CONTACT INFORMATION:
View contact information...
Nationality British
Status Married no Children
Date of Birth 18th December 1965
Qualifications Diploma – Civil Engineering
5 x O'Levels
Others Very Computer literate in Access, Excel & Word.
Employed by Wood~Stork (JV with The Wood Group & Stork ISC)
May '02 - Present Offshore Asset Modification & Maintenance
Position Cost Engineer / Estimator – All Disciplines
Client Nederlandse Aardolie Maaschappij BV (NAM)
Contract Reimbursable
Value Various from Euro 28K to 7million
Production of estimates from design through construction to close-out for E&I, piping, mechanical, systems, painting, insulation etc… implementing agreed norms (based on Page & Nation). Proposing improvement to the norms and provision of "Star Norms". Creating and maintaining the necessary budgets, work breakdown structures and database data. Ensuring timely accurate value of work and forecast cost availability at all times to the Area Delivery Managers and Senior Cost Engineers.
Development and implementation of a database to record Offshore Construction hours for the analysis of burned hours for Directs, Non-Productives and indirects.
Employed by McConnell Dowell - Saudi Arabia
Oct '00 to Apr '02 Ras Tanura to Dhahran Refined Products Pipeline BI-3000
Position Quantity Surveyor – All Disciplines
Client Saudi Aramco
Contract Lump Sum Turn Key
Value SR 300m
All disciplined Contract, (Civil, Mechanical, E&I, Pipeline). Re-measurement of the Contract Lump Sum relating to the 130 km Pipeline in extra pipeline crossings, different materials and extra meterage. Measurement of Change Requests in all disciplines. Negotiation with Aramco's Contracts department and agreement of Change Order values. Pricing of a complete, new substation through Civil, Mechanical and E&I including measurement of the substation's new HVAC system. Finally processing and compiling claim for prolongation at the head office in Melbourne.
Employed by McConnell Dowell - Saudi Arabia
Jan '00 to Oct '00 Controls System Replacement, Riyadh Refinery II.
Position Quantity Surveyor – Electrical & Instrumentation
Client Saudi Aramco
Contract Lump Sum Turn Key
Value US$65m
Upgrading, replacement and integration of existing instrumentation (7000 loops), control and auxiliary systems into an integrated DCS and stand alone ESD system and construction of a new Control Building.
Duties included the monthly applications for payment based on Lump Sum milestones, processing of Change Orders and the final claim for an Extension of Time with regards to overhead costs. Re-measurement of 375 P&ID drawings for extra hardware installed.
Employed by Clough Smith Rail – United Kingdom
Mar '99 to Jan '00 Various Sites North & South England
Position Quantity Surveyor, Civil / Electrical (Railways Division)
Clients Tarmac / Alstom / Railtrack
Value £3m and £5m
Working on various claims and closing out daywork, variation and measurement accounts for signaling and cable route works in the railway construction industry. Setting up company procedures with a view to easing the company's financial exposure and to bring it into line with more modern commercial practices.
Employed by McConnell Dowell – Thailand
Aug '98 to Feb '99 Siam Polyethylene Project, Rayong, Thailand
Position Quantity Surveyor – Electrical
Client Dow Chemicals
Value US$65m
Lump Sum re-measurement of AFC Electrical drawings and compilation of extra works (all measured on a daywork basis). Onsite re-measure of actual installation of Instrument and Electrical Cabling, Traywork, Supports and Equipment. Submittal of the Electrical and Instrumentation Monthly Progress and Applications for payment.
Employed by McConnell Dowell – Bangladesh
Jan '98 to Aug '98 Sangu Development Project, Chittagong, Bangladesh
Position Cost Engineer
Client Brown and Root
Originally a Re-Measurable Contract which had to go Reimbursable after the pirating of most of the companies allocated plant in the Bay of Bengal and the difficulties of logistics and local customs officials. Thus turning my position from QS to the above.
Duties included establishment of reimbursable rates for expats, labour, plant etc.. and making sure all cost were allocated to the correct cost centres. Submittal of monthly applications as usual.
Project Value US$ 20 million
Employed by McConnell Dowell – Indonesia
Oct '96 to Nov '97 Unocal Geothermal Project, Gunung Salak, West Java
Position Contracts Engineer
Client Fluor Daniel
Lump Sum Re-measurement of Piping Isometrics, equipment and steelwork for incorporation into monthly Contract Modification Payments. Administration of Subcontractors accounts for the Civil and Painting portions of the Works. Establishing Lump Sums and Extra Work sheets for reimbursement from the client. Compiling, submitting and agreement of monthly Pro-Forma invoices. Also the writing of various subcontracts with conditions applicable to Indonesia and the Subcontractor.
Project Value US$ 12million
Employed by McConnell Dowell – Singapore
Aug '96 to Oct '96 Esso Expansion Project, Chawan Island, Singapore
Position Quantity Surveyor
Client Foster Wheeler
First posting with McConnell Dowell to assist with a claim situation after final completion of the above project. Basically guiding Filipino QS's with the Standard Method of Measurement for evaluating the price of isometrics and pipe support drawings.
Employed by Mannesmann – Singapore
Feb '96 to Aug '96 Singapore Aromatics Hook-Up Project, Chawan Island, Singapore
Position Quantity Surveyor – Team Leader
Client Foster Wheeler
Joint Venture with Mannessman, Siemens and Willich for the hookup of modules including Piping, Structural Steel and Equipment Installation. My task included the measurement of 4500 piping isometrics and supports to establish AFC area values for incorporation into Interim Progress Payments and the Joint Venture's monthly Applications.
Project Value S$65 million
Employed by United Kingdom Construction & Engineering Company Limited - UK
Oct '95 to Feb '96 Conoco Limited, Humber Refinery – Vacuum Unit 3
Position Quantity Surveyor
Client Kellogs
Construction of a module in all disciplines for incorporation into the main refinery. My responsibilities included the administration of the Insulator's and Painter's Subcontract Accounts and evaluation of modifications after substantial completion due to re-design work by the client.
Project Value £4.2 million
Mar '94 to Sep '96 Tarmac, Black and Veatch – Medway Power Station UK
Position Quantity Surveyor
Client Tarmac (now Carillion)
Manhour Targeting of 5500 Spool Drawings to measure the weekly productivity Ratio against hours spent. Pricing of 1200 Piping Isometrics in Fabrication, Erection and Supply. Pricing and Agreement of 1000+ Variations using Daywork, Unit/Star Rate and Lump Sum methods.
Project Value £9million
Feb '93 to Mar '94 British Gas. Barrow-in-Furness – UK
Position Quantity Surveyor
Client British Gas
Re-Measurement of the Lump Sum Contract Price and Manhour Targetting of Isometrics in fabrication, erection, painting and NDT disciplines. Monthly compilation and submittal or interim applications for payment.
Project Value £9million
Feb '92 to Feb '93 Ciba Giegy – Building 120, Grimsby – UK
Position Cost Engineer
Client John Brown
Sole responsibility for establishing the database system of Cost Control on this Reimbursable Contract using cost centres as a basis for weekly / monthly budget analysis and forecasts against the breakdown of the Contract Selling Rate. Targetting of Spool, Support, and Steelwork drawings to calculate weekly productivity factors. Monthly / Final Valuation compilation, submittal and agreement.
Project Value £6 million
Jan '91 to Feb '92 Van den Burgh's and Jurgens, Purfleet, Essex – UK
Position Quantity Surveyor
Client Currie and Brown
Pre AFC Contract work with piping and steelwork disciplines and all commercial duties with the subcontractor's accounts and applications. Control of all Extra works including Dayworks, Field Instructions and Lump Sums. Monthly / Final valuation compilation, submittal and agreement.
Project Value £4million
Projects included since August 1985
Employed by United Kingdom Construction & Engineering Company Limited – UK
Owner Client Project
Glaxo John Brown Chemical Pilot Plant - Stevenage, UK.
Mobil Mobil St Fergus Gas Terminal, Peterhead, UK.
Yaku Pory Gleeds Caledonian Paper Mill, Irvine, UK.
British Steel Currie & Brown Regal Expansion Project, Shotton, UK.
BNFL John Brown Thorp Reprocessing, Sellafield, UK.
BP British Petroleum SNS Gas Terminal, Dimlington, UK.
Shell Oil Matthew Hall Catalytic Cracker, Stanlow, UK.
Bibby's Oil Wimpy Bibby's New Facility, Liverpool Docks, UK.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 51 to 100 of 755)
Go to Search Parameters...
Brief Description
I am currently on another project but can leave with a two week notice.
Proficient with auto cad 2006-2008, architectural desktop 2006-2008, microsoft word, publisher, power point, excel. Have done mechanicla drwaings, house plans, and civil drawings. I am bilingual
Safety Professional Seeking employment to develop and utilize my skills as a Professional Safety Administrator and Trainer primarily in the Resource Base and Construction Industries. I seek an employer that expects superlative effort from employees for a superlative compensation package.
Permanent (long term) employment in the construction industry. Equipment Manager or Master Mechanic position.
Estimator
Mechanical Engineer - Inernational Purchasing - Project Management
More than 10 years as an AutoCAD Draftsman in construction firm.
High level of computer skills including experience in Online Document Management System like Aconex, Hardworking, flexible, highly-organized and able to meet deadlines and committed to the highest standards of quality and accuracy
B.E(EEE), AUTOCAD, MICROSTATION, IRSE STUDENT MEMBER, WORKPLACE ASSESMENT FOR IRSE 1.1.150 C
Professional with systems marketing, business development, sales, extensive project engineering & management experience. Combines "hands-on" technical qualification with outstanding communication skills, developing interactive business relationships, organizing and hosting special events to promote
Document Control & IT / IS Support Services. Defining and implementing the strategy for the Documentation Management System during the project phase up to the hand-over to Operation.
Camp Boss/Driver/Roust about
Interest in Architectural/Construction Design and Engineering Document Control - Background experience in Aluminium Company and Electronics Production and Engineering - With excellent knowledge in Excel, Word, Powerpoint. Basic knowledge in Autocad
Sales, Client Development, Recruiting, Human Resources, Customer Service
Department of Translation, Qualification of Interpreter –Translator; IT Application Specialist
SAP Plant Maintenance, Supply Chain Management, Canada
Have facility engineering construction support experience as mechanical/ Electrical/ Plumbing (MEP Engr.) associated with construction of large commercial facilities. I can detail my own drawings using Microstation and/or AutoCAD software as required. I am alternate Site Manager for our team of en
Eight years of work experience on supply chain.
In–depth knowledge of theoretical principles of logistics, practical skills in materials management, supply chain management, control over transportation, storing & distribution of goods. Knowledge of basics and principles of operational planning. Experience in tutoring & supervision of small group
ERP, Consultancy, Movex, HumanResources Implementation, Payroll Implementation, Managment, Consulting Services, Independent
Mechanical Fitter
Nearly 20 years of experience in Environment, Health & Safety encompassing industrial safety, disaster management, firefighting, documentation and HR Functioned in India & Abroad.
Planning, Scheduling, Computerized Maintenance Management System - CMMS,
Five years field as well as laboratory experience (as JRF/SRF) in Collection, Collation, Computation and Synthesis of Land Resource Data of Himalayan terrain, particularly in the Nanda Devi Biosphere Reserve.
Chemical Engineer with 6 years experience in Drilling, Pipeline Operation, Construction, Economic Modelling, Health, Safety and Environment, together with Sustainable Development and Issues Management. 6 languages and American Citizenship, would like to work in Houston, Texas.
Proficient in AutoCAD with 3D applications, Basic knowledge in Microsoft Word, Excel, IntelliCAD.
is a supply professional in mining and construction. He has a proven track record of fulfilling all facets of procurement, material handling and inventory procedures.
I am a Full Member of International Institute of Risk and Safety Management (MIIRSM) and Technician member of Institute of Occupational Safety and Health (Tech IOSH) .Have expertise in working in ISO-9001, IS0-14001 and OSHAS 18001 environments.
Fifteen years experience in Process Plant Construction in the UK, Europe, Middle and Far East with regards to QS duties and Contract Administration on behalf of the Contractor.
I graduated from universtiy in June and have been working as a quantity surveyor. I worked as a trainee M&E quantity surveyor for two years before university and worked my university placement in the Turks & Caicos Islands where I currently work.
Professional Qualification,Advance Diploma in computer application ,(ADCA) Pursuing ‘O’ level from DOEACCA Society Work Experience,6 months working exp. As a marketing Executive at Dew Soft Over seas Ltd., New Delhi. Two year experience as sales executive
My experience has been in warehouse supervision and management. I have completed seven overseas contracts, to include, 4 in Africa, 2 in the Balkans and one in Iraq over a span of 13 years. I also have 26 years military experience in the Class V Ordnance Field and managed all of the Fort Hood, Tex
analyze and making risk assesstment. trained the workers for safety works and making safety reports.
I wish to apply for the post of Supervisor Warehouse /Material Specialist or (Buyer) Procurement.
I have Diploma in industrial safety and ASNT lavel II RT UT and 14 years experience in safety
Marketing, Marketing Research, International Economics, Data Entry, Entrepreneurship development.
To obtain a position with a respected, safety oriented company, where I would be challenged and able to use my knowledge and training in the HSE, management and enforcement fields, to help create and/or maintain a safe working environment for all its employees.
Over 18 years of proven expertise in Material Planning & Management, Negotiation, Procurement, Vendor Development, Logistics, and ERP System SAP.
This resume shows briefly my information about Personal Characteristics, Education Background, Experience history, Professional Skills, and other related information.
I’m a graduate Civil Engineer with nearly 18 years experience in the Construction of Sewerage, Drainage, Sewage treatment plant, 880 MW, 800 MW Power stations, Major Pumping stations of Sewerage/Drainage/Portable water/ Seawater, Heavy industrial structures, Piling.
A proven professional with the ability to grasp new tasks quickly and efficiently.
Employed by Centex Homes in the Land Acquisition department. Established a track record for securing quality land development opportunities for Centex. Participated in more than $40 million in development land transaction closings since 2004. Consistently delivered great sites.
Retired diesel mechanic, safety rep. for field, carpenter - 23 years of service to Shell Offshore Inc.
Post Applied Document Controller
Microsoft enterprises systems, Great Plain ERP, SharePoint services SQL Server 7\2K\2k5, Exchange Server 2k\2k4, ISA Server 2k\2k4, IIS 6.0, Manufacturing (Planning ERP, Execution MES, SCADA, Process Controlling) Active Directory, DNS, Windows Servers, Desktop, POS, PDA NT\2K\2k3\XP\Vista VBA\Access
Instrument fitter
Assist Lead QC Engineers in reviewing/approval process of contractor’s quality management system documentation. Assist other PMT construction personnel in resolving quality related issues. Surveillance / Witness of Contractor's site inspection and test per approved ITP. Participate in Construction m
I am a diploma holder in mechanical engineering and more than 9years experiance inthe field of fabrication
Institute Of Corrosion Certified Painting & Coating QC Inspector - Pipeline Senior Coating QC Inspector - Completed Fireproofing (Chartek -Thermolag) courses in Aberdeen UK
Planning Engineer
1
[ 2 ]
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Seach Parameters
Change search parameters...
CATEGORIES:
Other;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com