CONTACT INFORMATION:
View contact information...
ACADEMIC BACKGROUND:
Diploma examination in civil engineering awarding the academic title of Graduate Engineer at the Technical University in Braunschweig, Germany (1986)
Title of thesis: 'Comparable examinations on the determination of the compaction effect of various deep vibrators'
Countries Employed:
Germany, Austria, Japan (Trainee)
EXPERTISE:
Specialist ground engineering, Geotechnical engineering,
Water and culvert engineering, Project management,
Contract management, Acquisition, Processing of tenders,
Contract negotiations, Calculation, Supplement management,
Personnel management, Construction superintendence:
MAJOR PROJECT EXPERIENCE:
- Management and examination of contract, factual and planning supplements of new Inglostadt – Nuremberg railway line
- Planning of complex building pits, sheet-piling, jet-grouting and horizontal base cut-offs, Harbour-City, Hamburg
- Soil expertise and advise provided, Harbour-City, Hamburg
- Oriented expert opinions on harmful substances, Harbour-City, Hamburg
- Foundation advice provided, Harbour-City, Hamburg
- Dynamic deep soil compaction within the scope of a disposal site renovation, Hamburg
- Reconstruction of the harbour Aken (Elbe), Saxony-Anhalt
- Building pit 'ARGE Baugrube Methfesselstrabe', retaining walls made of bored steel piles and wood, Berlin - Tempelhof
- Bank protection and sheet piling 'Moabiter Werder', Berlin
- Diaphragm walls constructed of concrete - bentonite suspension barracks, Bernau near Berlin
- Railway construction, track modification in assembly line method, Hannover-Bremen
- Sheet-piling, bore-piling with large diameters, permanent anchoring, Lock Berlin-Spandau
- Building pit 'Berliner Bank' with retaining walls made of bored steel profiles and wood, Francfort/Oder
- Sheet-piling and permanent anchoring for 'fire brigade pond' at fire brigade school, Eisenhuettenstadt/Oder
- Building pit for car park with retaining walls made of bored steel profiles and wood, temporary anchoring, Berlin – Wedding
- Building pit 'Obermeyer Planning and Consulting' with retaining walls made of bored steel profiles and wood, temporary anchoring, in-front-of-wall piles, grouted-walls, water-retention, Berlin- Friedrichshain
- Bored piles with large diameters for railway-bridge foundation, Berlin-Baumschulenweg
- Sheet-piling with temporary anchoring, hot-rolling plant, pan furnace, roll grinding plant, granulation, open water circuit
EKO Steel, Eisenhuettenstadt, Oder
- Subsoil improvement with vibro compaction and vibro concrete columns, continuous flight auger pile, Bad Freienwalde
- Trial sheet-pile driving, Ragoeser Damm, Eberswalde
- Bore-piling with large diameters for railway-bridge foundation, Nauen – Paretzer Kanal, Nauen
- Bore-piling with large diameters, in the upper part horizontal and moveable, Berlin-Wedding
- Pile foundation of waste water line
- Building pit 'rain retaining basin' with diaphragm walls, Berlin – Neukoelln
- Building pit with diaphragm walls, made of sheet-piles in cement - bentonite suspension, temporary anchoring, soft-gel horizontal base cut-offs, water-retention, Potsdam near Berlin
- Building pit with retaining walls made of bored steel profiles and wood, temporary anchoring, Francfort/Oder
- Anchorage work for a subway lot D81, Berlin-Hermsdorf
- Building pit 'Rudolf Virchow Hospital' with retaining walls made of bored steel profiles and wood, temporary anchoring, Berlin – Wedding
- Building pit 'Guthsmuts-Street' with retaining walls made of bored steel profiles and wood, temporary anchoring, Berlin – Steglitz
- Building pit 'Löbbecke Bank' with diaphragm walls and temporary anchoring, jet-grouting and horizontal base cut-offs, Berlin – Wilmersdorf
- Building pit 'GEMA' with retaining walls made of bored steel profiles and wood, temporary anchoring, water-retention, Berlin – Wilmersdorf
- Building pit 'C&A Warehouse' with retaining walls made of bored steel profiles and wood, temporary anchoring and water retention, Berlin – Charlottenburg
- Lake pipeline (steel) for gas positioned on base of lake in distinct manner whilst submerged, Tegernsee / Bavaria
- Lake pipeline (PEHD) for waste-water positioned on base of the lake in specific sinking mode, Chiemsee/ Bavaria
- Donau culvert Riedlingen
- Enns culvert Liezen / Austria
- Inn culvert Wiesing / Austria
- Lahn culvert Weilburg
- Lahn culvert Marburg
- Weser culvert Vlotho
EMPLOYMENT HISTORY
2003-present Civil engineer, contract management
Dipl.-Ing. Bernd Gebauer Ingenieur GmbH, Munich
2002-2003 Civil engineer, geotechnics and environmental technology
BBI Geo- und Umwelttechnik Ingenieurges, mbH, Hamburg
2002 Civil engineer, construction and hydraulic engineering
Emch & Berger, Ingenieure und Planer GmbH, Berlin
2000-2001 Unit manager, specialist ground engineering
Gebr. Kemmer Ingenieurtiefbau GmbH, Berlin
1999-2000 Project supervisor, specialist ground engineering
Preussag Specialist Ground Engineering, Berlin
1998-1999 Manager, main unit operating point railway construction
E. Heitkamp GmbH, Celle
1998 Chief project supervisor, specialist ground engineering
Stump Specialist Ground Engineering, Berlin
1993-1998 Manager, foundation and specialist ground engineering
E. Heitkamp GmbH, Berlin
1992-1993 Project supervisor, specialist ground engineering
Bilfinger & Berger Bau AG, Berlin
1989-1992 Project supervisor, specialist ground engineering
Brueckner Grundbau GmbH, Berlin
1986-1989 Project supervisor, hydraulic and culvert engineering
Josef Riepl Bau AG, Munich
STUDENT ACTIVITIES:
1985 Assistant of building process activities and monitoring,
Japan Public Highway Corporation, Tokyo
1982-1983 Scientific assistant for developing evaluation programs in soil mechanics laboratory, Institute for Foundation Engineering and Soil Mechanics, Technical University of Braunschweig
INTERESTS:
Music, swimming, cycling, skiing & traveling
View contact information... |