To get a challenging, full-time senior level position in a dynamic organization, in the Mechanical industry, utilizing my ability to work as team member and contribute to support. Where I can effectively put to use my qualifications, experience and skills.

PROFESSIONAL EXPERIENCE (nine Years)
Senior Engineer- Since February 2004 to till date
Punj Lloyd Limited.

Project working on: MP Gas compressor for offshore facilities, Kalimantan timur, Indonesia.
Pt. Punj lloyd Indonesia/Mp Gas Compression Facility for Total E & P Indonesie at Senipah, East Kalimantan, Indonesia/ Piping Engineer Manage the fabrication, erection and pre-commissioning of complete piping activity in the project.

Mechanical Executive – From August 2000 to January 2004
Larsen & Toubro Limited Gr. II Project.

Project working for: SBAF Project, BPCL, Mumbai (Cap. 2 x 70 TPD)
Working as a Lead Piping Engineer for Sulpher Recovery Unit (Refinery modernization project) in BPCL Refinery, Mumbai. The job is including total Piping & Mechanical works for SRU/ARU/SWS I & II & FGTU. Plant for SRU.

Project working for: SDU Project, IOCL (AOD) Digboi (Cap. 0.33 MMTPA)
Working for Solvent De-Waxing Unit Project Site at IOCL Digboi as a lead engineer piping execution to expedite the piping execution, which was on the critical path in view of the time and site constraints. Digboi was a tough site
Where Construction was first time being directly supervised by Gr. II Projects and also because of its geographical constraints.
Spearheaded piping execution, with a team of only 4 piping engineers including myself, to get back the control over the piping erection and mechanical completion and hydro testing. I was involved in day-to-day monitoring and planning of hydro test loops and also liquidation of technical audit and other checklists in close coordination with client and PMC.
Assisted the process engineer in setting up of the procedure for the piping and equipment clearances for pre commissioning. Also assisted process team for various checklist liquidation and speeding up of flushing and boxing up activities.

Mechanical Engineer – From April 2000 to July 2000
Mukand Engineers Limited

Project working for: LPG Recovery Project
Working for LPG Recovery Project Site at LPG Recovery Project in GAIL Gandhar (Gujarat). The job is including total Piping & Mechanical works for Regeneration gas Heater for LPG I was involved in Fabrication, Erection & Alignment of Radiant shell, Convection section, Arch plate, End tube sheet, Stack cone & Coils.

Piping Engineer – From July 1998 to March 2000.
Larsen & Toubro Limited Gr II Projects

Project Working for: Hydrogen Unit (Cap. 25000 NM3/Hr.)
Working for Hydrogen Unit Project Site at IOCL Baroda as a engineer Piping execution to expedite the piping execution, I was Involved in Following activities v Execution & monitoring works in Piping v Involvement of 100,000-Inch dia welding and 15,000-Inch Meter U/G Under ground systems up to 16" (with the following of Wrapping Coating),
Erection of Pigtail tube & catalyst tube.
- Pre–fabrication and Erection of Piping in Process, Utilities & Fire fighting.
Following & studying of GAD's, Isometrics & P & ID's in the process Area.
Mechanical Completion of Works Inspected by EIL Standards.
- Involvement of Painting, Insulation & Hydrotesting of Piping Loops as per EIL Standards v Pre-commissioning Activities of Flushing of Piping Systems & Charging of Utilities.
- Reconciliation of Piping Material including field Measurement of works
Handing over of Spare & Surplus Material and Correlation with client.

ASST. ENGINEER – From July 1996 to April 1998.
Apex Electicals Limited (Baroda)

Working For: Shop Fabrication
Working as a Asst. Engineer with M/s Apex Electricals Limited. (ISO 9000 organization) in Baroda (Gujarat). The job is including total Fabrication of Transformer Tanks & Vacuum test of Tanks.

IMPORTANT JOB HANDLED
- Piping Pre fabrication, erection, testing & Pre-Commissioning of Hydrogen Unit for IOCL Baroda v Fabrication & Erection of Regeneration of Gas Heater for GAIL Gandhar.
- Piping Pre fabrication, erection, testing & Pre-Commissioning of Solvent De-waxing Unit for IOCL (AOD) Digboi.

Responsibilities held in construction and contracting firm.
Execution of projects right from conception stage till handing over in a professional and systematic manner.

- Invoicing/contractor invoice clearing.
- We shall also prepare erection procedures for submission/approval to Customer and for implementations by sub-contractors for important activities v The entire plant may be split into sub-systems. He shall intimate to the Customer as and when the sub-systems are mechanically completed for his punch listing and arrange for liquidation of the same.
- On completion of the pre-commissioning, We shall intimate to the Customer about his readiness for commissioning of the plant and obtain Mechanical Completion Certificates as per the conditions of the Contract.

- Coordinating the construction activities and Progress Monitoring by day-to-day interaction with Customer/ Consultant, Engineering Office and Construction Sub-Contractors.
- Finalization of Milestones in Construction Billing Schedule for LSTK Projects and Invoicing based on the same.

OTHER FIELD EXPIRIENCE
- Fully supervised the Installation of Catalyst tube & Hair Pin tube Supporting Grids of Naphtha Reformer, As part of Hydrogen Unit in IOCL Baroda.
- Preparation of QAP, Job procedures and Inspection test plans as per specification and Bid requirements and documentation accordingly.
- Familiar with WPS & PQR
- Involved in the Pre commissioning activities of Solvent De-waxing Unit of IOCL Digboi Refinery & Hydrogen unit of IOCL Baroda Refinery v Familiar with Codes like ASME SEC IX, ASME SEC II, ANSI B 31.3, API 650 and EIL Specifications regarding Piping, Welding, Material, Surface preparation & Painting, Hot & Cold Insulation, Jacketed Piping, Steam tracing, Storage Tank Fabrication, etc

FINAL DOCUMENTATION
Marking of site changes in drawings, documents and sending the markup to Engineering for as built document, Marking up includes layout drawing.

OTHER SKILLS
Possess sound knowledge of computer. Working knowledge of Excel, AutoCAD-2000 and other related day-today office Software Programs. Worked with Windows 98, Office 2000.

EDUCATIONAL QUALIFICATION
Diploma in Mechanical Engineering

Professional Qualification
Training in AutoCAD 2000 from Unique CAD Centre
Safety Training for Lifting workshop level 3

View contact information...
«« previous resume next resume »»
Search Results (Resumes 2301 to 2350 of 4362)Go to Search Parameters...
Brief Description
Worked as a Engineer Projects & Purchase.
I have many years of experience in customer service and administrative work. I am organized and skilled with many computer programs.
Objective: To work for a company as a Supervisor/Foreman/Journeyman carpenter. To use my skills to the best of my ability.
Construction Supervisor for Electrical and Instrumentation
Recent graduate with a Bachelor of Applied Science in Instrumentation seeking employment for supervisor positions within the instrumentation field or as an E & I Specialist.
I have 3 yrs of experience in multi-storey constructions.
ARCHITECT WITH 03 YEARS INDUSTRY EXPERIENCE
Planner / Scheduler: 2 Years Experience, Site Engineering: 1 Year Experience Developing Schedules, Resource Allocations, Planning Spreadsheets, Deployment Schedules, Charts, Progress Reports. Review of Contractor’s Programmes, Specifications, Contracts. Tracking Correspondences, Archives.
Positive thinking, motivating and making work to be done by others,accept responsibility, self confident, quick decision,
project management.contract management,business management.
HEAVEY DUTY DRIVER. (U.A.E) DUBAI, LIC.HOLDER
Just graduated from AVTEC Technical College in Seward, AK.
To work in an organization where I am given to excel in, to learn and gain experience and to be able to contribute to the organization in the long term.
Healthcare worker looking for career change. I have experience in construction and shop labor.
Commerical Truck Driver
Supervisor Production/Fabrication/Engineering Quality Control/Inspector
Professional Electrical Engineer
Total of 5years experience in Quality control, Welding, Heat treatment & NDT field a QC in EPC sector
Project enginer with 5 yrs experiece
Self-motivated young competent Mechanical Engineer with nine years experience with Oil companies and leading construction and contracting firms. Have proficiency in independent project execution. Possessing a Diploma in Mechanical Engineering. Able to independently plan, and execute Projects related
Microstation CADD Civil Engineer Utilities Specialist and GIS
Quality control and quality assurance of control systems and networking
Power Transmission Line & Lighting of Highways (design overhead lines, instillation, maintenance, modeling, coupling, pipeline, cable size, poles, illumination (lux) & cd/m2 calculation)Low Frequency Electromagnetic Field (Transmission Line) Environmental Radiation Effects on Human Health/ Mitigatio
I hold a JD as well as an MBA in finance and have been a land manager for mining companies for the last 10 years. I am very well trained at acquisition, due diligence, negotiation, sales, entitlement, permitting and construction techiques. I have excellent references.
A Mechanical Engineer with Masters Degree in Quality Assurance Technology (M.tech).IRCA certified QMS Lead Auditor; ISO 9001:2000, ASNT Level II in RI,MT & PT NDT techniques. Around 20 years professional experience in Manufacturing, Planning and QA/QC disciplines.
Mechanical Engineering Technician, MS Project, Premavera, Auto-CAD, SAP, Microstation, Planning , Maintenance
Planning, Scheduling, Primavera, Artemis, Cost, Project Controls, Metrics, Construction Manager, Site Manager
Construction & maintenace of installations, equipment and systems in hazardous areas (explosive gas atmosph.); Maintenance of el. equipment, installations in petrochemical industry.& el. Equip., systems in El.Power Plant ; Training el.personnel for preventive & predictive el. maintenace programs
Heavy Duty Diesel Mechanic/Fitter. 12 years experience with Volvo trucks and buses, hard working reliable skilled diesel technician.
Senior Project Management, Profit and Loss, Project Planning, development and execution. Consultancy in the areas of safety, risk management, and techncal writing and editing. Major contract administration for a multi-national firm in Saudi Arabia on two different assignments.
Ability to understand and learn new computer programmes accurately and quickly, Strong organizational skills, Ability to work under stressed conditions, Ability to work in multi-task duties, Excellent communication skills
AutoCAD, Surveying, Structural Surveying, Analitical Surveying
Chemical Engineer- Petroleum Industrial Processes Design
Experienced Nine Year Superintendent Commerical / Residential
Approximately 3 years experience in Production Planning, Scheduling & Inventory Control, ERP(BaaN)implementation, Production, Manufacturing, Industrial Engg., Production Management, Process Re-engg., Product Development, Product Costing.
civil engineer having a good knowledge of computers
Engineer’s degree in mechanics Speciality: “Construction and exploitation gas and oil pipelines, gas storages and petroleum storage depots”
Carrying out all Title & Non-Title Topographical, Engineering, Cadastral and Township Planning Surveys.
GIS Packages: MapInfo Products, AutoDesk Products, ArcGIS,
Well versed in P3e, P3 and MS Projects with very good knowledge of spread sheets and MS Access database. Have experience of Petrochemical, Oil & Gas and Chemical Projects. Have also seccessfully executed few projects as Project Manager.
• Preparing Material Approval Form.
Power generation, substations, transmission and distribution, circuit breakers, machines, service, plants, computer.
To acquire a technical/management position where engineering experience and managerial skills will significantly contribute to use the skills obtained through my experience and qualifications to benefit my employer and grow my self with organization.
MASTERS - Mechanical Engineering – [GPA: 3.6 / 4]
Preparation of Environmental Impact Statements (EIS) Report and of Resettlement Action Plan (RAP) Report for Mining Companies in Ghana
Structural Engineer with broad knowledge on design and analysis of Buildings (concrete and steel structures). Full knowledge in using Computer aided design Software such as Etabs, Staad pro, Prokon, Sap2000, CSI Safe, Xsteel, AutoCAD, Microstation, and other Computer programs (MS Office Word, Excel,
Project Management, Cost Control, Estimating
10 years Systems Administration experience, wide verity of systems.
Operational Specialist
Hands on experience in plant maintenance instrumentation as well as commissioning and precommissioning activities of the various chemical and petrochemical plants. Have experience in control valve overhauling, maintenance of transmitters,DCS,PLC etc.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   [ 47 ]   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com