Management position in the areas of Plant Maintenance, Renovation, Projects or Technical.
Alternative: Head of Central Cell for organization having multi location production plants which will reducing plant overhead up to minimum 5 % by implementing innovative ideas.
2) Summary of Skills & Experiences:
1. 27 years of experience in the field of Plant operation, Maintenance Management including Safety compliances, Industrial Relations, Budgetary Planning & Control, Project execution in Polyester Synthetics Plant - CP/POLY, POY, PSF, PTA & continuous process plants.
2. Deft in planning and streamlining maintenance operations resulting in effective productivity and enhanced profitability within planned budgets. Expected reduction up to 6-10% per annum by implementation of continuous cost saving plan & strategy.
3. Successfully initiated, designed and implemented various profitable and cost-saving assignments at Polysindo, Indo Rama, Reliance and Nirlon Synthetics.

3) Overseas Assignments handled:
1. SPC, China: For the Erection and Commissioning of Chemtex and DuPont plant in 1991.
2. Toray Engg, Japan & Teijin Seiki, Korea: To assess FDY pilot & PET plant in 1993.
3. Kohap & Honkook Polyester, Korea: To assess SSP plant supplied by Hosokawa, Japan.
4. Kaiping Polyester, China: To assess running FDY plant supplied by EMS-Inventa in 1993.
5. EMS-Inventa, Switzerland: To assess Reliance PET chips trials at the R&D plant in 1993.
6. DuPont, New York: As Technical Rep for J V project of Meter length package in 1994.
4) Educational Qualifications:
* B.E. (Mech.), VJTI Mumbai - 1979 with Ist. Grade.
* Diploma in Management Studies, Mumbai - 1986.
5) Other Distinctions:
Visited 28 Textile companies in Busto Arsizio, Italy as a team member of the Indian Trade Delegation, organized by the Italian Trade Commission in 1998.
6) Languages:
English, Bengali (Mother tongue), Hindi, Marathi, Bahasa Indonesia.

7) Trainings attended:
* Training of POY and FDY Spg m/c at Barmag, West Germany in 1984.
* Training of POY and FDY Spg m/c at Reiter M/c Works, Switzerland in 1984.
8) Specialized Training Program:
1. 21 days training course Energy Conservation, Management & Energy audit (April '06)
2. Indo Rama Potential Development program to access competency ratings in Sep'01.
3. Reliability Centered Maint Program at N P C in Feb '01.
4. Leadership skill for Technical Professionals in Jul '02.
5. Management & Supervisory Development Program at RIL.
6. SAP/ERP & MMS operation RIL & Indo Rama.
9) Exclusive Experience:
I had set up a workshop- Joy Air Enterprises (Year 1986) at Mumbai. Relevant documentation & statutory requirements were obtained by me. Setup was dissolved due lack of financial support.
10) Organizational Experience: The Career Path:
a) From March '03 to till date - M/s Lokesh Industrial Services:
General Manager - Technical Adviser/Consultant
Role Description:
1. Assistance in technical cum commercial bid to bag M/s INDORAMA material handling contract with annual turnover of Rs. 1.5 Millions.
2. Assistance for business collaboration with foreign OEM to establish showroom cum supporting facilities. To access site, a foreign delegate visited Nagpur.
3. Assistance in techno-commercial BHEL Tender bid for 130 Nos forklifts maint & opert.
4. Central India Co-0rdinator for engineering associates from Mumbai.
5. Preparation of Forklift safety cum training manual.
6. Design & Implementation of Lokesh GROUP web site.
7. Assistance to set up workshop for machining, fabrication, Forklift O/H & Show room.
b) From Jan '03 to Jan '06 - PT Polysindo Eka Perkasa, Indonesia
Expatriate Manager - Mechanical Maintenance & Project activities
Maintenance purview:
1. Four line Poly Plant 900 MTPD producing Chips–500 MTPD & PSF–400 MTPD;
2. Poly plant - John Brown Deutsch Engg.
3. PSF Plant - Fleissner & Eastman technology.
4. Poly, Fiber maint. & Specialty fiber Project/Development jobs.
Chief KRAs are:
1. Controlling department having total strength of 100 staff & technician's.
2. 25 ton/day specialty fiber production successfully commissioned.
3. Review, monitoring and improvising the Maintenance procedures and systems to ensure compliance of ISO9002 & ISO14001 along with Statutory Safety Regulation standards.
4. Inventory, Import Sub, Vendor Development, Budget control & cost reduction measures.
Chief Tasks Handled:
MAINTENANCE SYSTEMS & PROCEDURES DEVELOPED:
1. Review & improvise Maintenance Management systems & procedure.
2. Developed maintenance system for the idle POLY Plant for more then a year.
3. Reduced failure rate resulting in less major production losses.
TROUBLESHOOTING
1. Enhancement of crimper performance
2. Successful repair of the centre burner unit of HTM Bertram heater.
3. Analysis & implementation to improvise break level in fiber spinning.
4. Modification of cable bath to reduce fused fiber.
5. Improvement in Maag pump seal operation resulting in improvement in quality.
6. Assisted in the repair work of the finisher agitator shaft to avoid repetitive failure.
TECHNICAL ENHANCEMENTS:
1. Performance improvement by development of 3.5' crimper for tow baling.
2. Fleissner Crimper replaced with Eastman Crimper, Capacity Increase from 35T to 50T
3. Tow cutter performance improvement by installation of Mark-V cutter in place of Mark-IV.
4. Design of specialty fiber spinning. Crystallizer modification batch to continuous process Cost saving > $ 75,000. (35 yrs old unused Equipment)
5. Improvise in the machine part drawings to enhance quality & life of the spares.
COST REDUCTION MEASURES:
1. Alternate vendor development for chrome plating cost saving $30,000 per annum.
2. Reconditioning of mech. parts cost saving @ $25,000 per annum.
3. Development of steam ejector cost saving $30000 one time
4. Development of magnetic filter – cost saving $ 1200 one time
5. Assisted purchase to procure materials at lower cost – Total cost saving > $ 60,000
6. Local development of agitator shaft with improved design for easy maintenance and also cost saving of $5500 for each shaft.
c) From May'95 to Jan'03 - Indo Rama Synthetics (India) Ltd.
May'95 - Oct'98: Sr. Manager (Mech. Maint.), Nagpur.
Oct'98 - Jan'99: Assist. General Manager (Mech. Maint.), Nagpur.
Jan'99 – Jan 03: Chief Manager (Mech. Maint.), Nagpur.
Maintenance purview:
Three CP plants 660 MTPD (Operating at 824 MTPD) producing POY, PSF & Chips plant maintenance along with Central Engg Services, Mech. W/S Maint. of 47 Forklifts & 2 Hydra.
Chief KRAs are:
1. Heading a department with a total strength of 104 Staff & technicians.
2. Monitoring and improvising the Maintenance procedures and systems.
3. Ensure compliance of ISO9002 and Statutory Safety Regulation standards.
4. Monitoring Engg Cell activities from contract order release to Payment stage & MIS.
5. Assistance & support to the project team for finalization of equipments for POY Expansion.
Chief Tasks Handled:
MAINTENANCE SYSTEMS & PROCEDURES DEVELOPED:
1. Developed the Maintenance Management procedure and systems.
2. Introduced the concept of Job rotation among the engineers & technicians.
3. Reduced failure rate with no major production losses in the plant.
TROUBLESHOOTING
1. Identified a major erection fault in the Take up frame of POY machine.
2. Identified leakage and repaired HTM heaters resulting in saving Rs.7.5 Million.
3. Repaired leakage in Heat Exchanger without shutdown resulting in saving Rs. 0.12 Million.
4. Handled Loop Seal welding and Thermo well leakage online to avoid loss of Rs. 5 Million.
5. Rs.5 Million losses avoided by uninterrupted operations despite un-operative Vispac seal.
6. Transfer line GL coupling Dow leakage attended online & avoided shutdown of the plant.
7. Reconditioned mech. seals and saved Rs. 0.9 Millions.
TECHNICAL ENHANCEMENTS:
1. Saved costs up to Rs. 10.5 Million by designing Delay quenches for POY.
2. Saved Rs. 2.3 Million by initiating Plasma Coating for retrieving Rollers.
3. Modified UFPP bubble cap of CP-2 in 4 days vis-à-vis 7 days at DuPont, USA.
4. Saved Rs.12 Millions by fabricating heater top insert in-house based on Bertram's design.
5. Modified the Chipper cutter to 1500 from 1200 kg/hr enhancing 25% revenue.
6. Maag Pump internals replaced saving Rs. 0.25 Million towards technical consultancy fee.
7. Saved Rs. 6 Million by modifying design of POY1 common cutter system similar to POY2/3
COST REDUCTION MEASURES:
1. Spare parts MOC changed saving Rs. 1 Million
2. Saved Rs. 32 Million by analyses & implementing PM Schedule – Winder spindle bearing.
3. Achieved reduction in expenses by Rs.2 Millions through I.E. Study.
4. Cost saving > Rs. 3.5 Million by balancing jobs, Agitator shaft, Motor, Blower & Godet.
5. Cost saving > Rs. 7 Million by Import substitution & alternate vendor development.
6. Achieved cost saving of Rs. 3.9 Million by implementation of suggestion scheme.
STATUTORY COMPLIANCE:
Developed & implemented the ISO documentation & procedures & received No NC.
AWARD RECEIVED (Mech. Dept.):
1. Highest number of suggestion implemented - consecutive three occasions.
2. Highest suggestion (CP, POY, PSF) - 1st Price 2001-02
3. House keeping award - 2001
4. Highest saving achieved by mechanical through CIP (Continuous improvement plan).
5. 100% attendance in fire squad training - consecutive three occasions.
d) From Jul'86 to May'95 - Reliance Industries Ltd, Mumbai.
Joined as Sr. Engineer (Mech. Maint.) and promoted as Superintendent in Oct'89 and later as Additional Manager in Sep'93.
Maintenance purview:
3 CP plants of 60 MTPD, 1 CP plant of 90 MTPD, 17 spinning machines & TEG plant.
Chief Tasks Handled:
1. Technical Team member for the selection of FDY and Bottle Grade PET Projects.
2. Successfully supervised the job distribution of 500 workers & 60 technicians (Day shift), 300 workers and 30 technicians (Night Shift) and department operations for 20 days (20 hrs/day) during '89 flood, which submerge all the equipment below 6' under water. During the period, 100% equipment overhauled with out any damage.
3. Renovated / commissioned 3 old Untrop SDY M/c, DuPont team had failed to commission.
4. SDY m/cs were converted to POY locally. Chemtex team unable to take up the task.
e) From Nov'79 to Jul'86 - Nirlon Synthetics Fibers & Chemicals Ltd, Mumbai.
Joined as Jr. Engineer and promoted as Asstt. Engineer in Sep'84.
Maintenance purview:
CP (VK Tube) for Nylon, Batch Process for Polyester, 6 nos. POY machines of 800m/m, 2 nos. Barmag POY M/cs, 2 Rieter POY M/cs, 2 nos. DCS 1000, 2 nos. SDS8 texturing M/cs, 34 nos. Draw twisting machines, 4 nos. Conning M/cs, Utility boilers, AHU, Generators etc.
Chief Tasks Handled:
1. Successfully relocated and converted the Barmag FDY machine frame to POY.
2. Supervised the entire plant commissioning including the overhauling of 64 nos. Rieter Winders (Second hand) for the POY expansion project.
3. Assembled the Barmag and Rieter HS chuck winder for the Ist. time in Nirlon's history.
4. Deftly handled erection, commissioning & training of Schenk Balancing M/c in RIL/IR/China.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 151 to 200 of 751)Go to Search Parameters...
Brief Description
23 years in safety field in Petroleum Refineries, Petrochemical Plants, Pipeline Projects, Well Services, Wireline Operations, and Wastewater Treatment. 8 years with Safety Instructor tasks, 7 years in Construction Projects, 5 years with Q/A Q/C tasks, and 7 years in Managerial level
Video editor, cleaner, waiter, driver
Proven managerial skills combined with assertive personality sensitive to multi-cultural & multi-national environments.
QA/QC Engineer
SAP,JD EDWARDS,SYSTEM ANALYST,ABAPER,SAGE HR
Msc Quality & prodt. Mgr 16 Yease Experiance
B.Sc. HONS with 7 years of expe. in HSE field in oil & gas secter
Highly experienced project professional with broad engineering, maintenance and construction experience. Competitive by nature with a consistent focus on the “Bigger Picture”. Outstanding track record and highly adept at managing high-criticality maintenance and construction projects.
Seeking expatriate position
Studies, planning, schedule, reports, follow-up, iInvoices & claims for construction projects (gas plants, pipelines, buildings, others)
Health Safety & Env. Coordinator working with KBR for the Shell GTL Project in Qatar. Previously worked in Seismic, Exploration & Construction, 7 yrs exp.
HSE Management Diploma
BE(Mech) / DMS, 27 years of exp in the field of Plant Maint Managmt including Safety compliances, Industrial Relations, Budgetary Planning & Control, Project execution in Polyester Synthetics Plant - CP/POLY, POY, PSF.
Project EPC Contruction contracts interface facilitator (client to EPCM teams) bridging change processes
CAD Designer Project Manager Medical Laboratory HVAC Piping Design JCAHO ASHRE
Engineering/Project Manager skilled in organizational/project management/business development. Highly skilled in client relations/development. Diverse experience in environmental consulting/nuclear power/regulatory compliance/facilities/systems engineering/infrastructure projects.
I am a hardworking individual who can work efficiently in a group as well as individually with minimal supervision. I easily learn and work with determination.
EXPERIENCED HEALTH/MEDICAL PHYSICIST-ENGINEER-SCIENTIST
Free! „X Continually ascertain and adjust operating parameters regarding more than 375 on-base diesel generators.
O & M Supervisor, Licensed, Unlimited Stationary Engineer, USN experience
I can work as a carpenter, mason, cleaner (territories and premises), car driver and assist in other jobs.
*More than 3 yrs. experience in AutoCadd 14, 2000 and 2002. *Have knowledge in Land Desktop Development (LDD3)
I have been a Firefighter since 1990 and am considered to be a keen and effective senior member of the Defence Fire and Rescue Service. I am a mature, self-motivated and well-organised person who enjoys a challenge. I offer reliability, punctuality and commitment.
Well versed in preparation & analysis of financial reports, implementation of policy & procedure & internal control
Seeking a responsible and challenging growth oriented position in the field of electrical engineering with emphasis on high voltage out-door substations including its preliminary design, selection of transformers, switchgears and other materials
A Senior Land Surveyor/ Data Manager with 17 years experience on large infrastructural projects. Diverse 3D mapping and engineering experience using MicroStation, AutoCAD, MX, InRoads and Surveying software packages. A provider of survey, design and CAD support services for tenders and projects.
Graduate Diploma In Materials Management. Warehouse & Purchase activities are handled by me indepandently.
Professional Heavy Equipment Operator rated with Class B+, Professional Driver for both cars and Heavy Vehicles, Knowledge in Purchasing, Surveying.
More than 30 years experience in the field of General Engineering, Plant Maintenance Management, Project Management, Telecommunications, Electrical/Instrumentation and Process Control.
BS Mech/Indust Eng. Trade qualified: Marine Eng & HD Mech. Member: "Intl Assoc Airport Executives (Can.)" & "Inst of Transportation Eng (Can.)" Extensive o/seas experience as project engineer in frontier/conflict regions.
An experienced engineering manager, project manager, and program manager with Department and Division operations experience at engineering and construction, and consulting firms. Experience in multi-disciplinary infrastructure projects and environmental remediation.
Design, implementation and setup of Document Management System in accordance with project requirements and internal procedures.
Experienced concrete superintendent
Procurement of Capital Equipment, Contracts Management, Strategic Sourcing, Supply Chain Process Reengineering, Performance Monitoring, Contracts Administration
Extensive experience in accounting system installation, general & cost accounting, capital budgeting and financial analysis for trading, contracting, rent a car & hotel & restaurant, mining & project management business locally and abroad. Highly motivated with exceptional organizational skills
Millwright/Industrial mechanic and industrial construction mauntenance mechanic
I have vast experience in pipeline inspection involving smart pig, pipeline cleaning, coating. Also, i have experiences in commisioning/decommisioning of pipelines and other engineering maintenance activities relating to static equipment. I am very conversant with Microsoft office and HSE standards.
Project Interface Manager, Stategy Planning, Engineering/Projects Development/Management/Controls
An Electrical Engineer with over 17 years of versatile experience in the field of Proposals, Contract Management/ Co-ordination, Marketing with sufficient exposure to ISO 9001 quality standards and Total Quality Management. Have undergone skill enhancement courses at IIT & IIM.
Procurement, Supply Chain and Logistics professional spanning industry sectors on global basis
Instrument Quality Engineer/Inspector & Instrument Engineer and Commissioning Coordinator
B.Sc with Diploma In Safety,Health And Environmental Engineering, 1.5 Years Experience in Reputed Organization.
Senior Professional Geologist
Maritime chief engineer with more than 20 years on bord sea-going ships and 7 years as HVAC Technician and Electrician for shore-based companies,searching now a shore based job in accordance with education and experience.
Mechanical engineering professional in post-contract administration and expedition. Legal, project, and expediting experience in Europe and the Far East in plant, marine, and, offshore projects.
Senior management professional with extensive experience in Management & Operations of IT & Telecom Networked Infrastructure and Systems, Managed Services, Information Security, Process Modeling, SAP Implementation, Consultancy etc across industry segments.
HR Professional
Instituteof management Diploma, NVQ management level 4, Certificate of professional competence national & international road haulage, Confined space certificate of competence,CITB health & safety certificate, Excavators, Loading shovel, Dumper Trucks, Road rollers, HGV1 licence
Experienced Ops Engineer
Diploma in Safety Management S.A.C Dip(Safety Management) (Stone Bridge Collage London) Registration Number: 17965 ľ,Diploma in Industrial Security and Safety Management (India), ľ,Member of International Institute of Risk and Safety Management(IIRSM London), Completed OSHA Courses
1   2   3   [ 4 ]   5   6   7   8   9   10   11   12   13   14   15  
Seach Parameters

Change search parameters...
CATEGORIES: Other;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com