Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #2310 next resume »»
CONTACT INFORMATION:
View contact information...

Nationality British
Status Married no Children
Date of Birth 18th December 1965
Qualifications Diploma – Civil Engineering
5 x O'Levels
Others Very Computer literate in Access, Excel & Word.

Employed by Wood~Stork (JV with The Wood Group & Stork ISC)
May '02 - Present Offshore Asset Modification & Maintenance
Position Cost Engineer / Estimator – All Disciplines
Client Nederlandse Aardolie Maaschappij BV (NAM)
Contract Reimbursable
Value Various from Euro 28K to 7million
Production of estimates from design through construction to close-out for E&I, piping, mechanical, systems, painting, insulation etc… implementing agreed norms (based on Page & Nation). Proposing improvement to the norms and provision of "Star Norms". Creating and maintaining the necessary budgets, work breakdown structures and database data. Ensuring timely accurate value of work and forecast cost availability at all times to the Area Delivery Managers and Senior Cost Engineers.
Development and implementation of a database to record Offshore Construction hours for the analysis of burned hours for Directs, Non-Productives and indirects.

Employed by McConnell Dowell - Saudi Arabia
Oct '00 to Apr '02 Ras Tanura to Dhahran Refined Products Pipeline BI-3000
Position Quantity Surveyor – All Disciplines
Client Saudi Aramco
Contract Lump Sum Turn Key
Value SR 300m
All disciplined Contract, (Civil, Mechanical, E&I, Pipeline). Re-measurement of the Contract Lump Sum relating to the 130 km Pipeline in extra pipeline crossings, different materials and extra meterage. Measurement of Change Requests in all disciplines. Negotiation with Aramco's Contracts department and agreement of Change Order values. Pricing of a complete, new substation through Civil, Mechanical and E&I including measurement of the substation's new HVAC system. Finally processing and compiling claim for prolongation at the head office in Melbourne.

Employed by McConnell Dowell - Saudi Arabia
Jan '00 to Oct '00 Controls System Replacement, Riyadh Refinery II.
Position Quantity Surveyor – Electrical & Instrumentation
Client Saudi Aramco
Contract Lump Sum Turn Key
Value US$65m
Upgrading, replacement and integration of existing instrumentation (7000 loops), control and auxiliary systems into an integrated DCS and stand alone ESD system and construction of a new Control Building.
Duties included the monthly applications for payment based on Lump Sum milestones, processing of Change Orders and the final claim for an Extension of Time with regards to overhead costs. Re-measurement of 375 P&ID drawings for extra hardware installed.

Employed by Clough Smith Rail – United Kingdom
Mar '99 to Jan '00 Various Sites North & South England
Position Quantity Surveyor, Civil / Electrical (Railways Division)
Clients Tarmac / Alstom / Railtrack
Value £3m and £5m
Working on various claims and closing out daywork, variation and measurement accounts for signaling and cable route works in the railway construction industry. Setting up company procedures with a view to easing the company's financial exposure and to bring it into line with more modern commercial practices.

Employed by McConnell Dowell – Thailand
Aug '98 to Feb '99 Siam Polyethylene Project, Rayong, Thailand
Position Quantity Surveyor – Electrical
Client Dow Chemicals
Value US$65m
Lump Sum re-measurement of AFC Electrical drawings and compilation of extra works (all measured on a daywork basis). Onsite re-measure of actual installation of Instrument and Electrical Cabling, Traywork, Supports and Equipment. Submittal of the Electrical and Instrumentation Monthly Progress and Applications for payment.

Employed by McConnell Dowell – Bangladesh
Jan '98 to Aug '98 Sangu Development Project, Chittagong, Bangladesh
Position Cost Engineer
Client Brown and Root
Originally a Re-Measurable Contract which had to go Reimbursable after the pirating of most of the companies allocated plant in the Bay of Bengal and the difficulties of logistics and local customs officials. Thus turning my position from QS to the above.
Duties included establishment of reimbursable rates for expats, labour, plant etc.. and making sure all cost were allocated to the correct cost centres. Submittal of monthly applications as usual.
Project Value US$ 20 million

Employed by McConnell Dowell – Indonesia
Oct '96 to Nov '97 Unocal Geothermal Project, Gunung Salak, West Java
Position Contracts Engineer
Client Fluor Daniel
Lump Sum Re-measurement of Piping Isometrics, equipment and steelwork for incorporation into monthly Contract Modification Payments. Administration of Subcontractors accounts for the Civil and Painting portions of the Works. Establishing Lump Sums and Extra Work sheets for reimbursement from the client. Compiling, submitting and agreement of monthly Pro-Forma invoices. Also the writing of various subcontracts with conditions applicable to Indonesia and the Subcontractor.
Project Value US$ 12million

Employed by McConnell Dowell – Singapore
Aug '96 to Oct '96 Esso Expansion Project, Chawan Island, Singapore
Position Quantity Surveyor
Client Foster Wheeler
First posting with McConnell Dowell to assist with a claim situation after final completion of the above project. Basically guiding Filipino QS's with the Standard Method of Measurement for evaluating the price of isometrics and pipe support drawings.

Employed by Mannesmann – Singapore
Feb '96 to Aug '96 Singapore Aromatics Hook-Up Project, Chawan Island, Singapore
Position Quantity Surveyor – Team Leader
Client Foster Wheeler
Joint Venture with Mannessman, Siemens and Willich for the hookup of modules including Piping, Structural Steel and Equipment Installation. My task included the measurement of 4500 piping isometrics and supports to establish AFC area values for incorporation into Interim Progress Payments and the Joint Venture's monthly Applications.
Project Value S$65 million

Employed by United Kingdom Construction & Engineering Company Limited - UK
Oct '95 to Feb '96 Conoco Limited, Humber Refinery – Vacuum Unit 3
Position Quantity Surveyor
Client Kellogs
Construction of a module in all disciplines for incorporation into the main refinery. My responsibilities included the administration of the Insulator's and Painter's Subcontract Accounts and evaluation of modifications after substantial completion due to re-design work by the client.
Project Value £4.2 million

Mar '94 to Sep '96 Tarmac, Black and Veatch – Medway Power Station UK
Position Quantity Surveyor
Client Tarmac (now Carillion)
Manhour Targeting of 5500 Spool Drawings to measure the weekly productivity Ratio against hours spent. Pricing of 1200 Piping Isometrics in Fabrication, Erection and Supply. Pricing and Agreement of 1000+ Variations using Daywork, Unit/Star Rate and Lump Sum methods.
Project Value £9million

Feb '93 to Mar '94 British Gas. Barrow-in-Furness – UK
Position Quantity Surveyor
Client British Gas
Re-Measurement of the Lump Sum Contract Price and Manhour Targetting of Isometrics in fabrication, erection, painting and NDT disciplines. Monthly compilation and submittal or interim applications for payment.
Project Value £9million

Feb '92 to Feb '93 Ciba Giegy – Building 120, Grimsby – UK
Position Cost Engineer
Client John Brown
Sole responsibility for establishing the database system of Cost Control on this Reimbursable Contract using cost centres as a basis for weekly / monthly budget analysis and forecasts against the breakdown of the Contract Selling Rate. Targetting of Spool, Support, and Steelwork drawings to calculate weekly productivity factors. Monthly / Final Valuation compilation, submittal and agreement.
Project Value £6 million

Jan '91 to Feb '92 Van den Burgh's and Jurgens, Purfleet, Essex – UK
Position Quantity Surveyor
Client Currie and Brown
Pre AFC Contract work with piping and steelwork disciplines and all commercial duties with the subcontractor's accounts and applications. Control of all Extra works including Dayworks, Field Instructions and Lump Sums. Monthly / Final valuation compilation, submittal and agreement.
Project Value £4million

Projects included since August 1985

Employed by United Kingdom Construction & Engineering Company Limited – UK

Owner Client Project

Glaxo John Brown Chemical Pilot Plant - Stevenage, UK.

Mobil Mobil St Fergus Gas Terminal, Peterhead, UK.

Yaku Pory Gleeds Caledonian Paper Mill, Irvine, UK.

British Steel Currie & Brown Regal Expansion Project, Shotton, UK.

BNFL John Brown Thorp Reprocessing, Sellafield, UK.

BP British Petroleum SNS Gas Terminal, Dimlington, UK.

Shell Oil Matthew Hall Catalytic Cracker, Stanlow, UK.

Bibby's Oil Wimpy Bibby's New Facility, Liverpool Docks, UK.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1551 to 1600 of 4371)Go to Search Parameters...
Brief Description
Extensive management, administrative, financial and contractual experience.
To secure a position with a progressive firm utilizing my diversified material management capabilities.
Having six years of experience in managing various geotechnical projects with expertise in planning and execution of geotechnical investigations for mega industrial project sites incorporating all significant aspects.
Objective: To find a position to utilize and challenge the skills, which I have acquired, with the opportunity for advancement.
Fifteen years experience in Process Plant Construction in the UK, Europe, Middle and Far East with regards to QS duties and Contract Administration on behalf of the Contractor.
I am looking for the right company to commit to long term. I am willing to work overtime and travel. I have my own tools and transportation.
have skills and knowledge in science information technology and industrial engineering.
Qualified Welding Inspector
In my years of experience, I have gained a specific and wide knowledge of essential aspects of both the purchasing and distribution of products used in industrial environments that are essential to the growth of our market.
I graduated from universtiy in June and have been working as a quantity surveyor. I worked as a trainee M&E quantity surveyor for two years before university and worked my university placement in the Turks & Caicos Islands where I currently work.
Electrician 309A/fire alarm technician
I am a certified tool and die maker. I have design ability and 7 years hands on experience build automotive tooling. From design analysis to raw material to finished working/conforming automotive tooling.
Mechanical Enginner with two years experience in designs for commercial, domestic and retail buildings specialising in HVAC, water supply and waste reticulation.
Electrical & electronic trouble shooting, Sales
I have 25 years experience in hoisting & lifting operations within the oil & gas industry
35 years nursing experience in most disiplines
Engineering experience of construction projects; piping system and water resources
I am willing to relocate my current company is closing. I love working on construction sites and prefer to stay in the mining or construction field
Experienced equipment manager with earthmoving, material handling equipment, and cranes.
I am a Mechanical Engg graduate, with 9 years experience in various projects, out of which 7 years at Jacobs H&G Private Ltd. (an associate of Jacobs Engineering. Inc. USA), in ISO 9001 environment.
An Engineer with business acumen, client awareness, practical skills, overseas experience and sound engineering knowledge.
Construction Project Manager
I have around 15 years experience as a machine operator on 180 360 degree machines also dozers and dumptrucks. Also as foreman with a groundworks contractor and two years as assistant plant manager with a plant rental company. I am looking for similar work at home or abroad.
An energetic individual with an MBA and construction experience seeking for a challenging job with an institution in the Middle East that rewards creativity and hard work and helps me grow and contribute to the overall success of the firm.
This resume is a compilation of my past and present working experience. I feel that I am qualified for many positions and I believe that my resume is proof of that.
Highly motivated, team-oriented individual with excellent communication skills. Two years of industry experience with Turner Construction-USA & NESPAK-Pakistan respectively. Prepared budget reports, schedules, estimates and bill of quantities and performed engineering supervision of various trades.
Geotechnical Engineer working in design, planning, technical follow, contract administration, reporting, financial studies and cost control of underground works such as DW, Piles, Grouting, Tunnelling, Dewatering.
CV
Onshore drilling HSE Advisor
I am currently transitioning out of the U.S. Army. During this time, I have acquired extensive knowledge of electronics and electronic systems
Driller/Blaster/Talented/Heavy Equipment Operator
Professional Qualification,Advance Diploma in computer application ,(ADCA) Pursuing ‘O’ level from DOEACCA Society Work Experience,6 months working exp. As a marketing Executive at Dew Soft Over seas Ltd., New Delhi. Two year experience as sales executive
Welder
I have 21 years of professional experiences with several EPC Companies (Snamprogetti, ABB, Technip and etc.) and Clients (AGIP, CHEVRON) overseas in Civil Construction / Project Management Team.
Structural design
I have 8+ years in surveying including construction, boundary, topo, ALTA, environmental, and other special surveys. I have managed and trained field crews. I am proficient with GPS and robotic total stations. I have experience with CarlsonSurv2007, AutoCad LDD 2002-2006, LGO, and TGO.
I am a geologist with at 13 years experience in different fields of engineering geology. I have involved in different engineering geological and geotechnical studies of major infrastructures such as dams and tunnels. I am dynamic and motivative and wish to improve my knowledge in geotechnic
Quantity surveying and set work shop drawing
LNG, Project Manager
I have work with a variety of cnc machinery. Quality minded using various gauges. Can do set-ups and offsets.
Field service, strong troubleshooting skills, electrical/electronic
Environmental Engineer/Scientist with over thirty years of experience with project and program management, industrial hygiene, hazardous waste and material management, modeling, monitoring, regulations, risk and technology assessment, pollution control, and environmental remediation
My experience has been in warehouse supervision and management. I have completed seven overseas contracts, to include, 4 in Africa, 2 in the Balkans and one in Iraq over a span of 13 years. I also have 26 years military experience in the Class V Ordnance Field and managed all of the Fort Hood, Tex
I am a Heavy equipment operator /crusher mechanic/welder, I am looking for a better employment.
Experienced Safety manager in Contruction and through Mining/Oil/Gas. Safety Professional through design and planning to construction/commissioning, turn-key.
Looking for a bright career in the field of Supply chain Management.
Proficient in Document Management System & Secretarial Functions
Mechanical Engineer with 3 years of experience in electrical instalations
Summary of Qualifications. Eighteen years of documented success in the design, oilfield and construction industry. ·Experience on project and design working extensively with the Designers and Engineers.
Senior Electrical/Design/Project Engineer for HV and MV substations
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   [ 32 ]   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com