Objective: Master electrical contractor license. with active Top Secret Clearance. Seeking an overseas position in management or as journeyman in the electrical field or any of the fields listed in the skills section of this resume. I will also work in the USA.
Experience:
3/08-7/08 VMAC, Washington, DC
TSS Electrician
Responsibilities included installation and start up of the TSS system in at US Embassy in Bern, Switzerland
3/07-11/07 RMS LLC, Panama City, Florida
Fire Alarm Technician
Responsibilities included installation, repair and inspection of the fire alarm systems in over 300 buildings at
Al Udeid Air Force Base in Qatar.
9/06 -3/07 Greenway International, Helena, Montana
Electrician
Responsibilities included rebuilding offices along with power distribution, lighting, fire alarm and H.V.A.C. layout installation and start up.
US Embassy Shenyang, China
Electrician
Responsibilities included demolition of existing office spaces, fire alarm, power distribution, fire alarm, lighting and H.V.A.C. layout installation and start up.
US Embassy Saudi, Arabia
Electrician
Responsibilities included demolition of existing office spaces, electrical layout installation and start up of six HVAC units, lighting, power distribution, and fire alarm systems in the US Embassy in Saudi.
12/05-7/06 Hitt Construction Inc. Fairfax, Virginia
Fire Alarm Technician, Foreman and Electrician
Responsibilities included layout, installation of panels, conduit, wire, devices and startup of the fire alarm system.
US Embassy Tirana, Albania
Electrician
Responsibilities included electrical layout, installation, hookup, and startup of control panels, raceway, conduit, control devices, wire, lighting, power distribution and ground systems.
2/05-12/05 Harrison Electric Inc. North Augusta, South Carolina
Field Superintendent
Responsibilities included supervision, scheduling, contract management, meeting production dates, field design modifications, client negations, public relations, quality control, personnel management and procurement for several jobs in SC.
8/04-11/04 Fluor Daniel Service Corporation, Surry, Virginia
Electrician
Responsibilities included electrical layout and installation of conduit, raceway, wire, control panels, power panels, motor control centers, control devices, power dist, lighting, hookup and startup at Dominion Nuclear Power Plant in Surry VA.
3/04-4/04 Harrison Electrical Inc. North Augusta, South Carolina
Electrical Foreman
Responsibilities included supervision, scheduling, directing, time keeping, material procurement and layout for 30 personnel to install power distribution, control panels, devices, power panels, lighting, motor control centers, monitoring equipment startup and quality control at Fuji Film in Greenwood SC.
1/04-2/04 Greenway International, Helena, Montana
Electrician
Responsibilities included power calculation and to provide a complete set of as built electrical drawings for the US Embassy in Morocco, Africa.
07/02-12/03 Alutiiq - Fluor Construction Inc., Alaska
Electrician/Fire Alarm Technician
Responsibilities included electrical conduit, raceway, wire, lighting, control panels, devices, power dist., fire alarm, hookup, layout, installation, startup, warehousing and procurement at the US Embassy in Sao Paulo, Brazil.
4/02-Present Excaliber Electric LLC, Boynton FL.
Owner / Operator
Responsibilities included office management, payroll, book keeping, sales, procurement, contract management, warehousing, public relations, job bidding and installation for my electrical contracting company
12/99-1/03 Davis Electrical Inc. Greenville, South Carolina
Foreman
Responsibilities included overseeing work force of 20. Supervised electrical installation which included layout of conduit, raceway, control panels, lighting, power distribution, equipment, control devices, and hookup. Provided startup at Bridgestone Tire plant in North Carolina and several Owens Corning Fiberglass plants all over the US.
9/95-12/99 Davis International, Baton Rouge, Louisiana
Foreman
Supervised workforce of 20 in field design changes, layout, time keeping, direction, and quality control at Texas Instruments plant in Orlando FL.
8/97-10/97 Lifesaver Pool Fence of Arizona, Phoenix, Arizona
Owner/Operator
Responsibilities included book keeping, payroll, sales, procurement, office management, and installation of safety fencing for swimming pools.
4/79-7/97 Big Rivers Electric Power Plant, Owensboro, Kentucky
Senior Electrical Tech.
Responsibilities included boiler controls, power distribution, programmable controllers, motor rebuild, conveyor systems and preventative maintenance schedules.
Certifications Unlimited Master Electrical Contractor #U19271
Fire Alarm NFPA# 26484
Journeyman IBEW 1701 Owensboro, Kentucky 11/83-Present
Top Secret Security Clearance
Hazardous Locations #26746
Education I.C.S. Courses Offered By Big Rivers Electric 79-94
Oakland City College, Oakland City, Indiana 76/78
A.A.S. Degree/Mechanical
Washington High School, Washington Indiana 72/75
Skills Electrical motor repair Pumps
Management & safety H.V.A.C
Procurement Concrete work
Prints & schematics lighting
Boiler controls Three & single phase power distribution
Layout Sprinkler systems
Acoustical ceiling Fire suppression
Fire alarm systems Preventative maintenance schedules
Painting & stain Pluming
Pool construction Home construction
Auto repair& small motors Landscaping
Steel work Welding
Generator maintenance Motor control centers, V.F.D's
Lightning protection Grounding systems
High voltage Low voltage
A team player. What ever it takes to get the job done.
View contact information... |