication shop, cut pipes, lay out and beveled pipes by tri-tool machine.
PIPE FITTER KELLOGG ALGERIA INC.
January 14, 1998 – January 13, 1999 Raourde El Baguel, Algeria
- PIPE FITTER in fabrication shop, cut pipes on pantograph cutting machine, beveled pipes by tri-tool machines, fit up and erection pipes in pipe rack.
WELDER/STAND FITTER SAUDI IRON & STEEL COMPANY (HADEED)
February 5, 1984 – February 29, 1992 Jabail Industrial City,
Kingdom of Saudi Arabia
- WELDER fitter in rolling mills and roll shop.
- Maintained all stand from roughing Stand-1, intermediate and finishing 18.
- Set rolls guide on stand for operation.
- Modification and fabrication of cooling pipes to improve the cooling system of rolls and guides on stands.
LEADMAN PIPE FITTER SAUDI ABV, OMP, SIAB
September 9, 1981 – August 11, 1983 Jubail Industrial Waste Water Treatment Jubail Industrial City, K.S.A.
- FOREMAN and In-charge in pipe laying of underground pipes, hydro testing and repair of all pipe lines from 100mm diameter and follow all tasks assigned by the immediate Supervisor.
PIPE FABRICATOR NATIONAL PETROLEUM & CONST. CO. LTD.
November 27, 1979 – November 21, 1980 Abu Dhabi, United Arab Emirates
- FABRICATOR in fabrication shop, flatform & jacket leg for offshore projects, lay out, cut pipes and fabricate spools, copper nickel pipes, stainless pipes and carbon steel pipes as per isometric drawing and erection of fabricated spools on flatform.
PIPE FITTER NATIONAL CONTRACTING CO. LTD.
May 21, 1978 – May 21, 1979 Kuwait Oil company Refinery
Shuaiba, State of Kuwait
- PIPE FITTER in pipe rack, cut pipes, fit up according to isometric drawing and installed spools on pipe rack of train 1 to 3.
- Assists on hydro testing of pipeline on pipe rack.
BRACER/SPOT WELDING OPERATOR PHILIPPINE APPLIANCE CORPORATION
March 9, 1973 – May 1, 1978 Sucat Parañaque, Philippines
- BRACER, welder and operates spot welding machine.
- Assembled chest freezer, refrigerator, upright freezer for bonderizing the body to painting shop.
PIPE FITTER PHILIPPINE ENGINEERING & CONSTRUCTION CORP.
July 10, 1970 – February 4, 1973 Manila Electric Company
SNYDER I & SNYDER II
Sucat, Muntinlupa city, Philippines
- PIPE FITTER/INSTRUMENT FITTER. Cut pipes and fabricate spools as per isometric drawing and installed pipe racks.
QUALIFICATION/SKILLS
- Familiar with the local Plumbing Code.
- Have adept knowledge in operating required hand/power tools, test instrumentation and equipment required in a safe and approved manner.
- Understands and able to interpret piping CAD drawings/blueprints.
- Ability to work independently.
- Highly competent, patient and vigilant.
- Adaptable and versatile in any environment.
- Initiative and positive attitude.
SEMINARS / TRAININGS ATTENDED
HSE EMPLOYEE OF THE MONTH July 2005
Anchor Handling Tugs Project
Mesaieed Industrial City, Qatar
BASIC FIRE SAFETY December 22, 2003
Qatar Shipping Company
Doha, State of Qatar
MECHANICAL CUTTING & BEVELING EQUIPMENT July 1, - July 7, 1998
Kellogg Algeria Inc., Algeria
AUTOMATED WELDING/PIPEFITTING/BEVELING PROGRAM July 1998
Kellogg Algeria Inc., Algeria
INTENSIVE WELDING WORKSHOP SEMINAR September 1 – October 17, 1975
Philippine Appliance Corporation
EDUCATION
PHILIPPINE MARITIME INSTITUTE 1969 - 1970
Bachelor of Science in Nautical Science
PERSONAL DETAILS
Place of Birth: Manila, Philippines
Date of Birth: June 13, 1952
Height: 166.5 cm.
Status: Married
Nationality: Filipino
View contact information... |