Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #1030
next resume »»
CONTACT INFORMATION:
View contact information...
POSITION DESIRED: (full-time permanent or temporary project employee)
Construction Project Manager, or Construction Project Coordinator, Steel Erection Superintendent, or Superintendent of facility equipment installation & commissioning.
AVAILABILITY:
Available now - - - Willing to travel in performance of job.
LETTERS OF RECOMMENDATION: (Fax Copies Available)
Automatic Systems, Inc.
Staff Resources, Inc.
GM - Warren Powertrain
Saturn Corporation
Ford Motor Company, Inc.
GM - Worldwide Facilities Group
EDUCATION:
Certified Engineering Tech by NICET
Masters Degree in Administration
Degree in Mechanical Engineering
Degree in Mechanical Engineering Technology
Mechanical Design Drafting Diploma
COMPUTER PROFICIENCY:
Microsoft Project 2000 (project scheduling)
Microsoft Word
Microsoft Excel
Professional Experience
(1099 & W2 SELF EMPLOYED PROJECT CONTRACTOR - 1989 to Present)
GM WARREN POWERTRAIN - Warren, MI
POSITION: Regional Facilities Engineer - project construction (6-month project completed Feb. 2002)
Located at the customer’s facility from the time of site mobilization to project installation completion & acceptance. Duties included, but were not limited to, drawing and design review, purchasing, project coordination with union construction trades & installation personnel, scheduling and progress tracking, site construction safety and manpower monitoring. Responsible for, scope of work, equipment selection, specifications, request for quote preparation, project appropriations request, cost estimating, tracking and invoice approval. Total oversight and scope of work performance responsibility for mechanical, electrical, piping and controls subcontractors during the construction, installation, startup test & debug and launch phases of various construction and installation projects. Project managed the integration of subsystem equipment. Equipment included welding ventilation system, security camera upgrade and card access systems. Vendor selection, drawing review, purchasing and project management for fire protection systems (diesel fire pump, suction feed tank, sprinkler piping, waterflow switches, etc.) including installation, testing plus Fire Marshall and insurance carrier (IRI) acceptance. Monitored customer & subcontract personnel performance according to the functional specifications for each project. Assured that all punch list items were completed correctly and in a timely manner. Developed the master project schedules and maintained them current. Developed micro schedules for each discipline (engineering, construction & installation) and maintained a percent complete reporting structure. In addition, recommended field design modifications using concept sketches and verbal instruction to correct minor design or fabrication errors. Designed and developed programs Test & Acceptance Programs with effective feedback documentation. Held daily progress meetings with subcontractors and weekly meetings with the customer. Letter of Recommendation received from customer. Projects were successfully completed on time and within budget.
FORD KANSAS CITY ASSEMBLY PLANT - Kansas City, MO
POSITION: Project Manager of Building Construction & equipment installation (3-month project)
Contracted by Automatic Systems, Inc. (Prime contractor) to oversee their 13 subcontractors (civil, structural, mechanical, electrical, HVAC, fire protection, equipment controls, etc.) during the construction phase of a new 50,000 square foot building. Also, assisted the ASI field Superintendent during the equipment steel support structure installation phase for (6) six new Inverted Power & Free conveyor systems for Ford’s new Commercial Paint Department expansion project. Duties included, but were not limited to project coordination with subcontractors and plant personnel. Developed the master project schedule and maintained it current. An additional responsibility was site construction safety. Represented the Prime contractor at weekly safety & construction progress status meeting. Created and maintained current the project punch list in MS Excel format. Obtained customer buyoff and acceptance. Project was successfully completed on time as scheduled. Letter of recommendation was received from the Prime contractor.
GM DORAVILLE ASSEMBLY - Doraville, GA
POSITION: Worldwide Facilities Group Resident Engineer (3-month project)
Contracted through Staff Resources, Inc. for the General Motors Worldwide Facilities. My primary responsibility was to coordinate and assist in the Bid Package development, Vendor selection and Installation scheduling for new Primer Surfacer pre-fab building modification and Automation equipment. In addition, my duties included Project Management of a structural “Corrosion Study ” for the existing ELPO and Phosphate Systems. Both projects were successfully completed on time as scheduled.
POSITION: Worldwide Facilities Group Root Cause Analysis Engineer (5-month project)
Contracted for GM Corporate Facilities Engineering to troubleshoot and resolve “Plant Open Issues” concerning mechanical throughput and structural problems experienced by General Assembly, Body Shop, and Paint departments. My main objective was to reduced system downtime, which would increase production throughput and save the plant thousands of dollars in lost production time. To accomplish my task, I analyzed the problems and designed special structural steel support structures & components to eliminate product jams at load / unload points. Redesigned a portion of their "Webb Dog Magic" equipment structural support system. Modified existing structural track to achieve proper bite to eliminate drive torque outs at numerous chain to chain transfer points. All issues were resolved in a timely manner to the Plant’s satisfaction. Letter of Recommendation received from customer. Projects were successfully completed on time and within budget.
LESCO DESIGN & MANUFACTURING COMPANY, INC. - LaGrange, KY
POSITION: Procedure Designer of Reliability & Maintainability Program (7-week project)
Preliminary design of R&M standard data sheets for project management use. Project was placed on hold by customer due to funding issues.
FORD KENTUCKY TRUCK PLANT - Louisville, KY
POSITIONS: Project Manager (10-week project)
Installation Project Manager (6-month project)
Tooling and Facilities Erection Project Coordinator (4-month project)
Site Project Manager (7-month project)
Senior Construction Project Manager (18-month project)
Oversight of Tier-1 material handling equipment, rack supported building and steel structure installations. Project managed steel fabrication and erection projects. Management of electrical, piping and painting subcontractors. Developed and maintained current master project schedules (timelines). Compiled Reliability & Maintainability data. Management of Trim, Paint, Chassis, Engine, Final and Pre-delivery installation projects. Maintained the forecasted project budgets and project schedule milestones. Coordination of tooling (including facilities) installation and acceptance. Project management of ASRS, P&F and robot upgrade projects. Coordinated the integration of subsystem equipment. Developed and maintained a project percent complete reporting structure. Monitor system startup test/debug and launch teams. Created project punch lists. Selected local fabricators for economical completion of outstanding mechanical issues. Assured that all punch list items were completed in a timely manner. Letter of Recommendation received from customer. Project was successfully completed on time and within budget.
CONVEYORIZATION, INC. - Louisville, KY
POSITION: Vice President of Engineering (18-month project)
Managed the Mechanical Applications, Sales and Engineering departments. New business sales and customer development. Total engineering budget plus P&L responsibility. Approved all request for quotation and price estimating. Oversight of proposal, scope of work and specification preparation. Designed material handling systems. Project was successfully completed.
Additional Professional Consulting Experience
(overview only - detailed project duties available)
(UPS) United Parcel Service - Columbus, OH
Position: Site Project Manager (4-month project)
FORD ST LOUIS ASSEMBLY PLANT - St Louis, MO
Position: Senior Project Engineer (9-month project)
SATURN CORPORATION - Springhill, TN
Position: Site Project Manager (13-month project)
GM WILMINGTON ASSEMBLY PLANT - Wilmington, DE
Position: Senior Project Engineer (9-month project)
GORDON FOOD SERVICE DISTRIBUTION CENTER - Grand Rapids, MI
Position: Site Project Manager & Engineering Troubleshooter (16-month project)
FORD TRANSMISSION PLANT - Batavia, OH
Position: System Performance Monitor (6-week project)
GM TRUCK ASSEMBLY - Fort Wayne, IN
Position: Site Project Manager (14-month project)
K-MART FASHIONS DISTRIBUTION CENTER - Atlanta, GA
Position: System Start-up & Acceptance Manager (4-month project)
Previous Permanent Employee Experience
(overview only - detailed project duties available)
WEBB-STILES COMPANY - Gadsden, AL
POSITION: Engineering Manager / Regional Sales Manager (1987 to 1989)
LOGAN COMPANY - Louisville, KY
POSITION: Project Manager (1984 to 1987)
PUBLIC SERVICE OF INDIANA NUCLEAR POWER PLANT - Marble Hill, IN
POSITION: Project Construction Training & Development Manager (1981 to 1984)
BROWN & ROOT Petro Chem Solids Handling Div. - Houston, TX
POSITION: Senior Project Manager / Engineer (1980 to 1981)
LOUISVILLE TECHNICAL INSTITUTE - Louisville, KY
POSITION: Executive Director (1975 to 1980)
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 201 to 250 of 4371)
Go to Search Parameters...
Brief Description
B.Sc.1977, V.G. Honours, M.Sc.1985. Consultant and Executive Director (> 40 Transport & Railway projects). Teach Transport Planning, Railway Eng. & Applied Statistics & Eng. Systems for undergraduate, Faculty of Eng., Cairo Uni. DOS, Win., AutoCad, MSOffice. Organizing the 3rd CODATU-III Conference
APPLIACATION FOR THE POST OF JUNIOR CIVIL ENGINEER.
I am a creative civil engineer and construction inspector, with diverse multi disciplinary experience in reinforced concrete, pre-stressed concrete, precast concrete, structural steel and timber construction. I am well versed with all aspects of project management from inception to completion.
Project Manager: Responsible of the coordination and execution of the following projects: • Warehouse Management System (Oracle WMS) • Overall Revision to the actual ACP Master Catalog . Inventory Re-engineering Program
Welding(certificates). Electrical, mechanical, hydraulic and pneumatic equipment, installation, (30MPa certificate). Workplace Safety & Health field (Certificates). Staff training and retraining. Drawing and reading blueprints and schematics. Robotics. Repair. Maintenance. Management. Sales.
A specialist in rock mechanics and engineering geology. 26 years tunnelling and mining experience. Expertise in stability analysis, support design and monitoring; blast design and optimisation; TBM and road header performance; risk analysis.
25 YEARS OF MANAGING & BUILDING A/E PROJECTS EXCEEDING $ 600 MILLION BS & MS - CONSTRUCTION MANAGEMENT - MINOR IN CIVIL ENGINEERING - 4:00GPA FORMAL EDUCATION IN ARCHITECTURE -QUALIFIED WITH A.R.E IN THREE STATES
Experienced engineer in thermal power plant construction & commissioning
Commissioning Management
i have worked for construction of oil and gas ,refinery,petrochemical,fertilizer and powerplant construcion work i have responsible for fabrication,erection and mechanical completion work
To take up challenging responsibilities in relation to actual management and supervision in all various discipline related to my expertise as Site Superintendent .
I have vast experience in the Safety related field.
Looking for a long term contract or permanent challenging position worldwide, utilizing broad - based experience in projects maintenance– Maintenance manager, Supervisor, Team leader – Air Traffic Control, Industrial projects, Telecommunications.
CM Support of (3) State and Federally funded highway projects (2) Govt./Military Construction Projects; (1) Hi-Tech Facil. Control Upgrade; (3) Hospital Projects. (2) New civil underground water, gas, sewer and (3) major telecommunications infrastructure proj (2) Environmental – Remediation projects
Senior Hydrogeologist
Formal studies in civil engineering, information systems, business management and project management have provided me with extensive technical and financial expertise together with proven planning, coordination and control skills.
Twenty-five years in quality management including operations management, budget and manpower planning, supervision, project execution, quality system implementation, auditing, coordination and training during design, procurement and construction of international energy and petrochemical projects.
Senior Mechanical Engineer (M.Sc.) having experience as plant manager and project manager, specialist in mining, safety glass, manufacturing plant and brewery investments.
Mechanical engineer with design and project engineering experience. Proficient Designer with over 10,000 hours total CAD experience including Autocad 2002, and some Microstation. Extensive experience in mechanical systems design, product design, as-builts, and fieldwork.
I have over 15 years of experience in construction management. I have expertise in contract negotiations, budgets, multi-tasking, leading teams of employees, EPA and OSHA, and many other areas.
An HSE professional that has made significant input over the last ten years to the development of Occupational Health, Safety and Environment (HSE) as it affects the oil and gas industry. I am self motivated, result driven and possess strong business acumen with ability to motivate and drive
CSI / Construction Document Technology
Looking for the opportuniy in switchgear industry
To further improve gained 12 years excellent Experience of Chief Accountant, Financial Forecaster and Administrative Manager of all types of Accounts
Commercial Real Estate Agent, Construction Project Manager, Business Development Director
My education qualifications, career training, knowledge and acquired skills would be suited to position in your company (Former Soviet Union: Kazakhstan, Russia).
I am experience in AutoCAD Drafting/ Electrical TEchnicain/ Communication Technicain
Project Manager 20 yrs experience Oil/Gas from Ground Up. Objective supported by: INTERNATIONAL PM MBA Ceng INSTRUMENTATION AND CONTROL HNC PROCESS CONTROL CONSTRUCTION SUPERVISION COMMISSIONING / AUDITING FISCAL MEASUREMENT SYSTEMS ENGLISH / SPANISH
Master in Construction Management. Hands-on experience in the field and in the office in the three basic specialties: civil, electric and mechanical. Computer skills with: Expedition and Primavera /Suretrack, Windows, Excel, Lotus etc.. Prepare the WBS, OBS, budget control etc..
Throughout my Professional Career and experiences being a GC, one of my duties was Estimating, which I did learned and had to do from ground Up, on most of the Projects I did Participated in, from simple Electrical Ductworks up to Special Warehouses at Industrial Division.
I am an expert Civil Engineer with over 18 years of experience to offer. My most recent experience was Consultant Engineer in Kuwait. Furthermore, I work well with others, and I am experienced in project management. I've got the Master Degree in Construction Management.
I have been employed in the field of Power Engineering, Industrial Installations, Cement Industry and Sewage Treatment Plants at all stages, covering turnkey projects: erection, starting - up, commissioning, running and all kinds of maintenance.
A highly skilled industrial project construction & facility equipment installation management professional who has worked on projects from "cradle to grave" for various major companies. Over 15 years project management experience.
Twenty five years domestic and international experience in Prime Contracts and Subcontracts Management & Administration and Pricing involving all aspects of the procurement cycle.
Instrument Quality Control Inspector / Quality Control Engineer, Field Instrument Engineer & Field Instrument Supervisor
A likeable personality and cool-headed professional. A 1991 graduate of Electrical/Electronic Engineering with proven experience in project management, process automation and information technology.
Senior Engineer / Traffic Management I am confident that my experience would allow me to make an immediate and significant contribution. I am attaching a brief overview of my work history and accomplishments for your review.
Instrument supervisor
I am a 1995 Graduate I have been working in the field of utilities &civil engineering for almost 12 years.
Diploma in Mechanical Engg. Having 19/20 years of experience in FABRICATION AND PLANNING of structural steel, Pressure vessels, Boiler, as per ASME code and storage tanks etc. Last 15 years Iam working in Dubai in various organisation in verious responsible positions.
Sr. Subcontract Administrator with J.D. and Gov¡¦t, construction, international experience with FAR, UCC and SOX compliance
15 years experience in the construction industry.Professional Engineer from Ghana and MBA from the University of Houston. Plan to be certified in the US as soon as possible.
I have a diploma in Industrial Instrumentation and have recently completed a year in Process Operations with BCIT to gain certification as 4th Class Power Engineer and am looking forword to obtaining my 3rd Class.
Free!
15 years direct managerial, lead man, foreman and supervisory experience,
I am seeking a position which Railway Signalling experience on design, systems interface, installation, test and commissioning and maintenance skills can be fully facilitated. Techniques on project and resources management can be utilized.
A performance-driven Mechanical Engineering professional with 15 years Sales and Marketing experience of elevators & escalators in India, Dubai, Sharjah, Kazakhstan and Kyrgyzstan, seeking an assignment as, Country Head (Sales)/ Senior Business Development Manager in Elevator Industry.
PCS Manager - Cost and Planner Engineer
Facilities management, HR Management, Administration,- Mechanical Engineer, NEBOSH
Demonstrated ability and skills in the Project construction contract management
Structurd Cabling, Voice, Data, Fiber Optic, OSP, FTTP,
First
1
2
3
4
[ 5 ]
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com