CONTACT INFORMATION:
View contact information...
Date: __________
Dear Sir,
Sub: Application for the post of 'Project / Mechanical Engineer'
I refer your advertisement________________, I am a Mechanical Engineer Graduate with 10 years experience in Refinery / Power plant construction execution. Experienced in fabrication and erection of storage tanks, piping, pressure vessels, equipment erection, power plant boiler maintenance, shutdown jobs, maintenance jobs & engineering co-ordination. Job responsibilities include team management, sourcing and procurement, meeting targets, quality, budget compliance and profitability.
I think the above mentioned post will be a suitable and challenging offer.
I hereby send my CV for your kind reference. I am expecting a favorable reply.
CURRICULUM VITAE
OBJECTIVE: Project Engineer / Mechanical Engineer
LANGUAGES KNOWN: English, Hindi, Kannada & Malayalam
EDUCATIONLA QUALIFICATIONS
Examination Passed University / Board Class Obtained % of marks
S.S.L.C. Board of Examination Govt. of Kerala, India First Class 73.42
P.D.C. (Science) Calicut University, Kerala, India Second Class 57.00
B.E. Mechanical Mangalore University Karnataka, India. First Class 63.40
COMPUTER: AutoCAD, Lotus, MS Project, Primavera P3
PROFESSIONAL EXPERIENCE
10 Years Of Refinery, Petrochemicals, Power Plant And Lpg Plant Construction Experience In India & UAE
Period: Dec-2004 to till 6 March-2005
Employer: M/s. ABUDHABI OILFIELD SERVICES EST, LLC, Abu Dhabi.
Position: Project, Engineer
Duties & Responsibilities: Project procurement, engineering coordination with clients, Fabrication & erection of offshore piping, pressure vessels, oil bath heaters, heat exchangers, storage tanks, dehydrator vessels, boiler maintenance jobs, shut down jobs, etc. Conversant with project plan, manpower histograms, progress reporting, etc.
Period: November 31, 2003 to Dec-2004
Employer: INTERNATIONL ENGG. CONSTRUCTION GROUP, FUJAIRAH, U.A.E.
Position: Project Engineer
Duties and Responsibilities: From – August 2004 to Dec-2004, worked at M/s. Jotun Powder Coating LLC, Dubai. Consultant: M/s. Model Engineering Consultants, Dubai
Job Description: ::::: Project engineering, co-ordination, procurement of all the equipments, materials and execution of the project. etc. Demolition of existing steel structures, add new structures, utility and auxiliary machine to be added Turnkey fabrication of mechanical, civil, structural, MEP jobs, HVAC, for the capacity expansion of Jotun Powder Coatings LLC. Erection of al the process machineriesExecution of the turnkey project as per the quality standardsCommissioning of the turnkey project as per standards.
Duties & Responsibilities: Project Execution of Oil Terminal at Fujairah (Gulf Petrol Supplies LLC), under Mott Macdonald.* 25 Mtr Dia x 18 Mtr HT – Tanks – 2 Nos. * 27.5 Mtr. Dia x 15 Mtr HT – Tank –1 No.* Product piping of 2" NB to 20" NB, connecting pumping stations, truck loading and ship loading stations. Conversant with BS, ASME relevant engg. codes. * Engineering co-ordination with instrumentation and electrical contractors. * Erection & Testing of Piping, Tanks* Commissioning of the oil terminal in co-ordination with client & consultant.
Employer: GANNON DUNKERLEY & CO. LTD., INDIA
Designation: Engineer Gr. II
Period: August 1998 to 30 November 2003
a): From August 1998 to December 1999 worked at Reliance Industries Ltd., Hazira, and Gujarat, India. Executed Carbon Steel Piping of 6" NB to 24" NB at Naphtha Cracker, Tank Farm, PSF, PTA, Plants. Executed 24 MTR Dia Cone Roof Tank at Tank Farm, 3.6 MTR Dia & 2 MTR Dia Pressure Vessels at Naphtha Cracker Plant. Worked under the consultancy of M/S- BECHTEL.
b): From December 1999 to January 2002 worked at Reliance Petroleum Limited, Jamnagar, Gujarat, India. Executed Plant Piping, U/G-piping at LPG – Merox and RTF Plant (2" to 30" NB). Worked under the consultancyof M/S-BECHTEL
c): From January 2002 to May 2002 executed firewater tanks 2 Nos. BPCL – LPG Plant, Nagpur, India.
d): May 2002 to August 2002- executed power plant job at MSEB, Nagpur, India e): From August 2003 to December 2002 – Executed Power Plant (CPP), ESP – 340 MT at ACC, Tikaria (U.P.) India. Worked under consultancy of M/s. TATA PROJECTS LTD.
f): From December 2002 to November 2003 executed 20" NB Cross country pipeline (naphtha) at Zuari Indian Oil Tanking Ltd., Goa, India.
Duties & Responsibilities * Preparing the scope of work schedule, Bill of materials, Manpower chart for the job assigned by the client* Planning of materials, equipments of the assigned job. * Executed the jobs as per client, consultants' requirements and quality standards * Scheduling of the assigned job. * Fabrication of piping spools of various services as per requirements. * Erection, testing of the same piping etc. as per the process requirements. * Box-up & commissioning of the same piping as per client requirements. * Erection and alignment of prefabricated equipments, vessels, steel structures, etc.* Prepare the bill of executed jobs and getting it certified by the client.
Period: March 1997 to August 1988
Employer: M/S. SHRINIVAS PLATES & STRUCTURAL CO. LTD. (SPS) C/O. HOC LTD, URAN, RAIGAD (DIST)MAHARASHTRA, INDIA
Position: Assistant Engineer II
Job Assignment: Experienced in project planning, fabrication and erection of storage tanks, pressure vessels, piping, QA/AC documentations, etc. M/s. SPS is a reputed Engineering Construction Co. with a turnover of about Rs. 90 crores.
Period: August 1996 to March 1997
Employer: M/S. ESCO CONSTRUCTION CO. C/o. BPCL LTD (Lubricant Division)Bombay 39, India
Designation: Graduate Engineer
Job Description Experienced in shutdown jobs, maintenance jobs, piping, storage tanks, etc.
View contact information... |