SUMMARY OF QUALIFICATIONS:
------------
26 Years experience in THE KINGDOM OF SAUDI ARABIA.
ON Building Services Systems
HVAC Systems
Chilled water system; direct expansion system; CAV & VAV
Building management systems for all mechanical & electrical systems Integrated wit Energy Saving
Plumbing Systems
Sanitary sewage system; Storm Water system; Domestic water system;
Swimming pool; Sauna Rooms; Steam Rooms; Solarium Therapy Room
Irrigation; Fountain; Fire fighting;
Electrical Systems
Power Distribution; Lighting; Fire Alarm; Security; Telephone; Computer network
Elevator; Emergency Power generator
Building Category
Commercial & Residential
Factories & Industrial Building
Hospitals
5 Star Hotels
------------
OBJECTIVE:
------------
Based of my 26 Years Knowledge and Advanced Technique in MEP Systems for High Rise Building Starting from Development Stage up to Start up & Commotion [The Target of Technique is Best Quality, Minimum Cost; Best time Schedule, Best Operating Cost, So the Building Will Have Energy Star Stamp]
I am looking for position in Engineering Consulting or
Development / Management Group to use my advanced
Experience in MEP Systems for High rise Building or 5 Star
Hotels or Hospital
------------
WORK EXPERIENCE:
------------
From January 1973 up to Jun 1977 [Egypt]
* At north Cairo power station As Condenser level monitor and pump operator [1 year ] Sub Station Operator [1 year ]
As Steam turbine Operator [3 years]
From July 1977 up to May 1978 [Egypt]
* At west Cairo power station [ Extension project ] With WestingHouse & Kahromika As site engineer My responsibility: -
Install and test high pressure steam pipe line between Boiler and turbine
From 20 - 5 - 1978 up to 24 -7 -1981 E. A. Juffali [KSA Riyadh branch] As Duct Work Shop Manager
- Alkhashm alaam project
- Police academy project
From 20 - 8 - 1981 up to 14 -7 - 1988 TALL General Contracting Co. MEP Technical Manager
Projects:-
- Training building police college Riyadh
- prince saud bin naif offices Riyadh
- Alkharg hospital 200 bed with Aster int.
- Hael hospital 200 bed with Aster int.
- Alaudah sanitary fixture show room Riyadh
- Al-Monagem commercial center Riyadh
- Al-Baha tourist mottle ( sasco )
- Including many private villas & palace
From14 - 8 - 1988 to 20 - 7 - 1992 Alshahlah Est. As MEP G. Manager
Projects:-
- Dr. Omar Sabak villa Jeddah.
- Sh. Ibrahim al-Ibrahim makkah.
- Satellite station Km. 29 makkah.
- Prince KHALED AL-FISAL palace (private villa & guest salon + guest dining) Abha.
- Including many private villas & palace Madinah.
From 20 - 8 - 1992 to 30 - 6 - 1994 IDEA NETWORK Consultant & Management Engineering
Projects:-
* ASIR GOVERNORATE COMPLEX IN ABHA
The project comprises:
A very high quality four storey office block with five storey V.I.P. tower and two, four storey wing enclosing a courtyard from which the old Abha Tower can be viewed.
Basements include mechanical areas kitchen, computer suites and V.I.P. car parking.
There is separate housing for guard quarters and substation which will eventually form part of a viewing stand to the parade ground
- Some of silent features are:
* V.I.P. plaza with fountain adjacent to a V.I.P. viewing platform.
* Reflecting pool in the courtyard focuses the old Abha Tower which is accessible through a V.I.P. lobby.
* Service area for plant and equipment is accessible from a service road.
* West compactor system.
* Incinerator for V.I.B. west.
* 46,000 Sq. Mt. project area
* The buildings manage from computer center by using latest technology of BUILDING MANAGEMENT SYSTEM to monitor & control all service systems.
From 20 - 8 - 1992 up to 19 -10- 1993 IDEA NETWORK Consultant & Management Engineering [As Senior MEP Engineer]
* ASIR GOVERNORATE COMPLEX IN ABHA
* My responsibilities for all mechanical systems. (redesign and supervise & approve material & equipment & shop drawing & site Inspection)
* List of systems
- HVAC system
* Chilled water system & Hot water boilers with air distribution C.A.V. & V.A.V. air handling units 4 pipe ( 2 Cool & 2 Heat ) include 2 steam humidifier for each unit installed on 12 mechanical room & chiller plant..
- Treated fresh air.
- Central exhaust system.
- Plumbing
* Water systems
- Domestic Cold & hot water system
- Irrigation system.
- Fountains.
- Reflecting pool.
- Fire protection system
* Storm sewage system
* Sanitary sewage system
- Elevators.
- Standby Power Generators.
- Incinerators.
- Waste Compactors.
- Cold Storage Rooms.
- Food Service Equipment.
- Building Management systems (B.M.S. )
* Systems add to my responsibilities to interface with B.M.S.
- Fire alarm system.
- Security system.
- Out door light.
- Building Color dynamic graphic display
From 20 - 10- 1993 up to 30 - 6 - 1994 With IDEA NETWORK Consultant & Management Engineering in Design station [As Senior MEP Team leader]
Projects:-
- Jeddah Helton complex.
- Medina Helton.
- King abdul-aziz Mosque Makkah
* Responsible for: -
- Design all mechanical systems & co-ordinate with other services and quality control for mech... Graphic.
- Co-ordinate Architect & Civil with IDEA USA on Houston Texas
From 30 - 6 - 1994 Up to 30 - 7 -95 with Darwish Saudi Arabia Consultant Engineering Office As MEP Division Team Leader [Project Design & Site Supervision projects: -
- Shopika No. 1 Makkah 5 Star Hotel
- Area No. 155/165 Madinah 5 Star Hotel & Apartment
- Ben-Hamran Jeddah commercial Center
- Al-Hammrany Jeddah commercial Center
* Responsible for: -
- Manage & design & Supervise all mechanical & Electrical systems co-ordinate with other services
From 01 - 8 -95Up to 31 - 1 -99 with Dr. Soliman Fakeeh Hospital [Owner Management Group] As MEP Owner Representative
Project: -
- New Pediatric Hospital 350 Bed
- Medical Rehabilitation - Fitness - Plastic Surgery Center
* Responsible for: -
- Redesign & Supervise all Mechanical & Electrical systems & co-ordinate with other services
- Dr. Soliman Fakeeh Teach & Guide Me To Finalize The Medical Equipment & System Indicated Below:-
* Nurse Cal System
* Central Sterilize System
* Patient Bed
* Patient Bed head Unit
* Operating Theatre & Delivery Room Equipment
* I.C.U. Requirement
* Medical Gas System
* Operating Theatre & Delivery Room Requirement
* A/c Design
* Electrical Design
* Operating Theatre Ceiling & Wall & Floor
* Operating Theatre Scrub-Up Selection
* Operating Theatre Table Selection
* Operating Theatre Light Selection
* Operating Theatre Pendant
* Operating Theatre Camera
* Operating Theatre Control Panel
From 31 - 1 -1999 Up to Now with [Ahmed Saleh Kaki Sons Co.] As Property
Manager
Responsibility:-
* Marketing analyses for all Kaki Buildings to minimize the operating cost
* Study and design Central Operating Center With management and maintenance Software
* Supply and install Local manufacture Energy Saving System For all Kaki Buildings [Jeddah & Makkah]
* Communicate with international Supplier for any device or systems to be used in Kaki Building to upgrade the building performance Or Save the energy
* From 12 - Jan - 2001 Up 15 - Jul - 2003 Kaki Employ me with AnsaldoEnergia As Senior Documentation Manager
Responsibility:-
* Receive the document via the internet from Italy
* Arrange all the necessary action to submit the document to EnelPower
* Follow up the document status and arrange the necessary action
* Make the necessary modifications and resubmit the document
* Use special program to modify some document in different format
* Keep all the document in different rev. in special electronic archive
* Keep all information's in special electronic archive
* Plan for the AS Built Drawing [Electronic submittal] in different type of media and format
* From 1 - Aug. - 2003 Up 31 - Jan. - 2005 Kaki Employ me with Kaki Construction Management Group As MEP Design Manager
Responsibility:-
* Develop and Design All MEP Systems for Jeddah Cornish Dreams Project
The project comprises:-
4 Towers each tower 30 floors +Bent House & Basement & Ground and 2Mezanin
* Total Area 80,000 Sq. Mt
* Total Design Drawing for MEP 480 DWG A0 Size
* Total Specification Document 600 Page A4 Size
* Total B.O.Q 31 Page A4 Size
* Total Contract Document 120 Page A4 Size
* From 1 - Feb. - 2005 in Dubai Looking For My Objective
The Above Experience Approval and reference available if required
------------
EDUCATION & CERTIFICATION:
------------
BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING
From HELWAN UNIVERSITY Egypt
* Faculty of technology Cairo May 1977Mechanical engineering
Member of the Egyptian Engineering Syndicate
Training course
* Course on how to use the computer with HVAC engineering design and analysis programs.
- E20-II Package.
* Block load.
* Duct design.
* Water piping design.
- Electronic catalogue.
* HVAC equipment selection
* Course on Estimating HVAC cost & use project management program to optimize project planning.
* Course on Design & install & start up Carrier comfort network.
* Course with Daikin on HVAC engineering design & maintenance.
* Self training:-
* I started since 1982 up to now. Update my knowledge and increase my performance by teaching my self space-age technology (computer) and now I am a professional user for the software Indicated below.
- Carrier E20-II
- Carrier E2000
- HAP Hourly Analysis Program
- trane Trace package
- AutoCAD 2005
- Ms - Office 2003
- Ms - Visio 2003
- Ms - floor plan
- Ms - access - 2003
- Ms - Project Management
- Primavera
- Ms - work
- Coral-draw
- Coral Xara
- PC any ware
- All DOS command
- Norton Utility
Advanced Knowledge
* Course on how you manage from central location several buildings in close proximity (a building complex) and one building some distance away.
* Design B.M.S. for Mechanical & Electrical systems
HVAC system
Plumbing systems
Sewage
Domestic water (hot & cold) system
Swimming pool
Irrigation system
Fire fighting system
Emergency power engine
Elevator
Fire alarm system
Security system
Out door light
Any Other Equipment or Systems Need To Be Add & interface With the B.M.S For Monitor and Control
* Project Mat [Cost & Schedule & Document Project Management Program]
* Lock Out Software for National Instrument
* Citect SCADA System Software Certified from Citect as System Integrator
Taco Hydronic System Solution & Taco Net for Windows
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 151 to 200 of 4362)
Go to Search Parameters...
Brief Description
Design Manager, Residential construction superintendent, CAD design/drafter, and Manufacturing Engineering tech
To Perform under challenging environs
Marine Surveyor
Manage & Direct All site Works, Support the Project in administrating the jobs with respect to decision making ,organizing, Coordinating and providing solutions.
Knowledge of all signals as well as to give ground guide to all vehicles including tanks.
Seeking a Challenging Engineering position, with a potential for advancement, in Computer Systems (Unix/Windows O.S. Administration, Enterprise Infrastructure IT System & Network Management, Wireless Solutions, IP Video Surveillance, Enterprise Access Control and Information Security).
Certified PMP having rich experience in EPC & construction management of Real Estate, Infrastructure and Petro-chemical Projects, Proficient in Primavera, MS Project and MS Office
Mr. Bipradas Rajbongshi is a specialist in the field of Geotechnical Engineering. He has 20 years experience in technical and managerial roles.
A Senior Contract Specialist with 25 years international experience on most types of construction/engineering projects worldwide.
Being a Diploma in Mechanical Engineering holder having more than 16 years experience in construction particularly in Welding and NDE
I am qualified Associate civil engineer having 20+year experince of project construction in oil and gas fields.
Experienced Structural Design Engineer in 3-D FEM Experties
Planning and project controller
More than 26 years of experience in this feild and capable of handling induvidual stores
Bitumen storage terminal construction and all bitumen products manufacturing expereince
Over 17 years in the field of Construction and Buildings in Egypt, Qatar and UAE
Power Generation Manager / Technician
Mechanical building services design engineer. Experience in design HVAC, Plumbing & Fire Fighting along with site supervision and project management activities.
Project managemet, construction management
Professionally qualified and highly experienced Electromechanical Design/Senior Project Engineer offering over 26 years experience in the design, project management, installation, commissioning and maintenance of HVAC systems and associated electrical and control equipments.
Property Services
Diploma in Civil Engineering
Broadcast Engineer
Electrical Engineering. Hardware Design. Hardware/Software Testing. Hardware/Software Troubleshooting.
Skills: Computer Literate ( Microsoft Windows: Words, Excel, Project ), Primavera- Working Knowledge
Thermal Power Plant Operation & Maintenance. 17 years experience in Project Management & Execution which involves Engineering, Procurement, Construction, Commissioning, Operation & Maintenance of Thermal Power Plants up to 100 MW capacities.Project Engineering, Project Management & Execution of Coge
I have experience in procurement of contractors and consultants, contract administration using FIDIC conditions of contracts and highway designs. I have more than 15 years total experience in above fields.I can therefore engage as a project manager of a road and bridge project.
Masters degree management. 20+ years commercial/ heavy industrial construction. Carpenter based w/15 years management
Contracts Experience in Construction, Management and Administration (EPC), Materials Manager (PMC), Materials Control, Procurement & Expeditor; Fluent in English, conversational in French, Russian. Seeking to continue professional career effectively utilizing my skills and gained experience
Registered Mechanical engineer with heavy industrial, mining and USACE construction experience.
Extensive experience in safety management and operations spanning construction, seafood, industrial, retail, government, marine, airline, energy, industries. I am, Passionate about quality, and customer satisfaction. With a record of improving efficiency, productivity, and profitability through pro
Experienced Architect with solid knowledge and practice of CAD (ArchiCAD & AutoCAD) and artistic presentations of projects.
Detailed Structural designs of Civil Structures(RCC structure i,e, Buildings(Multi-storied office and residential), Roads, Bridges, Culverts, earth retaining structures(Retaining wall), Dams, rig & machinery foundations for Gas exploration
Civil Engineer, Site/Construction Manager
Presently working as Site Supt. Civil here in the construction of Khursaniyah Gas Plant (KGP) at NGL Trains 1 & 2, Saudi Arabia with Saudi ARAMCO. Representing the client in all civil works aspect of the work, I supervise two (2) major contractors-Bechtel/Technip Joint Venture.
Iam an Indian working in Malaysia for the past twelve years,I have a vast experience of 19 years in civil construction field.Idon't hold arelavant visa to enter Australia.Is it possible for an employer to sponsor me a visa?.
Thermal generating plant facility engineering experience
MEP Professional Engineer with advanced Management Knowledge For High Rise Building
I have 20 years of experienced in the field of Quality Control, Material Engineering and Construction Supervision in Heavy Construction such as: PetroChemical industries, Pipelines, Infrastructure, Highrise Building, Commercial Mall, Sewage Treatment Plant, Pumping Station, Milk Processing Plant etc
Extensive experience in project mgmt, tool,fixture, & machine design
I am having vast experience (22 Years) in Maintenance & Projects and in diverse fields. I am suitably qualified (BE, ME, PGDM, PGDIT) to take up any challenging assignments across the globe.
Civil Engineer. Management in RCM Reliability centred Maintenance.
Electrical engineer - building electrical design and rapid transit systems; proposals and specifications; CAD.
Engineering Geologist having 12yrs of exp. in Planning & Execution for Geotech Investigations for Hydropower Projects, Collection of Geotechnical field data & their analysis for Civil Design, Slope Stabilization, Tunneling & blasting, Rock & Soil Stabilization & Support Analysis, Foundation studies
Electrical Engineer ,exp 16 years in Maintenance & MEP Project Building Services /Hospital Facilities
Project Controls
I have intensive experience in project estimate, project supervision and management.
To secure a position in a company where career advancement is achieve thru efficient performance and hard work. I am working in Luanda, Angola as a Maintenance Engineer in a prestigious Hospital in this country. Under Sigma Group Co., we involves in a Consultancy, Designing and Management.
Catering Operation Manager, French, fluent in English, Spanish, indonesian and Malay, seek position anywhere. Ready to move anytime
7 Years of exposure to ABB/Honeywell DCS systems erection, testing and commissioning of Boilers, Turbines and Desalination Plant. 18 Years of Power and Desalination Plants Instrumentation experiencets.
First
1
2
3
[ 4 ]
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com