Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #3040
next resume »»
CONTACT INFORMATION:
View contact information...
PROFESSIONAL EXPERIENCES
A. Al - Suwaidi Industrial Services Co.
Jubail, Kingdom of Saudi Arabia
April 1, 2002 - October 30, 2002
Worked with Kemya Petrochemical Co.
as Mechanical Project Superintendent at LDPE Plant Located at Jubail, K.S.A.
Duties and Responsibilities:
1. In charge of all Mechanical Works based on M.O.C. (Management of Change) issued by the Client.
2. Holds Coordination Meeting daily with the client regarding the status of the jobs.
3. Establishes E.R.P. (Equipment Requirement Program) and M.R.P. (Manpower Requirement Program).
4. Reports to Project Manager regarding the daily update of the project.
5. Prepares and follows-up equipments, tools and materials / consumables required for the project.
6. Prepares Cost Estimates based on R.F.Q. (Request for Quotation) issued by the client.
7. Organizes daily Safety and Toolbox Meeting.
8. Prepares Construction Method Statement prior to the start-up of work.
9. Reviews all critical lifting procedures prior for submission to client for approval.
10. Over all in charge on every discipline.
B. Plant Engineering Construction Private Ltd, Co.
21 Shipyard Road, Singapore
November 8, 2000 - November 7, 2001
Worked with Exxon-Mobil Chemicals as
Piping Supervisor for various projects at Singapore Olefins
Plant (SOP), in Jurong Island, Singapore
Duties and Responsibilities:
1. Fully in-charge of all piping works based on (M.O.C.)
Management of Change issued by Exxon-Mobil.
2. Supervises several tie-in works such as HOT TAPPING,
COLD TAPPING around the plant.
3. Makes sure the system is constructed as per specs.
4. Conducts daily Toolbox Meeting with alliance partner.
Secures work permits & conducts Job Safety Analysis
(JSA) & the Client regarding Talk Action Knowledge Equipment (TAKE-2) steps before starting the job.
5. Holds Coordination Meeting daily regarding the status of the job.
6. Prepares Construction Method Statement ( CMS) whenever there is a window for shutdown of equipment for the tie-in works.
7. Over-all in charge of the project including E & I, Insulation Works,
Scaffolding Works, Painting & other related jobs.
C.Titan Project
Pasir Gudang, Johor Bahru
Malaysia
June 19, 1998 - Feb. 1999
Assistant Site Manager/Erection Supervisor
ABB Power Generation Ltd., Australia
Boiler Installation Project
Assigned as ABB (Australia) site representative
In the construction of two (2) site assembled, supplementary Oil
Fired Modulated Force Circulation Heat Recovery Steam Generator
(FCHRSG), each rated 83 Ton/ Hr, at a pressure of 43 BAR and temperature of 400°C each connected to a Gas Turbine (GT) 10.
Duties and Responsibilities:
1. Ensures that the plant is constructed in accordance with the
ABB Power Generations requirements.
2. Site management and coordination with sub-contractors.
3. Management and coordination of resources to ensure program of work is achieved.
4. Represents ABB Power Generation in a day to day interfaces with the client and ABB Power Generation's sub-contractors on reporting, etc.
5. Authorized to purchase from the site equipmenst/ goods/
services in accordance with ABB Power Generation Procedure QA-09 Purchasing.
6. Authorized to control further processing until the deficiency or unsatisfactory condition has been corrected.
D. PIC/BLACK and VEATCH INTERNATIONAL TURBINE INSTALLATION PROJECT
Kapar, Malaysia
Oct. 31, 1997 to Dec. 14, 1997
May 2, 1998 to June 1, 1998
MECHANICAL QA/QC ENGINEER
Assigned as Mechanical QA/QC Engineer during the construction of Two (2) Units Phase 3- 500MW Power Plant.
Duties and Responsibilities:
1. Focused mainly on clearing several systems on Turbine Hall which involve Pneumatic Tests on the following items:
Instrument/Plant Air Lines
Condensing and Condenser Extraction Lines
Boiler Feedwater System
High Pressure / Low Pressure Heater
Drain / Vents Lines
E. POWER INDUSTRY CONSULTANT (PIC)
ATLANTA, GEORGIA, USA
INDOKODECO CEMENT PLANT PROJECT
SOUTH KALIMANTAN, INDONESIA
May 1, 1997 to October 17, 1997
BOILER PROJECT CONSULTANT
Worked with PT ABB Energy System Indonesia with the following duties and responsibilities:
1. Over-all in-charge in the installation of 55 MW Coal-
Fired Power Plant.
2. Make sure the plant is constructed as per ABB
Specification.
3. Conduct daily coordination meeting with the contractor on the daily update of the project.
F. JAMJOOM WESCON SAUDI ARABIA CO. LTD,
RABIGH, KSA
August 1993 - August 1995
BOILER MAINTENANCE SUPERVISOR
Assigned at Petromin-Petrola Refinery Company to supervise the maintenance of the following equipments:
* Four Gas and Oil Steam Boiling Plants having a capacity of 65 tons/hr of steam.
* Waste Heat Boiler for Sulfur Units
* Equipments such as Air Fin Coolers, Heat Exchangers, and other pressure vessel such as Condensers and Deaerators
G. ENGINEERING EQUIPMENT, INC.
AL-TAMEER / BECHTEL PROJECT, KUWAIT
December 1991 - December 1992
BOILER / PIPING INSTALLATION SUPERVISOR
Assigned in oil gathering center for the refurbishment of oil and gas separator plant.
Duties and Responsibilities:
1. Secures work permits before starting the job.
2. Prepares daily accomplishment reports.
3. Supervises the Commissioning of BERTH 10 and the Installation of Air Heaters and Air Fin Coolers at Mina Ahmadi Refinery, KUWAIT OIL CO.
4. In-charge of the Installation of 12" Crude Oil Line from Wafra to the Crude Oil Desalting Unit at Mina Abdullah Refinery.
H. ENGINEERING EQUIPMENT, INC.
AZZOUR SOUTH POWER PLANT PROJECT
AZZOUR, KUWAIT
November 1984 - August 1990
BOILER INSTALLATION SUPERVISOR
Duties and Responsibilities:
1. Performs all remaining outstanding punchlist items particularly on mechanical and instrument panel locations, and local devices based on actual site condition.
2. Prepares monthly status reports on completed and remaining outstanding items.
3. Prepares and monitors daily work schedules and secures work permits.
4. In-charge of the Installation of Boiler Pressure Parts such as water panels (front, rear, and side wall), economizer elements, superheater elements and Downcomers for Eight (8) - Units 300MW CE Mitsubishi Boilers.
5. Oversees Pre-assembling and Fitting of Main Piping such as High Pressure Steam Air and Gas Ducts, Boiler Frames, Boiler Casing, Buckstays for Units 1,4,7 and 36" Piping Desalination Plant.
I. ATLANTIC GULF AND PACIFIC (A.G.&P.)
HONIRON DIVISION, PORT AREA, MANILA
April 1982 - November 1983
PROJECT MONITORING
Duties and Responsibilities:
1. Monitors the Installation of Four (4) Quadruple Effect Evaporators in Pampanga Sugar Development Company (PASUDECO) in San Fernando, Pampanga.
2. Controls and supervises daily work schedules, prepares weekly reports including cost consumed per week, submits weekly reports to head office every weekend.
3. Assigned at A.G.& P. Head Office and estimates costs for every project, prepares PERT/CPM and Bar Charts per project.
4. Assigned as Boiler Maker Leadman for the Installation of Two Babcock and Wilcox Boilers having a capacity of 76,000lbs/hr steam at Phil. Petroleum Corp., in Pililia, Rizal.
5. Cleaning and re-aligning of steam drum and mud drum.
6. Installation of frames and boiler casing
7. Assigned as Boilermaker for the Installation of Takuma & Keeler Boilers having a capacity of 150,000 lbs/hr and 75,000 lbs/hr of steam at Binalbagan Isabela Sugar Co., Inc., Binalbagan, Negros Occidental.
8. Assembles and fits boiler tube ends, fabricates and installs Air and Gas Ducts for Keeler Boiler.
9. Conducts Hydrotesting for Keeler Boiler.
BIO -DATA
Personal Data:
Age: 46 years old
Date of Birth: December 17, 1956
Place of Birth: Binalbagan, Negros Occidental
Philippines
Height: 163 cm
Weight: 69 kg
Civil Status: Married
Spouse's Name: Bernadette M. Suarez
Citizenship: Filipino
Profession: B.S. Mechanical Engineering
T.A.N.: 8642-168 H
Educational Background:
College: FEATI University
Sta. Cruz, Manila
: Western Institute of Technology
La Paz, Iloilo
: La Salle College
Bacolod City
Course: Bachelor of Science in Mechanical
Engineering
High School: Hinigaran High School
Hinigaran, Negros Occidental
Elementary: BISCOM Elementary School
Binalbagan, Negros Occidental
References will be provided on request.
SEMINARS ATTENDED:
1. Team Building Seminar EEI-EHI Azzour Project, Kuwait 1985
2. Boilermaker and Training Seminar EEI. Bo. Ugong Pasig, Metro Manila
3. First Aid Course Al - Tameer, Kuwait, 1992
4. Safety Orientation Course Singapore, February 4, 2001
5. Quality Assurance Training Singapore, August 15, 2001
6. Operations Integrity Management Practices OIMP Singapore February 13, 2001
7. Operations Integrity Management Practices OIMP Kemya Petrochemical Plant, July 10, 2002
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 401 to 450 of 4496)
Go to Search Parameters...
Brief Description
Sub : Application for the post of Project Manager
Summary: • Civil Engineering with 30 years Experience • 6 yrs construction experience in the Arabian Gulf, Dubai and Oman, as Senior Construction Manager. Hold Expired UAE/Oman driving Licences. Speak Arabic.• 18 yrs Consultancy Experience.
I am a successful Industrial Construction Manager with extensive experience on domestic and international projects of various magnitudes (mostly heavy industrial). I have been a valued contributor to all of my employers.
Registered Civil Engineer in Philippines. Vast experience in contract and cost eng'g., qty surveying and estimating gained mostly in international environment in projects such as high-speed train station, MRT undergrd struc., stadiums, industrial plant, high-rise bldgs, foundations and civil works.
The summary of my resume is included in the first paragraph of my resume.
My experiences in the field of mechanical mostly covered construction/maintenance of power plants and oil/gas/petrochemical plants. Pls. see attachments.
Interested in project management position.
I have 25 years of experience working in the Construction Management field. Seeking Project Manager position with your International Company in the Middle East. Fluent in Arabic, French, Spanish and English. BA Degree from the Monterey Institute of International Studies.
Results-oriented Mechanical Engineer with strong analytical and effective interpersonal skills. Corporate site and office experience in all facets of Engineering at design/build, manufacturing, consulting and telecommunications companies in Canada, USA and Europe.
I have done bsc in civil engineering and have an experience of 20 years in it.
Extensive experience in the civil engineering construction industry ,Feasibility and Pre construction Survey , Construction of buildings ,Dikes, roads, railways, Power Plants, Oil and Gas processing Plants on local and Overseas projects with renown multinational companies in the industry as Engineer
I am a Civil Engineer with more than twelve years experience. I can perform structural analysis and design by manual and computer methods.
Contract Management / Quantity Surveying
My most importance skills are: Trusting in God, Loyal, Self-confident, Adaptive, Honest, Conscientious, Persevering, Dependable, and Efficient.
An Electrical Engineer with 13 years of Progressive Experience in Maintenance and Plant Operations
Civil Engineer specialist to cast_in_place bored piles and Marine Piled Jetties, Block Concrete Quays
Construction Manager
I have 15 years of Planning experiences within oil and gas, petrochemical, mining, power plant and industrial plant construction. I am also an advance user of P3/P5.
Work as Senior Civil engineer in all aspect but mostly in Quality control and Materials control
Experienced Construction manager with additional strong experience in Contract Administration. Track record of successful projects completed ahead of schedule and under budget. Willing to relocate/work either domestic or international locations.
Joint Ventures, Contract Administration, Business Development, Contract Proposals, Project Restructure, Human Resources, Multi-Million Dollar Budgets, Corporate Profit and Loss and Financial Controls
The majority of my working experience has been in Oil & Gas construction as Project Manager, Director and Engineer.
I am a Degree Petroleum Engineer with 23 years of broad experience in the industry. My expertise is well work, projects, engineering, supervision and education. Specifically developing programs and site supervision for Drilling, Workover, Completion and Abandonment operations.
experienced construction planner and P3 user. He has both design and site experience. His strength is in planning, construction sequence, resource optimization and cost application. He has been working in Singapore for more than 10y.
A young physically fit 55 year old with 30 years worldwide Maintenance Management experience. Speaks 3 languages.
To obtain a key Project Manager, Project Engineer or Construction Management position where leadership, experience and action skills will contribute to organization, profitability and effectiveness.
Objective: Looking to obtain a career in the Management or Supervisory area. A career position within a progressive corporation where my management experience and training can be utilized to be beneficial to the company in reaching their goals and objectives.
My resume is a brief description of notable experiences of which I believe is necessary.
x
I am a self employed, highly motivated and innovative Engineer. I have much experience in the management of projects for the construction of Rail Equipment plants, Aircraft Facilities, Paper and Steel Mills.
Managed and implemented product, equipment, and process design/modifications in industrial manufacturing plants. Extensive experience in facility/manufacturing interface, acceptance testing, and hazardous material handling.
Thirty years in the industrial design and construction services. My pledge is to be the "best" in quality, safety, and providing a better working environment in the industry.
ELECTRICAL ENGINEERING PROJECT MANAGER
*Twenty-seven (27) years of experience, have been working in MIDDLE EAST, EUROPE and in Far East Asia. Highly professional with strong communication and leadership skills. Well organized with flexibility and common sense. Computer literate in WIN 95/98,Office 2000,MS XP and Internet task.
If you are looking for a seasoned project manager/construction manager offering 25 years experience directing multi-million dollar construction projects, please take a few moments to review my resume. I have been instrumental in successful management of many large construction projects.
WORKING AS A SAFETY OFFICER IN A COMPANY IN QATAR
34 years of Project Controls and Constr. Mgmt. experience. 28 years with Brown & Root/KBR and 6 years with Black & Veatch, Int’l. Functioned as Site Project Manager of two(2) CC power plants w/Black & Veatch and as Sr Tech. Prof. Mgr. and Constr. Mgr. w/KBR in Oil & Gas and Petrochem facilities.
Qualification master degree(statistics)=profession=cost controller in construction
Safety Management Position
Structural Design Engineer
I have 16 years of experience in Marketing and HR in construction related industry. presently I Working with management Consultant as principal Consultant.
Operate a machine on a assembly line, especially operate a automatic welding machine.
Senior Cost and Planner Engineer
Experinced quality control in shipbuilding,
MTech structures having 9 yrs of exp in structural designs. knowledge in staad ,etabs,cad
15 years experience in Mechanical Construction, Commissioning and Maintenance work with Multi National Companies, in Country and Abroad.
4+ Years Project Management, 4+ Years in Construction Management/Supervision, 4+ Years in Engineering Design, Costing Budgetory, Primavera Planning, Preparing Commercial & Technical Proposal, High Self Confident, Team Coordinator and Leader, Supportive in Team Work,Strategic Planning,Time Management
I am a post graduate in Personal Management & Industrial Relations
Computer programming knowledge in BASIC, COBOL, C+, DBASE, LOTUS.
Master of Business Administration(Marketing),Master of engineering (Project engineering),Bachelor of Mechanical Engineering. Experienced in project design and engineering (engineering manager for EPC execution) for Balance of plants,material handling,offsites in power plant,steel plant,oil & petro
First
1
2
3
4
5
6
7
8
[ 9 ]
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com