QUALIFICATIONS CSWIP Welding Inspector
AND APPROVALS: CSWIP Industrial Radiologist
ERS Radiographer

COMPUTER SKILLS: Proficient in MS Office and Web based programs

INSTITUTE New Zealand Institute of Welding
MEMBERSHIP: New Zealand Institute of Professional Engineers (NZNDTA)

SUMMARY OF EXPERIENCE

Having been in the construction industry since 1969, mainly in the petrochemical area, my experience covers a wide range of field activities in both quality control management and technical supervision of pipework and mechanical installations on major projects.
From 1973 I have held positions of responsibility with various inspection companies and project management groups and have a successful career record as project manager, quality control manager, inspection administrator, welding consultant, quality control auditor etc., in compliance with ISO 9000 / ISO 9001 quality systems and practices.
My experience has been gained on a variety of contracts, from industrial pipework to plant engineering over a wide range of industries including petroleum refineries, petrochemical plants, gas and oil production platforms, power plants, and onshore / offshore pipelines at various locations in the Middle East, North East Africa, South East Asia, India, China, Australia and New Zealand.
Over the years my duties have included responsibility for the inspection and consultation of determining welding techniques, developing welding procedures, physically monitoring weld procedure trials from welding through to final mechanical acceptance. On all classes of process and utility piping systems for fuel oil, petroleum by-products, condensate-natural gas-compressed air pipelines, pumping stations, heavy fabrication construction of offshore platforms and associated modules. Utilizing for inspection, testing and quality control – local and expatriate manpower of either direct labour or contract hire.
I have had the responsibility of coordinating and controlling inspection staff through all stages of fabrication and assembly ensuring that progress liaison is maintained with engineering personnel managing projects.
Having experience of engineering design and drawing office practices and being familiar with the relevant British, American, Australian and New Zealand piping design codes and standards, I am aware of the considerations applicable to piped service covering hydrocarbon processing, liquid, gasses and vacuum systems.
I was responsible for carrying out complete mechanical inspections of final installations ensuring compliance to material and design specifications, raising "punch lists" as necessary, detailing the circuits for hydrostatic or pneumatic pressure tests, working in close liaison with client engineers inspecting actual tests and obtaining final hand over acceptance certificates

PROFESSIONAL HISTORY

Mar 2007 to Present INCO MANAGEMENT PTY LIMITED
Turnover Engineer on construction of the GORO Nickel Mine Plant in New Caledonia.
Responsible for ensuring that all construction discipline phases are documented and recorded, confirming that work items have been inspected as compliant. Compiled in system packages utilizing WinPCS database application, to construction completion phase prior to commissioning acceptance.

Jan 2007 to Mar 2007 OGI PTE LTD
Seconded to OGI Pte Ltd, Singapore office to compile and write technical procedure documents and manuals. Namely Inspection, Maintenance and Repair for the Owner Operator of South Sumatra to West Java 32" offshore pipeline in Indonesia waters.

Oct 2006 to Dec 2006 ACERGY-GROUP., BV
Quality Control Supervision on board Seaways Orion construction barge on EPC2B pipeline project in the Mobil Producing field, offshore Nigeria.
Responsible for all Quality Control functions during installation of riser piping and ensuring that construction activities are monitored fully, in accordance with contractual requirements.

Aug 2005 to July 2006 BECHTEL INTERNATIONAL., INC
Quality Welding Engineer/ Client Representative on behalf of Petroleum Authority of Thailand, onboard Hyundai Lay Barge HD60 during construction of 614Km 42 inch diameter. Third Transmission Pipeline project, Gulf of Thailand.
Ensure that all welding and pipeline construction activities are carried out in accordance with the approved construction, welding and quality procedures. Monitoring lay barge activities in the field to ensure that project requirements are met through liaison with contractors project management team.

May 2005 to July 2005 VELOSI L.L.C.
Seconded to Shell/ Petroleum Development Oman, as Senior Pipeline Supervisor/Client Site Representative on Al Huwaisa to Yibal 18" Twin GRE Pipeline Project.
Representing the client in all construction activities included but not limited to; Monitoring construction progress and quality to agreed schedule and approved Inspection and Test Plans. Review and approval of quality control procedures and construction method statements. Ensure that all activities are carried out in accordance with contractual, quality and HSE requirements through routine audits.

Jan 2005 to April 2005 LEIGHTON CONTRACTORS (ASIA) LIMITED
Quality Control Welding Engineer on Shenzen to Tai Po Twin Submarine Gas Pipeline Project, Hong Kong.
Responsible for developing and implementing welding procedures specific for each individual project construction requirement. Instigating and supervising Welder Qualification program and ensuring that all welding quality requirements are met during actual construction phase of the project.

Aug 2004 To Nov 2004 DOWNER EDI LTD
Main Control Room Supervisor at Britomart Transport Centre, Auckland.
Operations Management maintenance through Scada control of ventilation system, heat detection sensory system, pumping and waste water control, fire and deluge systems. Administration and control of security emergency and evacuation procedures.

Mar 2004 To May 2004 KHARAFI NATIONAL Company
Quality Control Unit Head, Kuwait.
Managing and Administering Quality Control activities and functions on construction of Oil and Gas Projects in Kuwait. Responsible for updating and Developing new Quality Control Procedures. Supervising Company Quality Control staff to ensure that Quality requirements in accordance with various Client and Project Specifications are met and maintained throughout the individual project construction periods.

Jan 2002 To Sept 2003 UNIVERSAL ENSCO INC
Seconded to PETROCHINA Corporation as Quality/HSE Representative. On West/East 4000 Kilometre 40 inch Diameter Gas Pipeline Project, from Korla in west China to Shanghai.
Responsible for Mechanical Quality/HSE and advising PETROCHINA on Contractor issues relating to Construction Quality work practices and safety, on Nanjing to Shanghai section of project. Review of Contractors welding procedures and advising of any anomalies prior to test. Witnessing weld procedure trials and mechanical tests, monitoring of welder qualification program, all prior to start of field construction activities.
Transferred to Singapore in May 2003 as PETROCHINA Representative for fabrication of (16) Sixteen Metering Skids at Vendor works.

May 2001 To Jan 2002 ABB LUMMUS / PETROFAC INTERNATIONAL LTD
QA/QC Manager, for Project Management Team on construction of Ohanet Development Gas Pipeline Project, Algeria. Consisting of 47 Well Heads installation, Gas Gathering and Main Trunk Pipelines of various diameters, Manifolds, Receiver station Piping and Gas Processing Facility Plant.
Initially tutoring contractors how to develop Quality Plans, Method statements and Quality Procedures, developing and qualifying Welding Procedures for pipelines and process piping for the various piped services.
Responsible for overall audit/review of Contractors Quality Plans and implementation, to all discipline activities from initial construction phase to completion of the works and commissioning of the completed project through involvement and utilizing WINPCS software program.

Sept 1999 To Dec 2000 QUALITECH Co., LTD
Project Manager controlling and administrating Non-Destructive inspection contract on 30 inch diameter, Ratchaburi to Wang Noi Gas Pipeline Project, Thailand.
Responsible for implementing all contractual activities, reporting and liaison with the Client, ensuring that inspection requirements are maintained within construction program and that local employee personnel are fully aware and conversant with requirements of the project.

Dec 1997 – Sept 1999 HYUNDAI HEAVY INDUSTRIES Co., LTD
QA/QC Manager during installation of following construction projects-
Yung-an to Tung-hsiao Offshore Pipeline Project, consisting of 36 inch diameter 240 kilometre length offshore pipeline, for Chinese Petroleum Corporation, Taiwan.
Weizhou Oil Fields Development project, consisting of (7) seven offshore heavy crude, condensate and gas pipelines of various diameters, for China National Offshore Oil Corporation.
Responsible for compiling and writing project QA/QC Test plan manuals and Quality procedures. Developing and implementing welding procedures specific for each individual project construction requirement. Implementing Quality procedures and supervising Quality Control staff, ensuring that quality requirements in accordance with Client Specifications are maintained throughout project construction

May 1997 – Nov 1997 NIPPON STEEL CORPORATION
QA/QC Manager during installation of following offshore jacket and topside module platforms.-Pogo Producing company, Platform 'D', Tantawan Phase II development, Thailand.-Total Bongkot Field, WP9 and WP10 Platforms, Thailand.-Esso Production Malaysia inc., Raya 'A' and Seligi 'F' Platforms, 1997 Offshore Installation Program, Malaysia.
Responsible for implementing company contract Quality procedures. Developing/performing trials and implementing welding procedures as required for various structural and piping components during installation construction activities.

Jan 1996 – Feb 1997 TENNECO ENERGY AUSTRALIA PTY LIMITED
Owner Operator Authorized Quality Assurance Representative, on construction of South West Queensland – Wallumbilla to Ballera 755 kilometre Gas Pipeline Project. Review and approval of all Quality Control procedures in accordance with statutory and contract specifications, with ongoing audit and assuring implementation of Quality Control requirements during all phases of construction. Review and monitoring of Contractor's welding procedures during trials, and surveillance monitoring during the construction phase. Audit of all handover mechanical completion packages prior to pre-commissioning and involved as a team member during commissioning of the completed pipeline.

Jul 1994 – Dec 1995 SAIPEM PEREMBA SDN BHD
QA/QC Coordinator. Controlling/Supervision of quality control third party inspection staff, coordinating mainline and mobile radiographic crews to construction/welding locations, as and when required on Peninsular Gas Utilization Project – Stage III – Sector 1, Malaysia. Compiling all inspection reports into asbuilt data information prior to clearance for hydrostatic tests, witnessing hydrostatic test program and completing all packages to pre-commissioning status for final handover acceptance.

Mar 1994 – Jul 1994 SGS (MIDDLE EAST) LTD
Project Logistic Coordinator controlling inspection personnel / equipment and representing the company on sub-contract matters between SGS and Offshore Hyundai International Limited, SBHT Offshore Project, India.

Mar 1993 – Mar 1994 SAIPEM AUSTRALIA PTY LTD
Senior Third Party Pipeline Inspector on the Lumlukka to Rangsit section of the Sriracha – Saraburi Multi Products Pipeline Project – Thailand. Duties involved the controlling and supervising quality control personnel and inspection functions throughout all phases of construction on the project

May 1991 – Mar 1993 QED INTERNATIONAL S.A. (SINGAPORE)
Initially employed as Offshore Supervisor controlling NDT and quality control functions during laying of submarine pipelines and installation of topside module facilities on oil / gas production platforms, in Peoples Republic of China, Taiwanese and Malaysian waters.
Transferred to QED Services Pte Ltd in August 1992 to manage NDT and inspection services on the Mobil Refinery Expansion Project, Jurong, Singapore.

Mar 1984 – May 1991 BRYAN STREETER INSPECTION CONSULTANTS LTD.
Formed Limited Liability Company:-

Client BECHTEL INTERNATIONAL. INC
Project management piping / mechanical supervision of contractors during construction of a hydrogen peroxide plant at Morrinsville, New Zealand. Supervising and monitoring welding, pipe spool erection and small bore piping installation. Raising punch lists as necessary, compiling test package systems, supervising all hydro / pneumatic tests and obtaining final hand over acceptance, on mechanical completion.
Duration – Thirteen months.

Client COOLJARLOO MANAGEMENT SERVICES PTY LTD
Owners' site representative during construction of a mineral sands and pigment plant, Western Australia. Responsible for mechanical acceptance completion prior to handover to owner of following sites, asbuilt on a progressive basis:-
-Cataby Wet Concentrate Plant
-Muchea Dry Mill & Synthetic Rutile Plant
Duration – Twelve months.

Client CMPS ENGINEERS PTY LTD
Project management piping / mechanical supervision of contractors on construction of a Nagal Gallium rare earth plant at Pinjarra, Western Australia. Supervising and monitoring pipe spool erection, raising punch lists as necessary, supervising all hydrotests and obtaining final handover acceptance on mechanical completion.
Duration – Eleven months

Client TURNKEY BUILDERS (OVERSEAS) INC
Contractors quality control representative on revamp / rehabilitation of (7) seven existing fuel tanks and associated piping at Berbera, Somalia. US Naval Department Strategic Air Support Base.
Duration – Seven months.
Client LIQUIGAS LTD
Client's authorized inspection representative on construction of 2300 tonne LPG storage depot at Wiri, Auckland. Quality assurance audit on all phases of fabrication from initial weld procedures to completion of associated pipework within storage depot, pipeline from depot to marine jetty and module construction of marine jetty terminal.
Duration – Twelve months.

Client WILLIAM BROS – CMPS ENGINEERS
Audit of NDT subcontractor, welding / fabrication inspection of associated pipework for valve gate stations on Amadeus Basin to Darwin 1500 kilometre natural gas pipeline.
Duration – eight months.

Client COOPERHEAT OF NEW ZEALAND LTD
NDT supervision on pipework fabrication at IST Engineering Ltd, for Kinleith Pulp & Paper Mill, No 5 Recovery Boiler.
Duration – four months.

Client NORTHERN METAL TESTING LABORATORY LTD
Seconded to New Zealand Refining Company as NDT coordinator on revamp / shutdown, during hook up of existing plant to expansion project.
Duration – four months

Client I.H. INSPECTION LTD
Seconded to Newcan Engineering Ltd as quality control supervisor on pipework contract for Glenbrook Steel Mill expansion project.
Duration – four months.

Client NEW ZEALAND STEEL DEVELOPMENT
Welding / fabrication inspection of various structural and pipe spool fabrication, quality assurance audit of NDT performance and results.
Duration – eight months.

Client METLAB MAPEL (NZ) LTD
NDT inspection on LPG terminal pipework and 100 tonne LPG storage vessels.
Duration – four months

Aug 1983 – Mar 1984 R.J. BROWN & ASSOCIATES (FAR EAST) PTE LTD
Seconded to Sabah Energy corp., project management team, Labuan Sabah. On gas terminal complex and onshore pipeline project quality assurance department. Audit of contractors quality control division, daily welding performance and NDT.
Responsible for audit/review of contractors construction activities, mainly welding, application of various types of anticorrosion coating for above and below ground piping and structures. Also review/audit of all radiographic and associated NDT performed by subcontractor.

Feb 1983 – Jul 1983 ETRS (WESTERN AUSTRALIA) PTY LTD
Radiographic audit on Dampier to Perth natural gas 1570 Kilometre pipeline project. Controlling NDT contractor in the field on daily production to ensure (continuous) flow – on of welding clearance to construction and pipe laying crews.
Responsible on behalf of owner operator (Client) for audit/review of radiographic results to ensure compliance to project requirements and specifications.

Jan 1981 – Feb 1983 OILFIELD INSPECTION SERVICES PTY LTD
Initial employment as welding fabrication inspector and quality controller on North Rankin 'A' module fabrication works. Direct control of all NDT supervising both OIS and other contractors, direct liaison with client and certification authority in preparation and submission of all documentation and reports.
Responsible to ensure that all inspection activities are maintained with fabrication progress, traceability records are correctly compiled, review/audit of NDT results conform to project specifications prior to submission to Client, final inspection hand over documents are correctly compiled.

1979 – 1981 UNIT INSPECTION COMPANY – SOUTHERN AFRICA
Seconded to Fluor International inc., quality compliance department as welding / fabrication inspector on SASOL II AND SASOL III coal to gasoline refineries.
Responsibilities as field inspector were but not limited to; Witnessing weld procedure trials, welder qualification tests, field fit up and weld inspection of piping fabrication, ensuring welding of piping conforms to correct procedure/material, compiling field inspection reports and punch listing of completed piping after installation.

1978 SOLUS SCHALL – UNITED KINGDOM
Visual and radiographic inspection of 24" dia pipe / pile welds on harbour extension, Aqaba, Jordan.
Seconded to main contractor (Tarmac-Shahin) as Third Party Welding/NDT Inspector. Carrying out all inspection duties from Weld procedure trials through to inspection activities during fabrication. Also performed radiographic inspection to completed welds prior to submission of results to Client.

1975 – 1977 BIX – ETRS INSPECTION LTD
Contract visual / radiographic inspection on 30" and 34" dia Oanui to Huntly gas pipeline project.
Seconded to Ministry of Works Department, New Zealand to perform Third Party inspection duties and carry out radiographic inspection on completed pipeline welds.

1969 – 1975 BIX PACIFIC LTD
Promoted to manager 1973 and administered following projects:-
Maui offshore module fabrication, Otahuhu
Maui offshore module pipework fabrication, Robt Stone & co
Maui onshore 20" dia gas pipeline, Kapuni to New Plymouth
Responsibilities as Manager designate for New Zealand office of UK Company included but not limited to; Administering profit and loss control, Budget management and forecast plans, Technical management and administering projects. Safety awareness and quality training of staff personnel.

NDT Technician working on various projects, including:-
Kapuni to Auckland 8" dia gas pipeline
Pulp and paper mill, Kawerau. NDT on piping and pressure vessels
New Plymouth power station, pipework fabrication. Robt Stone & co ltd.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 301 to 350 of 757)Go to Search Parameters...
Brief Description
I am a highly motivated and ambitious Senior Electrical Engineer who worked in Emirate , Saudi Arabia , Kuwait , Iraq & Lebanon since 1994 and interested to pursue my future professional career in your company. The scope of work I am looking for is a job in the field of Residential Industry ,
Over 26 years experience of Gological Explorations for various minerals in Government Sector. Now seeking for an upward change.
Experience Crushing and Screening engineer armed with mechanical degree have more than 10 years of working experience in a few Multi-national organisation around Asia region (Singapore, China, Malaysia and Indonesia). Advance Project management and IT skills.
Account Management - International Department
MSc Engineering / Business Development / Project Management /Energy field/ Gas&Oil/Power/Heat Transfer/Cooling Condesing Plant/
A Senior Financial, Systems and Accounting Manager with significant experience in the development, creation and management of accounting and reporting systems gained both internationally and domestically. Have worked in the United States and the United Kingdom for Citibank, Xerox, Yale, Louis Dreyf
Seeking a Management position where my considerable experience and knowledge of Construction civil estimating and project management that can be fully utilized to help drive employer profit margins and complete contracts on time.
Accomplished Head of Finance & Administration with 11 years of experience and a history of reducing costs, effectively managing financial operations, and optimizing efficiency and productivity. Demonstrated expertise in accounting and GAAP, SAP, strategic planning, and cross functional collaboration
Qualified, results-producing Emergency Management Professional with experience steering and directing all aspects of operations, administration, budgeting, and equipment maintenance. Successful in managing multiple projects with compelling priorities involving program development.
By having multi-discipline skill; I have 21years of combine technical work experience in Project Management/ Consultant/ Coordinator/ Advisor/ Engineering/ Fabrication/ Construction/ Erection/ Installation & Maintenance work on both offshore & onshore.
See Resume
I am writing to express my interest in applying for vacancies at your organization.
20 + Years Experience / Supervisor / Heavy Equipment / Haul Trucks / Will Relocate
15 years construction and maintenace experience in electrical and instrumentation relating to the oil and gas indusrty. Other skills and experience gained in the last 5 years through construction supervision and project mamangement are piping, mechanical and civil disciplines.
Having 16 years experience in pumping and assescories of Pipe line, Motors, Engines, System study, Trouble shooting etc. Having abroad experince. Visited Lao PDR, Thailand, Srilanka. Handled Project works at varoius sites in India and in Abroad.
Project Manager, QA/QC Wireless Telecommunications
mechanical structure engineer
Outside Plant Technian, Bell System Trained, College Degree, AVAYA ACS PBX READY, copper/fiber palnt install/test/termination, Cat 5 and 6 as well as paging, cameras and home theater seeks contract/fulltime work in Middle East or almost anywhere in the world..
Human Resources professional with over 15 years experience. Areas of expertise include benefits administration, employee relations, payroll, reporting, records management and project management. Responsible, detail oriented with strong organizational, analytical, problem solving, communication, an
Apprentice Heavy Equipment Operator available for immediate Employment. Current Class A License. Trained in several types of Heavy Equipment. Some training in Grade checking/surveying. HAZWOPER Certified.
Vast Experience in Document Control, Administration, Human Resourses and IT
25 yrs mining experience. Engineering. Operations. Supervised heavy equipment. Team player. Give job 100%. Quick learner. Show respect to all individuals. Represent employer with professionalism. Impeccable attendance & safety. Open to international positions
I am a fast learner with a proven ability to prioritize and complete multiple tasks. I am highly motivated, work well on a team or independently and can complete assignments with little supervision. My enthusiasm, along with my ability to adapt to challenges, will be a benefit to any company.
Mining Engineer with surface, underground, contracting, industrial minerals, metal mining, hard rock mining, block caving, narrow vein, cut & fill, dragline, international, process, frontline shift supervisory, mine planning, & permitting experience
Licensed professional civil engineer. Have worked mostly in construction as either an owner or an owner's representative. Enjoy doing field work and would like to work in a foreign country.
QA / QC Instrument Inspector
Skills in various disciplines such as Welding Inspection, Plant Inspection which includes static equipments and piping, Material Testing, Failure Analysis and Lifting Inspection.
Manager / Supervisory position in the field of Administration, Personnel, Finance Accounting, Business
Procurement, Materials and Logistics Manager (SCM): 20 years international experience in gas & oil and energy projects.
I am an Industrial Hygiene & Safety Specialist in NJ and am looking for standard full-time work that uses IH sampling, report, and engineer control development skills.
Certified chemistry graduate with experience in quality control and pharmaceutical laboratories seeking a position in a professional establishment within which to further advance skills and experience
Self stater and takes full charge of enterprise
Long experience, professional skills, mastered business sectors: Oil - Petrochemical plants, Banks, Government organizations, Multinational organizations, Hotels & Commercial companies all with its different type of applications, working environments and unique needs.
CAD Designer (electrical/instrument) Extensive years of experience in AutoCAD (Rel. 2004)
Motor Pool Manager. Construction heavy equipment, vehicle and tool maintenance and repair experience. 5 years overseas work experince. Active military runway repair experience.
PIM EDW EDMS CAD INTERGRAPH Engineer. 11 years of experience on IT Application in Engineering, Working on Engineering Data / Document Management, Intergraph CAD System and EDMS (Electronic Document Management System) (such as PDS, Smart Plant products, AIM, Directa, SPF); Experienced in Oracle Data
QA Manager,Quality Engineer, QA/QC Supervisor, Auditor, Instructor,Multi-Discipline Field Inspector
Senior Logistics Coordinator
Talented HR professional with a generalist background. Experienced working in a professional services environment with complex hierarchies and matrix management. Ability to operate at both a strategic and operational level, within a geographically diverse team and in an international role.
Maintenance Planning scheduling, Maximo, Ms Office- Word, Excel, Power Point etc. Excellant English communications, Dedicated, organized, time management, result oriented, punctual and hard working
Over 20 years Quality Management and Supervision experience in Heavy Engineering Construction Industry
Since April 2004: Aeronautic Source Inspector “hardware” in Bourges and Méru (only 1 to 2 missions of 4 hours/month) for a diversified technology and manufacturing leader, serving customers worldwide with aerospace products and services (40% of sales); control technologies for buildings, etc
I have extensive experience in a wide range of Instrumentation and control systems; covering a range of job functions in various industries i.e. process, chemical and petro-chemical, on-shore oil & gas, pharmaceutical. Involvement in all areas of instrumentation engineering: electrical interfaces an
Innovative thinker with broad-based expertise in human resources, and business development.
10 years experience in IT software development environment in various organizations
Roughneck, Roustabout, Rigger, Rig Clerk, HLO
Manufacturing, Maintenance, Sales and Service, Application Engg, Project Engg, Administration
Sir, iam finished bacholor degree and i have computer skill. I have worked in Singapore for 2 years(Aug 2005- Aug 2007) as Fork Lift Operator in "CROWN BEVERAGE CANS PVT. LTD." SINGAPORE . If there is any opportunity in Fork lift operator please send me mail
Financial Manager (expat)
20+ years of experience with the environmental aspects of major energy projects - power plants, pipelines, transmission lines, refineries.
1   2   3   4   5   6   [ 7 ]   8   9   10   11   12   13   14   15   16  
Seach Parameters

Change search parameters...
CATEGORIES: Other;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com