Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #3129
next resume »»
CONTACT INFORMATION:
View contact information...
EXPERIENCE
June15,1988–
Erdem Dis Ticaret A.S. Istanbul/TURKEY
MANAGER of GLASS MANUFACTURING PLANTS
Reporting to Group Owner, he managed 200-250 employee plants producing automotive architectural,and applience safety glasses .He was responsible for production ,sales and customer relations,new investments and cost control.
Under his management, in 1988 newly established plants acquired approximately 40 % of the OEM market in 3 years with trade marks TEZCAM and TAMCAM and the percentages are almost the same nowadays. The competitor group , Sise-Cam ,which is monopoly in float production and supported by Isbankasi ,has the rest of the percentage .The group supplied glass to almost all OEM’s in Turkey (Fiat, Renault, Ford, Isuzu, Chrysler, Mercedes are the main ones) and Dogus Ltd. which is the largest aftermarket glass distributor .
He managed to get ECE R43 approval as the first manufacturer in Turkey through Utac/France in 1990 even before Sise-Cam Group did. The plants acquired ISO 9002 and QS 9000 in 1994 and in 1998 respectively.
The groups total annual turnover was approximately 50 million US$ including other types of glasses ( building, kitchen appliences etc.) and glass trading.
Almost in every year during his employment he made new or modernization investmens according to the market demands. He attended glass machinery fairs every year and found most recent machinery and equipment and bought from the best machinery suppliers with least prices together with group owner.
The companies he had business relations are SIV (Vertical Bending. and Tempering, Horizontal Complex Bending and Tempering), Tamglass (Horizontal Bending and Flat Tempering, Laminating), Uniglass (Horizontal Flat Tempering) ,Glassrobots (Laminating Lines), Cougher(Printing Lines), Bavelloni(Double Edgers, Washing Machines), Lisec ( Insulating Glass Lines), Bottero ( Automatic Glass Cutting, Grinding lines , Double Edgers ), Cannon/Italy ( encapsulation plant) and many others.
Lately he managed the investment of a new architectural and kitchen appliances plant , to separate physically the manufacturing of automotive and other safety glasses , and a mirror production line from Kloepper which can produce 2 million sq.m of mirror ,in addition to his regular duties .He applied MS Project as project managing software. The new plant consisted of 18000 sq. m closed area with a 6 million US $ new machinery added to 25000 sq.meter closed area existing plant which produces only automotive glass from then on . The capacity of the new plant is 2 million sq.m of safety glass per year. The capacity of the existing plant is 500000 car sets per year.
July1,1982–June14,1988
Efes Pilsen Breweries Istanbul /TURKEY
PROJECT MANAGER
He was employed by the Efes Pilsen Breweries ,which is owned by AEH (Anadolu Industrial Holding) ,as the Project Manager of an at that time planned new Brewery in Ankara and moved Istanbul for only one year to complete the projects and purchase of the machinery and return back to Ankara to realise the investment. But , the investment was postponed by the board of directors of the Group. Instead, they decided to extend the existing three breweries in Istanbul, Izmir and Adana. Therefore he stayed in Istanbul and realised these extension projects . He worked in close cooperation with the Managers of these three existing plants , but all the project preparation and purchasing of the equipment have been realised by him centrally , with the help of german advisors.In the last two years in AEH Group , he worked as technical director of TAF and SEFAS companies which were overtaken by AEH Group.The first company was dealing with manufacturing and exporting of detergents, the second manufactured fluted cartoon packages.Both companies were founded initially by the same owners on the same area.Later , since the owners could not pay back the export pre-financing credits taken from Annex Co. which was fully owned by AEH, most of the shares were given to AEH and a three members committee in the name of AEH started to manage both companies . He was one of the members who was responsible for production and exporting of detergents and production of fluted cartoon packages. In that two years , the production capacity of detergent plant was doubled and 18000 tons of detergent was exported to Algeria. Fluted cartoon plant was run very effectively too, most of the production was sold in Turkey. One of the members of the board of directors of AEH was the owner of the safety glass manufacturing group mentioned above and he needed a company manager , and since AEH Group had difficulties at that time too, he accepted the offer of the member and transferred tothe glass manufacturing group as Glass Manufacturing Plants Manager.
Sept.1980–June30,1982
Taksan Machine Tools & Manufact. Co Ankara/TURKEY
PROJECT MANAGER
Taksan was establishing an integrated Machine Tools Manufacturing Factories complex in Kayseri/Turkey under licence of WMN/East Germany and TOS/Czechoslovakia companies at that time. The total investment amounted 500 million US $ and consisted of mainly one foundary, one central gear and gear boxes, one milling and boring machines ,one automates ,and one grinding machines plants with 120000 sq.m. closed area. He was employed as Project Manager of Milling and Boring Machines Plant. Under his management , plant lay-outs were prepared, machinery and equipment were provided, buildings and auxiliary facilities were completed and trial production was planned. He quitted Taksan on June 30,1982 and joined Efes Breweries Group of AEH.
March ,1977–Sept,1980
Tustas Ind.Establishments Co. Ankara/TURKEY
CHIEF MECHANICAL ENGINEER
Tustas offers mainly engineering and conculting services to industrial establishments. During his stay in this company he worked for the investment of Divrigi Pelletizing and Concentrating Plants for iron ore which belong to state owned Iron and Steel Works Co.Under his management, the native made equipment were designed ,contracts awarded, installations were controlled and acceptance tests made.
Nov.,1973–March,1977
Metag Consulting &Engineering Co. Ankara/TURKEY
CHIEF MECHANICAL ENGINEER
He started in Metag as design engineer ,after he returned back from Germany to finish his Master studies, since it was possible to work during M.S. studies.In this company he worked mainly for Cinkur which was a mining and metallurgical company and was in investment phase at that time.His duties consisted of design and procurement of locally provided equipment according to rough specifications prepared by companies Canadian SNC , West German KHD which were responsible for the process and know-how of the whole project.On June , 1975 he quitted Metag to prepare his M.S. thesis and afterwards to complete his military service.On July 1,1975 he finished his short term military service as reserve officer and during the service, he attended the thesis jury and qualified to gain his M.S. degree on July 22, 1975.After completion of the military service, on October23,1975 , he worked in Metag Co. again, this time as Chief Mechanical Engineer and worked for and finished the Lead Plant projects of Cinkur.
Oct.1,1971–June 30,1973
Richard Hofheinz & Co Solingen/GERMANY
DESIGN ENGINEER
On Oct. 1,1971 , he quitted Kronprinz A.G. on his own wish , and started in the design office of Special Machine Tools section of Richard Hofheinz und Co. company. In this office he worked for developing and designing of half automatic, multihead ,special tool machinery which ordered by customers (e.g. car manufacturers) , and capable of producing the same pieces in big quantities ( 20000 ,30000 pieces per year).He worked there until June 30,1973 and return to Ankara to start his M.S. studies, since the permission of the University was expired.
Apr.1,1971–Oct.1,1971
Kronprinz A.G. Solingen/GERMANY
DESIGN ENGINEER
As will be seen in the following education section, in October 1970 he started his M.S. studies, however in Spring 1971 the studies were interrupted due to student movements at that time. With the permission of the Mechanical Engineering Department of the University , he started working in Kronprinz A.G. Solingen /Germany , in order to gain professional experience and to learn German language on April 1,1971.Kronprinz A.G. was one of the biggest in its field in Europe which mass produced tire rims for automotive industry OEM .He worked in the design office to develop and design of an automatic welding machine which would be used in new production line of tire rims.
EDUCATION
1973–1975
Middle East Technical University Ankara/TURKEY M.S. in Mechanical Engineering from Mechanical Engineering Department of Engineering Faculty with a g.p.a of 3.00 .
1965–1970
Middle East Technical University Ankara/TURKEY
B.S. in Mechanical Engineering from Mechanical Engineering Department of Engineering Faculty with a g.p.a of 3.02 .
(He attended english language prep school before the studies)In October 1970 he started his M.S. studies , however in Spring of 1971 , the studies were interrupted due to to student movements.As seen above, he took the advantage and started working in Germany.
He attended primary , secondary and high schools in Ankara and was graduated from Ankara Ataturk High School in June 1965.
INTERESTS AND SKILLS
Computers, internet, tennis (playing , watching ,and following the events), football,music.
He is a very experienced PC User. ( Exel, Word, MS Project , Autocad etc.)
He speaks English and German very well.
PERSONAL DATA
He was born in 11/01/1948 in Manisa / Turkey.
He is married and has two sons 23 and 17 years old.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 301 to 350 of 4813)
Go to Search Parameters...
Brief Description
MEP Professional Engineer with advanced Management Knowledge For High Rise Building
I have 20 years of experienced in the field of Quality Control, Material Engineering and Construction Supervision in Heavy Construction such as: PetroChemical industries, Pipelines, Infrastructure, Highrise Building, Commercial Mall, Sewage Treatment Plant, Pumping Station, Milk Processing Plant etc
Extensive experience in project mgmt, tool,fixture, & machine design
I am having vast experience (22 Years) in Maintenance & Projects and in diverse fields. I am suitably qualified (BE, ME, PGDM, PGDIT) to take up any challenging assignments across the globe.
Civil Engineer. Management in RCM Reliability centred Maintenance.
Electrical engineer - building electrical design and rapid transit systems; proposals and specifications; CAD.
Senior mechanical engineer with experience in engineering for material handling, industrial installations and conveying machines in steel industry, mining, cement & chemicals. Start-up assistance for steel industry.
Close supervision of projects handle and monitoring
I have masters in Water Resources Management followed by Bachelor of Engineering. Skills in Construction management,people management,sub conatractor mangment,quality control,health and safety
A result oriented and self-motivated M.Tech Civil Engineering Professional with over 18 years of rich & qualitative experience in Project Management, Civil Engineering and Construction Management of infrastructure projects including Airport Terminals, Buildings Roads and Flyovers.
Engineer Graduate with 09 years experience in Automotive Field as Sales ,Warranty, Technical Engineer
Over 25 years in the construction industry
HEALTH, SAFETY & ENVIRONMENT SPECIALIST WITH 20+ YEARS OF EXPERIENCE
Senior structural engineer with 15 years experience. National Diploma (Civil Engineering)Bachelor of Technology (Structural)
Auto Electrical / Mechanical/ heavy vehicles, Cat, Deutz, Comatsu, Man, M/Benz, Feul rail engines, Airconditioning, Hydraulics, Electrical repair on all types of vehicles, Mining vehicles.
B.Sc.1977, V.G. Honours, M.Sc.1985. Consultant and Executive Director (> 40 Transport & Railway projects). Teach Transport Planning, Railway Eng. & Applied Statistics & Eng. Systems for undergraduate, Faculty of Eng., Cairo Uni. DOS, Win., AutoCad, MSOffice. Organizing the 3rd CODATU-III Conference
APPLIACATION FOR THE POST OF JUNIOR CIVIL ENGINEER.
I am a creative civil engineer and construction inspector, with diverse multi disciplinary experience in reinforced concrete, pre-stressed concrete, precast concrete, structural steel and timber construction. I am well versed with all aspects of project management from inception to completion.
Project Manager: Responsible of the coordination and execution of the following projects: • Warehouse Management System (Oracle WMS) • Overall Revision to the actual ACP Master Catalog . Inventory Re-engineering Program
Welding(certificates). Electrical, mechanical, hydraulic and pneumatic equipment, installation, (30MPa certificate). Workplace Safety & Health field (Certificates). Staff training and retraining. Drawing and reading blueprints and schematics. Robotics. Repair. Maintenance. Management. Sales.
A specialist in rock mechanics and engineering geology. 26 years tunnelling and mining experience. Expertise in stability analysis, support design and monitoring; blast design and optimisation; TBM and road header performance; risk analysis.
25 YEARS OF MANAGING & BUILDING A/E PROJECTS EXCEEDING $ 600 MILLION BS & MS - CONSTRUCTION MANAGEMENT - MINOR IN CIVIL ENGINEERING - 4:00GPA FORMAL EDUCATION IN ARCHITECTURE -QUALIFIED WITH A.R.E IN THREE STATES
I am an experienced AutoCAD operator / draftsman with expertise on mechanical, structural, civil and electrical drawings, using Autocad 2009. I have eleven years of extensive hands-on work experience in a manufacturing as well as construction set-up.
I have vast experience in the Safety related field.
Installation of electrical pipe,electrical wiring,electrical controls,electrical panel board.Installation of main over current protection,lightings,switches.Banking of transformers and splcing of wires.Installation of A.C. electric motors,magnetic contactor.Installation AHU,ACU,FCU,colling tower
 Project Management; Demand Forecasting; Simulation & Analysis Packages/Models
I am a professional Mechanical Engineer with 20 years Gulf experience with MEP services in building construction..
PROFILE:A Piping/mechanical superintendent with 13 years experience in the petrochemical & construction industries in Middle East. Proven leadership skills involving managing, developing and motivating teams to achieve their objectives. First-class analytical, design and problem solving skills. Good
Welding Technologies, Technical assistance, Workshop, site, AutoCAD, Tekla Structures, XSteel, SolidWorks, MS Project
Looking for a long term contract or permanent challenging position worldwide, utilizing broad - based experience in projects maintenance– Maintenance manager, Supervisor, Team leader – Air Traffic Control, Industrial projects, Telecommunications.
CM Support of (3) State and Federally funded highway projects (2) Govt./Military Construction Projects; (1) Hi-Tech Facil. Control Upgrade; (3) Hospital Projects. (2) New civil underground water, gas, sewer and (3) major telecommunications infrastructure proj (2) Environmental – Remediation projects
Senior Hydrogeologist
Formal studies in civil engineering, information systems, business management and project management have provided me with extensive technical and financial expertise together with proven planning, coordination and control skills.
Twenty-five years in quality management including operations management, budget and manpower planning, supervision, project execution, quality system implementation, auditing, coordination and training during design, procurement and construction of international energy and petrochemical projects.
Senior Mechanical Engineer (M.Sc.) having experience as plant manager and project manager, specialist in mining, safety glass, manufacturing plant and brewery investments.
Mechanical engineer with design and project engineering experience. Proficient Designer with over 10,000 hours total CAD experience including Autocad 2002, and some Microstation. Extensive experience in mechanical systems design, product design, as-builts, and fieldwork.
I have over 15 years of experience in construction management. I have expertise in contract negotiations, budgets, multi-tasking, leading teams of employees, EPA and OSHA, and many other areas.
Commercial Real Estate Agent, Construction Project Manager, Business Development Director
My education qualifications, career training, knowledge and acquired skills would be suited to position in your company (Former Soviet Union: Kazakhstan, Russia).
Qualified & Experienced Design Engineer Looking for New Challenge.
A reliable, enthusiastic and confident candidate with post graduate qualification of Project Management and experience with various property development projects in Vietnam.
Iam expert with health and safety practices
Electrical/electronic engineer. Autocad design engineer.
More than 25 years experience in the Project and Detailed Designs and Management of Water & Wastewater Treatment Systems, Pumping Stations and Sewerage Reticulation Systems
A Chartered member of Institution of Engineers (India), Project Management credential holder from PMI, USA and Post Graduate in Civil Engineering with specialization in Soil Mechanics and Foundation Engineering with over 21 years of professional experience in infrastructure projects including constr
Project Manager 20 yrs experience Oil/Gas from Ground Up. Objective supported by: INTERNATIONAL PM MBA Ceng INSTRUMENTATION AND CONTROL HNC PROCESS CONTROL CONSTRUCTION SUPERVISION COMMISSIONING / AUDITING FISCAL MEASUREMENT SYSTEMS ENGLISH / SPANISH
Master in Construction Management. Hands-on experience in the field and in the office in the three basic specialties: civil, electric and mechanical. Computer skills with: Expedition and Primavera /Suretrack, Windows, Excel, Lotus etc.. Prepare the WBS, OBS, budget control etc..
Throughout my Professional Career and experiences being a GC, one of my duties was Estimating, which I did learned and had to do from ground Up, on most of the Projects I did Participated in, from simple Electrical Ductworks up to Special Warehouses at Industrial Division.
I have been employed in the field of Power Engineering, Industrial Installations, Cement Industry and Sewage Treatment Plants at all stages, covering turnkey projects: erection, starting - up, commissioning, running and all kinds of maintenance.
A highly skilled industrial project construction & facility equipment installation management professional who has worked on projects from "cradle to grave" for various major companies. Over 15 years project management experience.
First
1
2
3
4
5
6
[ 7 ]
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com