CONTACT INFORMATION:
View contact information...
OBJECTIVE: To obtain a key Project Manager, Project Engineer or Construction Management position where leadership, experience and action skills will contribute to organization, profitability and effectiveness.
SUMMARY OF QUALIFICATIONS:
„h Certified Plant Engineer / Former Fl. License Contractor with Over 18 Years of Experience in Turn-Key Communication Construction Management, Airport Construction & Communication Support, Infrastructure, Wastewater & Water Facilities, ,Project Inspection, Security, O&M of Industrial/Education/Manufacturing Complexes
„h Dynamic and Valuable Working Knowledge of International Customs and World Cultural Idiosyncrasies and Regulations
„h Progressive Management Skills Include Airport Communication Systems Integration, Construction and Infrastructure of University, Hospital, Industrial and Commercial Facility Operations
„h Familiar with High Tech Manufacturing Installations on a national and International Scale
PROFILE:
„h Excellent Ability to Coordinate Architects, Contractors, Consultants, Subcontractors, etc.
„h Creative and Effective Negotiator/Liaison when Working with Customers, Workers and Vendors
„h Able to Provide Quality, Consistent and Timely Technical Construction Management Support
„h Highly Experienced in Total Airport Management Systems (TAMS)
„h Intensely Motivated, Self-starter, Competent, Resourceful and innovative
„h Contributing Greatly to Cost Reductions for Client's Manufacturing Plant Operations in Lighting, Heating, Air Conditioning, Handling Hazardous Waste, Computer and Telephone Services
PROFESSIONAL EXPERIENCE:
November 2000 to January 2002 (Contract Completed)
INDEPENDENT PROJECT MANAGEMENT SERVICES, INC. (IPM), St Louis, Mo.
Bick Group, 11902 Lackland Rd., St. Louis, Missouri, 63146
Project Manager, Georgia Region, Client - Charter Communication, Inc.
On-the-job accomplishments; Management of multiple TV Cable Head End & Hub projects to include site selection, permitting, construction, infrastructure, security systems, OSP & ISP fit-up for turn-key TV Cable Head End & Hub communication facilities supporting from 50K to 250K subscribers throughout North Georgia. Head-End sites included 150¡¦ towers, 3.8 & 4.5-meter dishes and Simulsat 5 dish. Projects from $2.8M to $4.3M.
February 2000 to August 2000 (Contract Completed)
PARSONS AVIATION, Reina Beatrix International Airport, Oranjestead, Aruba
Division of Parsons Transportation Group, Miami Fl. 33126
Airport Systems Integration Specialist
On-the-job accomplishments; Owner¡¦s Rep for mechanical, electrical and security systems integration acceptance for the Aruba Airport Authority. This $120M terminal expansion project included an international & USA departure terminals with US Immigration & Customs facilities, arrival terminal, FIDS, BIDS, BHS, BMS, Fire System, Passenger Boarding Bridges and other subsystems.
Frederick L. Sexton, Page 2
October 1998 to February 2000
DIVI PHOENIX NV., Palm Beach, Aruba
Project Development & Construction Director, Aruba Phoenix Beach Resort (Contract Completed)
On-the-job accomplishments; clearing the $34M. construction/renovation projects punch list, design and contract all outside lighting and landscaping for this 101-unit timeshare resort in the Caribbean.
Also design and development of two 10-acre Aruba National indigenous beach side state parks for the Aruba government.
April 1997 to July 1998
HARRIS CORPORATION TRANS COMM. DIV., STH CONSORTIUM, KL Malaysia
Kuala Lumpur International Airport - Total Airport Management Systems (TAMS).
Integration Engineer (Related Works Construction Manager) (Contract Completed)
On-the-job accomplishments; management of 3 Expiate, 5 Malaysian Related Works
Engineer's day-to-day interfacing with 35 contractors, 21 consultants and client representatives on the $1.4B, 10 sq. mile construction project. Directly responsible for the Main Terminal Building and Contact Pier facilities. The "TAMS" network has a fiber backbone with fiber and copper Cat 5 connectivity to 205 buildings, integrating security, CCTV, ACAM, FIDS, FMS, BMS, PSS, PGTS, POS, AGL and other subsystems to 310 satellite equipment rooms within the 10,000 hector site.
March 1995 to March 1997
FLUOR DANIEL CORPORATION, GE PLASTIC,
One Lexan Avenue, Mount Vernon, Indiana 47620 (Contract Completed)
Mechanical Reliability Engineer
Performed reliability studies for all rotating equipment in the Lexan plastic chemical process. Establish a current master equipment database for FMS and CMM program for the 14 GE Plastic Divisions at Mt. Vernon, Indiana site (this plant produces over 1.7 million lbs/day of Lexan Resin Plastic).
December 1993 to March 1995
SIGNAL TECHNOLOGY, ST KELTIC CORPORATION DIVISION,
Fort Walton Beach, Florida 32548
Plant Engineer & Safety Officer
Scope included facility support of Mil. Spec. Power supply and Amplifier Manufacturing Operation, Telecommunication, FMS, Safety, OSHA, EPA and facility renovation and acquisition acceptance
May 1991 to October 1993
FLUOR DANIEL CORPORATION, KING ABDUL AZIZ UNIVERSITY, P.O. Box 8120, Jeddah, Saudi Arabia (Contract Completed)
Construction/O&M Manager of Infrastructure & Wastewater Treatment Plant
A $2.2 Billion, 800 bed teaching hospital, Science Center, Research Complex and Men's and Women's Academic facilities. Responsibilities: Construction and O&M management of infrastructure to include FMS for LPG systems, 2 m/gl potable water storage facility and pumping station, wastewater treatment plant, chilled water system, storm water system supporting a population of 40,000.
March 1986 to March 1991
SPARTON DEFENSE ELECTRONIC, P.O. Box 788, DeLeon Springs, Florida
Facility & Maintenance Engineer Supervisor
Managed Operation and Maintenance, FMS integration, HAZMAT, Construction and Telecommunications for three manufacturing facilities (750,000 sq. ft.) producing underwater sonar electronics.
Frederick L. Sexton, Page 3
February 1984 to March 1986
BURROUGHS CORPORATION, FSG, 8259 Exchange Drive, Orlando, Florida
Plant Engineer/Construction Manager
Complete responsibility for plant fit-up and operation to include Telecommunication, FMS integration of a 100,000-sq. ft. Laser Printer manufacturing operation and R&D facility.
January 1983 to January 1984
HARRIS CORPORATION, INTERNATIONAL PROGRAM DIVISION
Luzon, Philippine Islands
Quality Assurance Consultant (Field Installation Engineer)
On-the-job accomplishments; Inspection, repair and retrofit of a $152 M, Luzon Grid Load Dispatching System on the Luzon. 50 remote sites consisting of Farinon microwave equipment, UPS systems, Harris Master Station, Tri-Ex towers (110 ft. to 400 ft.) and other communication equipment.
EDUCATION:
AMERICAN INSTITUTE OF PLANT ENGINEERS, Cincinnati, Ohio
Certified Plant Engineer
FLORIDA CONSTRUCTION SCHOOL, Orlando, Florida
Building Contractor License
COLUMBIA PACIFIC UNIVERSITY, Mill Valley, Ca.
BA Industrial Management, Business Administration
BREVARD COMMUNITY COLLEGE, Melbourne, Florida
Industrial Management, Business Administration, Computer Technology
CUYOHOGA COMMUNITY COLLEGE, Cleveland, Ohio
Mechanical Engineering
GRISWOLD INSTITUTE OF ELECTRONICS, Cleveland, Ohio
Electronics
LICENSES & CERTIFICATIONS:
Former FLORIDA STATE BUILDING CONTRACTOR
CBC # 036424, 1985 to 1996
CERTIFIED PLANT ENGINEER
CPE # 2608
FLORIDA HAZMAT & OSHA TRAINER
Further Information and Excellent References Available on Request.
View contact information... |