? Master in Construction Management. University of BATH UK (Four years) In progress 3th year.
? College: National Technological University - Electrical Engineering (Not finished)
? High School: Institute Luis A. Huergo - Electronic Technician - 1968
? Project Management Software: PRIMAVERA Scheduling, EXPEDITION 6.3, Windows, Lotus 123 w5, Excel, Lotus Word Pro, Microsoft Word, Power Point. Internet
? AACE international - Associated Member (American Cost Engineering)
? LANGUAGES: Spanish (Mother Language). English: fluent speech / write/read
Portuguese: fluent speech/read. Italian: basic speech/ read
? COURSES
? Automatic Control of Industrial Process 1975
? Industrial Electric Installations 1976
? Personnel Management 1977
? Project of Electrical Industrial Installations 1978
? Basic Course of Pneumatic and Hydraulic 1979
? Protection of Industrial Electric Networks 1982
? Belgrano University: Civil Construction Quality Control 1993
? Fort Lauderdale ( U.S.A ) CES Executive Course in Business English 1996
? Cincinnati, Ohio (USA) Advanced Planning, Cost & Schedule Control 1998
Main Employers / Clients
PEPSI - GUERRIT General Contractor - CHRYSLER - MORRISON KNUDSEN-JS ALBERICI - RENAULT - NESTLE - TECHINT - ALTECNICA-LOCKWOOD GREEN - ALPARGATAS - Alpezca - NAI International - BELL SOUTH - Acindar - SULLAIR - Biofarma - Piccardo - Shullberger - Cerveceria Quilmes - FORD
EXPERIENCE
? Self Employed ( by Project) 1997 to date
v THE STELLAR GROUP Jacksonville USA
INDULAC Puerto Rico ? Project Manager ? Approx. Value US$ 9,000,000
Refrigerated Warehouse. Surface 14,000 m2. Design and Build contract. Metal Structure/ Isolated Metal Panel
Earthwork, Civil/ Architectural works, Electric / Mechanical Installation. Client realtionship, Permits Contractors screening and bid/award process. WBS, Scheduling, Budget Control.
CUNIPROC Puerto Rico ? Project Manager ? Approx. Value US$ 3,000,000
Rabbit Process Plant. Surface 2,500 m2. Design and Build contract. Metal Structure/ Isolated Metal Panel.
Similar responsibilities and scope of work.
v CAPUTO S.A Approx. Value US$ 4,000,000.
DATA CENTER. As external consultant. Coordination of the detail design and construction of the electrical/mechanical installation for METRORED S.A . Total surface 7,000 m2. Total Power 9,000 kVA.
v EASTEL S.A Approx. value US$ 7,500,000.
As external Consultant. Republic of Guatemala. Coordination and the construction of Cellular Telephone base stations for BellSouth. Civil and electric/mechanical installations including the erecting of the antenna tower.
v FJA y Asociados
? Associate Project Manager
NAI International. Building of three cinemas complex (34 Cinemas Rooms, aprox. Value US$ 17,000,000). Total Area of 18.000 m2. Review all design drawings, value engineering, prepare brief/spec.(civil, electrical, mechanical), WBS, scheduling, contractors screening, pre/post bidding meetings and contract award.
Hospital. Feasibility study for Medical Center project value aprox. US$ 10,000,000 ) including pre design, bid specification., budget, WBS, Scheduling and Contractor screening.
.
v MORRISON KNUDSEN/ J.S ALBERICI Oct. 98/ April 99
? PROJECT MANAGER
? Project RENAULT - Civil/Mechanic/Electric works App. value US$ 7,000,000
? Responsibility: prepare a bidding for new Renault project at the Cordoba Plant, Argentina. Coordinate all documentation. Prepare formats for Civil, Mechanical/Electrical works, WBS, schedule. Select and coordinate all subcontractors including process’s equipment. I held all post bidding negotiations (short list bidder), including pre award evaluation conference with the French and Argentine staff. The project was Abandoned by the Client in March 1999.
v CHRYSLER / MORRISON KNUDSEN 1997 / 1998 ELCO Engenheria
J.S ALBERICI by contract
? PROJECT MANAGER
? Project DAKOTA BRAZIL - Electric Installation value US$ 3,000,000
? Responsibility: From pre bidding meeting to completion, including all relationships and pre award negotiations with the client. Preliminary bidding design, the bidding itself, WBS, schedule, CBS. Selection of construction team, final design and administration.
? Works Summary: Surface: 30,000 m2. Power 10,000 Kw. Substation 13,2 kV. Main Power (Bus Duct) and Branch distribution. Internal/External Lighting. All MIS system including Fire Protection, CCTV, Access Control and Turn Stiles. Sprinklers and Hydrants at a 5,000 m2 warehouse area.
v GERRIT General Contractor BAESA / PEPSI COLA 1993 / 1996
v PROJECT MANAGER
? Project BRAZIL / CHILE - Approximated project value US$ 350.000.000
? Responsibility: reporting to ?Board Director?. Budgets, Planning, WBS, Schedules, Brief/ spec. Plants Lay outs, Bidding formats. Contractors Screening/awards, Civil, Electric, HVAC, Waste Water Plant. Coordination with Production Areas. Cost/Technical Tracking. Feasibility of new Bottling Plants at the Bahia/Recife Cities.
l BRAZIL SUMMARY Porto Alegre, Curitiba, Blumenau, Londrina, San Pablo, Rio
After inception stage, I was in charge of the management of the Civil, Electric, Mechanic contracts at South area. Buildings Surface 35,000 m2, Power 10,000 kw. Epoxy/Concrete Floors, quartz surface finishing, Asphalt Pavements, Pre cast/Steel Structures. Potable Water tanks 1,500/2,000 m3 Epoxy coated. Substation 22 kV/13.8/0,4 kV. HVAC. Waste Water Plant 50/100m3/h. Earth Movement approx. 100,000 m3. Drains.
l CHILE SUMMARY Santiago, Antofagasta, Concepcion
Remodeling and expansion of existent building. Planning, Price Estimating, Scheduling. Contractor screening and award for Civil, Electric/ Mechanical Works. Warehouse and production areas.
v ALTECNICA/LOCKWOOD GREEN 1980/1993 ALPARGATAS 1973/1980
v PROJECT MANAGER
? Responsibility: Reporting to the General Manager, Contract Management. Planning, Organization, administration, coordination and execution of CIVIL/ Architect., ELECTRIC and MECHANIC works.
l WORKS 1992/1993 BAESA Approx. worth US$ 10,000,000
? Largest PEPSI Bottling Plant in South America. Surface 40,000 m2. Production and warehouse bldg. Aerobic Waste Water Treatment 100m3/h ?Trickling Towers?. Steel and Concrete Structures. Industrial Drains. Epoxy and concrete floors Quartz Finishing. Concrete Fire Barrier Wall (150 Mts. Long, 13 Mts. High). H.V Substation 13.2/0,4 Kv 6,000 Kva. Boilers, Air/Cooling Compressors, HVAC. Fire Protection. Exterior concrete and asphalt pavement. Administration Bldg., Lockers, Cafeteria, Nursery. Potable Water Steel Tank 2,400 m3 , Epoxy Paint. Vibrating Piling.
l WORKS 1991 LABORATORIO BIOFARMA - Approx. worth US$ 1,500,000
? Pharmacy Lab. brand-new Bldg. Surf. 4500 m2. Soil Movement, Concrete Structures Cast in Place. Admin. Bldg. Concrete Floors/Pavement. Electric/HVAC installation, Boilers, Piping. Process Equipment and utilities. installations. Fire Protections. Concrete Water Reservoir 15 mts. High .
l WORKS 1990 BAESA - Bottling Plant - Appr. project value US$ 1,500,000
? Remodeling very old Steel Mill and conversion in a soft drink bottling plant. Surface 10.000 m2. Extensive Demolition and Metal Structure recover. Civil/Architectural works. Concrete/Epoxy Floors. Electric/HVAC. Mechanical installations. Piping.
l WORKS 1987 /1989
ACINDAR S.A - Steel Mill ? Appr. project value US$ 800.000
? Construction of Water Treatment Plant forn the roller mill train. Concrete Structure Cast in Place including two Underground Tanks, 6 Mts. deep 1,500 m3 / 150 m3 and one elevate tank of 150 m3 at 12 mts. High. Many spillway and water gate systems.
CAMSA /SHULBEGER - Approximated project value US$ 350,000
? Concrete Pre cast Building for administration and lockers room. Remodel existing Industrial area. Architectural Works. Concrete floors. Electric installation, telephone/data. Landscape.
SULLAIR S.A - Approximated project worth US$ 250,000
? Complete remodeling of very old existing building. Architectural works in offices, Dry Walls, Glass Brick Walls. Lockers rooms and Warehouse. Concrete repairing with epoxy, concrete floors, roofing, electric installations, Air Conditioning.
BREWERY QUILMES S.A - App.. value US$ 4,000,000
? Responsibility: Civil Works Inspection Team. Refurbish existing brewery.
? Summary: Area 25,000 m2. Extensive demolition. BLASTING of concrete bases. Earth works. Concrete structures for 12 cure beer storage tanks. Concrete floors/ pavement. Industrial/ storm drains. Four floor Concrete building for beer process. Tunnels. Epoxy floors, Admin. Bldg
v JOB SITE SUPERINTENDENT
l WORKS 1987 NESTLE S.A
? Facilities : Panamericana
Civil and Electric/Mechanical Works for expansion of Compressors / boilers/ Substation room. Concrete Cast in Place. New high voltage Vault 33 Kv
Facilities: Mendizabal - Lincoln Pcia. Bs. As.
New Yogurt room. Concrete two floor structure with Metal Roof and pre cast siding closing. Drains, Epoxy floors. Administration/lockers bldg. Electric installations 3,000 KVA 13,2 /0,4Kv.
l WORKS 1982/1987 Approx. Value US$ 20,000,000 Pcia. de San Luis
? Responsibilities: Company Proxy and job site Super Intendent for Civil/Architectural and Electrical/Mechanical Works. Bank accounts. Personnel. Select Contractors. Suppliers payments.
? Summary: Building of 35,000 m2 of industrial facilities. The works included: Planing, Scheduling, Cost/Quality tracking. Earth movements. Heavy Steel/ Concrete Pre cast Structures. Bridge Crane, Concrete Floors/Pavement. Electrical/ HVAC.
v ELECTRIC WORKS SUPERINTENDENT - ELECTRONIC SUPERVISOR
l WORKS 1980/1981 ALPARGATAS - Textile Mill - Pcia. de Corrientes
Surface 22.000 m2. Electric Power 8000 Kva.. Two Substations with four 2000 KVA 33/0,4 kV. Emergency generator 200 KVA. Textile machinery installation.
l WORKS 1978/1979 ALPEZCA Fishing factories - Mar del Plata
Electrical Installations. Freezing chambers -30 oC. Defrost tunnel. Installations at FACTORY SHIPS
l WORKS 1976/1978 ALPARGATAS Textile Mill - Catamarca
Building Surface 22,000 m2. Responsible of the finals works and commissioning of Electric Installation. Three substations in ring and radial connection in 33kv. Total Power 12,000 Kva.
l WORKS 1973/1976 ALPARGATAS - Textile Mill
Maintenance/Development of equipment for textile machinery. Electronic speed Controls for DC Motors.
v PICCARDO S.A - 1974/1976 Tobacco Manufacturer
w As a Electronic Consultant. Trainer and maintenance support for special electronic equipment.
v SERVOTRON S.A 1972 - 1973 Manufacturer of Electronics Industrial Equipment
l Supervisor for Start Up of Special Equipment. Digital and Analogic. Electronic Variable Speed Controls for DC Motors. Electronic Controls for Electric Furnace up to 100 kW.
v GURMENDI S.A - 1972 Steel Mill
w Electronic Technician at Instrumentation and Electronic Lab.
Maintenance of electronic Equip., Scales, chart recorders. Controls for 20 MVA Melting Electric Furnace.
v PHONALEX S.A - 1970 - 1972 Sound Music Study for movies and discs.
w Electronic Technician at Electronic Lab.
Professional Audio works. Development of special analog/digital equipment. Maintenance. Acoustic.
v AUDINAC S.A - 1968 - 1970 Manufacturer of Audio Equipment
w Electronic Technician
Production Line / Service Technician, Customer Assistant. Start up and tuning of Multiband Radios and Audio amplifiers and Preamplifiers. Citizen band Transceivers.